36C24518B0233-002.pdf
PDF 1 MB Posted
- Attached to
- CONST DOM CLINIC & CLC ADMIN PROJ 613-121 Federal contract opportunity
- Solicitation number
- 36C24518B0233
About this file
36C24518B0233 0 General Drawings.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24518C0215-000.docx | DOCX document | |
| 36C24518B0233-0001001.pdf | ||
| 36C24518B0233-0001000.docx | DOCX document | |
| 36C24518B0233-007.pdf | ||
| 36C24518B0233-001.docx | DOCX document | |
| 36C24518B0233-009.pdf | ||
| 36C24518B0233-008.pdf | ||
| 36C24518B0233-010.pdf | ||
| 36C24518B0233-003.pdf | ||
| 36C24518B0233-013.pdf | ||
| 36C24518B0233-012.pdf | ||
| 36C24518B0233-011.pdf | ||
| 36C24518B0233-005.pdf | ||
| 36C24518B0233-004.pdf | ||
| 36C24518B0233-006.pdf | ||
| 36C24518B0233-000.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET INDEX
G001G001G001G001
SHEET
NO.
GENERALGENERALGENERALGENERAL
COVER SHEETCOVER SHEETCOVER SHEETCOVER SHEET
ARCHITECTURALARCHITECTURALARCHITECTURALARCHITECTURAL
A102A102A102A102
FIRST FLOOR REFLECTED CEILING PLAN - CLC ADMINFIRST FLOOR REFLECTED CEILING PLAN - CLC ADMINFIRST FLOOR REFLECTED CEILING PLAN - CLC ADMINFIRST FLOOR REFLECTED CEILING PLAN - CLC ADMIN
SHEET
NO.
DRAWING
TITLE
FIRST FLOOR ANNOTATION PLAN - CLC ADMINFIRST FLOOR ANNOTATION PLAN - CLC ADMINFIRST FLOOR ANNOTATION PLAN - CLC ADMINFIRST FLOOR ANNOTATION PLAN - CLC ADMINA101A101A101A101
FIRST FLOOR ANNOTATION PLAN - DOM CLINICFIRST FLOOR ANNOTATION PLAN - DOM CLINICFIRST FLOOR ANNOTATION PLAN - DOM CLINICFIRST FLOOR ANNOTATION PLAN - DOM CLINIC
A111A111A111A111
FIRST FLOOR REFLECTED CEILING PLAN - DOM CLINICFIRST FLOOR REFLECTED CEILING PLAN - DOM CLINICFIRST FLOOR REFLECTED CEILING PLAN - DOM CLINICFIRST FLOOR REFLECTED CEILING PLAN - DOM CLINICA112A112A112A112
ROOM FINISH SCHEDULES AND EQUIPMENT SCHEDULEROOM FINISH SCHEDULES AND EQUIPMENT SCHEDULEROOM FINISH SCHEDULES AND EQUIPMENT SCHEDULEROOM FINISH SCHEDULES AND EQUIPMENT SCHEDULEA601A601A601A601
DOOR AND FRAME TYPES, SCHEDULES AND DETAILSDOOR AND FRAME TYPES, SCHEDULES AND DETAILSDOOR AND FRAME TYPES, SCHEDULES AND DETAILSDOOR AND FRAME TYPES, SCHEDULES AND DETAILSA611A611A611A611
G002G002G002G002 GENERAL NOTES, DETAILS, ABBREVIATIONS AND LEGENDSGENERAL NOTES, DETAILS, ABBREVIATIONS AND LEGENDSGENERAL NOTES, DETAILS, ABBREVIATIONS AND LEGENDSGENERAL NOTES, DETAILS, ABBREVIATIONS AND LEGENDS
AREA PLANS - CLC ADMIN AND DOM CLINICAREA PLANS - CLC ADMIN AND DOM CLINICAREA PLANS - CLC ADMIN AND DOM CLINICAREA PLANS - CLC ADMIN AND DOM CLINICA100A100A100A100
ROOF PLAN - CLC ADMINROOF PLAN - CLC ADMINROOF PLAN - CLC ADMINROOF PLAN - CLC ADMINA121A121A121A121
ROOF PLAN - DOM CLINICROOF PLAN - DOM CLINICROOF PLAN - DOM CLINICROOF PLAN - DOM CLINICA122A122A122A122
EXTERIOR ELEVATIONS - CLC ADMINEXTERIOR ELEVATIONS - CLC ADMINEXTERIOR ELEVATIONS - CLC ADMINEXTERIOR ELEVATIONS - CLC ADMINA201A201A201A201
EXTERIOR ELEVATIONS AND BUILDING SECTIONS - DOM CLINICEXTERIOR ELEVATIONS AND BUILDING SECTIONS - DOM CLINICEXTERIOR ELEVATIONS AND BUILDING SECTIONS - DOM CLINICEXTERIOR ELEVATIONS AND BUILDING SECTIONS - DOM CLINICA202A202A202A202
BUILDING SECTIONS - CLC ADMINBUILDING SECTIONS - CLC ADMINBUILDING SECTIONS - CLC ADMINBUILDING SECTIONS - CLC ADMINA301A301A301A301
PARTITION TYPES & FRAMING ELEVATIONSPARTITION TYPES & FRAMING ELEVATIONSPARTITION TYPES & FRAMING ELEVATIONSPARTITION TYPES & FRAMING ELEVATIONSA501A501A501A501
FIRE PROTECTIONFIRE PROTECTIONFIRE PROTECTIONFIRE PROTECTION
CIVILCIVILCIVILCIVIL
C001C001C001C001 SITE SYMBOLSSITE SYMBOLSSITE SYMBOLSSITE SYMBOLS
C100C100C100C100 EXISTING SITE FEATURES - BUILDINGS 501 & 502EXISTING SITE FEATURES - BUILDINGS 501 & 502EXISTING SITE FEATURES - BUILDINGS 501 & 502EXISTING SITE FEATURES - BUILDINGS 501 & 502
CD100CD100CD100CD100 SITE DEMOLITION PLANSITE DEMOLITION PLANSITE DEMOLITION PLANSITE DEMOLITION PLAN
C110C110C110C110
C111C111C111C111 SITE MATERIALS-BUILDING 502FSITE MATERIALS-BUILDING 502FSITE MATERIALS-BUILDING 502FSITE MATERIALS-BUILDING 502F
C120C120C120C120 SITE STAKE OUT PLAN - BUILDING 501DSITE STAKE OUT PLAN - BUILDING 501DSITE STAKE OUT PLAN - BUILDING 501DSITE STAKE OUT PLAN - BUILDING 501D
C121C121C121C121 SITE STAKE OUT PLAN-BUILDING 502FSITE STAKE OUT PLAN-BUILDING 502FSITE STAKE OUT PLAN-BUILDING 502FSITE STAKE OUT PLAN-BUILDING 502F
C130C130C130C130 SITE GRADING PLAN-BUILDING 501DSITE GRADING PLAN-BUILDING 501DSITE GRADING PLAN-BUILDING 501DSITE GRADING PLAN-BUILDING 501D
C131C131C131C131 SITE GRADING PLAN-BUILDING 502FSITE GRADING PLAN-BUILDING 502FSITE GRADING PLAN-BUILDING 502FSITE GRADING PLAN-BUILDING 502F
C140C140C140C140 SITE UTILITY PLAN-BUILDING 501DSITE UTILITY PLAN-BUILDING 501DSITE UTILITY PLAN-BUILDING 501DSITE UTILITY PLAN-BUILDING 501D
C141C141C141C141 SITE UTILITY PLAN-BUILDING 502FSITE UTILITY PLAN-BUILDING 502FSITE UTILITY PLAN-BUILDING 502FSITE UTILITY PLAN-BUILDING 502F
C150C150C150C150 EROSION & SEDIMENTATION CONTROL (E&S) PLAN-BUILDING 501DEROSION & SEDIMENTATION CONTROL (E&S) PLAN-BUILDING 501DEROSION & SEDIMENTATION CONTROL (E&S) PLAN-BUILDING 501DEROSION & SEDIMENTATION CONTROL (E&S) PLAN-BUILDING 501D
C510C510C510C510 SITE DETAILSSITE DETAILSSITE DETAILSSITE DETAILS
C540C540C540C540 STORM WATER MANAGEMENT DETAILSSTORM WATER MANAGEMENT DETAILSSTORM WATER MANAGEMENT DETAILSSTORM WATER MANAGEMENT DETAILS
C541C541C541C541 SITE UTILITY DETAILSSITE UTILITY DETAILSSITE UTILITY DETAILSSITE UTILITY DETAILS
F001F001F001F001 GENERAL NOTES AND DETAILSGENERAL NOTES AND DETAILSGENERAL NOTES AND DETAILSGENERAL NOTES AND DETAILS
FP101FP101FP101FP101 FIRST FLOOR CLC ADMINFIRST FLOOR CLC ADMINFIRST FLOOR CLC ADMINFIRST FLOOR CLC ADMIN
FP102FP102FP102FP102 FIRST FLOOR DOM CLINICFIRST FLOOR DOM CLINICFIRST FLOOR DOM CLINICFIRST FLOOR DOM CLINIC
PLUMBINGPLUMBINGPLUMBINGPLUMBING
P001P001P001P001 PLUMBING LEGEND, GENERAL NOTES, AND SCHEDULESPLUMBING LEGEND, GENERAL NOTES, AND SCHEDULESPLUMBING LEGEND, GENERAL NOTES, AND SCHEDULESPLUMBING LEGEND, GENERAL NOTES, AND SCHEDULES
FOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - CLC ADMINFOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - CLC ADMINFOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - CLC ADMINFOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - CLC ADMINPL101PL101PL101PL101
PL102PL102PL102PL102
MECHANICALMECHANICALMECHANICALMECHANICAL
M001M001M001M001 MECHANICAL LEGEND AND GENERAL NOTESMECHANICAL LEGEND AND GENERAL NOTESMECHANICAL LEGEND AND GENERAL NOTESMECHANICAL LEGEND AND GENERAL NOTES
