CONST DOM CLINIC & CLC ADMIN PROJ 613-121 Federal contract opportunity
Solicitation number
36C24518B0233
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 5

About this file

36C24518B0233 0 General Drawings.pdf

View the file

Other files for this federal contract opportunity

Other files attached to CONST DOM CLINIC & CLC ADMIN PROJ 613-121, newest first.
File Type Posted
36C24518C0215-000.docx DOCX document
36C24518B0233-0001001.pdf PDF
36C24518B0233-0001000.docx DOCX document
36C24518B0233-007.pdf PDF
36C24518B0233-001.docx DOCX document
36C24518B0233-009.pdf PDF
36C24518B0233-008.pdf PDF
36C24518B0233-010.pdf PDF
36C24518B0233-003.pdf PDF
36C24518B0233-013.pdf PDF
36C24518B0233-012.pdf PDF
36C24518B0233-011.pdf PDF
36C24518B0233-005.pdf PDF
36C24518B0233-004.pdf PDF
36C24518B0233-006.pdf PDF
36C24518B0233-000.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET INDEX

G001G001G001G001

SHEET

NO.

GENERALGENERALGENERALGENERAL

COVER SHEETCOVER SHEETCOVER SHEETCOVER SHEET

ARCHITECTURALARCHITECTURALARCHITECTURALARCHITECTURAL

A102A102A102A102

FIRST FLOOR REFLECTED CEILING PLAN - CLC ADMINFIRST FLOOR REFLECTED CEILING PLAN - CLC ADMINFIRST FLOOR REFLECTED CEILING PLAN - CLC ADMINFIRST FLOOR REFLECTED CEILING PLAN - CLC ADMIN

SHEET

NO.

DRAWING

TITLE

FIRST FLOOR ANNOTATION PLAN - CLC ADMINFIRST FLOOR ANNOTATION PLAN - CLC ADMINFIRST FLOOR ANNOTATION PLAN - CLC ADMINFIRST FLOOR ANNOTATION PLAN - CLC ADMINA101A101A101A101

FIRST FLOOR ANNOTATION PLAN - DOM CLINICFIRST FLOOR ANNOTATION PLAN - DOM CLINICFIRST FLOOR ANNOTATION PLAN - DOM CLINICFIRST FLOOR ANNOTATION PLAN - DOM CLINIC

A111A111A111A111

FIRST FLOOR REFLECTED CEILING PLAN - DOM CLINICFIRST FLOOR REFLECTED CEILING PLAN - DOM CLINICFIRST FLOOR REFLECTED CEILING PLAN - DOM CLINICFIRST FLOOR REFLECTED CEILING PLAN - DOM CLINICA112A112A112A112

ROOM FINISH SCHEDULES AND EQUIPMENT SCHEDULEROOM FINISH SCHEDULES AND EQUIPMENT SCHEDULEROOM FINISH SCHEDULES AND EQUIPMENT SCHEDULEROOM FINISH SCHEDULES AND EQUIPMENT SCHEDULEA601A601A601A601

DOOR AND FRAME TYPES, SCHEDULES AND DETAILSDOOR AND FRAME TYPES, SCHEDULES AND DETAILSDOOR AND FRAME TYPES, SCHEDULES AND DETAILSDOOR AND FRAME TYPES, SCHEDULES AND DETAILSA611A611A611A611

G002G002G002G002 GENERAL NOTES, DETAILS, ABBREVIATIONS AND LEGENDSGENERAL NOTES, DETAILS, ABBREVIATIONS AND LEGENDSGENERAL NOTES, DETAILS, ABBREVIATIONS AND LEGENDSGENERAL NOTES, DETAILS, ABBREVIATIONS AND LEGENDS

AREA PLANS - CLC ADMIN AND DOM CLINICAREA PLANS - CLC ADMIN AND DOM CLINICAREA PLANS - CLC ADMIN AND DOM CLINICAREA PLANS - CLC ADMIN AND DOM CLINICA100A100A100A100

ROOF PLAN - CLC ADMINROOF PLAN - CLC ADMINROOF PLAN - CLC ADMINROOF PLAN - CLC ADMINA121A121A121A121

ROOF PLAN - DOM CLINICROOF PLAN - DOM CLINICROOF PLAN - DOM CLINICROOF PLAN - DOM CLINICA122A122A122A122

EXTERIOR ELEVATIONS - CLC ADMINEXTERIOR ELEVATIONS - CLC ADMINEXTERIOR ELEVATIONS - CLC ADMINEXTERIOR ELEVATIONS - CLC ADMINA201A201A201A201

EXTERIOR ELEVATIONS AND BUILDING SECTIONS - DOM CLINICEXTERIOR ELEVATIONS AND BUILDING SECTIONS - DOM CLINICEXTERIOR ELEVATIONS AND BUILDING SECTIONS - DOM CLINICEXTERIOR ELEVATIONS AND BUILDING SECTIONS - DOM CLINICA202A202A202A202

BUILDING SECTIONS - CLC ADMINBUILDING SECTIONS - CLC ADMINBUILDING SECTIONS - CLC ADMINBUILDING SECTIONS - CLC ADMINA301A301A301A301

PARTITION TYPES & FRAMING ELEVATIONSPARTITION TYPES & FRAMING ELEVATIONSPARTITION TYPES & FRAMING ELEVATIONSPARTITION TYPES & FRAMING ELEVATIONSA501A501A501A501

FIRE PROTECTIONFIRE PROTECTIONFIRE PROTECTIONFIRE PROTECTION

CIVILCIVILCIVILCIVIL

C001C001C001C001 SITE SYMBOLSSITE SYMBOLSSITE SYMBOLSSITE SYMBOLS

C100C100C100C100 EXISTING SITE FEATURES - BUILDINGS 501 & 502EXISTING SITE FEATURES - BUILDINGS 501 & 502EXISTING SITE FEATURES - BUILDINGS 501 & 502EXISTING SITE FEATURES - BUILDINGS 501 & 502

CD100CD100CD100CD100 SITE DEMOLITION PLANSITE DEMOLITION PLANSITE DEMOLITION PLANSITE DEMOLITION PLAN

C110C110C110C110

C111C111C111C111 SITE MATERIALS-BUILDING 502FSITE MATERIALS-BUILDING 502FSITE MATERIALS-BUILDING 502FSITE MATERIALS-BUILDING 502F

C120C120C120C120 SITE STAKE OUT PLAN - BUILDING 501DSITE STAKE OUT PLAN - BUILDING 501DSITE STAKE OUT PLAN - BUILDING 501DSITE STAKE OUT PLAN - BUILDING 501D

C121C121C121C121 SITE STAKE OUT PLAN-BUILDING 502FSITE STAKE OUT PLAN-BUILDING 502FSITE STAKE OUT PLAN-BUILDING 502FSITE STAKE OUT PLAN-BUILDING 502F

C130C130C130C130 SITE GRADING PLAN-BUILDING 501DSITE GRADING PLAN-BUILDING 501DSITE GRADING PLAN-BUILDING 501DSITE GRADING PLAN-BUILDING 501D

C131C131C131C131 SITE GRADING PLAN-BUILDING 502FSITE GRADING PLAN-BUILDING 502FSITE GRADING PLAN-BUILDING 502FSITE GRADING PLAN-BUILDING 502F

C140C140C140C140 SITE UTILITY PLAN-BUILDING 501DSITE UTILITY PLAN-BUILDING 501DSITE UTILITY PLAN-BUILDING 501DSITE UTILITY PLAN-BUILDING 501D

C141C141C141C141 SITE UTILITY PLAN-BUILDING 502FSITE UTILITY PLAN-BUILDING 502FSITE UTILITY PLAN-BUILDING 502FSITE UTILITY PLAN-BUILDING 502F

C150C150C150C150 EROSION & SEDIMENTATION CONTROL (E&S) PLAN-BUILDING 501DEROSION & SEDIMENTATION CONTROL (E&S) PLAN-BUILDING 501DEROSION & SEDIMENTATION CONTROL (E&S) PLAN-BUILDING 501DEROSION & SEDIMENTATION CONTROL (E&S) PLAN-BUILDING 501D

C510C510C510C510 SITE DETAILSSITE DETAILSSITE DETAILSSITE DETAILS

C540C540C540C540 STORM WATER MANAGEMENT DETAILSSTORM WATER MANAGEMENT DETAILSSTORM WATER MANAGEMENT DETAILSSTORM WATER MANAGEMENT DETAILS

C541C541C541C541 SITE UTILITY DETAILSSITE UTILITY DETAILSSITE UTILITY DETAILSSITE UTILITY DETAILS

F001F001F001F001 GENERAL NOTES AND DETAILSGENERAL NOTES AND DETAILSGENERAL NOTES AND DETAILSGENERAL NOTES AND DETAILS

FP101FP101FP101FP101 FIRST FLOOR CLC ADMINFIRST FLOOR CLC ADMINFIRST FLOOR CLC ADMINFIRST FLOOR CLC ADMIN

FP102FP102FP102FP102 FIRST FLOOR DOM CLINICFIRST FLOOR DOM CLINICFIRST FLOOR DOM CLINICFIRST FLOOR DOM CLINIC

PLUMBINGPLUMBINGPLUMBINGPLUMBING

P001P001P001P001 PLUMBING LEGEND, GENERAL NOTES, AND SCHEDULESPLUMBING LEGEND, GENERAL NOTES, AND SCHEDULESPLUMBING LEGEND, GENERAL NOTES, AND SCHEDULESPLUMBING LEGEND, GENERAL NOTES, AND SCHEDULES

FOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - CLC ADMINFOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - CLC ADMINFOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - CLC ADMINFOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - CLC ADMINPL101PL101PL101PL101

PL102PL102PL102PL102

MECHANICALMECHANICALMECHANICALMECHANICAL

M001M001M001M001 MECHANICAL LEGEND AND GENERAL NOTESMECHANICAL LEGEND AND GENERAL NOTESMECHANICAL LEGEND AND GENERAL NOTESMECHANICAL LEGEND AND GENERAL NOTES

ELECTRICALELECTRICALELECTRICALELECTRICAL

E001E001E001E001 ELECTRICAL LEGENDELECTRICAL LEGENDELECTRICAL LEGENDELECTRICAL LEGEND

FIRST FLOOR LIGHTING PLAN - CLC ADMINFIRST FLOOR LIGHTING PLAN - CLC ADMINFIRST FLOOR LIGHTING PLAN - CLC ADMINFIRST FLOOR LIGHTING PLAN - CLC ADMINEL101EL101EL101EL101

EL102EL102EL102EL102

LIGHTING FIXTURE SCHEDULE AND DETAILSLIGHTING FIXTURE SCHEDULE AND DETAILSLIGHTING FIXTURE SCHEDULE AND DETAILSLIGHTING FIXTURE SCHEDULE AND DETAILSEL601EL601EL601EL601

STRUCTURALSTRUCTURALSTRUCTURALSTRUCTURAL

S001S001S001S001 STRUCTURAL NOTESSTRUCTURAL NOTESSTRUCTURAL NOTESSTRUCTURAL NOTES

S002S002S002S002 STRUCTURAL NOTESSTRUCTURAL NOTESSTRUCTURAL NOTESSTRUCTURAL NOTES

S101S101S101S101 CLC ADMIN ADDITION FOUNDATION PLANCLC ADMIN ADDITION FOUNDATION PLANCLC ADMIN ADDITION FOUNDATION PLANCLC ADMIN ADDITION FOUNDATION PLAN

S102S102S102S102 CLC ADMIN ADDITION LOW ROOF FRAMING PLANCLC ADMIN ADDITION LOW ROOF FRAMING PLANCLC ADMIN ADDITION LOW ROOF FRAMING PLANCLC ADMIN ADDITION LOW ROOF FRAMING PLAN

S103S103S103S103 CLC ADMIN ADDITION HIGH ROOF FRAMING PLANCLC ADMIN ADDITION HIGH ROOF FRAMING PLANCLC ADMIN ADDITION HIGH ROOF FRAMING PLANCLC ADMIN ADDITION HIGH ROOF FRAMING PLAN

S104S104S104S104 DOMICILIARY CLINIC ADDITION FOUNDATION PLANDOMICILIARY CLINIC ADDITION FOUNDATION PLANDOMICILIARY CLINIC ADDITION FOUNDATION PLANDOMICILIARY CLINIC ADDITION FOUNDATION PLAN

S105S105S105S105 DOMICILIARY CLINIC ADDITION ROOF FRAMING PLANDOMICILIARY CLINIC ADDITION ROOF FRAMING PLANDOMICILIARY CLINIC ADDITION ROOF FRAMING PLANDOMICILIARY CLINIC ADDITION ROOF FRAMING PLAN

S201S201S201S201 BRACING ELEVATIONS CLC ADMIN ADDITIONBRACING ELEVATIONS CLC ADMIN ADDITIONBRACING ELEVATIONS CLC ADMIN ADDITIONBRACING ELEVATIONS CLC ADMIN ADDITION

S202S202S202S202 BRACING AND FRAMING ELEVATIONS CLC ADMIN ADDITIONBRACING AND FRAMING ELEVATIONS CLC ADMIN ADDITIONBRACING AND FRAMING ELEVATIONS CLC ADMIN ADDITIONBRACING AND FRAMING ELEVATIONS CLC ADMIN ADDITION

S203S203S203S203 BRACING ELEVATIONS - DOMICILIARY ADDITIONBRACING ELEVATIONS - DOMICILIARY ADDITIONBRACING ELEVATIONS - DOMICILIARY ADDITIONBRACING ELEVATIONS - DOMICILIARY ADDITION

S301S301S301S301 CONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILS

S302S302S302S302 CONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILS

S401S401S401S401 MASONRY DETAILSMASONRY DETAILSMASONRY DETAILSMASONRY DETAILS

S501S501S501S501 STEEL DETAILSSTEEL DETAILSSTEEL DETAILSSTEEL DETAILS

S502S502S502S502 STEEL DETAILSSTEEL DETAILSSTEEL DETAILSSTEEL DETAILS

SITE MATERIALS-BUILDING 501DSITE MATERIALS-BUILDING 501DSITE MATERIALS-BUILDING 501DSITE MATERIALS-BUILDING 501D

INTERIOR ELEVATIONSINTERIOR ELEVATIONSINTERIOR ELEVATIONSINTERIOR ELEVATIONSA451A451A451A451

INTERIOR ELEVATIONSINTERIOR ELEVATIONSINTERIOR ELEVATIONSINTERIOR ELEVATIONSA452A452A452A452

INTERIOR ELEVATIONSINTERIOR ELEVATIONSINTERIOR ELEVATIONSINTERIOR ELEVATIONSA453A453A453A453

AD102AD102AD102AD102

FIRST FLOOR DEMO PLAN - CLC ADMINFIRST FLOOR DEMO PLAN - CLC ADMINFIRST FLOOR DEMO PLAN - CLC ADMINFIRST FLOOR DEMO PLAN - CLC ADMINAD101AD101AD101AD101

FIRST FLOOR DEMO PLAN - DOM CLINICFIRST FLOOR DEMO PLAN - DOM CLINICFIRST FLOOR DEMO PLAN - DOM CLINICFIRST FLOOR DEMO PLAN - DOM CLINIC

DRAWING

TITLE

DRAWING

TITLE

WALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINA351A351A351A351

C151C151C151C151 EROSION & SEDIMENTATION CONTROL (E&S) PLAN-BUILDING 502FEROSION & SEDIMENTATION CONTROL (E&S) PLAN-BUILDING 502FEROSION & SEDIMENTATION CONTROL (E&S) PLAN-BUILDING 502FEROSION & SEDIMENTATION CONTROL (E&S) PLAN-BUILDING 502F

C511C511C511C511 SITE DETAILSSITE DETAILSSITE DETAILSSITE DETAILS

C550C550C550C550 EROSION & SEDIMENTATION CONTROL (E&S) DETAILSEROSION & SEDIMENTATION CONTROL (E&S) DETAILSEROSION & SEDIMENTATION CONTROL (E&S) DETAILSEROSION & SEDIMENTATION CONTROL (E&S) DETAILS

C740C740C740C740 UTILITY PROFILESUTILITY PROFILESUTILITY PROFILESUTILITY PROFILES

S303S303S303S303 CONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILS

S304S304S304S304 CONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILS

S503S503S503S503 STEEL DETAILSSTEEL DETAILSSTEEL DETAILSSTEEL DETAILS

FOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - DOM CLINICFOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - DOM CLINICFOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - DOM CLINICFOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - DOM CLINIC

PL103PL103PL103PL103 FIRST FLOOR PLUMBING PIPING PLAN - CLC ADMINFIRST FLOOR PLUMBING PIPING PLAN - CLC ADMINFIRST FLOOR PLUMBING PIPING PLAN - CLC ADMINFIRST FLOOR PLUMBING PIPING PLAN - CLC ADMIN

PL104PL104PL104PL104 FIRST FLOOR PLUMBING PIPING PLAN - DOM CLINICFIRST FLOOR PLUMBING PIPING PLAN - DOM CLINICFIRST FLOOR PLUMBING PIPING PLAN - DOM CLINICFIRST FLOOR PLUMBING PIPING PLAN - DOM CLINIC

PL201PL201PL201PL201 WASTE, DRAIN, AND VENT PIPING ISOMETRIC RISER DIAGRAMSWASTE, DRAIN, AND VENT PIPING ISOMETRIC RISER DIAGRAMSWASTE, DRAIN, AND VENT PIPING ISOMETRIC RISER DIAGRAMSWASTE, DRAIN, AND VENT PIPING ISOMETRIC RISER DIAGRAMS

PL301PL301PL301PL301 DOMESTIC WATER DISTRIBUTION ISOMETRIC RISER DIAGRAMSDOMESTIC WATER DISTRIBUTION ISOMETRIC RISER DIAGRAMSDOMESTIC WATER DISTRIBUTION ISOMETRIC RISER DIAGRAMSDOMESTIC WATER DISTRIBUTION ISOMETRIC RISER DIAGRAMS

MD101MD101MD101MD101 FIRST FLOOR DEMO PLAN - CLC ADMINFIRST FLOOR DEMO PLAN - CLC ADMINFIRST FLOOR DEMO PLAN - CLC ADMINFIRST FLOOR DEMO PLAN - CLC ADMIN

