36C24518B0233 4 Fire Protection Drawings.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24518C0215-000.docx | DOCX document | |
| 36C24518B0233-0001001.pdf | ||
| 36C24518B0233-0001000.docx | DOCX document | |
| 36C24518B0233-010.pdf | ||
| 36C24518B0233-003.pdf | ||
| 36C24518B0233-013.pdf | ||
| 36C24518B0233-007.pdf | ||
| 36C24518B0233-001.docx | DOCX document | |
| 36C24518B0233-002.pdf | ||
| 36C24518B0233-012.pdf | ||
| 36C24518B0233-011.pdf | ||
| 36C24518B0233-005.pdf | ||
| 36C24518B0233-004.pdf | ||
| 36C24518B0233-009.pdf | ||
| 36C24518B0233-008.pdf | ||
| 36C24518B0233-000.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE:
SCALE:
SCALE:
SCALE: NONE
WET SYSTEM
FIRE PROTECTION ENTRANCE RISER DETAIL
GENERAL NOTES:
D
D
BACK FLOW
PREVENTER TEST
LINE OS&Y GATE VALVE
BACK FLOW PREVENTER
(WITH SUPERVISORY SWITCH)EXTERIOR WALL
THRUST BLOCK
EXTERIOR WALL
WALL HYDRANT
DUCTILE IRON
FLOOR SLAB
FDC
GRADE
MAIN DRAIN
WET PIPE ALARM VALVE
WITH TRIM
TO SPRINKLER SYSTEM
WATER MOTOR
GONG
RETARD CHAMBER
PRESSURE SWITCHSTRAINER
A
(WET SYSTEM RISER DETAIL ONLY)
B
INSTALL PIPING RESTRAINTS IN ACCORDANCE WITH NFPA 24.
INSTALL ALL SIGNS IN ACCORDANCE WITH NFPA 13.
CHECK VALVE WITH
AUTOMATIC DRAIN VALVE
FROM SUPPLY MAIN
POST INDICATOR VALVE
(WITH SUPERVISORY SWITCH)
OS&Y GATE VALVE
(WITH SUPERVISORY SWITCH)
MAIN DRAIN (PROVIDE
SPLASH BLOCK FOR
DISCHARGE POINT)
NONE
NONE
NONE
GENERAL NOTES:
PIPE HANGER DETAIL
GENERAL NOTES:
DROP TO
PENDENT SPRINKLER HEAD DETAIL
WALL PENETRATION AND SLEEVE DETAIL
GENERAL NOTES:
FIRE PROTECTION LEGEND
1. THE SPRINKLER HEAD LAYOUT AND PIPING SHOWN IS FOR
INFORMATION ONLY AND FOR THE PURPOSE OF A PRELIMINARY
HYDRAULIC CALCULATION ANALYSIS BY THE FIRE PROTECTION
ENGINEER TO DETERMINE IF THE EXISTING WATER SUPPLY IS
SUITABLE FOR SYSTEM FLOW AND PRESSURE REQUIREMENTS.
THE CONTRACTOR SHALL EXECUTE A HYDRANT FLOW TEST,
PROVIDE SPRINKLER SYSTEM INSTALLATION DRAWINGS
INCLUDING HYDRAULIC CALCULATIONS, MATERIALS AND
COMPONENTS ALL OF WHICH SHALL BE IN FULL COMPLIANCE
WITH VA FIRE PROTECTION DESIGN MANUAL, NFPA 13 AND THE
AUTHORITY HAVING JURISDICTION FOR A COMPLETE AND
OPERABLE SYSTEM.
2. PIPING TO PENDENT SPRINKLER HEADS SHALL BE SUPPLIED
FROM TOP OF MAIN OR BRANCHLINE IN A RETURN BEND
CONFIGURATION.
3. IN ROOMS WITH ACOUSTICAL TILE CEILINGS, INSTALL QUICK
RESPONSE PENDENT SPRINKLER HEADS IN CENTER TILE OF
CEILING. REFER TO DETAILS ON THIS SHEET.
4. IN ROOMS WITH GYPSUM BOARD CEILINGS, INSTALL QUICK
RESPONSE PENDENT SPRINKLER HEADS COORDINATED WITH
OTHER CEILING EQUIPMENT. REFER TO DETAILS ON THIS SHEET.
5. ALL PIPING SHALL BE SUPPORTED FROM BUILDING STRUCTURE.
REFER TO DETAILS ON THIS SHEET.
6. PIPE SLEEVES SHALL BE INSTALLED ON ALL PENETRATIONS OF
FIRE RATED WALLS.
RESIDUAL PRESSURE - 50 psi
FLOW - 750 gpm
REQUIRED FLOW: 400.6 GPM
AVAILABLE PRESSURE @ FLOW: 55.3 PSI
REQUIRED PRESSURE @ FLOW: 40.4 PSI
STATIC PRESSURE - 60 psi
HANGER ROD
PIPE
STRAP HANGER
HANGER ROD
PIPE
CLEVIS TYPE
HANGER
HEX NUT
HANGER ROD
(HANGER DETAIL ONLY)
A ALL HANGERS SHALL BE SPACED IN ACCORDANCE WITH PIPE
MANUFACTURERS REQUIREMENTS.