ELECTRICALELECTRICALELECTRICALELECTRICAL
E001E001E001E001 ELECTRICAL LEGENDELECTRICAL LEGENDELECTRICAL LEGENDELECTRICAL LEGEND
FIRST FLOOR LIGHTING PLAN - CLC ADMINFIRST FLOOR LIGHTING PLAN - CLC ADMINFIRST FLOOR LIGHTING PLAN - CLC ADMINFIRST FLOOR LIGHTING PLAN - CLC ADMINEL101EL101EL101EL101
EL102EL102EL102EL102
LIGHTING FIXTURE SCHEDULE AND DETAILSLIGHTING FIXTURE SCHEDULE AND DETAILSLIGHTING FIXTURE SCHEDULE AND DETAILSLIGHTING FIXTURE SCHEDULE AND DETAILSEL601EL601EL601EL601
STRUCTURALSTRUCTURALSTRUCTURALSTRUCTURAL
S001S001S001S001 STRUCTURAL NOTESSTRUCTURAL NOTESSTRUCTURAL NOTESSTRUCTURAL NOTES
S002S002S002S002 STRUCTURAL NOTESSTRUCTURAL NOTESSTRUCTURAL NOTESSTRUCTURAL NOTES
S101S101S101S101 CLC ADMIN ADDITION FOUNDATION PLANCLC ADMIN ADDITION FOUNDATION PLANCLC ADMIN ADDITION FOUNDATION PLANCLC ADMIN ADDITION FOUNDATION PLAN
S102S102S102S102 CLC ADMIN ADDITION LOW ROOF FRAMING PLANCLC ADMIN ADDITION LOW ROOF FRAMING PLANCLC ADMIN ADDITION LOW ROOF FRAMING PLANCLC ADMIN ADDITION LOW ROOF FRAMING PLAN
S103S103S103S103 CLC ADMIN ADDITION HIGH ROOF FRAMING PLANCLC ADMIN ADDITION HIGH ROOF FRAMING PLANCLC ADMIN ADDITION HIGH ROOF FRAMING PLANCLC ADMIN ADDITION HIGH ROOF FRAMING PLAN
S104S104S104S104 DOMICILIARY CLINIC ADDITION FOUNDATION PLANDOMICILIARY CLINIC ADDITION FOUNDATION PLANDOMICILIARY CLINIC ADDITION FOUNDATION PLANDOMICILIARY CLINIC ADDITION FOUNDATION PLAN
S105S105S105S105 DOMICILIARY CLINIC ADDITION ROOF FRAMING PLANDOMICILIARY CLINIC ADDITION ROOF FRAMING PLANDOMICILIARY CLINIC ADDITION ROOF FRAMING PLANDOMICILIARY CLINIC ADDITION ROOF FRAMING PLAN
S201S201S201S201 BRACING ELEVATIONS CLC ADMIN ADDITIONBRACING ELEVATIONS CLC ADMIN ADDITIONBRACING ELEVATIONS CLC ADMIN ADDITIONBRACING ELEVATIONS CLC ADMIN ADDITION
S202S202S202S202 BRACING AND FRAMING ELEVATIONS CLC ADMIN ADDITIONBRACING AND FRAMING ELEVATIONS CLC ADMIN ADDITIONBRACING AND FRAMING ELEVATIONS CLC ADMIN ADDITIONBRACING AND FRAMING ELEVATIONS CLC ADMIN ADDITION
S203S203S203S203 BRACING ELEVATIONS - DOMICILIARY ADDITIONBRACING ELEVATIONS - DOMICILIARY ADDITIONBRACING ELEVATIONS - DOMICILIARY ADDITIONBRACING ELEVATIONS - DOMICILIARY ADDITION
S301S301S301S301 CONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILS
S302S302S302S302 CONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILS
S401S401S401S401 MASONRY DETAILSMASONRY DETAILSMASONRY DETAILSMASONRY DETAILS
S501S501S501S501 STEEL DETAILSSTEEL DETAILSSTEEL DETAILSSTEEL DETAILS
S502S502S502S502 STEEL DETAILSSTEEL DETAILSSTEEL DETAILSSTEEL DETAILS
SITE MATERIALS-BUILDING 501DSITE MATERIALS-BUILDING 501DSITE MATERIALS-BUILDING 501DSITE MATERIALS-BUILDING 501D
INTERIOR ELEVATIONSINTERIOR ELEVATIONSINTERIOR ELEVATIONSINTERIOR ELEVATIONSA451A451A451A451
INTERIOR ELEVATIONSINTERIOR ELEVATIONSINTERIOR ELEVATIONSINTERIOR ELEVATIONSA452A452A452A452
INTERIOR ELEVATIONSINTERIOR ELEVATIONSINTERIOR ELEVATIONSINTERIOR ELEVATIONSA453A453A453A453
AD102AD102AD102AD102
FIRST FLOOR DEMO PLAN - CLC ADMINFIRST FLOOR DEMO PLAN - CLC ADMINFIRST FLOOR DEMO PLAN - CLC ADMINFIRST FLOOR DEMO PLAN - CLC ADMINAD101AD101AD101AD101
FIRST FLOOR DEMO PLAN - DOM CLINICFIRST FLOOR DEMO PLAN - DOM CLINICFIRST FLOOR DEMO PLAN - DOM CLINICFIRST FLOOR DEMO PLAN - DOM CLINIC
DRAWING
TITLE
DRAWING
TITLE
WALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINA351A351A351A351
C151C151C151C151 EROSION & SEDIMENTATION CONTROL (E&S) PLAN-BUILDING 502FEROSION & SEDIMENTATION CONTROL (E&S) PLAN-BUILDING 502FEROSION & SEDIMENTATION CONTROL (E&S) PLAN-BUILDING 502FEROSION & SEDIMENTATION CONTROL (E&S) PLAN-BUILDING 502F
C511C511C511C511 SITE DETAILSSITE DETAILSSITE DETAILSSITE DETAILS
C550C550C550C550 EROSION & SEDIMENTATION CONTROL (E&S) DETAILSEROSION & SEDIMENTATION CONTROL (E&S) DETAILSEROSION & SEDIMENTATION CONTROL (E&S) DETAILSEROSION & SEDIMENTATION CONTROL (E&S) DETAILS
C740C740C740C740 UTILITY PROFILESUTILITY PROFILESUTILITY PROFILESUTILITY PROFILES
S303S303S303S303 CONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILS
S304S304S304S304 CONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILS
S503S503S503S503 STEEL DETAILSSTEEL DETAILSSTEEL DETAILSSTEEL DETAILS
FOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - DOM CLINICFOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - DOM CLINICFOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - DOM CLINICFOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - DOM CLINIC
PL103PL103PL103PL103 FIRST FLOOR PLUMBING PIPING PLAN - CLC ADMINFIRST FLOOR PLUMBING PIPING PLAN - CLC ADMINFIRST FLOOR PLUMBING PIPING PLAN - CLC ADMINFIRST FLOOR PLUMBING PIPING PLAN - CLC ADMIN
PL104PL104PL104PL104 FIRST FLOOR PLUMBING PIPING PLAN - DOM CLINICFIRST FLOOR PLUMBING PIPING PLAN - DOM CLINICFIRST FLOOR PLUMBING PIPING PLAN - DOM CLINICFIRST FLOOR PLUMBING PIPING PLAN - DOM CLINIC
PL201PL201PL201PL201 WASTE, DRAIN, AND VENT PIPING ISOMETRIC RISER DIAGRAMSWASTE, DRAIN, AND VENT PIPING ISOMETRIC RISER DIAGRAMSWASTE, DRAIN, AND VENT PIPING ISOMETRIC RISER DIAGRAMSWASTE, DRAIN, AND VENT PIPING ISOMETRIC RISER DIAGRAMS
PL301PL301PL301PL301 DOMESTIC WATER DISTRIBUTION ISOMETRIC RISER DIAGRAMSDOMESTIC WATER DISTRIBUTION ISOMETRIC RISER DIAGRAMSDOMESTIC WATER DISTRIBUTION ISOMETRIC RISER DIAGRAMSDOMESTIC WATER DISTRIBUTION ISOMETRIC RISER DIAGRAMS
MD101MD101MD101MD101 FIRST FLOOR DEMO PLAN - CLC ADMINFIRST FLOOR DEMO PLAN - CLC ADMINFIRST FLOOR DEMO PLAN - CLC ADMINFIRST FLOOR DEMO PLAN - CLC ADMIN
FIRST FLOOR DEMO PLAN - DOM CLINICFIRST FLOOR DEMO PLAN - DOM CLINICFIRST FLOOR DEMO PLAN - DOM CLINICFIRST FLOOR DEMO PLAN - DOM CLINICMD102MD102MD102MD102
MH101MH101MH101MH101 FIRST FLOOR DUCTWORK PLAN - CLC ADMINFIRST FLOOR DUCTWORK PLAN - CLC ADMINFIRST FLOOR DUCTWORK PLAN - CLC ADMINFIRST FLOOR DUCTWORK PLAN - CLC ADMIN
FIRST FLOOR DUCTWORK PLAN - DOM CLINICFIRST FLOOR DUCTWORK PLAN - DOM CLINICFIRST FLOOR DUCTWORK PLAN - DOM CLINICFIRST FLOOR DUCTWORK PLAN - DOM CLINICMH102MH102MH102MH102
MH103MH103MH103MH103 ROOF PLAN - CLC ADMINROOF PLAN - CLC ADMINROOF PLAN - CLC ADMINROOF PLAN - CLC ADMIN
MH104MH104MH104MH104 ROOF PLAN - DOM CLINICROOF PLAN - DOM CLINICROOF PLAN - DOM CLINICROOF PLAN - DOM CLINIC
MP101MP101MP101MP101 FIRST FLOOR PIPING PLAN - CLC ADMINFIRST FLOOR PIPING PLAN - CLC ADMINFIRST FLOOR PIPING PLAN - CLC ADMINFIRST FLOOR PIPING PLAN - CLC ADMIN
FIRST FLOOR PIPING PLAN - DOM CLINICFIRST FLOOR PIPING PLAN - DOM CLINICFIRST FLOOR PIPING PLAN - DOM CLINICFIRST FLOOR PIPING PLAN - DOM CLINICMP102MP102MP102MP102