FIRST FLOOR DEMO PLAN - DOM CLINICFIRST FLOOR DEMO PLAN - DOM CLINICFIRST FLOOR DEMO PLAN - DOM CLINICFIRST FLOOR DEMO PLAN - DOM CLINICMD102MD102MD102MD102

MH101MH101MH101MH101 FIRST FLOOR DUCTWORK PLAN - CLC ADMINFIRST FLOOR DUCTWORK PLAN - CLC ADMINFIRST FLOOR DUCTWORK PLAN - CLC ADMINFIRST FLOOR DUCTWORK PLAN - CLC ADMIN

FIRST FLOOR DUCTWORK PLAN - DOM CLINICFIRST FLOOR DUCTWORK PLAN - DOM CLINICFIRST FLOOR DUCTWORK PLAN - DOM CLINICFIRST FLOOR DUCTWORK PLAN - DOM CLINICMH102MH102MH102MH102

MH103MH103MH103MH103 ROOF PLAN - CLC ADMINROOF PLAN - CLC ADMINROOF PLAN - CLC ADMINROOF PLAN - CLC ADMIN

MH104MH104MH104MH104 ROOF PLAN - DOM CLINICROOF PLAN - DOM CLINICROOF PLAN - DOM CLINICROOF PLAN - DOM CLINIC

MP101MP101MP101MP101 FIRST FLOOR PIPING PLAN - CLC ADMINFIRST FLOOR PIPING PLAN - CLC ADMINFIRST FLOOR PIPING PLAN - CLC ADMINFIRST FLOOR PIPING PLAN - CLC ADMIN

FIRST FLOOR PIPING PLAN - DOM CLINICFIRST FLOOR PIPING PLAN - DOM CLINICFIRST FLOOR PIPING PLAN - DOM CLINICFIRST FLOOR PIPING PLAN - DOM CLINICMP102MP102MP102MP102

DETAILSDETAILSDETAILSDETAILSM501M501M501M501

DETAILSDETAILSDETAILSDETAILSM502M502M502M502

SCHEDULESSCHEDULESSCHEDULESSCHEDULESM601M601M601M601

SCHEDULESSCHEDULESSCHEDULESSCHEDULESM602M602M602M602

CONTROLSCONTROLSCONTROLSCONTROLSM701M701M701M701

EP101EP101EP101EP101

EP102EP102EP102EP102

EY101EY101EY101EY101

EY102EY102EY102EY102

FIRST FLOOR LIGHTING PLAN - DOM CLINICFIRST FLOOR LIGHTING PLAN - DOM CLINICFIRST FLOOR LIGHTING PLAN - DOM CLINICFIRST FLOOR LIGHTING PLAN - DOM CLINIC

FIRST FLOOR POWER PLAN - CLC ADMINFIRST FLOOR POWER PLAN - CLC ADMINFIRST FLOOR POWER PLAN - CLC ADMINFIRST FLOOR POWER PLAN - CLC ADMIN

FIRST FLOOR POWER PLAN - DOM CLINICFIRST FLOOR POWER PLAN - DOM CLINICFIRST FLOOR POWER PLAN - DOM CLINICFIRST FLOOR POWER PLAN - DOM CLINIC

ELECTRICAL SCHEDULESELECTRICAL SCHEDULESELECTRICAL SCHEDULESELECTRICAL SCHEDULESEP601EP601EP601EP601

ELECTRICAL SCHEDULESELECTRICAL SCHEDULESELECTRICAL SCHEDULESELECTRICAL SCHEDULESEP602EP602EP602EP602

EP701EP701EP701EP701 POWER RISER DIAGRAM AND MECHANICAL CONNECTION SCHEDULEPOWER RISER DIAGRAM AND MECHANICAL CONNECTION SCHEDULEPOWER RISER DIAGRAM AND MECHANICAL CONNECTION SCHEDULEPOWER RISER DIAGRAM AND MECHANICAL CONNECTION SCHEDULE

FIRST FLOOR TELELCOMMUNICATIONS PLAN - CLC ADMINISTRATION ADDITIONFIRST FLOOR TELELCOMMUNICATIONS PLAN - CLC ADMINISTRATION ADDITIONFIRST FLOOR TELELCOMMUNICATIONS PLAN - CLC ADMINISTRATION ADDITIONFIRST FLOOR TELELCOMMUNICATIONS PLAN - CLC ADMINISTRATION ADDITION

FIRST FLOOR TELELCOMMUNICATIONS PLAN - DOMICILIARY CLINICFIRST FLOOR TELELCOMMUNICATIONS PLAN - DOMICILIARY CLINICFIRST FLOOR TELELCOMMUNICATIONS PLAN - DOMICILIARY CLINICFIRST FLOOR TELELCOMMUNICATIONS PLAN - DOMICILIARY CLINIC

EY501EY501EY501EY501 TELELCOMMUNICATIONS DETAILSTELELCOMMUNICATIONS DETAILSTELELCOMMUNICATIONS DETAILSTELELCOMMUNICATIONS DETAILS

EY701EY701EY701EY701 TELELCOMMUNICATIONS RISER DIAGRAMSTELELCOMMUNICATIONS RISER DIAGRAMSTELELCOMMUNICATIONS RISER DIAGRAMSTELELCOMMUNICATIONS RISER DIAGRAMS

FIRST FLOOR DIMENSION PLAN - CLC ADMINFIRST FLOOR DIMENSION PLAN - CLC ADMINFIRST FLOOR DIMENSION PLAN - CLC ADMINFIRST FLOOR DIMENSION PLAN - CLC ADMINA101AA101AA101AA101A

FIRST FLOOR DIMENSION PLAN - DOM CLINICFIRST FLOOR DIMENSION PLAN - DOM CLINICFIRST FLOOR DIMENSION PLAN - DOM CLINICFIRST FLOOR DIMENSION PLAN - DOM CLINICA102AA102AA102AA102A

C741C741C741C741 UTILITY PROFILESUTILITY PROFILESUTILITY PROFILESUTILITY PROFILES

ARCHITECTURAL (CONTINUED)ARCHITECTURAL (CONTINUED)ARCHITECTURAL (CONTINUED)ARCHITECTURAL (CONTINUED)

FIRST FLOOR LIFE SAFETY PLAN - CLC ADMINFIRST FLOOR LIFE SAFETY PLAN - CLC ADMINFIRST FLOOR LIFE SAFETY PLAN - CLC ADMINFIRST FLOOR LIFE SAFETY PLAN - CLC ADMINLS101LS101LS101LS101

FIRST FLOOR LIFE SAFETY PLAN - DOM CLINICFIRST FLOOR LIFE SAFETY PLAN - DOM CLINICFIRST FLOOR LIFE SAFETY PLAN - DOM CLINICFIRST FLOOR LIFE SAFETY PLAN - DOM CLINICLS102LS102LS102LS102

FIRST FLOOR HAZARDOUS MATERIAL ABATEMENT PLAN - CLC ADMINFIRST FLOOR HAZARDOUS MATERIAL ABATEMENT PLAN - CLC ADMINFIRST FLOOR HAZARDOUS MATERIAL ABATEMENT PLAN - CLC ADMINFIRST FLOOR HAZARDOUS MATERIAL ABATEMENT PLAN - CLC ADMINHM101HM101HM101HM101

FIRST FLOOR HAZARDOUS MATERIAL ABATEMENT PLAN - DOM CLINICFIRST FLOOR HAZARDOUS MATERIAL ABATEMENT PLAN - DOM CLINICFIRST FLOOR HAZARDOUS MATERIAL ABATEMENT PLAN - DOM CLINICFIRST FLOOR HAZARDOUS MATERIAL ABATEMENT PLAN - DOM CLINICHM102HM102HM102HM102

WALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINA352A352A352A352

WALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINA353A353A353A353

WALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINA354A354A354A354

WALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINA355A355A355A355

WALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINA356A356A356A356

WALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINA357A357A357A357

WALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINWALL SECTIONS - CLC ADMINA358A358A358A358

WALL SECTIONS - DOM CLINICWALL SECTIONS - DOM CLINICWALL SECTIONS - DOM CLINICWALL SECTIONS - DOM CLINICA361A361A361A361

WALL SECTIONS - DOM CLINICWALL SECTIONS - DOM CLINICWALL SECTIONS - DOM CLINICWALL SECTIONS - DOM CLINICA362A362A362A362

ENLARGED FLOOR PLANSENLARGED FLOOR PLANSENLARGED FLOOR PLANSENLARGED FLOOR PLANSA401A401A401A401

S504S504S504S504 STEEL DETAILSSTEEL DETAILSSTEEL DETAILSSTEEL DETAILS

PL105PL105PL105PL105 ROOF PLAN PLUMBING PIPING PLAN - CLC ADMINROOF PLAN PLUMBING PIPING PLAN - CLC ADMINROOF PLAN PLUMBING PIPING PLAN - CLC ADMINROOF PLAN PLUMBING PIPING PLAN - CLC ADMIN

