This pre-solicitation notice seeks construction services for a new hospice unit at the Loch Raven Veterans Affairs Medical Center in Baltimore, Maryland. The project involves approximately 20,000 square feet of new construction and renovations including a new second story addition, stair/elevator tower, and pedestrian walkway. The solicitation is anticipated to be issued on June 4, 2020 as a 100% small business set-aside for Service-Disabled Veteran-Owned Small Businesses. The construction magnitude is estimated between $10-20 million. Bids are due by July 8, 2020 and contract performance is required within 540 days of award. Interested parties should monitor the Federal Business Opportunities website and direct any inquiries in writing by July 10, 2020 referencing solicitation number 36C24520B0001.

View the file

Other files

File Type Posted
36C24520B0001 0005.docx DOCX document
RFI No - 69.docx DOCX document
RFI No - 60.docx DOCX document
I103 MECH PENTHOUSE _ PED WALKWAY LEVEL - FLOOR FINISH PLANS.pdf PDF
321723 Pavement Markings (rev 8-20).pdf PDF
RFI No - 20.pdf PDF
RFI No - 26.docx DOCX document
RFI No - 61.docx DOCX document
RFI No - 59.docx DOCX document
RFI No - 1.pdf PDF
RFI No - 86.pdf PDF
RFI No - 85.pdf PDF
088000.pdf PDF
RFI No - 87_VA Response.pdf PDF
RFI No - 12.pdf PDF
312319 Dewatering (rev 8-20).pdf PDF
RFI No - 90.pdf PDF
RFI No - 7.pdf PDF
RFI No - 31.docx DOCX document
RFI No - 63_VA Response.docx DOCX document
RFI No - 10_VA Response.pdf PDF
331000 Water Utilities - (rev 8-20).pdf PDF
RFI No - 37.docx DOCX document
RFI No - 43.docx DOCX document
RFI No - 48.docx DOCX document
RFI No - 50.docx DOCX document
A501 INTERIOR DETAILS.pdf PDF
RFI No - 24.docx DOCX document
312000 Earthwork1 (rev 8-20).pdf PDF
RFI No - 71.docx DOCX document
RFI No - 17.pdf PDF
RFI No - 53.docx DOCX document
RFI No - 66.docx DOCX document
RFI No - 84.pdf PDF
RFI No - 76.docx DOCX document
RFI No - 67.docx DOCX document
RFI No - 45.docx DOCX document
Virtual Bid Opening Updated.pdf PDF
RFI No - 15.pdf PDF
RFI No - 78.docx DOCX document
RFI No - 13.pdf PDF
36C24520B0001 0004.docx DOCX document
A406 ENLARGED RESTROOM PLANS AND ELEVATIONS.pdf PDF
RFI No - 8.pdf PDF
078123 - Intumescent Fireproofing.pdf PDF
RFI No - 41.docx DOCX document
RFI No - 2.pdf PDF
RFI No - 54.docx DOCX document
RFI No - 52.docx DOCX document
A408 ENLARGED PLANS AND CASEWORKS ELEVATIONS.pdf PDF
Show 40 more

Latest 50 of 147 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Veterans Administration Medical Center 03-19

Baltimore, Maryland REV. 08-20

Expand Loch Raven Hospice Unit

512-532 11 73 00 - 1

SECTION 11 73 00

CEILING MOUNTED PATIENT LIFT SYSTEM

PART 1 - GENERAL

1.1 DESCRIPTION

Ceiling Mounted Patient Lift Systems for the transfer of physically challenged patients are specified in this section. Provide a 600 lb.

Ceiling Mounted Patient Lift System in all Bedrooms connecting to the

Bathrooms except Bariatric Bedrooms and connected bathrooms, rooms 239 and 240, which shall be 1,000 lb. Ceiling Mounted Patient Lift System.

The Ceiling Mounted Patient Lift System is VA Furnished and Contractor

Installed (VC). Contractor shall coordinate installation with the lift

Ceiling Mounted Lift Manufacturer selected by the VA. Prism Medical is the current proposed lift manufacturer. The contractor is responsible for the design and installation of all structural support of the ceiling lifts to adequately support the lift system specified following the lift manufacturers requirements. Refer to the submittal requirements in paragraph 1.4 for additional information.

1.2 RELATED WORK

A. Section 01 00 00, GENERAL REQUIREMENTS: Requirements for pre-test of equipment.

B. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: General

Electrical Requirements and items, which are common to sections of

Division 26.