DETAILSDETAILSDETAILSDETAILSM501M501M501M501
DETAILSDETAILSDETAILSDETAILSM502M502M502M502
SCHEDULESSCHEDULESSCHEDULESSCHEDULESM601M601M601M601
SCHEDULESSCHEDULESSCHEDULESSCHEDULESM602M602M602M602
CONTROLSCONTROLSCONTROLSCONTROLSM701M701M701M701
EP101EP101EP101EP101
EP102EP102EP102EP102
EY101EY101EY101EY101
EY102EY102EY102EY102
FIRST FLOOR LIGHTING PLAN - DOM CLINICFIRST FLOOR LIGHTING PLAN - DOM CLINICFIRST FLOOR LIGHTING PLAN - DOM CLINICFIRST FLOOR LIGHTING PLAN - DOM CLINIC
FIRST FLOOR POWER PLAN - CLC ADMINFIRST FLOOR POWER PLAN - CLC ADMINFIRST FLOOR POWER PLAN - CLC ADMINFIRST FLOOR POWER PLAN - CLC ADMIN
FIRST FLOOR POWER PLAN - DOM CLINICFIRST FLOOR POWER PLAN - DOM CLINICFIRST FLOOR POWER PLAN - DOM CLINICFIRST FLOOR POWER PLAN - DOM CLINIC
ELECTRICAL SCHEDULESELECTRICAL SCHEDULESELECTRICAL SCHEDULESELECTRICAL SCHEDULESEP601EP601EP601EP601
ELECTRICAL SCHEDULESELECTRICAL SCHEDULESELECTRICAL SCHEDULESELECTRICAL SCHEDULESEP602EP602EP602EP602
EP701EP701EP701EP701 POWER RISER DIAGRAM AND MECHANICAL CONNECTION SCHEDULEPOWER RISER DIAGRAM AND MECHANICAL CONNECTION SCHEDULEPOWER RISER DIAGRAM AND MECHANICAL CONNECTION SCHEDULEPOWER RISER DIAGRAM AND MECHANICAL CONNECTION SCHEDULE
FIRST FLOOR TELELCOMMUNICATIONS PLAN - CLC ADMINISTRATION ADDITIONFIRST FLOOR TELELCOMMUNICATIONS PLAN - CLC ADMINISTRATION ADDITIONFIRST FLOOR TELELCOMMUNICATIONS PLAN - CLC ADMINISTRATION ADDITIONFIRST FLOOR TELELCOMMUNICATIONS PLAN - CLC ADMINISTRATION ADDITION
FIRST FLOOR TELELCOMMUNICATIONS PLAN - DOMICILIARY CLINICFIRST FLOOR TELELCOMMUNICATIONS PLAN - DOMICILIARY CLINICFIRST FLOOR TELELCOMMUNICATIONS PLAN - DOMICILIARY CLINICFIRST FLOOR TELELCOMMUNICATIONS PLAN - DOMICILIARY CLINIC
EY501EY501EY501EY501 TELELCOMMUNICATIONS DETAILSTELELCOMMUNICATIONS DETAILSTELELCOMMUNICATIONS DETAILSTELELCOMMUNICATIONS DETAILS
EY701EY701EY701EY701 TELELCOMMUNICATIONS RISER DIAGRAMSTELELCOMMUNICATIONS RISER DIAGRAMSTELELCOMMUNICATIONS RISER DIAGRAMSTELELCOMMUNICATIONS RISER DIAGRAMS
FIRST FLOOR DIMENSION PLAN - CLC ADMINFIRST FLOOR DIMENSION PLAN - CLC ADMINFIRST FLOOR DIMENSION PLAN - CLC ADMINFIRST FLOOR DIMENSION PLAN - CLC ADMINA101AA101AA101AA101A
FIRST FLOOR DIMENSION PLAN - DOM CLINICFIRST FLOOR DIMENSION PLAN - DOM CLINICFIRST FLOOR DIMENSION PLAN - DOM CLINICFIRST FLOOR DIMENSION PLAN - DOM CLINICA102AA102AA102AA102A
C741C741C741C741 UTILITY PROFILESUTILITY PROFILESUTILITY PROFILESUTILITY PROFILES
ARCHITECTURAL (CONTINUED)ARCHITECTURAL (CONTINUED)ARCHITECTURAL (CONTINUED)ARCHITECTURAL (CONTINUED)
FIRST FLOOR LIFE SAFETY PLAN - CLC ADMINFIRST FLOOR LIFE SAFETY PLAN - CLC ADMINFIRST FLOOR LIFE SAFETY PLAN - CLC ADMINFIRST FLOOR LIFE SAFETY PLAN - CLC ADMINLS101LS101LS101LS101
FIRST FLOOR LIFE SAFETY PLAN - DOM CLINICFIRST FLOOR LIFE SAFETY PLAN - DOM CLINICFIRST FLOOR LIFE SAFETY PLAN - DOM CLINICFIRST FLOOR LIFE SAFETY PLAN - DOM CLINICLS102LS102LS102LS102
FIRST FLOOR HAZARDOUS MATERIAL ABATEMENT PLAN - CLC ADMINFIRST FLOOR HAZARDOUS MATERIAL ABATEMENT PLAN - CLC ADMINFIRST FLOOR HAZARDOUS MATERIAL ABATEMENT PLAN - CLC ADMINFIRST FLOOR HAZARDOUS MATERIAL ABATEMENT PLAN - CLC ADMINHM101HM101HM101HM101
FIRST FLOOR HAZARDOUS MATERIAL ABATEMENT PLAN - DOM CLINICFIRST FLOOR HAZARDOUS MATERIAL ABATEMENT PLAN - DOM CLINICFIRST FLOOR HAZARDOUS MATERIAL ABATEMENT PLAN - DOM CLINICFIRST FLOOR HAZARDOUS MATERIAL ABATEMENT PLAN - DOM CLINICHM102HM102HM102HM102
WALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINA352A352A352A352
WALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINA353A353A353A353
WALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINA354A354A354A354
WALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINA355A355A355A355
WALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINA356A356A356A356
WALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINA357A357A357A357
WALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINA358A358A358A358
WALL SECTIONS - DOM CLINICWALL SECTIONS - DOM CLINICWALL SECTIONS - DOM CLINICWALL SECTIONS - DOM CLINICA361A361A361A361
WALL SECTIONS - DOM CLINICWALL SECTIONS - DOM CLINICWALL SECTIONS - DOM CLINICWALL SECTIONS - DOM CLINICA362A362A362A362
ENLARGED FLOOR PLANSENLARGED FLOOR PLANSENLARGED FLOOR PLANSENLARGED FLOOR PLANSA401A401A401A401
S504S504S504S504 STEEL DETAILSSTEEL DETAILSSTEEL DETAILSSTEEL DETAILS
PL105PL105PL105PL105 ROOF PLAN PLUMBING PIPING PLAN - CLC ADMINROOF PLAN PLUMBING PIPING PLAN - CLC ADMINROOF PLAN PLUMBING PIPING PLAN - CLC ADMINROOF PLAN PLUMBING PIPING PLAN - CLC ADMIN
PL108PL108PL108PL108 FIRST FLOOR PLUMBING PIPING PLAN - CLC ADMIN BID ALTERNATE 5FIRST FLOOR PLUMBING PIPING PLAN - CLC ADMIN BID ALTERNATE 5FIRST FLOOR PLUMBING PIPING PLAN - CLC ADMIN BID ALTERNATE 5FIRST FLOOR PLUMBING PIPING PLAN - CLC ADMIN BID ALTERNATE 5
MH401MH401MH401MH401 ENLARGED PLANSENLARGED PLANSENLARGED PLANSENLARGED PLANS
ELECTRICAL DEMOLITION PLAN - CLC ADMINELECTRICAL DEMOLITION PLAN - CLC ADMINELECTRICAL DEMOLITION PLAN - CLC ADMINELECTRICAL DEMOLITION PLAN - CLC ADMINED101ED101ED101ED101
EP103EP103EP103EP103 ROOF POWER, LIGHTNING PROTECTION, AND GROUNDING PLANS - CLC ADMIN AND DOM CLINICROOF POWER, LIGHTNING PROTECTION, AND GROUNDING PLANS - CLC ADMIN AND DOM CLINICROOF POWER, LIGHTNING PROTECTION, AND GROUNDING PLANS - CLC ADMIN AND DOM CLINICROOF POWER, LIGHTNING PROTECTION, AND GROUNDING PLANS - CLC ADMIN AND DOM CLINIC
EP501EP501EP501EP501 ELECTRICAL DETAILSELECTRICAL DETAILSELECTRICAL DETAILSELECTRICAL DETAILS
SIGNAGE TYPESSIGNAGE TYPESSIGNAGE TYPESSIGNAGE TYPESA701A701A701A701
FRAMING DETAILSFRAMING DETAILSFRAMING DETAILSFRAMING DETAILSA502A502A502A502
PLAN DETAILSPLAN DETAILSPLAN DETAILSPLAN DETAILSA511A511A511A511
PLAN DETAILSPLAN DETAILSPLAN DETAILSPLAN DETAILSA512A512A512A512
G003G003G003G003 FIRST FLOOR DEDUCTIVE ALTERNATE PLAN - ALTERNATE NO. 5 (BID ITEM NO. 6)FIRST FLOOR DEDUCTIVE ALTERNATE PLAN - ALTERNATE NO. 5 (BID ITEM NO. 6)FIRST FLOOR DEDUCTIVE ALTERNATE PLAN - ALTERNATE NO. 5 (BID ITEM NO. 6)FIRST FLOOR DEDUCTIVE ALTERNATE PLAN - ALTERNATE NO. 5 (BID ITEM NO. 6)
FIRST FLOOR PNEUMATIC TUBE SYSTEM PLAN - CLC ADMINFIRST FLOOR PNEUMATIC TUBE SYSTEM PLAN - CLC ADMINFIRST FLOOR PNEUMATIC TUBE SYSTEM PLAN - CLC ADMINFIRST FLOOR PNEUMATIC TUBE SYSTEM PLAN - CLC ADMINA131A131A131A131
FIRST FLOOR PNEUMATIC TUBE SYSTEM PLAN - DOM CLINICFIRST FLOOR PNEUMATIC TUBE SYSTEM PLAN - DOM CLINICFIRST FLOOR PNEUMATIC TUBE SYSTEM PLAN - DOM CLINICFIRST FLOOR PNEUMATIC TUBE SYSTEM PLAN - DOM CLINICA132A132A132A132