PL108PL108PL108PL108 FIRST FLOOR PLUMBING PIPING PLAN - CLC ADMIN BID ALTERNATE 5FIRST FLOOR PLUMBING PIPING PLAN - CLC ADMIN BID ALTERNATE 5FIRST FLOOR PLUMBING PIPING PLAN - CLC ADMIN BID ALTERNATE 5FIRST FLOOR PLUMBING PIPING PLAN - CLC ADMIN BID ALTERNATE 5

MH401MH401MH401MH401 ENLARGED PLANSENLARGED PLANSENLARGED PLANSENLARGED PLANS

ELECTRICAL DEMOLITION PLAN - CLC ADMINELECTRICAL DEMOLITION PLAN - CLC ADMINELECTRICAL DEMOLITION PLAN - CLC ADMINELECTRICAL DEMOLITION PLAN - CLC ADMINED101ED101ED101ED101

EP103EP103EP103EP103 ROOF POWER, LIGHTNING PROTECTION, AND GROUNDING PLANS - CLC ADMIN AND DOM CLINICROOF POWER, LIGHTNING PROTECTION, AND GROUNDING PLANS - CLC ADMIN AND DOM CLINICROOF POWER, LIGHTNING PROTECTION, AND GROUNDING PLANS - CLC ADMIN AND DOM CLINICROOF POWER, LIGHTNING PROTECTION, AND GROUNDING PLANS - CLC ADMIN AND DOM CLINIC

EP501EP501EP501EP501 ELECTRICAL DETAILSELECTRICAL DETAILSELECTRICAL DETAILSELECTRICAL DETAILS

SIGNAGE TYPESSIGNAGE TYPESSIGNAGE TYPESSIGNAGE TYPESA701A701A701A701

FRAMING DETAILSFRAMING DETAILSFRAMING DETAILSFRAMING DETAILSA502A502A502A502

PLAN DETAILSPLAN DETAILSPLAN DETAILSPLAN DETAILSA511A511A511A511

PLAN DETAILSPLAN DETAILSPLAN DETAILSPLAN DETAILSA512A512A512A512

G003G003G003G003 FIRST FLOOR DEDUCTIVE ALTERNATE PLAN - ALTERNATE NO. 5 (BID ITEM NO. 6)FIRST FLOOR DEDUCTIVE ALTERNATE PLAN - ALTERNATE NO. 5 (BID ITEM NO. 6)FIRST FLOOR DEDUCTIVE ALTERNATE PLAN - ALTERNATE NO. 5 (BID ITEM NO. 6)FIRST FLOOR DEDUCTIVE ALTERNATE PLAN - ALTERNATE NO. 5 (BID ITEM NO. 6)

FIRST FLOOR PNEUMATIC TUBE SYSTEM PLAN - CLC ADMINFIRST FLOOR PNEUMATIC TUBE SYSTEM PLAN - CLC ADMINFIRST FLOOR PNEUMATIC TUBE SYSTEM PLAN - CLC ADMINFIRST FLOOR PNEUMATIC TUBE SYSTEM PLAN - CLC ADMINA131A131A131A131

FIRST FLOOR PNEUMATIC TUBE SYSTEM PLAN - DOM CLINICFIRST FLOOR PNEUMATIC TUBE SYSTEM PLAN - DOM CLINICFIRST FLOOR PNEUMATIC TUBE SYSTEM PLAN - DOM CLINICFIRST FLOOR PNEUMATIC TUBE SYSTEM PLAN - DOM CLINICA132A132A132A132

PLAN DETAILSPLAN DETAILSPLAN DETAILSPLAN DETAILSA513A513A513A513

SECTION DETAILSSECTION DETAILSSECTION DETAILSSECTION DETAILSA521A521A521A521

SECTION DETAILSSECTION DETAILSSECTION DETAILSSECTION DETAILSA522A522A522A522

ROOF DETAILSROOF DETAILSROOF DETAILSROOF DETAILSA531A531A531A531

EXTERIOR INSULATION FINISHING SYSTEM DETAILSEXTERIOR INSULATION FINISHING SYSTEM DETAILSEXTERIOR INSULATION FINISHING SYSTEM DETAILSEXTERIOR INSULATION FINISHING SYSTEM DETAILSA541A541A541A541

S003S003S003S003 STRUCTURAL NOTESSTRUCTURAL NOTESSTRUCTURAL NOTESSTRUCTURAL NOTES

PL106PL106PL106PL106 ROOF PLAN PLUMBING PIPING PLAN - DOM CLINICROOF PLAN PLUMBING PIPING PLAN - DOM CLINICROOF PLAN PLUMBING PIPING PLAN - DOM CLINICROOF PLAN PLUMBING PIPING PLAN - DOM CLINIC

PL107PL107PL107PL107 FOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - CLC ADMIN BID ALTERNATE 5FOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - CLC ADMIN BID ALTERNATE 5FOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - CLC ADMIN BID ALTERNATE 5FOUNDATION WASTE, DRAIN, AND VENT PIPING PLAN - CLC ADMIN BID ALTERNATE 5

MH105MH105MH105MH105 FIRST FLOOR MECHANICAL PLAN - CLC ADMIN - ALTERNATE No.5 - (BID ITEM No.6)FIRST FLOOR MECHANICAL PLAN - CLC ADMIN - ALTERNATE No.5 - (BID ITEM No.6)FIRST FLOOR MECHANICAL PLAN - CLC ADMIN - ALTERNATE No.5 - (BID ITEM No.6)FIRST FLOOR MECHANICAL PLAN - CLC ADMIN - ALTERNATE No.5 - (BID ITEM No.6)

EP104EP104EP104EP104 FIRST FLOOR ELECTRICAL PLAN - CLC ADMIN - ALTERNATE No.5 - (BID ITEM No.6)FIRST FLOOR ELECTRICAL PLAN - CLC ADMIN - ALTERNATE No.5 - (BID ITEM No.6)FIRST FLOOR ELECTRICAL PLAN - CLC ADMIN - ALTERNATE No.5 - (BID ITEM No.6)FIRST FLOOR ELECTRICAL PLAN - CLC ADMIN - ALTERNATE No.5 - (BID ITEM No.6)

ROOF DETAILSROOF DETAILSROOF DETAILSROOF DETAILSA532A532A532A532

WINDOW AND LOUVER TYPES AND DETAILSWINDOW AND LOUVER TYPES AND DETAILSWINDOW AND LOUVER TYPES AND DETAILSWINDOW AND LOUVER TYPES AND DETAILSA612A612A612A612

S305S305S305S305 CONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILSCONCRETE DETAILS

TRUETRUETRUETRUE

NORTHNORTHNORTHNORTH

TRUETRUETRUETRUE

NORTHNORTHNORTHNORTH

VI

I N

TSEFO

A

W

S T

T A

E GR

I

A RCH IT

D

CE

T

I RETSGER

E

ALAN J. TOLAND

NO. 4071

th re e in ch es o ne fo ot

6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

CONSULTANTS: ARCHITECT/ENGINEERS:

590 MEANS ST NW ATLANTA, GA 30318

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Number:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

BID DOCUMENTS

COVER SHEET CONSTRUCT DOM CLINIC

AND CLC ADMINISTRATION

ADDITION

MARTINSBURG, WV

G001

613-121

June 27, 2018 PB SJ

MARTINSBURG VA MEDICAL CENTER

CONSTRUCT DOM CLINIC AND

CLC ADMINISTRIATION ADDITION

510 BUTLER AVENUE

MARTINSBURG, WV 25405

PROJECT NO. 613-121

BID DOCUMENTS

AREA MAPAREA MAPAREA MAPAREA MAP

NOT TO SCALENOT TO SCALENOT TO SCALENOT TO SCALE

LOCATION MAPLOCATION MAPLOCATION MAPLOCATION MAP

NOT TO SCALENOT TO SCALENOT TO SCALENOT TO SCALE

501D & 502F

ARCHITECTURAL ABBREVIATIONSARCHITECTURAL LEGENDARCHITECTURAL GENERAL NOTES

GENERAL PROJECT NOTES

AAAA

123123123123

GA4GA4GA4GA4

A301A301A301A301

A201A201A201A201

A401A401A401A401

ROOMROOMROOMROOM

NAMENAMENAMENAME

123123123123

+ 0'-6"+ 0'-6"+ 0'-6"+ 0'-6"

F.E.C.F.E.C.F.E.C.F.E.C.