EXTERNAL PLUG
DROP IN CONCRETE
ANCHOR
CONCRETE STRUCTURE
1" PIPE
REDUCER COUPLING
PENDENT SPRINKLER
ESCUTCHEON PLATE
SPRINKLER
MAIN SUPPLY
PIPING
ESCUTCHEON RETAINER
APPLICABLE TO PENETRATIONS OF ALL WALLS AND FIRE RATED
MEMBRANES, IN ACCORDANCE WITH IBC 2015.
FIRE STOP MATERIAL ON EXPOSED SECTION OF WALLS SHALL BE
FINISHED UNIFORMED, SMOOTH AND PAINTED TO MATCH
SURROUNDING AREA.
(SLEEVE DETAIL ONLY)
A
DRYWALL PARTITION
FIRE STOP MATERIAL
PIPE SLEEVE
FIRE STOP MATERIAL
BLOCK PARTITION
PIPE
PIPE SLEEVE
FIRE STOP MATERIAL
FIRE STOP MATERIAL
CAVITY IN BLOCK
CAVITY BETWEEN STUDS
B
EXPOSED SECTION OF
WALL
EXPOSED SECTION OF
WALL
EXPOSED SECTION OF
WALL
EXPOSED SECTION OF
WALL
ESCUTCHEON WITH SET
SCREW
PRELIMINARY
HYDRAULIC ANALYSIS
FIRE HYDRANT FLOW
DATA
DESIGN AREA: 1500 FT²
LIGHT HAZARD: 0.10 GPM/FT²
HOSE STREAM ALLOWANCE: 100 GPM
DESIGN DENSITY,
AREA & HOSE
STREAM ALLOWANCE
SPRINKLER PIPING
UPRIGHT FIRE SPRINKLER HEAD
PENDANT SPRINKLER HEAD
PIPE DROP
PIPE UP/STAND PIPE
POINT OF NEW CONNECTION
CEILING
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
CONSULTANTS: ARCHITECT/ENGINEERS:
590 MEANS ST NW ATLANTA, GA 30318
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Number:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
BID DOCUMENTS
GENERAL NOTES AND DETAILS CONSTRUCT DOM CLINIC
AND CLC ADMINISTRATION
ADDITION
MARTINSBURG, WV
F001
613-121
June 27, 2018 RWC PNW
501D & 502F
DNDN
DN
DN
CORR.
501D-105
ELECTRICAL
501D-104
LOADING
501D-103
MECHANICAL
501D-102
IT
501D-101
ENTRANCE
501D-100
CONNECTOR
RAMP
501D-C5
CORRIDOR
501D-C1
ADMIN. SUPP.
501D-107
WAITING
501D-106
OFF. / EX.
501D-111
OFF. / EX.
501D-109
CONFERENCE
ROOM
501D-122
STOR.
501D-111A
CORRIDOR
501D-C2
N. CASE MAN.
501D-108
OFF. / EX.
501D-110
OFF. / EX.
501D-112
N. CASE MAN.
501D-113
PSYCHOL.
501D-114
G. FELLOW
501D-115
G. FELLOW
501D-116
CORR. A
501D-C3
LANDING
501D-136
ENTRANCE
501D-131
SERV. CHIEF.
501D-130
AD. ASST.
501D-129
STOR.
501D-129A
CORR. B
501D-C4
BUS. MAN.
501D-127
PROG. MAN.
501D-126
OFFICE/EXAM
501D-125
OFFICE/EXAM
501D-124
N. ADMIN.
501D-123
LIGHTWELL
501C-125A
16"
STAFF T.
501D-118
HAC
501D-134
STAFF T.
501D-133
GUEST T.
501D-132
CUBICLES
501D-128
BREAK ROOM
501D-121
COPY /
WORKROOM
501D-120
GUEST T.
501D-117
4"2
/4
1"
4" 4"4"
/2
/2
/4
/2
/2
1"
/4
/2
/2
/4
/2
/2
/4
/2
/2
/2
/4
/2
/2 " 1
/4
/2
/2
/4
/4
/4
/2
/4
1"
/4
/2
/4
1"
/2 " 1
/2
/4
3 4
2"
2"
2" 2" 2
1 3 3.1 3.4 4 4.5 4.8 5 5.3 6 7.4E 6.5 9E 7 7.5 8 12E 12.2E 9 9.7 9.8 9.9 14E 10 10.5 11 15E 12 16E
K
I
H
G.5
G
F
C.4
C.2
C
B.5
B
A
RE
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
CONSULTANTS: ARCHITECT/ENGINEERS:
590 MEANS ST NW ATLANTA, GA 30318
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Number:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
BID DOCUMENTS
FIRST FLOOR CLC ADMIN CONSTRUCT DOM CLINIC
AND CLC ADMINISTRATION
ADDITION
MARTINSBURG, WV
FP101
613-121
June 27, 2018 RWC PNW
1/8" = 1'-0"
FIRST FLOOR CLC ADMIN
1. ROUTE AND CONNECT NEW 6" FIRE SUPPRESSION PIPING TO EXISTING
WATER SERVICE EAST OF THE BUILDING ADDITION.