PLAN DETAILSPLAN DETAILSPLAN DETAILSPLAN DETAILSA513A513A513A513
SECTION DETAILSSECTION DETAILSSECTION DETAILSSECTION DETAILSA521A521A521A521
SECTION DETAILSSECTION DETAILSSECTION DETAILSSECTION DETAILSA522A522A522A522
ROOF DETAILSROOF DETAILSROOF DETAILSROOF DETAILSA531A531A531A531
EXTERIOR INSULATION FINISHING SYSTEM DETAILSEXTERIOR INSULATION FINISHING SYSTEM DETAILSEXTERIOR INSULATION FINISHING SYSTEM DETAILSEXTERIOR INSULATION FINISHING SYSTEM DETAILSA541A541A541A541
S003S003S003S003 STRUCTURAL NOTESSTRUCTURAL NOTESSTRUCTURAL NOTESSTRUCTURAL NOTES
PL106PL106PL106PL106 ROOF PLAN PLUMBING PIPING PLAN - DOM CLINICROOF PLAN PLUMBING PIPING PLAN - DOM CLINICROOF PLAN PLUMBING PIPING PLAN - DOM CLINICROOF PLAN PLUMBING PIPING PLAN - DOM CLINIC
PL107PL107PL107PL107 FOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - CLC ADMIN BID ALTERNATE 5FOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - CLC ADMIN BID ALTERNATE 5FOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - CLC ADMIN BID ALTERNATE 5FOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - CLC ADMIN BID ALTERNATE 5
MH105MH105MH105MH105 FIRST FLOOR MECHANICAL PLAN - CLC ADMIN - ALTERNATE No.5 - (BID ITEM No.6)FIRST FLOOR MECHANICAL PLAN - CLC ADMIN - ALTERNATE No.5 - (BID ITEM No.6)FIRST FLOOR MECHANICAL PLAN - CLC ADMIN - ALTERNATE No.5 - (BID ITEM No.6)FIRST FLOOR MECHANICAL PLAN - CLC ADMIN - ALTERNATE No.5 - (BID ITEM No.6)
EP104EP104EP104EP104 FIRST FLOOR ELECTRICAL PLAN - CLC ADMIN - ALTERNATE No.5 - (BID ITEM No.6)FIRST FLOOR ELECTRICAL PLAN - CLC ADMIN - ALTERNATE No.5 - (BID ITEM No.6)FIRST FLOOR ELECTRICAL PLAN - CLC ADMIN - ALTERNATE No.5 - (BID ITEM No.6)FIRST FLOOR ELECTRICAL PLAN - CLC ADMIN - ALTERNATE No.5 - (BID ITEM No.6)
ROOF DETAILSROOF DETAILSROOF DETAILSROOF DETAILSA532A532A532A532
WINDOW AND LOUVER TYPES AND DETAILSWINDOW AND LOUVER TYPES AND DETAILSWINDOW AND LOUVER TYPES AND DETAILSWINDOW AND LOUVER TYPES AND DETAILSA612A612A612A612
S305S305S305S305 CONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILS
TRUETRUETRUETRUE
NORTHNORTHNORTHNORTH
TRUETRUETRUETRUE
NORTHNORTHNORTHNORTH
VI
I N
TSEFO
A
W
S T
T A
E GR
I
A RCH IT
D
CE
T
I RETSGER
E
ALAN J. TOLAND
NO. 4071
th re e in ch es o ne fo ot
6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
CONSULTANTS: ARCHITECT/ENGINEERS:
590 MEANS ST NW ATLANTA, GA 30318
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Number:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
BID DOCUMENTS
COVER SHEET CONSTRUCT DOM CLINIC
AND CLC ADMINISTRATION
ADDITION
MARTINSBURG, WV
G001
613-121
June 27, 2018 PB SJ
MARTINSBURG VA MEDICAL CENTER
CONSTRUCT DOM CLINIC AND
CLC ADMINISTRIATION ADDITION
510 BUTLER AVENUE
MARTINSBURG, WV 25405
PROJECT NO. 613-121
BID DOCUMENTS
AREA MAPAREA MAPAREA MAPAREA MAP
NOT TO SCALENOT TO SCALENOT TO SCALENOT TO SCALE
LOCATION MAPLOCATION MAPLOCATION MAPLOCATION MAP
NOT TO SCALENOT TO SCALENOT TO SCALENOT TO SCALE
501D & 502F
ARCHITECTURAL ABBREVIATIONSARCHITECTURAL LEGENDARCHITECTURAL GENERAL NOTES
GENERAL PROJECT NOTES
AAAA
123123123123
GA4GA4GA4GA4
A301A301A301A301
A201A201A201A201
A401A401A401A401
ROOMROOMROOMROOM
NAMENAMENAMENAME
123123123123
+ 0'-6"+ 0'-6"+ 0'-6"+ 0'-6"
F.E.C.F.E.C.F.E.C.F.E.C.
AIR CONDITIONINGAIR CONDITIONINGAIR CONDITIONINGAIR CONDITIONING
ACOUSTICAL CEILING TILEACOUSTICAL CEILING TILEACOUSTICAL CEILING TILEACOUSTICAL CEILING TILE
ABOVE FINISH FLOORABOVE FINISH FLOORABOVE FINISH FLOORABOVE FINISH FLOOR
ALUMINUMALUMINUMALUMINUMALUMINUM
BATT INSULATIONBATT INSULATIONBATT INSULATIONBATT INSULATION
BOTTOM OFBOTTOM OFBOTTOM OFBOTTOM OF
CEMENTITIOUS BACKER BOARDCEMENTITIOUS BACKER BOARDCEMENTITIOUS BACKER BOARDCEMENTITIOUS BACKER BOARD CEMENTITIOUS CRYSTALLINE WATERPROOFINGCEMENTITIOUS CRYSTALLINE WATERPROOFINGCEMENTITIOUS CRYSTALLINE WATERPROOFINGCEMENTITIOUS CRYSTALLINE WATERPROOFING COLD-FORMED METAL FRAMINGCOLD-FORMED METAL FRAMINGCOLD-FORMED METAL FRAMINGCOLD-FORMED METAL FRAMING
CORNER GUARDCORNER GUARDCORNER GUARDCORNER GUARD
CENTERLINECENTERLINECENTERLINECENTERLINE
CERAMIC MOSAIC TILECERAMIC MOSAIC TILECERAMIC MOSAIC TILECERAMIC MOSAIC TILE
CONCRETE MASONRY UNITCONCRETE MASONRY UNITCONCRETE MASONRY UNITCONCRETE MASONRY UNIT
CASED OPENINGCASED OPENINGCASED OPENINGCASED OPENING
COMMUNICATIONCOMMUNICATIONCOMMUNICATIONCOMMUNICATION
CONCRETECONCRETECONCRETECONCRETE
CONCRETE WITH SEALERCONCRETE WITH SEALERCONCRETE WITH SEALERCONCRETE WITH SEALER
CONTINUOUSCONTINUOUSCONTINUOUSCONTINUOUS
CONTRACTING OFFICER'S REPRESENTATIVECONTRACTING OFFICER'S REPRESENTATIVECONTRACTING OFFICER'S REPRESENTATIVECONTRACTING OFFICER'S REPRESENTATIVE CONTRACTING OFFICER'S TECHNICALCONTRACTING OFFICER'S TECHNICALCONTRACTING OFFICER'S TECHNICALCONTRACTING OFFICER'S TECHNICAL
REPRESENTATIVEREPRESENTATIVEREPRESENTATIVEREPRESENTATIVE
CERAMIC TILECERAMIC TILECERAMIC TILECERAMIC TILE
CERAMIC TILE BASECERAMIC TILE BASECERAMIC TILE BASECERAMIC TILE BASE
CARPETCARPETCARPETCARPET
DIAMETERDIAMETERDIAMETERDIAMETER
EXPANSION JOINTEXPANSION JOINTEXPANSION JOINTEXPANSION JOINT
ELECTRICALELECTRICALELECTRICALELECTRICAL
EQUALEQUALEQUALEQUAL
EXPOSED STRUCTUREEXPOSED STRUCTUREEXPOSED STRUCTUREEXPOSED STRUCTURE
ET CETERAET CETERAET CETERAET CETERA
EXISTINGEXISTINGEXISTINGEXISTING
EXPOSEDEXPOSEDEXPOSEDEXPOSED
FACTORY FINISHFACTORY FINISHFACTORY FINISHFACTORY FINISH
FLOOR DRAINFLOOR DRAINFLOOR DRAINFLOOR DRAIN
FIRE EXTINGUISHER CABINETFIRE EXTINGUISHER CABINETFIRE EXTINGUISHER CABINETFIRE EXTINGUISHER CABINET
FIRE HOSE CABINETFIRE HOSE CABINETFIRE HOSE CABINETFIRE HOSE CABINET
FINISHED FLOORFINISHED FLOORFINISHED FLOORFINISHED FLOOR
FINISHFINISHFINISHFINISH
FLOORFLOORFLOORFLOOR
FACE OFFACE OFFACE OFFACE OF
FIELD VERIFYFIELD VERIFYFIELD VERIFYFIELD VERIFY
(PRIOR TO ORDERING OR CUTTING)(PRIOR TO ORDERING OR CUTTING)(PRIOR TO ORDERING OR CUTTING)(PRIOR TO ORDERING OR CUTTING)
FABRIC WALLCOVERINGFABRIC WALLCOVERINGFABRIC WALLCOVERINGFABRIC WALLCOVERING
GAGEGAGEGAGEGAGE
GRANITEGRANITEGRANITEGRANITE
GYPSUM (WALL) BOARDGYPSUM (WALL) BOARDGYPSUM (WALL) BOARDGYPSUM (WALL) BOARD
HANDICAPPEDHANDICAPPEDHANDICAPPEDHANDICAPPED
HOLLOW METALHOLLOW METALHOLLOW METALHOLLOW METAL
HANDRAILHANDRAILHANDRAILHANDRAIL
HEATING VENTILATION AND AIR-CONDITIONINGHEATING VENTILATION AND AIR-CONDITIONINGHEATING VENTILATION AND AIR-CONDITIONINGHEATING VENTILATION AND AIR-CONDITIONING
MATERIALMATERIALMATERIALMATERIAL
MAXIMUMMAXIMUMMAXIMUMMAXIMUM
MECHANICALMECHANICALMECHANICALMECHANICAL