AIR CONDITIONINGAIR CONDITIONINGAIR CONDITIONINGAIR CONDITIONING

ACOUSTICAL CEILING TILEACOUSTICAL CEILING TILEACOUSTICAL CEILING TILEACOUSTICAL CEILING TILE

ABOVE FINISH FLOORABOVE FINISH FLOORABOVE FINISH FLOORABOVE FINISH FLOOR

ALUMINUMALUMINUMALUMINUMALUMINUM

BATT INSULATIONBATT INSULATIONBATT INSULATIONBATT INSULATION

BOTTOM OFBOTTOM OFBOTTOM OFBOTTOM OF

CEMENTITIOUS BACKER BOARDCEMENTITIOUS BACKER BOARDCEMENTITIOUS BACKER BOARDCEMENTITIOUS BACKER BOARD CEMENTITIOUS CRYSTALLINE WATERPROOFINGCEMENTITIOUS CRYSTALLINE WATERPROOFINGCEMENTITIOUS CRYSTALLINE WATERPROOFINGCEMENTITIOUS CRYSTALLINE WATERPROOFING COLD-FORMED METAL FRAMINGCOLD-FORMED METAL FRAMINGCOLD-FORMED METAL FRAMINGCOLD-FORMED METAL FRAMING

CORNER GUARDCORNER GUARDCORNER GUARDCORNER GUARD

CENTERLINECENTERLINECENTERLINECENTERLINE

CERAMIC MOSAIC TILECERAMIC MOSAIC TILECERAMIC MOSAIC TILECERAMIC MOSAIC TILE

CONCRETE MASONRY UNITCONCRETE MASONRY UNITCONCRETE MASONRY UNITCONCRETE MASONRY UNIT

CASED OPENINGCASED OPENINGCASED OPENINGCASED OPENING

COMMUNICATIONCOMMUNICATIONCOMMUNICATIONCOMMUNICATION

CONCRETECONCRETECONCRETECONCRETE

CONCRETE WITH SEALERCONCRETE WITH SEALERCONCRETE WITH SEALERCONCRETE WITH SEALER

CONTINUOUSCONTINUOUSCONTINUOUSCONTINUOUS

CONTRACTING OFFICER'S REPRESENTATIVECONTRACTING OFFICER'S REPRESENTATIVECONTRACTING OFFICER'S REPRESENTATIVECONTRACTING OFFICER'S REPRESENTATIVE CONTRACTING OFFICER'S TECHNICALCONTRACTING OFFICER'S TECHNICALCONTRACTING OFFICER'S TECHNICALCONTRACTING OFFICER'S TECHNICAL

REPRESENTATIVEREPRESENTATIVEREPRESENTATIVEREPRESENTATIVE

CERAMIC TILECERAMIC TILECERAMIC TILECERAMIC TILE

CERAMIC TILE BASECERAMIC TILE BASECERAMIC TILE BASECERAMIC TILE BASE

CARPETCARPETCARPETCARPET

DIAMETERDIAMETERDIAMETERDIAMETER

EXPANSION JOINTEXPANSION JOINTEXPANSION JOINTEXPANSION JOINT

ELECTRICALELECTRICALELECTRICALELECTRICAL

EQUALEQUALEQUALEQUAL

EXPOSED STRUCTUREEXPOSED STRUCTUREEXPOSED STRUCTUREEXPOSED STRUCTURE

ET CETERAET CETERAET CETERAET CETERA

EXISTINGEXISTINGEXISTINGEXISTING

EXPOSEDEXPOSEDEXPOSEDEXPOSED

FACTORY FINISHFACTORY FINISHFACTORY FINISHFACTORY FINISH

FLOOR DRAINFLOOR DRAINFLOOR DRAINFLOOR DRAIN

FIRE EXTINGUISHER CABINETFIRE EXTINGUISHER CABINETFIRE EXTINGUISHER CABINETFIRE EXTINGUISHER CABINET

FIRE HOSE CABINETFIRE HOSE CABINETFIRE HOSE CABINETFIRE HOSE CABINET

FINISHED FLOORFINISHED FLOORFINISHED FLOORFINISHED FLOOR

FINISHFINISHFINISHFINISH

FLOORFLOORFLOORFLOOR

FACE OFFACE OFFACE OFFACE OF

FIELD VERIFYFIELD VERIFYFIELD VERIFYFIELD VERIFY

(PRIOR TO ORDERING OR CUTTING)(PRIOR TO ORDERING OR CUTTING)(PRIOR TO ORDERING OR CUTTING)(PRIOR TO ORDERING OR CUTTING)

FABRIC WALLCOVERINGFABRIC WALLCOVERINGFABRIC WALLCOVERINGFABRIC WALLCOVERING

GAGEGAGEGAGEGAGE

GRANITEGRANITEGRANITEGRANITE

GYPSUM (WALL) BOARDGYPSUM (WALL) BOARDGYPSUM (WALL) BOARDGYPSUM (WALL) BOARD

HANDICAPPEDHANDICAPPEDHANDICAPPEDHANDICAPPED

HOLLOW METALHOLLOW METALHOLLOW METALHOLLOW METAL

HANDRAILHANDRAILHANDRAILHANDRAIL

HEATING VENTILATION AND AIR-CONDITIONINGHEATING VENTILATION AND AIR-CONDITIONINGHEATING VENTILATION AND AIR-CONDITIONINGHEATING VENTILATION AND AIR-CONDITIONING

MATERIALMATERIALMATERIALMATERIAL

MAXIMUMMAXIMUMMAXIMUMMAXIMUM

MECHANICALMECHANICALMECHANICALMECHANICAL

MANUFACTURERMANUFACTURERMANUFACTURERMANUFACTURER

MINIMUMMINIMUMMINIMUMMINIMUM

MASONRY OPENINGMASONRY OPENINGMASONRY OPENINGMASONRY OPENING

METALMETALMETALMETAL

NOT IN CONTRACTNOT IN CONTRACTNOT IN CONTRACTNOT IN CONTRACT

NOT TO SCALENOT TO SCALENOT TO SCALENOT TO SCALE

ON CENTERON CENTERON CENTERON CENTER

OPPOSITE HANDOPPOSITE HANDOPPOSITE HANDOPPOSITE HAND

PORCELAIN BASEPORCELAIN BASEPORCELAIN BASEPORCELAIN BASE

PLASTERPLASTERPLASTERPLASTER

PLASTIC LAMINATEPLASTIC LAMINATEPLASTIC LAMINATEPLASTIC LAMINATE

PORCELAIN TILEPORCELAIN TILEPORCELAIN TILEPORCELAIN TILE

PAIRPAIRPAIRPAIR

PAINTPAINTPAINTPAINT

QUARRY TILEQUARRY TILEQUARRY TILEQUARRY TILE

RESILIENT BASERESILIENT BASERESILIENT BASERESILIENT BASE

REFRIGERATORREFRIGERATORREFRIGERATORREFRIGERATOR

REQUIREDREQUIREDREQUIREDREQUIRED

RESINOUS FLOORINGRESINOUS FLOORINGRESINOUS FLOORINGRESINOUS FLOORING

RESINOUS EPOXY WALL-CEILINGRESINOUS EPOXY WALL-CEILINGRESINOUS EPOXY WALL-CEILINGRESINOUS EPOXY WALL-CEILING

ROUGH OPENINGROUGH OPENINGROUGH OPENINGROUGH OPENING

RUBBER FLOORINGRUBBER FLOORINGRUBBER FLOORINGRUBBER FLOORING

RECESSED PAPER HOLDERRECESSED PAPER HOLDERRECESSED PAPER HOLDERRECESSED PAPER HOLDER SEALED HIGH BUILD GLAZED COATINGSEALED HIGH BUILD GLAZED COATINGSEALED HIGH BUILD GLAZED COATINGSEALED HIGH BUILD GLAZED COATING

(SPECIAL COATING)(SPECIAL COATING)(SPECIAL COATING)(SPECIAL COATING)

SOAP DISPENSERSOAP DISPENSERSOAP DISPENSERSOAP DISPENSER

SOLID CORE WOODSOLID CORE WOODSOLID CORE WOODSOLID CORE WOOD

SIMILARSIMILARSIMILARSIMILAR

SANITARY NAPKIN DISPENSERSANITARY NAPKIN DISPENSERSANITARY NAPKIN DISPENSERSANITARY NAPKIN DISPENSER

SPECIAL FACEDSPECIAL FACEDSPECIAL FACEDSPECIAL FACED

STAINLESS STEEL/SOLID SURFACESTAINLESS STEEL/SOLID SURFACESTAINLESS STEEL/SOLID SURFACESTAINLESS STEEL/SOLID SURFACE

STEELSTEELSTEELSTEEL

SUBSTRATESUBSTRATESUBSTRATESUBSTRATE

SHEET VINYLSHEET VINYLSHEET VINYLSHEET VINYL

SOLID VINYL TILESOLID VINYL TILESOLID VINYL TILESOLID VINYL TILE

TACK BOARDTACK BOARDTACK BOARDTACK BOARD

TELEPHONETELEPHONETELEPHONETELEPHONE

TOP OFTOP OFTOP OFTOP OF

TOILET PAPERTOILET PAPERTOILET PAPERTOILET PAPER

TYPICALTYPICALTYPICALTYPICAL

UNLESS NOTED OTHERWISEUNLESS NOTED OTHERWISEUNLESS NOTED OTHERWISEUNLESS NOTED OTHERWISE VINYL COMPOSITION TILEVINYL COMPOSITION TILEVINYL COMPOSITION TILEVINYL COMPOSITION TILE

VINYL WALL COVERINGVINYL WALL COVERINGVINYL WALL COVERINGVINYL WALL COVERING

WALL COVERINGWALL COVERINGWALL COVERINGWALL COVERING

WALL PROTECTIONWALL PROTECTIONWALL PROTECTIONWALL PROTECTION

WOODWOODWOODWOOD

WELDED SEAM SHEET FLOORINGWELDED SEAM SHEET FLOORINGWELDED SEAM SHEET FLOORINGWELDED SEAM SHEET FLOORING (HEAT WELDED WITH ROD)(HEAT WELDED WITH ROD)(HEAT WELDED WITH ROD)(HEAT WELDED WITH ROD)

