36C24520B0001 0004.docx
DOCX document 17 KB Posted
- Solicitation number
- 36C24520B0001
About this file
This document is an amendment to an invitation for bid for construction services to build a hospice unit at the Loch Raven VA Medical Center. The amendment extends the bid opening date to September 8, 2020 at 1:30 PM Eastern time and provides responses to 91 questions asked by bidders. It also includes updated drawings, specifications, and documents related to the project scope. Bidders are required to acknowledge receipt of the amendment. The construction project involves building approximately 20,000 square feet of new construction and additional renovations at an estimated price range of $10-20 million. The work must be completed by a 100% service-disabled veteran-owned small business within 540 days of award.
View the file
Other files
Show 40 more
Latest 50 of 147 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 08-25-2020 512-532 Department of Veterans Affairs VA Maryland Health Care System Contracting Officer (90C) P.O. Box 1000, Bldg. 101B, Room 8 Perry Point
MD
21902 Department of Veterans Affairs VA Maryland Health Care System Contracting Officer (90C) P.O. Box 1000, Bldg. 101B, Room 8 Perry Point
MD
21902 To all Offerors/Bidders
36C24520B0001 08-07-2020
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
Sept. 08, 2020 13:30PM EST X The purpose of Amendment 0004 is to update the bid opening date to September 8, 2020 at 1:30PM Eastern Standard Time and issue RFI responses with associated drawing and specification updates.
Documents Attached to Amendment:
Updated Virtual Bid Memo to address Bid Guarantee, Bid Bonds and Performance Bonds RFI responses: RFI#1 through RFI#91 RFI Attachments Updated Drawings Updated Specifications
Bryan Burgee Contract Specialist See attached document: Virtual Bid Opening Updated.
See attached document: RFI No - 1.
See attached document: RFI No - 2.
See attached document: RFI No - 3.
See attached document: RFI No - 4.
See attached document: RFI No - 5.
See attached document: RFI No - 6.
See attached document: RFI No - 7.
See attached document: RFI No - 8.
See attached document: RFI No - 9.
See attached document: RFI No - 10_VA Response.
See attached document: RFI No - 11_VA Response.
See attached document: RFI No - 12.
See attached document: RFI No - 13.
See attached document: RFI No - 14.
See attached document: RFI No - 15.
See attached document: RFI No - 16.
See attached document: RFI No - 17.
See attached document: RFI No - 18.
See attached document: RFI No - 19.
See attached document: RFI No - 20.
See attached document: RFI No - 21.
See attached document: RFI No - 22.
See attached document: RFI No - 23.
See attached document: RFI No - 24.
See attached document: RFI No - 25.
See attached document: RFI No - 26.
See attached document: RFI No - 27.
See attached document: RFI No - 28.
See attached document: RFI No - 29.
See attached document: RFI No - 30.
See attached document: RFI No - 31.
See attached document: RFI No - 32.
See attached document: RFI No - 33.
See attached document: RFI No - 34.
See attached document: RFI No - 35.
See attached document: RFI No - 36.
See attached document: RFI No - 37.
See attached document: RFI No - 38.
See attached document: RFI No - 39.
See attached document: RFI No - 40.
See attached document: RFI No - 41.
See attached document: RFI No - 42.
See attached document: RFI No - 43.
See attached document: RFI No - 44.
See attached document: RFI No - 45.
See attached document: RFI No - 46.
See attached document: RFI No - 47.
See attached document: RFI No - 48.
See attached document: RFI No - 49.
See attached document: RFI No - 50.
See attached document: RFI No - 51.
See attached document: RFI No - 52.
See attached document: RFI No - 53.
See attached document: RFI No - 54.
See attached document: RFI No - 55.
See attached document: RFI No - 56.
See attached document: RFI No - 57.
See attached document: RFI No - 58.
See attached document: RFI No - 59.
See attached document: RFI No - 60.
See attached document: RFI No - 61.
See attached document: RFI No - 62_VA Response.
See attached document: RFI No - 63_VA Response.
See attached document: RFI No - 64.
See attached document: RFI No - 65.
See attached document: RFI No - 66.
See attached document: RFI No - 67.
See attached document: RFI No - 68.
See attached document: RFI No - 69.
See attached document: RFI No - 70.
See attached document: RFI No - 71.
See attached document: RFI No - 72.
See attached document: RFI No - 73.
See attached document: RFI No - 74.
See attached document: RFI No - 75.
See attached document: RFI No - 76.
See attached document: RFI No - 77.
See attached document: RFI No - 78.
See attached document: RFI No - 79.
See attached document: RFI No - 80.
See attached document: RFI No - 81.
See attached document: RFI No - 82.
See attached document: RFI No - 83.
See attached document: RFI No - 84.
See attached document: RFI No - 85.
See attached document: RFI No - 86.
See attached document: RFI No - 87_VA Response.
See attached document: RFI No - 88.
See attached document: RFI No - 89.
See attached document: RFI No - 90.
See attached document: RFI No - 91.
See attached document: 12 24 13 Manual Roller Shade Specification.
See attached document: 014500.
See attached document: 014529.
See attached document: 078100A.
See attached document: 078123 - Intumescent Fireproofing.
See attached document: 088000.
See attached document: 105000.
See attached document: 117300 REV.
See attached document: 312000 Earthwork1 (rev 8-20).
See attached document: 323113 Chain Link Fences and Gates (rev 8-20).
See attached document: 312319 Dewatering (rev 8-20).
See attached document: 321723 Pavement Markings (rev 8-20).
See attached document: A102 NEW SECOND FLOOR PLAN.
See attached document: A108 FIRST FLOOR REFLECTED CEILING PLAN.
See attached document: A109 SECOND FLOOR REFLECTED CEILING PLAN.
See attached document: A307 WALL SECTIONS AND DETAILS.
See attached document: A404 ENLARGED RESTROOM PLANS AND ELEVATIONS.
See attached document: A405 ENLARGED RESTROOM PLANS AND ELEVATIONS.
See attached document: A406 ENLARGED RESTROOM PLANS AND ELEVATIONS.
See attached document: A407 ENLARGED RESTROOM PLANS AND ELEVATIONS.
See attached document: A408 ENLARGED PLANS AND CASEWORKS ELEVATIONS.
See attached document: A409 ENLARGED PLANS AND CASEWORK ELEVATIONS.
See attached document: A501 INTERIOR DETAILS.
See attached document: 331000 Water Utilities - (rev 8-20).
See attached document: A602 INTERIOR STOREFRONT ELEVATIONS AND DETAILS.
See attached document: I101 FIRST FLOOR - FLOOR FINISH PLAN.
See attached document: I102 SECOND FLOOR - FLOOR FINISH PLAN.
See attached document: I103 MECH PENTHOUSE _ PED WALKWAY LEVEL - FLOOR FINISH PLANS.
See attached document: I104 FINISH SCHEDULE.
See attached document: I105 FINISH SCHEDULE LEGENDS.
File details come from the government source that posted it. Updated .