MANUFACTURERMANUFACTURERMANUFACTURERMANUFACTURER
MINIMUMMINIMUMMINIMUMMINIMUM
MASONRY OPENINGMASONRY OPENINGMASONRY OPENINGMASONRY OPENING
METALMETALMETALMETAL
NOT IN CONTRACTNOT IN CONTRACTNOT IN CONTRACTNOT IN CONTRACT
NOT TO SCALENOT TO SCALENOT TO SCALENOT TO SCALE
ON CENTERON CENTERON CENTERON CENTER
OPPOSITE HANDOPPOSITE HANDOPPOSITE HANDOPPOSITE HAND
PORCELAIN BASEPORCELAIN BASEPORCELAIN BASEPORCELAIN BASE
PLASTERPLASTERPLASTERPLASTER
PLASTIC LAMINATEPLASTIC LAMINATEPLASTIC LAMINATEPLASTIC LAMINATE
PORCELAIN TILEPORCELAIN TILEPORCELAIN TILEPORCELAIN TILE
PAIRPAIRPAIRPAIR
PAINTPAINTPAINTPAINT
QUARRY TILEQUARRY TILEQUARRY TILEQUARRY TILE
RESILIENT BASERESILIENT BASERESILIENT BASERESILIENT BASE
REFRIGERATORREFRIGERATORREFRIGERATORREFRIGERATOR
REQUIREDREQUIREDREQUIREDREQUIRED
RESINOUS FLOORINGRESINOUS FLOORINGRESINOUS FLOORINGRESINOUS FLOORING
RESINOUS EPOXY WALL-CEILINGRESINOUS EPOXY WALL-CEILINGRESINOUS EPOXY WALL-CEILINGRESINOUS EPOXY WALL-CEILING
ROUGH OPENINGROUGH OPENINGROUGH OPENINGROUGH OPENING
RUBBER FLOORINGRUBBER FLOORINGRUBBER FLOORINGRUBBER FLOORING
RECESSED PAPER HOLDERRECESSED PAPER HOLDERRECESSED PAPER HOLDERRECESSED PAPER HOLDER SEALED HIGH BUILD GLAZED COATINGSEALED HIGH BUILD GLAZED COATINGSEALED HIGH BUILD GLAZED COATINGSEALED HIGH BUILD GLAZED COATING
(SPECIAL COATING)(SPECIAL COATING)(SPECIAL COATING)(SPECIAL COATING)
SOAP DISPENSERSOAP DISPENSERSOAP DISPENSERSOAP DISPENSER
SOLID CORE WOODSOLID CORE WOODSOLID CORE WOODSOLID CORE WOOD
SIMILARSIMILARSIMILARSIMILAR
SANITARY NAPKIN DISPENSERSANITARY NAPKIN DISPENSERSANITARY NAPKIN DISPENSERSANITARY NAPKIN DISPENSER
SPECIAL FACEDSPECIAL FACEDSPECIAL FACEDSPECIAL FACED
STAINLESS STEEL/SOLID SURFACESTAINLESS STEEL/SOLID SURFACESTAINLESS STEEL/SOLID SURFACESTAINLESS STEEL/SOLID SURFACE
STEELSTEELSTEELSTEEL
SUBSTRATESUBSTRATESUBSTRATESUBSTRATE
SHEET VINYLSHEET VINYLSHEET VINYLSHEET VINYL
SOLID VINYL TILESOLID VINYL TILESOLID VINYL TILESOLID VINYL TILE
TACK BOARDTACK BOARDTACK BOARDTACK BOARD
TELEPHONETELEPHONETELEPHONETELEPHONE
TOP OFTOP OFTOP OFTOP OF
TOILET PAPERTOILET PAPERTOILET PAPERTOILET PAPER
TYPICALTYPICALTYPICALTYPICAL
UNLESS NOTED OTHERWISEUNLESS NOTED OTHERWISEUNLESS NOTED OTHERWISEUNLESS NOTED OTHERWISE VINYL COMPOSITION TILEVINYL COMPOSITION TILEVINYL COMPOSITION TILEVINYL COMPOSITION TILE
VINYL WALL COVERINGVINYL WALL COVERINGVINYL WALL COVERINGVINYL WALL COVERING
WALL COVERINGWALL COVERINGWALL COVERINGWALL COVERING
WALL PROTECTIONWALL PROTECTIONWALL PROTECTIONWALL PROTECTION
WOODWOODWOODWOOD
WELDED SEAM SHEET FLOORINGWELDED SEAM SHEET FLOORINGWELDED SEAM SHEET FLOORINGWELDED SEAM SHEET FLOORING (HEAT WELDED WITH ROD)(HEAT WELDED WITH ROD)(HEAT WELDED WITH ROD)(HEAT WELDED WITH ROD)
ACACACAC
ATATATAT
AFFAFFAFFAFF
ALUMALUMALUMALUM
BATTBATTBATTBATT
BOBOBOBO
CBBCBBCBBCBB
CCWCCWCCWCCW
CFMFCFMFCFMFCFMF
CGCGCGCG
CCCC
CMTCMTCMTCMT
CMUCMUCMUCMU
COCOCOCO
COMMCOMMCOMMCOMM
CONCCONCCONCCONC
CONC-SCONC-SCONC-SCONC-S
CONTCONTCONTCONT
CORCORCORCOR
COTRCOTRCOTRCOTR
CTCTCTCT
CTBCTBCTBCTB
CPCPCPCP
DIADIADIADIA
EJEJEJEJ
ELECELECELECELEC
EQEQEQEQ
ESESESES
ETCETCETCETC
EXISTEXISTEXISTEXIST
EXPEXPEXPEXP
FAC FINFAC FINFAC FINFAC FIN
FDFDFDFD
FECFECFECFEC
FHCFHCFHCFHC
FFFFFFFF
FINFINFINFIN
FLRFLRFLRFLR
FOFOFOFO
FVFVFVFV
FWCFWCFWCFWC
GAGAGAGA
GRAGRAGRAGRA
GYP BD/GWBGYP BD/GWBGYP BD/GWBGYP BD/GWB
HCHCHCHC
HMHMHMHM
HRHRHRHR
HVACHVACHVACHVAC
MATLMATLMATLMATL
MAXMAXMAXMAX
MECHMECHMECHMECH
MFRMFRMFRMFR
MINMINMINMIN
MOMOMOMO
MTLMTLMTLMTL
NICNICNICNIC
NTSNTSNTSNTS
OCOCOCOC
OHOHOHOH
PBPBPBPB
PLSPLSPLSPLS
PLPLPLPL
PTPTPTPT
PRPRPRPR
PPPP
QTQTQTQT
RBRBRBRB
REFREFREFREF
REQ'DREQ'DREQ'DREQ'D
RES-2RES-2RES-2RES-2
RES-WRES-WRES-WRES-W
RORORORO
RFRFRFRF
RPHRPHRPHRPH
SCSCSCSC
SDSDSDSD
SCWSCWSCWSCW
SIMSIMSIMSIM
SNDSNDSNDSND
SPSPSPSP
SSSSSSSS
STLSTLSTLSTL
SUBSSUBSSUBSSUBS
SVSVSVSV
SVTSVTSVTSVT
TBTBTBTB
TELETELETELETELE
TOTOTOTO
TPTPTPTP
TYPTYPTYPTYP
UNOUNOUNOUNO
VCTVCTVCTVCT
VWCVWCVWCVWC
WCWCWCWC
WPWPWPWP
WDWDWDWD
WSFWSFWSFWSF
LLLL
FIRE EXTINGUISHER CABINETFIRE EXTINGUISHER CABINETFIRE EXTINGUISHER CABINETFIRE EXTINGUISHER CABINET
ROOM NAME AND NUMBERROOM NAME AND NUMBERROOM NAME AND NUMBERROOM NAME AND NUMBER
DOOR NUMBERDOOR NUMBERDOOR NUMBERDOOR NUMBER
KEYED NOTEKEYED NOTEKEYED NOTEKEYED NOTE
WINDOW TYPEWINDOW TYPEWINDOW TYPEWINDOW TYPE
PARTITION TYPE OR TOILET ACCESSORYPARTITION TYPE OR TOILET ACCESSORYPARTITION TYPE OR TOILET ACCESSORYPARTITION TYPE OR TOILET ACCESSORY
DETAIL CALLOUTDETAIL CALLOUTDETAIL CALLOUTDETAIL CALLOUT
DETAIL NUMBERDETAIL NUMBERDETAIL NUMBERDETAIL NUMBER
SHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWN
SECTION CALLOUTSECTION CALLOUTSECTION CALLOUTSECTION CALLOUT
VERTICAL ELEVATIONVERTICAL ELEVATIONVERTICAL ELEVATIONVERTICAL ELEVATION
COLUMN CENTERLINE DESIGNATIONCOLUMN CENTERLINE DESIGNATIONCOLUMN CENTERLINE DESIGNATIONCOLUMN CENTERLINE DESIGNATION
DEMOLITION NOTEDEMOLITION NOTEDEMOLITION NOTEDEMOLITION NOTE
DETAIL NUMBERDETAIL NUMBERDETAIL NUMBERDETAIL NUMBER
SHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWN
ELEVATION CALLOUTELEVATION CALLOUTELEVATION CALLOUTELEVATION CALLOUT
DETAIL NUMBERDETAIL NUMBERDETAIL NUMBERDETAIL NUMBER
SHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWN
A.A.A.A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO:DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO:DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO:DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO:
FACE OF NEW MASONRYFACE OF NEW MASONRYFACE OF NEW MASONRYFACE OF NEW MASONRY
FACE OF NEW WALL STUDSFACE OF NEW WALL STUDSFACE OF NEW WALL STUDSFACE OF NEW WALL STUDS
TOP OF SLABTOP OF SLABTOP OF SLABTOP OF SLAB
TOP OF MASONRYTOP OF MASONRYTOP OF MASONRYTOP OF MASONRY