ACACACAC

ATATATAT

AFFAFFAFFAFF

ALUMALUMALUMALUM

BATTBATTBATTBATT

BOBOBOBO

CBBCBBCBBCBB

CCWCCWCCWCCW

CFMFCFMFCFMFCFMF

CGCGCGCG

CCCC

CMTCMTCMTCMT

CMUCMUCMUCMU

COCOCOCO

COMMCOMMCOMMCOMM

CONCCONCCONCCONC

CONC-SCONC-SCONC-SCONC-S

CONTCONTCONTCONT

CORCORCORCOR

COTRCOTRCOTRCOTR

CTCTCTCT

CTBCTBCTBCTB

CPCPCPCP

DIADIADIADIA

EJEJEJEJ

ELECELECELECELEC

EQEQEQEQ

ESESESES

ETCETCETCETC

EXISTEXISTEXISTEXIST

EXPEXPEXPEXP

FAC FINFAC FINFAC FINFAC FIN

FDFDFDFD

FECFECFECFEC

FHCFHCFHCFHC

FFFFFFFF

FINFINFINFIN

FLRFLRFLRFLR

FOFOFOFO

FVFVFVFV

FWCFWCFWCFWC

GAGAGAGA

GRAGRAGRAGRA

GYP BD/GWBGYP BD/GWBGYP BD/GWBGYP BD/GWB

HCHCHCHC

HMHMHMHM

HRHRHRHR

HVACHVACHVACHVAC

MATLMATLMATLMATL

MAXMAXMAXMAX

MECHMECHMECHMECH

MFRMFRMFRMFR

MINMINMINMIN

MOMOMOMO

MTLMTLMTLMTL

NICNICNICNIC

NTSNTSNTSNTS

OCOCOCOC

OHOHOHOH

PBPBPBPB

PLSPLSPLSPLS

PLPLPLPL

PTPTPTPT

PRPRPRPR

PPPP

QTQTQTQT

RBRBRBRB

REFREFREFREF

REQ'DREQ'DREQ'DREQ'D

RES-2RES-2RES-2RES-2

RES-WRES-WRES-WRES-W

RORORORO

RFRFRFRF

RPHRPHRPHRPH

SCSCSCSC

SDSDSDSD

SCWSCWSCWSCW

SIMSIMSIMSIM

SNDSNDSNDSND

SPSPSPSP

SSSSSSSS

STLSTLSTLSTL

SUBSSUBSSUBSSUBS

SVSVSVSV

SVTSVTSVTSVT

TBTBTBTB

TELETELETELETELE

TOTOTOTO

TPTPTPTP

TYPTYPTYPTYP

UNOUNOUNOUNO

VCTVCTVCTVCT

VWCVWCVWCVWC

WCWCWCWC

WPWPWPWP

WDWDWDWD

WSFWSFWSFWSF

LLLL

FIRE EXTINGUISHER CABINETFIRE EXTINGUISHER CABINETFIRE EXTINGUISHER CABINETFIRE EXTINGUISHER CABINET

ROOM NAME AND NUMBERROOM NAME AND NUMBERROOM NAME AND NUMBERROOM NAME AND NUMBER

DOOR NUMBERDOOR NUMBERDOOR NUMBERDOOR NUMBER

KEYED NOTEKEYED NOTEKEYED NOTEKEYED NOTE

WINDOW TYPEWINDOW TYPEWINDOW TYPEWINDOW TYPE

PARTITION TYPE OR TOILET ACCESSORYPARTITION TYPE OR TOILET ACCESSORYPARTITION TYPE OR TOILET ACCESSORYPARTITION TYPE OR TOILET ACCESSORY

DETAIL CALLOUTDETAIL CALLOUTDETAIL CALLOUTDETAIL CALLOUT

DETAIL NUMBERDETAIL NUMBERDETAIL NUMBERDETAIL NUMBER

SHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWN

SECTION CALLOUTSECTION CALLOUTSECTION CALLOUTSECTION CALLOUT

VERTICAL ELEVATIONVERTICAL ELEVATIONVERTICAL ELEVATIONVERTICAL ELEVATION

COLUMN CENTERLINE DESIGNATIONCOLUMN CENTERLINE DESIGNATIONCOLUMN CENTERLINE DESIGNATIONCOLUMN CENTERLINE DESIGNATION

DEMOLITION NOTEDEMOLITION NOTEDEMOLITION NOTEDEMOLITION NOTE

DETAIL NUMBERDETAIL NUMBERDETAIL NUMBERDETAIL NUMBER

SHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWN

ELEVATION CALLOUTELEVATION CALLOUTELEVATION CALLOUTELEVATION CALLOUT

DETAIL NUMBERDETAIL NUMBERDETAIL NUMBERDETAIL NUMBER

SHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWNSHEET WHERE DETAIL IS DRAWN

A.A.A.A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO:DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO:DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO:DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO:

FACE OF NEW MASONRYFACE OF NEW MASONRYFACE OF NEW MASONRYFACE OF NEW MASONRY

FACE OF NEW WALL STUDSFACE OF NEW WALL STUDSFACE OF NEW WALL STUDSFACE OF NEW WALL STUDS

TOP OF SLABTOP OF SLABTOP OF SLABTOP OF SLAB

TOP OF MASONRYTOP OF MASONRYTOP OF MASONRYTOP OF MASONRY

B.B.B.B. COORDINATE WITH ELECTRICAL, HVAC, PLUMBING, AND FIRE PROTECTIONCOORDINATE WITH ELECTRICAL, HVAC, PLUMBING, AND FIRE PROTECTIONCOORDINATE WITH ELECTRICAL, HVAC, PLUMBING, AND FIRE PROTECTIONCOORDINATE WITH ELECTRICAL, HVAC, PLUMBING, AND FIRE PROTECTION DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE DUCT, CONDUIT,DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE DUCT, CONDUIT,DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE DUCT, CONDUIT,DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE DUCT, CONDUIT, AND PIPE OPENINGS IN SLABS, ROOF, AND WALLS. COORDINATE DUCT,AND PIPE OPENINGS IN SLABS, ROOF, AND WALLS. COORDINATE DUCT,AND PIPE OPENINGS IN SLABS, ROOF, AND WALLS. COORDINATE DUCT,AND PIPE OPENINGS IN SLABS, ROOF, AND WALLS. COORDINATE DUCT, CONDUIT, AND PIPE ROUTING ABOVE CEILINGS. PATCH HOLES CAUSEDCONDUIT, AND PIPE ROUTING ABOVE CEILINGS. PATCH HOLES CAUSEDCONDUIT, AND PIPE ROUTING ABOVE CEILINGS. PATCH HOLES CAUSEDCONDUIT, AND PIPE ROUTING ABOVE CEILINGS. PATCH HOLES CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLS,BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLS,BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLS,BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLS, ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE,ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE,ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE,ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE, MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY.MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY.MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY.MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY.

C.C.C.C. COORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED WOOD BLOCKINGCOORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED WOOD BLOCKINGCOORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED WOOD BLOCKINGCOORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED WOOD BLOCKING FOR WALL HOOKS, BRACKETS, GRAB BARS, COMPUTER MONITORS,FOR WALL HOOKS, BRACKETS, GRAB BARS, COMPUTER MONITORS,FOR WALL HOOKS, BRACKETS, GRAB BARS, COMPUTER MONITORS,FOR WALL HOOKS, BRACKETS, GRAB BARS, COMPUTER MONITORS, TELEVISION WALL BRACKETS, HANDRAILS, GUARDRAILS, WOOD MOLDINGS,TELEVISION WALL BRACKETS, HANDRAILS, GUARDRAILS, WOOD MOLDINGS,TELEVISION WALL BRACKETS, HANDRAILS, GUARDRAILS, WOOD MOLDINGS,TELEVISION WALL BRACKETS, HANDRAILS, GUARDRAILS, WOOD MOLDINGS, DISPLAYS, ACCESSORIES ETC., BETWEEN STUDS. COORDINATE LOCATIONSDISPLAYS, ACCESSORIES ETC., BETWEEN STUDS. COORDINATE LOCATIONSDISPLAYS, ACCESSORIES ETC., BETWEEN STUDS. COORDINATE LOCATIONSDISPLAYS, ACCESSORIES ETC., BETWEEN STUDS. COORDINATE LOCATIONS WITH COR FOR GOVERNMENT FURNISHED EQUIPMENT.WITH COR FOR GOVERNMENT FURNISHED EQUIPMENT.WITH COR FOR GOVERNMENT FURNISHED EQUIPMENT.WITH COR FOR GOVERNMENT FURNISHED EQUIPMENT.

D.D.D.D. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE,`PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE,`PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE,`PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEMHANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEMHANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEMHANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM

INDICATED.INDICATED.INDICATED.INDICATED.