1.3 QUALITY ASSURANCE

Certification for compliance is required for Ceiling Mounted Patient

Lift Systems. Certifications shall be provided by an independent third party who will conduct testing to ensure that the ceiling lift installation, and charging system are safe and in compliance with ISO

10535 & UL 60601-1

1.4 SUBMITTALS

A. Submit in accordance with specification Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA AND SAMPLES.

B. Certificates of Compliance

C. Manufacturer's Literature and Data:

1. Lifting Capacity

2. Lifting Speed

11 73 00 - 2

3. Horizontal Displacement Speeds

4. Horizontal Axis Motor

5. Vertical Axis Motor

6. Emergency Brake

7. Emergency Lowering Device

8. Emergency Stopping Device

9. Electronic Soft-Start and Soft-Stop Motor Control

10. Current Limiter for Circuit Protection

11. Low Battery Disconnect System

12. Strap Length

13. Provide sealed engineering shop drawings for all equipment anchors and supports. Submittals shall include weights, dimensions, center of gravity, standard connections, manufacturer's recommendations and behavior problems (e.g., vibration, thermal expansion,) associated with equipment or piping so that the proposed installation can be properly reviewed.

D. Individual Room layouts showing location of lift system installation shall be approved before proceeding with installation of lifts.

1.5 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are listed in the text by the basic designation only.

B. International Organization for Standardization (IOS):

10535-06................Hoist for the Transfer of Disabled Persons-

Requirements and Test Methods

C. Underwriters Laboratories (UL):

60601-1(2003)...........Medical Electrical Equipment: General

Requirements for Safety

94-2013.................UL Standards for Safety Test for Flammability of Plastic Materials for Parts in Devices and

Appliances-Fifth Edition

D. International Electromagnetic Commission (IEC):

801-2(1991).............Electromagnetic Compatibility for Industrial-

Process Measurement and Control Equipment-Part

2: Electromagnetic Discharge Requirements

11 73 00 - 3

PART 2 - PRODUCTS

2.1 CEILING TRACK SYSTEM

The Ceiling Track shall be made from high strength extruded aluminum

T66081-T5 at a thickness of 3/16” (4.8mm). Provide anchor supports at a minimum 3 per linear foot at ceiling substrate. The ceiling track shall be finished with baked enamel paint.

2.2 LIFT UNIT

A. The Lift Unit shall be constructed of a steel frame system (2205lbs /

1000kg tested) driven by a gear reduced high torque motor

B. The Lift system shall have the following features.

1. Lifting capacity: 1000 lbs (455 kg)(K5185B) and 600 lbs.(A5185A)

2. Electronic soft-start and soft-stop motor control

3. Emergency lowering device

4. Emergency stopping device

5. Current limiter for circuit protection in case of overload.

6. Safety device that stops the motor to lift when batteries are low.

7. Lifting speed: 2.3in/s (6 cm/s), 1.6in/s (3.5cm) in full capacity

8. Horizontal displacement speed: 5.9in/s (150mm/s)

9. Horizontal axis motor: 24VDC at 62 watts and vertical axis motor at

110 watts

10. Emergency brake (in case of mechanical failure)

11. Strap length up to 90in (2.3m) tested for 2998lbs (1360kg)

12. Cab: VO plastic–fire retardant, UL 94

13. Wireless remote control (optional)

2.3 MOTORS

A. Vertical Movement-DC Motor

1. Type: Class A, fully enclosed, permanent magnet.

2. Rating: 24Vdc, 1.1A, 110W, 4000RPM, 0.3N-m.

3. Mounting: Secured to chassis.

B. Horizontal Movement-DC Motor

1. Type: Fully enclosed, permanent magnet, integral reducer.

2. Rating: 24Vdc, 1.8A, 62W, 260RPM, 1.0N-m.

3. Mounting: Secured to chassis.

2.4 BATTERIES

A. The life cycle (number of charging cycles) for batteries shall be in compliance with IEC 801-2.

11 73 00 - 4

B. Provide rechargeable batteries with up to 120 transfers with a load of

200lbs (74kg) and up to 70 transfers with its maximum load of 440lbs

(200kg).

2.5 CHARGER

A. Charger Input: 100-240 Vac, 50/60 Hz.

B. Charger Output: 27 Vdc, 1 A max.

C. Supplemental to the charger provide a clip on charging station with indicator lights.

2.6 STRAPS AND SLING

A. The straps shall be made of threaded nylon. The straps shall ensure the patient’s safety by preventing the patient from falling out of the sling.

B. The sling shall be made from a polyester/nylon net material that is pliable, breathable and easy to use. The sling shall cradle the body of the patient.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install ceiling mounted patient lift system as per manufacturer's instruction and under the supervision of manufacturer's qualified representative and as shown on drawings.

B. If the distance in between the suspended ceiling and anchors is more than 18” consult with manufacturer to determine if lateral braces will be required.

3.2 INSTRUCTION AND PERSONNEL TRAINING

Training shall be provided for the required personnel to educate them on proper operation and maintenance for the lift system equipment.

3.3 TEST

Conduct performance test, in the presence of the Resident Engineer and a manufacturer's field representative, to show that the patient lift system equipment and control devices operate properly and in accordance with design and specification requirements.

- - - E N D - - -