B.B.B.B. COORDINATE WITH ELECTRICAL, HVAC, PLUMBING, AND FIRE PROTECTIONCOORDINATE WITH ELECTRICAL, HVAC, PLUMBING, AND FIRE PROTECTIONCOORDINATE WITH ELECTRICAL, HVAC, PLUMBING, AND FIRE PROTECTIONCOORDINATE WITH ELECTRICAL, HVAC, PLUMBING, AND FIRE PROTECTION DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE DUCT, CONDUIT,DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE DUCT, CONDUIT,DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE DUCT, CONDUIT,DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE DUCT, CONDUIT, AND PIPE OPENINGS IN SLABS, ROOF, AND WALLS. COORDINATE DUCT,AND PIPE OPENINGS IN SLABS, ROOF, AND WALLS. COORDINATE DUCT,AND PIPE OPENINGS IN SLABS, ROOF, AND WALLS. COORDINATE DUCT,AND PIPE OPENINGS IN SLABS, ROOF, AND WALLS. COORDINATE DUCT, CONDUIT, AND PIPE ROUTING ABOVE CEILINGS. PATCH HOLES CAUSEDCONDUIT, AND PIPE ROUTING ABOVE CEILINGS. PATCH HOLES CAUSEDCONDUIT, AND PIPE ROUTING ABOVE CEILINGS. PATCH HOLES CAUSEDCONDUIT, AND PIPE ROUTING ABOVE CEILINGS. PATCH HOLES CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLS,BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLS,BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLS,BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLS, ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE,ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE,ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE,ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE, MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY.MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY.MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY.MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY.
C.C.C.C. COORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED WOOD BLOCKINGCOORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED WOOD BLOCKINGCOORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED WOOD BLOCKINGCOORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED WOOD BLOCKING FOR WALL HOOKS, BRACKETS, GRAB BARS, COMPUTER MONITORS,FOR WALL HOOKS, BRACKETS, GRAB BARS, COMPUTER MONITORS,FOR WALL HOOKS, BRACKETS, GRAB BARS, COMPUTER MONITORS,FOR WALL HOOKS, BRACKETS, GRAB BARS, COMPUTER MONITORS, TELEVISION WALL BRACKETS, HANDRAILS, GUARDRAILS, WOOD MOLDINGS,TELEVISION WALL BRACKETS, HANDRAILS, GUARDRAILS, WOOD MOLDINGS,TELEVISION WALL BRACKETS, HANDRAILS, GUARDRAILS, WOOD MOLDINGS,TELEVISION WALL BRACKETS, HANDRAILS, GUARDRAILS, WOOD MOLDINGS, DISPLAYS, ACCESSORIES ETC., BETWEEN STUDS. COORDINATE LOCATIONSDISPLAYS, ACCESSORIES ETC., BETWEEN STUDS. COORDINATE LOCATIONSDISPLAYS, ACCESSORIES ETC., BETWEEN STUDS. COORDINATE LOCATIONSDISPLAYS, ACCESSORIES ETC., BETWEEN STUDS. COORDINATE LOCATIONS WITH COR FOR GOVERNMENT FURNISHED EQUIPMENT.WITH COR FOR GOVERNMENT FURNISHED EQUIPMENT.WITH COR FOR GOVERNMENT FURNISHED EQUIPMENT.WITH COR FOR GOVERNMENT FURNISHED EQUIPMENT.
D.D.D.D. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE,`PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE,`PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE,`PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEMHANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEMHANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEMHANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM
INDICATED.INDICATED.INDICATED.INDICATED.
E.E.E.E. SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATEDSEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATEDSEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATEDSEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATED PARTITIONS AND FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOPPARTITIONS AND FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOPPARTITIONS AND FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOPPARTITIONS AND FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF THE WALL OR SLAB. SUBMIT CUT SHEETSTO MAINTAIN THE RATING OF THE WALL OR SLAB. SUBMIT CUT SHEETSTO MAINTAIN THE RATING OF THE WALL OR SLAB. SUBMIT CUT SHEETSTO MAINTAIN THE RATING OF THE WALL OR SLAB. SUBMIT CUT SHEETS AND SPECIFICATIONS TO THE COR FOR APPROVAL PRIOR TO INSTALLATION.AND SPECIFICATIONS TO THE COR FOR APPROVAL PRIOR TO INSTALLATION.AND SPECIFICATIONS TO THE COR FOR APPROVAL PRIOR TO INSTALLATION.AND SPECIFICATIONS TO THE COR FOR APPROVAL PRIOR TO INSTALLATION.
PROVIDE UL LISTED ASSEMBLIES.PROVIDE UL LISTED ASSEMBLIES.PROVIDE UL LISTED ASSEMBLIES.PROVIDE UL LISTED ASSEMBLIES.
F.F.F.F. COORDINATE CONTRACTOR DUMPSTER LOCATION WITH GOVERNMENT.COORDINATE CONTRACTOR DUMPSTER LOCATION WITH GOVERNMENT.COORDINATE CONTRACTOR DUMPSTER LOCATION WITH GOVERNMENT.COORDINATE CONTRACTOR DUMPSTER LOCATION WITH GOVERNMENT.
DUMPSTER LOCATION TO BE IDENTIFIED PRIOR TO BIDDING.DUMPSTER LOCATION TO BE IDENTIFIED PRIOR TO BIDDING.DUMPSTER LOCATION TO BE IDENTIFIED PRIOR TO BIDDING.DUMPSTER LOCATION TO BE IDENTIFIED PRIOR TO BIDDING.
G.G.G.G. COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES.COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES.COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES.COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES.
H.H.H.H.
I.I.I.I.
REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS ANDREMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS ANDREMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS ANDREMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS REQUIRED FOR NEW CONSTRUCTION.AS REQUIRED FOR NEW CONSTRUCTION.AS REQUIRED FOR NEW CONSTRUCTION.AS REQUIRED FOR NEW CONSTRUCTION.
A.A.A.A. THE CONTRACTOR SHALL BE PREPARED TO STOP ANY WORK AND CLEAR UPTHE CONTRACTOR SHALL BE PREPARED TO STOP ANY WORK AND CLEAR UPTHE CONTRACTOR SHALL BE PREPARED TO STOP ANY WORK AND CLEAR UPTHE CONTRACTOR SHALL BE PREPARED TO STOP ANY WORK AND CLEAR UP THE WORK AREA IF SO ASKED IN MEDICAL SITUATIONS REQUIRING SUCHTHE WORK AREA IF SO ASKED IN MEDICAL SITUATIONS REQUIRING SUCHTHE WORK AREA IF SO ASKED IN MEDICAL SITUATIONS REQUIRING SUCHTHE WORK AREA IF SO ASKED IN MEDICAL SITUATIONS REQUIRING SUCH
ACTION.ACTION.ACTION.ACTION.
B.B.B.B. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS ORTHE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS ORTHE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS ORTHE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED.EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED.EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED.EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED.
C.C.C.C. ALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLYALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLYALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLYALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED AT ALL TIMES BY THE CONTRACTOR TO REDUCE POSSIBILITY OFSECURED AT ALL TIMES BY THE CONTRACTOR TO REDUCE POSSIBILITY OFSECURED AT ALL TIMES BY THE CONTRACTOR TO REDUCE POSSIBILITY OFSECURED AT ALL TIMES BY THE CONTRACTOR TO REDUCE POSSIBILITY OF ANY OF THESE TOOLS BEING A HAZARD TO PATIENTS, VISITORS, ORANY OF THESE TOOLS BEING A HAZARD TO PATIENTS, VISITORS, ORANY OF THESE TOOLS BEING A HAZARD TO PATIENTS, VISITORS, ORANY OF THESE TOOLS BEING A HAZARD TO PATIENTS, VISITORS, OR
EMPLOYEES.EMPLOYEES.EMPLOYEES.EMPLOYEES.
