About this file

This document includes a request for information and a pre-solicitation notice for a construction project. The request for information confirms the minimum on-site staffing requirement for a construction project is two personnel, a superintendent and a safety and health officer.

The pre-solicitation notice provides details about a planned solicitation to construct a new hospice unit at the Loch Raven VA Medical Center in Baltimore, Maryland. The project scope involves approximately 20,000 square feet of new construction and renovations with a magnitude between $10-20 million. The solicitation is anticipated to be issued on June 4th, 2020 as a 100% small business set-aside for Service-Disabled Veteran-Owned Small Businesses. Proposals are due on July 8th, 2020 and work completion is expected within 540 days of award. Plans will be available on the Government Point of Entry and inquiries should be submitted by July 10th, 2020 to the named contracting specialists.

View the file

Other files

File Type Posted
36C24520B0001 0005.docx DOCX document
RFI No - 69.docx DOCX document
RFI No - 60.docx DOCX document
I103 MECH PENTHOUSE _ PED WALKWAY LEVEL - FLOOR FINISH PLANS.pdf PDF
321723 Pavement Markings (rev 8-20).pdf PDF
RFI No - 20.pdf PDF
RFI No - 26.docx DOCX document
RFI No - 61.docx DOCX document
RFI No - 59.docx DOCX document
RFI No - 1.pdf PDF
RFI No - 86.pdf PDF
RFI No - 85.pdf PDF
088000.pdf PDF
RFI No - 87_VA Response.pdf PDF
RFI No - 12.pdf PDF
312319 Dewatering (rev 8-20).pdf PDF
RFI No - 90.pdf PDF
RFI No - 7.pdf PDF
RFI No - 31.docx DOCX document
RFI No - 63_VA Response.docx DOCX document
RFI No - 10_VA Response.pdf PDF
331000 Water Utilities - (rev 8-20).pdf PDF
RFI No - 37.docx DOCX document
RFI No - 43.docx DOCX document
RFI No - 48.docx DOCX document
RFI No - 50.docx DOCX document
A501 INTERIOR DETAILS.pdf PDF
RFI No - 24.docx DOCX document
312000 Earthwork1 (rev 8-20).pdf PDF
RFI No - 71.docx DOCX document
RFI No - 17.pdf PDF
RFI No - 53.docx DOCX document
RFI No - 66.docx DOCX document
RFI No - 84.pdf PDF
RFI No - 76.docx DOCX document
RFI No - 67.docx DOCX document
RFI No - 45.docx DOCX document
Virtual Bid Opening Updated.pdf PDF
RFI No - 15.pdf PDF
RFI No - 78.docx DOCX document
RFI No - 13.pdf PDF
36C24520B0001 0004.docx DOCX document
A406 ENLARGED RESTROOM PLANS AND ELEVATIONS.pdf PDF
RFI No - 8.pdf PDF
078123 - Intumescent Fireproofing.pdf PDF
RFI No - 41.docx DOCX document
RFI No - 2.pdf PDF
RFI No - 54.docx DOCX document
RFI No - 52.docx DOCX document
A408 ENLARGED PLANS AND CASEWORKS ELEVATIONS.pdf PDF
Show 40 more

Latest 50 of 147 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment

36C24520B0001

U.S. DEPARTMENT OF VETERANS AFFAIRS

REQUEST FOR INFORMATION

Date Submitted: _____08/19/20______________________ RFI # ________6_______

Reference/Subject: _______Key On-Site Personnel__________

Spec. Section No. / Title ___01 35 26/Safety Requirements__________ Page / Art. / Para. ____1.6C________________

Drawing No.: ______________ Plan/Detail/Schedule: _________________

Request (Explain your request in detail here):

There was no mention of a requirement for a full time Quality Control Manager onsite at all times. What are the minimum onsite staff requirements for the General Contractor? Superintendent Only if qualified for other roles? Please confirm the minimum required quantity of General Contractor Staff onsite is 2 (SSHO and superintendent).

Submitted by (Company Name): ___5366 Logistics Leopardo SDVOSB MPA JV, LLC

(Person Name): _______Vicki Lezon on behalf of Dan Bitton______________________

VAMHCS Response: ________________________________________________________________________________

Date Received by VAMHCS: _______________________________________________________

Response by: ___________________________________ Date: __________________________________________

Attachments: ______________________________________________________________________________________

A/E Firm Response: ____Confirmed. Minimum required onsite is 2.____________________________________________________

A/E Firm Response Date: _____8/24/2020_________________________________

SUBMIT ALL QUESTIONS TO THE CONTRACTING OFFICER BY E-MAIL, Bryan.Burgee@va.gov.

PLEASE NOTE DEADLINE FOR RECEIPT OF ALL QUESTIONS IS 19 August 2020 at 12:00PM Eastern

Standard Time.