E.E.E.E. SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATEDSEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATEDSEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATEDSEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATED PARTITIONS AND FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOPPARTITIONS AND FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOPPARTITIONS AND FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOPPARTITIONS AND FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF THE WALL OR SLAB. SUBMIT CUT SHEETSTO MAINTAIN THE RATING OF THE WALL OR SLAB. SUBMIT CUT SHEETSTO MAINTAIN THE RATING OF THE WALL OR SLAB. SUBMIT CUT SHEETSTO MAINTAIN THE RATING OF THE WALL OR SLAB. SUBMIT CUT SHEETS AND SPECIFICATIONS TO THE COR FOR APPROVAL PRIOR TO INSTALLATION.AND SPECIFICATIONS TO THE COR FOR APPROVAL PRIOR TO INSTALLATION.AND SPECIFICATIONS TO THE COR FOR APPROVAL PRIOR TO INSTALLATION.AND SPECIFICATIONS TO THE COR FOR APPROVAL PRIOR TO INSTALLATION.

PROVIDE UL LISTED ASSEMBLIES.PROVIDE UL LISTED ASSEMBLIES.PROVIDE UL LISTED ASSEMBLIES.PROVIDE UL LISTED ASSEMBLIES.

F.F.F.F. COORDINATE CONTRACTOR DUMPSTER LOCATION WITH GOVERNMENT.COORDINATE CONTRACTOR DUMPSTER LOCATION WITH GOVERNMENT.COORDINATE CONTRACTOR DUMPSTER LOCATION WITH GOVERNMENT.COORDINATE CONTRACTOR DUMPSTER LOCATION WITH GOVERNMENT.

DUMPSTER LOCATION TO BE IDENTIFIED PRIOR TO BIDDING.DUMPSTER LOCATION TO BE IDENTIFIED PRIOR TO BIDDING.DUMPSTER LOCATION TO BE IDENTIFIED PRIOR TO BIDDING.DUMPSTER LOCATION TO BE IDENTIFIED PRIOR TO BIDDING.

G.G.G.G. COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES.COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES.COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES.COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES.

H.H.H.H.

I.I.I.I.

REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS ANDREMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS ANDREMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS ANDREMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS REQUIRED FOR NEW CONSTRUCTION.AS REQUIRED FOR NEW CONSTRUCTION.AS REQUIRED FOR NEW CONSTRUCTION.AS REQUIRED FOR NEW CONSTRUCTION.

A.A.A.A. THE CONTRACTOR SHALL BE PREPARED TO STOP ANY WORK AND CLEAR UPTHE CONTRACTOR SHALL BE PREPARED TO STOP ANY WORK AND CLEAR UPTHE CONTRACTOR SHALL BE PREPARED TO STOP ANY WORK AND CLEAR UPTHE CONTRACTOR SHALL BE PREPARED TO STOP ANY WORK AND CLEAR UP THE WORK AREA IF SO ASKED IN MEDICAL SITUATIONS REQUIRING SUCHTHE WORK AREA IF SO ASKED IN MEDICAL SITUATIONS REQUIRING SUCHTHE WORK AREA IF SO ASKED IN MEDICAL SITUATIONS REQUIRING SUCHTHE WORK AREA IF SO ASKED IN MEDICAL SITUATIONS REQUIRING SUCH

ACTION.ACTION.ACTION.ACTION.

B.B.B.B. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS ORTHE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS ORTHE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS ORTHE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED.EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED.EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED.EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED.

C.C.C.C. ALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLYALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLYALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLYALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED AT ALL TIMES BY THE CONTRACTOR TO REDUCE POSSIBILITY OFSECURED AT ALL TIMES BY THE CONTRACTOR TO REDUCE POSSIBILITY OFSECURED AT ALL TIMES BY THE CONTRACTOR TO REDUCE POSSIBILITY OFSECURED AT ALL TIMES BY THE CONTRACTOR TO REDUCE POSSIBILITY OF ANY OF THESE TOOLS BEING A HAZARD TO PATIENTS, VISITORS, ORANY OF THESE TOOLS BEING A HAZARD TO PATIENTS, VISITORS, ORANY OF THESE TOOLS BEING A HAZARD TO PATIENTS, VISITORS, ORANY OF THESE TOOLS BEING A HAZARD TO PATIENTS, VISITORS, OR

EMPLOYEES.EMPLOYEES.EMPLOYEES.EMPLOYEES.

D.D.D.D. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FORTHE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FORTHE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FORTHE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIREDEACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIREDEACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIREDEACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE WITH COR.TO RECEIVE BADGES. COORDINATE WITH COR.TO RECEIVE BADGES. COORDINATE WITH COR.TO RECEIVE BADGES. COORDINATE WITH COR.

E.E.E.E. THE CONTRACTOR, AT HIS EXPENSE, WILL BE RESPONSIBLE FOR TRAININGTHE CONTRACTOR, AT HIS EXPENSE, WILL BE RESPONSIBLE FOR TRAININGTHE CONTRACTOR, AT HIS EXPENSE, WILL BE RESPONSIBLE FOR TRAININGTHE CONTRACTOR, AT HIS EXPENSE, WILL BE RESPONSIBLE FOR TRAINING EACH MEMBER OF HIS WORK FORCE ON VA POLICIES FOR ON-SITE WORKEACH MEMBER OF HIS WORK FORCE ON VA POLICIES FOR ON-SITE WORKEACH MEMBER OF HIS WORK FORCE ON VA POLICIES FOR ON-SITE WORKEACH MEMBER OF HIS WORK FORCE ON VA POLICIES FOR ON-SITE WORK BEFORE ANY MEMBER WILL BE ALLOWED TO PERFORM WORK ON VABEFORE ANY MEMBER WILL BE ALLOWED TO PERFORM WORK ON VABEFORE ANY MEMBER WILL BE ALLOWED TO PERFORM WORK ON VABEFORE ANY MEMBER WILL BE ALLOWED TO PERFORM WORK ON VA

PREMISES.PREMISES.PREMISES.PREMISES.

F.F.F.F. ABSOLUTELY NO VA TOOLS, MATERIALS, OR EQUIPMENT WILL BE LOANED ORABSOLUTELY NO VA TOOLS, MATERIALS, OR EQUIPMENT WILL BE LOANED ORABSOLUTELY NO VA TOOLS, MATERIALS, OR EQUIPMENT WILL BE LOANED ORABSOLUTELY NO VA TOOLS, MATERIALS, OR EQUIPMENT WILL BE LOANED OR GIVEN BY THE VA TO ANY MEMBER OF THE CONTRACTOR'S WORK FORCEGIVEN BY THE VA TO ANY MEMBER OF THE CONTRACTOR'S WORK FORCEGIVEN BY THE VA TO ANY MEMBER OF THE CONTRACTOR'S WORK FORCEGIVEN BY THE VA TO ANY MEMBER OF THE CONTRACTOR'S WORK FORCE

AT ANY TIME.AT ANY TIME.AT ANY TIME.AT ANY TIME.

G.G.G.G. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TOANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TOANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TOANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE, DUST, AND DEBRIS SHALL BE SUITABLYCONSTRUCTION SMOKE, DUST, AND DEBRIS SHALL BE SUITABLYCONSTRUCTION SMOKE, DUST, AND DEBRIS SHALL BE SUITABLYCONSTRUCTION SMOKE, DUST, AND DEBRIS SHALL BE SUITABLY PROTECTED TO PREVENT ACCIDENTAL ALARM DURING CONSTRUCTION. ALLPROTECTED TO PREVENT ACCIDENTAL ALARM DURING CONSTRUCTION. ALLPROTECTED TO PREVENT ACCIDENTAL ALARM DURING CONSTRUCTION. ALLPROTECTED TO PREVENT ACCIDENTAL ALARM DURING CONSTRUCTION. ALL SUCH ACTION MUST BE FIRST COORDINATED AND CLEARED WITH CORSUCH ACTION MUST BE FIRST COORDINATED AND CLEARED WITH CORSUCH ACTION MUST BE FIRST COORDINATED AND CLEARED WITH CORSUCH ACTION MUST BE FIRST COORDINATED AND CLEARED WITH COR AND THE VA SAFETY OFFICER. ALL FUNCTIONAL FIRE ALARM DEVICESAND THE VA SAFETY OFFICER. ALL FUNCTIONAL FIRE ALARM DEVICESAND THE VA SAFETY OFFICER. ALL FUNCTIONAL FIRE ALARM DEVICESAND THE VA SAFETY OFFICER. ALL FUNCTIONAL FIRE ALARM DEVICES SHALL BE ACTIVE WHENEVER CONTRACTOR'S FORCES ARE NOT PRESENTSHALL BE ACTIVE WHENEVER CONTRACTOR'S FORCES ARE NOT PRESENTSHALL BE ACTIVE WHENEVER CONTRACTOR'S FORCES ARE NOT PRESENTSHALL BE ACTIVE WHENEVER CONTRACTOR'S FORCES ARE NOT PRESENT

IN WORK AREA.IN WORK AREA.IN WORK AREA.IN WORK AREA.