D.D.D.D. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FORTHE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FORTHE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FORTHE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIREDEACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIREDEACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIREDEACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE WITH COR.TO RECEIVE BADGES. COORDINATE WITH COR.TO RECEIVE BADGES. COORDINATE WITH COR.TO RECEIVE BADGES. COORDINATE WITH COR.
E.E.E.E. THE CONTRACTOR, AT HIS EXPENSE, WILL BE RESPONSIBLE FOR TRAININGTHE CONTRACTOR, AT HIS EXPENSE, WILL BE RESPONSIBLE FOR TRAININGTHE CONTRACTOR, AT HIS EXPENSE, WILL BE RESPONSIBLE FOR TRAININGTHE CONTRACTOR, AT HIS EXPENSE, WILL BE RESPONSIBLE FOR TRAINING EACH MEMBER OF HIS WORK FORCE ON VA POLICIES FOR ON-SITE WORKEACH MEMBER OF HIS WORK FORCE ON VA POLICIES FOR ON-SITE WORKEACH MEMBER OF HIS WORK FORCE ON VA POLICIES FOR ON-SITE WORKEACH MEMBER OF HIS WORK FORCE ON VA POLICIES FOR ON-SITE WORK BEFORE ANY MEMBER WILL BE ALLOWED TO PERFORM WORK ON VABEFORE ANY MEMBER WILL BE ALLOWED TO PERFORM WORK ON VABEFORE ANY MEMBER WILL BE ALLOWED TO PERFORM WORK ON VABEFORE ANY MEMBER WILL BE ALLOWED TO PERFORM WORK ON VA
PREMISES.PREMISES.PREMISES.PREMISES.
F.F.F.F. ABSOLUTELY NO VA TOOLS, MATERIALS, OR EQUIPMENT WILL BE LOANED ORABSOLUTELY NO VA TOOLS, MATERIALS, OR EQUIPMENT WILL BE LOANED ORABSOLUTELY NO VA TOOLS, MATERIALS, OR EQUIPMENT WILL BE LOANED ORABSOLUTELY NO VA TOOLS, MATERIALS, OR EQUIPMENT WILL BE LOANED OR GIVEN BY THE VA TO ANY MEMBER OF THE CONTRACTOR'S WORK FORCEGIVEN BY THE VA TO ANY MEMBER OF THE CONTRACTOR'S WORK FORCEGIVEN BY THE VA TO ANY MEMBER OF THE CONTRACTOR'S WORK FORCEGIVEN BY THE VA TO ANY MEMBER OF THE CONTRACTOR'S WORK FORCE
AT ANY TIME.AT ANY TIME.AT ANY TIME.AT ANY TIME.
G.G.G.G. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TOANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TOANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TOANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE, DUST, AND DEBRIS SHALL BE SUITABLYCONSTRUCTION SMOKE, DUST, AND DEBRIS SHALL BE SUITABLYCONSTRUCTION SMOKE, DUST, AND DEBRIS SHALL BE SUITABLYCONSTRUCTION SMOKE, DUST, AND DEBRIS SHALL BE SUITABLY PROTECTED TO PREVENT ACCIDENTAL ALARM DURING CONSTRUCTION. ALLPROTECTED TO PREVENT ACCIDENTAL ALARM DURING CONSTRUCTION. ALLPROTECTED TO PREVENT ACCIDENTAL ALARM DURING CONSTRUCTION. ALLPROTECTED TO PREVENT ACCIDENTAL ALARM DURING CONSTRUCTION. ALL SUCH ACTION MUST BE FIRST COORDINATED AND CLEARED WITH CORSUCH ACTION MUST BE FIRST COORDINATED AND CLEARED WITH CORSUCH ACTION MUST BE FIRST COORDINATED AND CLEARED WITH CORSUCH ACTION MUST BE FIRST COORDINATED AND CLEARED WITH COR AND THE VA SAFETY OFFICER. ALL FUNCTIONAL FIRE ALARM DEVICESAND THE VA SAFETY OFFICER. ALL FUNCTIONAL FIRE ALARM DEVICESAND THE VA SAFETY OFFICER. ALL FUNCTIONAL FIRE ALARM DEVICESAND THE VA SAFETY OFFICER. ALL FUNCTIONAL FIRE ALARM DEVICES SHALL BE ACTIVE WHENEVER CONTRACTOR'S FORCES ARE NOT PRESENTSHALL BE ACTIVE WHENEVER CONTRACTOR'S FORCES ARE NOT PRESENTSHALL BE ACTIVE WHENEVER CONTRACTOR'S FORCES ARE NOT PRESENTSHALL BE ACTIVE WHENEVER CONTRACTOR'S FORCES ARE NOT PRESENT
IN WORK AREA.IN WORK AREA.IN WORK AREA.IN WORK AREA.
H.H.H.H. THE CONTRACTOR MUST PROVIDE WRITTEN FIRE SAFETY CHECKLIST AT THETHE CONTRACTOR MUST PROVIDE WRITTEN FIRE SAFETY CHECKLIST AT THETHE CONTRACTOR MUST PROVIDE WRITTEN FIRE SAFETY CHECKLIST AT THETHE CONTRACTOR MUST PROVIDE WRITTEN FIRE SAFETY CHECKLIST AT THE END OF EVERY WORK DAY TO THE COR CERTIFYING THAT ALL WORK AREASEND OF EVERY WORK DAY TO THE COR CERTIFYING THAT ALL WORK AREASEND OF EVERY WORK DAY TO THE COR CERTIFYING THAT ALL WORK AREASEND OF EVERY WORK DAY TO THE COR CERTIFYING THAT ALL WORK AREAS HAVE BEEN SURVEYED AND FOUND TO BE SECURE, SAFE, AND FREE OFHAVE BEEN SURVEYED AND FOUND TO BE SECURE, SAFE, AND FREE OFHAVE BEEN SURVEYED AND FOUND TO BE SECURE, SAFE, AND FREE OFHAVE BEEN SURVEYED AND FOUND TO BE SECURE, SAFE, AND FREE OF ANY FLAMMABLE LIQUIDS.ANY FLAMMABLE LIQUIDS.ANY FLAMMABLE LIQUIDS.ANY FLAMMABLE LIQUIDS.
I.I.I.I. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR ANDCONTRACTOR SHALL COORDINATE ONLY WITH THE COR ANDCONTRACTOR SHALL COORDINATE ONLY WITH THE COR ANDCONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND
CONTRACTING OFFICER.CONTRACTING OFFICER.CONTRACTING OFFICER.CONTRACTING OFFICER.
J.J.J.J. SEE SPECIFICATION SECTION 01 35 26 FOR INTERIM LIFE SAFETY MEASURES.SEE SPECIFICATION SECTION 01 35 26 FOR INTERIM LIFE SAFETY MEASURES.SEE SPECIFICATION SECTION 01 35 26 FOR INTERIM LIFE SAFETY MEASURES.SEE SPECIFICATION SECTION 01 35 26 FOR INTERIM LIFE SAFETY MEASURES.
K.K.K.K.
L.L.L.L.
ALL FINISH COLORS TO BE SELECTED BY COR/ V.A INTERIORALL FINISH COLORS TO BE SELECTED BY COR/ V.A INTERIORALL FINISH COLORS TO BE SELECTED BY COR/ V.A INTERIORALL FINISH COLORS TO BE SELECTED BY COR/ V.A INTERIOR DESIGNER WHERE NOT OTHERWISE INDICATED. CONTRACTOR SHALLDESIGNER WHERE NOT OTHERWISE INDICATED. CONTRACTOR SHALLDESIGNER WHERE NOT OTHERWISE INDICATED. CONTRACTOR SHALLDESIGNER WHERE NOT OTHERWISE INDICATED. CONTRACTOR SHALL SUBMIT THE COLORS PER SUBMITTAL REQUIREMENT OF CONTRACT.SUBMIT THE COLORS PER SUBMITTAL REQUIREMENT OF CONTRACT.SUBMIT THE COLORS PER SUBMITTAL REQUIREMENT OF CONTRACT.SUBMIT THE COLORS PER SUBMITTAL REQUIREMENT OF CONTRACT.
M.M.M.M.
SEAL ALL PLATES, COVERS, DEVICES, AND GENERAL WALL AND CEILINGSEAL ALL PLATES, COVERS, DEVICES, AND GENERAL WALL AND CEILINGSEAL ALL PLATES, COVERS, DEVICES, AND GENERAL WALL AND CEILINGSEAL ALL PLATES, COVERS, DEVICES, AND GENERAL WALL AND CEILING PENETRATIONS IN ALL NEW SPACES, TYPICAL.PENETRATIONS IN ALL NEW SPACES, TYPICAL.PENETRATIONS IN ALL NEW SPACES, TYPICAL.PENETRATIONS IN ALL NEW SPACES, TYPICAL.
N.N.N.N.
PROVIDE 16" x 16" ACCESS PANELS IN HARD CEILINGS WHERE DUCTSPROVIDE 16" x 16" ACCESS PANELS IN HARD CEILINGS WHERE DUCTSPROVIDE 16" x 16" ACCESS PANELS IN HARD CEILINGS WHERE DUCTSPROVIDE 16" x 16" ACCESS PANELS IN HARD CEILINGS WHERE DUCTS AND DAMPERS OR OTHER PIPES REQUIRE ACCESS AS REQUIRED.AND DAMPERS OR OTHER PIPES REQUIRE ACCESS AS REQUIRED.AND DAMPERS OR OTHER PIPES REQUIRE ACCESS AS REQUIRED.AND DAMPERS OR OTHER PIPES REQUIRE ACCESS AS REQUIRED.