2. NEW 6" RISER WITH DOUBLE CHECK DETECTOR BACKFLOW PREVENTER,
ALARM VALVE AND FIRE DEPARTMENT CONNECTION TO SERVE BUILDING
ADDITION.
3. REMOVE EXISTING FIRE DEPARTMENT CONNECTION FROM THIS LOCATION.
4. ROUTE NEW PIPING AND RE-INSTALL EXISTING FIRE DEPARTMENT
CONNECTION AT THIS APPROXIMATE LOCATION AND IN ACCORDANCE
WITH NFPA 13.
GENERAL NOTES
KEY NOTES
GRAPHIC SCALE(S)
1/8" = 1' - 0" 0 5' 10' 15' 30'
X
A. FIRE SUPPRESSION SYSTEM SHALL BE A HYDRAULICALLY CALCULATED
WET PIPE SYSTEM WITH QUICK RESPONSE HEADS.
B. FIRE SUPPRESSION PIPING AND EQUIPMENT SHALL BE SUPPORTED FROM
BUILDING STRUCTURE.
TRUE
NORTH
PLAN
NORTH
501D
A. IN THE EVENT THAT ALTERNATE 5 (BID ITEM #6) IS INCORPERATED
CONTRACTOR SHALL INSTALL QUICK RESPONCE STANDARD
COVERAGE UPRIGHT SPRINKLER HEADS TO PROVIDE 100%
COVERAGE IN AREA EFFECTED IN ACCORDANCE WITH VA FIRE
PROTECTION DESIGN GUIDE AND NFPA 13.
NOTE TO CONTRACTOR
FF
DD CC AAEE
BB
21.4
MANAGER
502F-123
PSYCH.
502F-125
PSYCH.
502F-127
PSYCH.
502F-129
CORR. B
502F-C2
PA OFFICE
502F-126
MECHANICAL
502F-128
ELECT
502F-130
N. ASSESS.
502F-114
REC. THER.
502F-116
DIETICIAN
502F-118
IT
502F-120
SOC. WORK.
502F-121
PEER SUPP.
502F-119
DOM SUPV.
SCREEN.
502F-117
DOM STAFF
SCREENER
502F-115
CORR. A
502F-C1
DOM SCREENING
CLERK
502F-113
VESTIBULE
502F-110
N. ASSESS.
502F-109
N. ASSESS.
502F-108
TRIAGE
502F-104
CHECK IN
502F-102
LOBBY
502F-100
WAITING
502F-103
MEDS
502F-106
STAFF T.
502F-124
HAC
502F-122
SPEC. VEST.
502F-111
N. STATION
502F-107
N. STATION
502F-105
PAT. T.
502F-101
SPEC. T.
502F-112
/2
/4
1"
/4
/2
/2 " 1
/4
/4
/2
4"
4"
4"
4"
4" 4"
4" 4"
"1
1"
1"
/4
" 1 th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
CONSULTANTS: ARCHITECT/ENGINEERS:
590 MEANS ST NW ATLANTA, GA 30318
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Number:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
BID DOCUMENTS
FIRST FLOOR DOM CLINIC CONSTRUCT DOM CLINIC
AND CLC ADMINISTRATION
ADDITION
MARTINSBURG, WV
FP102
613-121
June 27, 2018 RWC PNW
1/8" = 1'-0"
FIRST FLOOR DOM CLINIC
1. ROUTE AND CONNECT NEW 6" FIRE SUPPRESSION PIPING TO EXISTING
WATER SERVICE IN BETWEEN EXISTING BUILDING 502 AND FUTURE
DOMICILIARY BUILDING.
2. NEW 6" FIRE RISER WITH DOUBLE CHECK DETECTOR BACKFLOW
PREVENTER, ALARM VALVE AND FIRE DEPARTMENT CONNECTION TO
SERVE BUILDING ADDITION.
GENERAL NOTES
KEY NOTES
GRAPHIC SCALE(S)
1/8" = 1' - 0" 0 5' 10' 15' 30'
X
A. FIRE SUPPRESSION SYSTEM SHALL BE A HYDRAULICALLY CALCULATED
WET PIPE SPRINKLER SYSTEM WITH QUICK RESPONSE HEADS.
B. FIRE SUPPRESSION PIPING AND EQUIPMENT SHALL BE SUPPORTED FROM
THE BUILDING STRUCTURE.
TRUE
NORTH