COORDINATE EXACT LOCATION W/COR.COORDINATE EXACT LOCATION W/COR.COORDINATE EXACT LOCATION W/COR.COORDINATE EXACT LOCATION W/COR.
THE CONTRACTOR SHALL NOT OPERATE ANY EXISTING VA EQUIPMENTTHE CONTRACTOR SHALL NOT OPERATE ANY EXISTING VA EQUIPMENTTHE CONTRACTOR SHALL NOT OPERATE ANY EXISTING VA EQUIPMENTTHE CONTRACTOR SHALL NOT OPERATE ANY EXISTING VA EQUIPMENT INCLUDING BUT NOT LIMITED TO ELECTRICAL, FIRE-HYDRANT, VALVES,INCLUDING BUT NOT LIMITED TO ELECTRICAL, FIRE-HYDRANT, VALVES,INCLUDING BUT NOT LIMITED TO ELECTRICAL, FIRE-HYDRANT, VALVES,INCLUDING BUT NOT LIMITED TO ELECTRICAL, FIRE-HYDRANT, VALVES, PUMPS, ETC., WITH OUT AUTHORIZATION FROM THE VAMCPUMPS, ETC., WITH OUT AUTHORIZATION FROM THE VAMCPUMPS, ETC., WITH OUT AUTHORIZATION FROM THE VAMCPUMPS, ETC., WITH OUT AUTHORIZATION FROM THE VAMC ENGINEERING SERVICE, UNLESS AN EMERGENCY SITUATION EXISTS. INENGINEERING SERVICE, UNLESS AN EMERGENCY SITUATION EXISTS. INENGINEERING SERVICE, UNLESS AN EMERGENCY SITUATION EXISTS. INENGINEERING SERVICE, UNLESS AN EMERGENCY SITUATION EXISTS. IN GENERAL, THE OPERATING STAFF OF THE VAMC ENGINEERINGGENERAL, THE OPERATING STAFF OF THE VAMC ENGINEERINGGENERAL, THE OPERATING STAFF OF THE VAMC ENGINEERINGGENERAL, THE OPERATING STAFF OF THE VAMC ENGINEERING SERVICE WILL OPERATE ANY EXISTING EQUIPMENT WHICH THESERVICE WILL OPERATE ANY EXISTING EQUIPMENT WHICH THESERVICE WILL OPERATE ANY EXISTING EQUIPMENT WHICH THESERVICE WILL OPERATE ANY EXISTING EQUIPMENT WHICH THE CONTRACTOR MAY REQUIRECONTRACTOR MAY REQUIRECONTRACTOR MAY REQUIRECONTRACTOR MAY REQUIRE
CONTRACTOR SHALL NOT PROCEED WITH WORK UTIL CONSTRUCTION PERMITCONTRACTOR SHALL NOT PROCEED WITH WORK UTIL CONSTRUCTION PERMITCONTRACTOR SHALL NOT PROCEED WITH WORK UTIL CONSTRUCTION PERMITCONTRACTOR SHALL NOT PROCEED WITH WORK UTIL CONSTRUCTION PERMIT
IS APPROVED/SIGNED.IS APPROVED/SIGNED.IS APPROVED/SIGNED.IS APPROVED/SIGNED.
CARD READERCARD READERCARD READERCARD READERCRCRCRCR
HIGH-PRESSURE LAMINATEHIGH-PRESSURE LAMINATEHIGH-PRESSURE LAMINATEHIGH-PRESSURE LAMINATEHPLHPLHPLHPL
LUXURY VINYL TILELUXURY VINYL TILELUXURY VINYL TILELUXURY VINYL TILELVTLVTLVTLVT
EDGE OF DECKEDGE OF DECKEDGE OF DECKEDGE OF DECKEODEODEODEOD
J.J.J.J. COMPLETE LAYOUT AND COORDINATION DRAWINGS AT 1/4" SCALE SHALLCOMPLETE LAYOUT AND COORDINATION DRAWINGS AT 1/4" SCALE SHALLCOMPLETE LAYOUT AND COORDINATION DRAWINGS AT 1/4" SCALE SHALLCOMPLETE LAYOUT AND COORDINATION DRAWINGS AT 1/4" SCALE SHALL BE PROVIDED. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEMBE PROVIDED. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEMBE PROVIDED. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEMBE PROVIDED. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT AND COORDINATION DRAWINGS HAVE BEEN APPROVED.UNTIL THE LAYOUT AND COORDINATION DRAWINGS HAVE BEEN APPROVED.UNTIL THE LAYOUT AND COORDINATION DRAWINGS HAVE BEEN APPROVED.UNTIL THE LAYOUT AND COORDINATION DRAWINGS HAVE BEEN APPROVED.
DOWNSPOUTDOWNSPOUTDOWNSPOUTDOWNSPOUTDSDSDSDS
CONTROL JOINTCONTROL JOINTCONTROL JOINTCONTROL JOINTCJCJCJCJ
ELECTRIC DRINKING FOUNTAINELECTRIC DRINKING FOUNTAINELECTRIC DRINKING FOUNTAINELECTRIC DRINKING FOUNTAINEDFEDFEDFEDF
FIRE RETARDANT TREATEDFIRE RETARDANT TREATEDFIRE RETARDANT TREATEDFIRE RETARDANT TREATEDFRTFRTFRTFRT
EXTERIOR INSULATION FINISHING SYSTEMEXTERIOR INSULATION FINISHING SYSTEMEXTERIOR INSULATION FINISHING SYSTEMEXTERIOR INSULATION FINISHING SYSTEMEIFSEIFSEIFSEIFS
WATER RESISTANTWATER RESISTANTWATER RESISTANTWATER RESISTANTWRWRWRWR
J1J1J1J1
SECTION CUTSECTION CUTSECTION CUTSECTION CUT
HEAD/JAMB/SILL DETAIL NUMBERHEAD/JAMB/SILL DETAIL NUMBERHEAD/JAMB/SILL DETAIL NUMBERHEAD/JAMB/SILL DETAIL NUMBER
MOUNTING HEIGHTS
NOTE: NOT ALL ITEMS ARE INCLUDED IN THE WORK.NOTE: NOT ALL ITEMS ARE INCLUDED IN THE WORK.NOTE: NOT ALL ITEMS ARE INCLUDED IN THE WORK.NOTE: NOT ALL ITEMS ARE INCLUDED IN THE WORK.
ACCESSIBILITY REQUIREMENTS
FRONT APPROACHES
HINGE-SIDE APPROACHES
LATCH-SIDE APPROACHES
USE EITHERUSE EITHERUSE EITHERUSE EITHER
OPTION 1 OROPTION 1 OROPTION 1 OROPTION 1 OR
OPTION 2OPTION 2OPTION 2OPTION 2
ALL DOOR ASSEMBLIES SHALL BE CONSTRUCTED TO MEET THEALL DOOR ASSEMBLIES SHALL BE CONSTRUCTED TO MEET THEALL DOOR ASSEMBLIES SHALL BE CONSTRUCTED TO MEET THEALL DOOR ASSEMBLIES SHALL BE CONSTRUCTED TO MEET THE INDICATED MINIMUM CLEARANCES AS APPLICABLE.INDICATED MINIMUM CLEARANCES AS APPLICABLE.INDICATED MINIMUM CLEARANCES AS APPLICABLE.INDICATED MINIMUM CLEARANCES AS APPLICABLE.
1'-0" IF DOOR HAS1'-0" IF DOOR HAS1'-0" IF DOOR HAS1'-0" IF DOOR HAS
BOTH A CLOSERBOTH A CLOSERBOTH A CLOSERBOTH A CLOSER
AND A LATCHAND A LATCHAND A LATCHAND A LATCH
5' 0"
5' 0"
5' 0"
5' 0"
1'-6"1'-6"1'-6"1'-6"
3' 6"
3' 6"
3' 6"
3' 6"
4'-6"4'-6"4'-6"4'-6"
4' 0"
4' 0"
4' 0"
4' 0"
O
PT
IO
N
O
PT
IO
N
O
PT
IO
N
O
PT
IO
N
5' 0"
5' 0"
5' 0"
5' 0"
OPTION 1OPTION 1OPTION 1OPTION 1
3'-0"3'-0"3'-0"3'-0"
O
PT
IO
N
O
PT
IO
N
O
PT
IO
N
O
PT
IO
N
4' 6"
4' 6"
4' 6"
4' 6"
OPTION 2OPTION 2OPTION 2OPTION 2
3'-6"3'-6"3'-6"3'-6"
2'-0"2'-0"2'-0"2'-0"
4' 0"
4' 0"
4' 0"
4' 0"
2'-0"2'-0"2'-0"2'-0"
3' 6"
3' 6"
3' 6"
3' 6"
4' 0"
4' 0"
4' 0"
4' 0"
4' 6"
4' 6"
4' 6"
4' 6"
W C
LO
SE
R
W C
LO
SE
R
W C
LO
SE
R
W C
LO
SE
R
4' 0"
4' 0"
4' 0"
4' 0"
W C
LO
SE
R
W C
LO
SE
R
W C
LO
SE
R
W C
LO
SE
R
W C
LO
SE
R
W C
LO
SE
R
W C
LO
SE
R
W C
LO
SE
R
AN
D
LA
TC
H
AN
D
LA
TC
H
AN
D
LA
TC
H
AN
D
LA
TC
H
ALL WORK SHALL COMPLY WITH FEDERAL ABA,ALL WORK SHALL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.