H.H.H.H. THE CONTRACTOR MUST PROVIDE WRITTEN FIRE SAFETY CHECKLIST AT THETHE CONTRACTOR MUST PROVIDE WRITTEN FIRE SAFETY CHECKLIST AT THETHE CONTRACTOR MUST PROVIDE WRITTEN FIRE SAFETY CHECKLIST AT THETHE CONTRACTOR MUST PROVIDE WRITTEN FIRE SAFETY CHECKLIST AT THE END OF EVERY WORK DAY TO THE COR CERTIFYING THAT ALL WORK AREASEND OF EVERY WORK DAY TO THE COR CERTIFYING THAT ALL WORK AREASEND OF EVERY WORK DAY TO THE COR CERTIFYING THAT ALL WORK AREASEND OF EVERY WORK DAY TO THE COR CERTIFYING THAT ALL WORK AREAS HAVE BEEN SURVEYED AND FOUND TO BE SECURE, SAFE, AND FREE OFHAVE BEEN SURVEYED AND FOUND TO BE SECURE, SAFE, AND FREE OFHAVE BEEN SURVEYED AND FOUND TO BE SECURE, SAFE, AND FREE OFHAVE BEEN SURVEYED AND FOUND TO BE SECURE, SAFE, AND FREE OF ANY FLAMMABLE LIQUIDS.ANY FLAMMABLE LIQUIDS.ANY FLAMMABLE LIQUIDS.ANY FLAMMABLE LIQUIDS.

I.I.I.I. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR ANDCONTRACTOR SHALL COORDINATE ONLY WITH THE COR ANDCONTRACTOR SHALL COORDINATE ONLY WITH THE COR ANDCONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND

CONTRACTING OFFICER.CONTRACTING OFFICER.CONTRACTING OFFICER.CONTRACTING OFFICER.

J.J.J.J. SEE SPECIFICATION SECTION 01 35 26 FOR INTERIM LIFE SAFETY MEASURES.SEE SPECIFICATION SECTION 01 35 26 FOR INTERIM LIFE SAFETY MEASURES.SEE SPECIFICATION SECTION 01 35 26 FOR INTERIM LIFE SAFETY MEASURES.SEE SPECIFICATION SECTION 01 35 26 FOR INTERIM LIFE SAFETY MEASURES.

K.K.K.K.

L.L.L.L.

ALL FINISH COLORS TO BE SELECTED BY COR/ V.A INTERIORALL FINISH COLORS TO BE SELECTED BY COR/ V.A INTERIORALL FINISH COLORS TO BE SELECTED BY COR/ V.A INTERIORALL FINISH COLORS TO BE SELECTED BY COR/ V.A INTERIOR DESIGNER WHERE NOT OTHERWISE INDICATED. CONTRACTOR SHALLDESIGNER WHERE NOT OTHERWISE INDICATED. CONTRACTOR SHALLDESIGNER WHERE NOT OTHERWISE INDICATED. CONTRACTOR SHALLDESIGNER WHERE NOT OTHERWISE INDICATED. CONTRACTOR SHALL SUBMIT THE COLORS PER SUBMITTAL REQUIREMENT OF CONTRACT.SUBMIT THE COLORS PER SUBMITTAL REQUIREMENT OF CONTRACT.SUBMIT THE COLORS PER SUBMITTAL REQUIREMENT OF CONTRACT.SUBMIT THE COLORS PER SUBMITTAL REQUIREMENT OF CONTRACT.

M.M.M.M.

SEAL ALL PLATES, COVERS, DEVICES, AND GENERAL WALL AND CEILINGSEAL ALL PLATES, COVERS, DEVICES, AND GENERAL WALL AND CEILINGSEAL ALL PLATES, COVERS, DEVICES, AND GENERAL WALL AND CEILINGSEAL ALL PLATES, COVERS, DEVICES, AND GENERAL WALL AND CEILING PENETRATIONS IN ALL NEW SPACES, TYPICAL.PENETRATIONS IN ALL NEW SPACES, TYPICAL.PENETRATIONS IN ALL NEW SPACES, TYPICAL.PENETRATIONS IN ALL NEW SPACES, TYPICAL.

N.N.N.N.

PROVIDE 16" x 16" ACCESS PANELS IN HARD CEILINGS WHERE DUCTSPROVIDE 16" x 16" ACCESS PANELS IN HARD CEILINGS WHERE DUCTSPROVIDE 16" x 16" ACCESS PANELS IN HARD CEILINGS WHERE DUCTSPROVIDE 16" x 16" ACCESS PANELS IN HARD CEILINGS WHERE DUCTS AND DAMPERS OR OTHER PIPES REQUIRE ACCESS AS REQUIRED.AND DAMPERS OR OTHER PIPES REQUIRE ACCESS AS REQUIRED.AND DAMPERS OR OTHER PIPES REQUIRE ACCESS AS REQUIRED.AND DAMPERS OR OTHER PIPES REQUIRE ACCESS AS REQUIRED.

COORDINATE EXACT LOCATION W/COR.COORDINATE EXACT LOCATION W/COR.COORDINATE EXACT LOCATION W/COR.COORDINATE EXACT LOCATION W/COR.

THE CONTRACTOR SHALL NOT OPERATE ANY EXISTING VA EQUIPMENTTHE CONTRACTOR SHALL NOT OPERATE ANY EXISTING VA EQUIPMENTTHE CONTRACTOR SHALL NOT OPERATE ANY EXISTING VA EQUIPMENTTHE CONTRACTOR SHALL NOT OPERATE ANY EXISTING VA EQUIPMENT INCLUDING BUT NOT LIMITED TO ELECTRICAL, FIRE-HYDRANT, VALVES,INCLUDING BUT NOT LIMITED TO ELECTRICAL, FIRE-HYDRANT, VALVES,INCLUDING BUT NOT LIMITED TO ELECTRICAL, FIRE-HYDRANT, VALVES,INCLUDING BUT NOT LIMITED TO ELECTRICAL, FIRE-HYDRANT, VALVES, PUMPS, ETC., WITH OUT AUTHORIZATION FROM THE VAMCPUMPS, ETC., WITH OUT AUTHORIZATION FROM THE VAMCPUMPS, ETC., WITH OUT AUTHORIZATION FROM THE VAMCPUMPS, ETC., WITH OUT AUTHORIZATION FROM THE VAMC ENGINEERING SERVICE, UNLESS AN EMERGENCY SITUATION EXISTS. INENGINEERING SERVICE, UNLESS AN EMERGENCY SITUATION EXISTS. INENGINEERING SERVICE, UNLESS AN EMERGENCY SITUATION EXISTS. INENGINEERING SERVICE, UNLESS AN EMERGENCY SITUATION EXISTS. IN GENERAL, THE OPERATING STAFF OF THE VAMC ENGINEERINGGENERAL, THE OPERATING STAFF OF THE VAMC ENGINEERINGGENERAL, THE OPERATING STAFF OF THE VAMC ENGINEERINGGENERAL, THE OPERATING STAFF OF THE VAMC ENGINEERING SERVICE WILL OPERATE ANY EXISTING EQUIPMENT WHICH THESERVICE WILL OPERATE ANY EXISTING EQUIPMENT WHICH THESERVICE WILL OPERATE ANY EXISTING EQUIPMENT WHICH THESERVICE WILL OPERATE ANY EXISTING EQUIPMENT WHICH THE CONTRACTOR MAY REQUIRECONTRACTOR MAY REQUIRECONTRACTOR MAY REQUIRECONTRACTOR MAY REQUIRE

CONTRACTOR SHALL NOT PROCEED WITH WORK UTIL CONSTRUCTION PERMITCONTRACTOR SHALL NOT PROCEED WITH WORK UTIL CONSTRUCTION PERMITCONTRACTOR SHALL NOT PROCEED WITH WORK UTIL CONSTRUCTION PERMITCONTRACTOR SHALL NOT PROCEED WITH WORK UTIL CONSTRUCTION PERMIT

IS APPROVED/SIGNED.IS APPROVED/SIGNED.IS APPROVED/SIGNED.IS APPROVED/SIGNED.

CARD READERCARD READERCARD READERCARD READERCRCRCRCR

HIGH-PRESSURE LAMINATEHIGH-PRESSURE LAMINATEHIGH-PRESSURE LAMINATEHIGH-PRESSURE LAMINATEHPLHPLHPLHPL

LUXURY VINYL TILELUXURY VINYL TILELUXURY VINYL TILELUXURY VINYL TILELVTLVTLVTLVT

EDGE OF DECKEDGE OF DECKEDGE OF DECKEDGE OF DECKEODEODEODEOD

J.J.J.J. COMPLETE LAYOUT AND COORDINATION DRAWINGS AT 1/4" SCALE SHALLCOMPLETE LAYOUT AND COORDINATION DRAWINGS AT 1/4" SCALE SHALLCOMPLETE LAYOUT AND COORDINATION DRAWINGS AT 1/4" SCALE SHALLCOMPLETE LAYOUT AND COORDINATION DRAWINGS AT 1/4" SCALE SHALL BE PROVIDED. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEMBE PROVIDED. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEMBE PROVIDED. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEMBE PROVIDED. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT AND COORDINATION DRAWINGS HAVE BEEN APPROVED.UNTIL THE LAYOUT AND COORDINATION DRAWINGS HAVE BEEN APPROVED.UNTIL THE LAYOUT AND COORDINATION DRAWINGS HAVE BEEN APPROVED.UNTIL THE LAYOUT AND COORDINATION DRAWINGS HAVE BEEN APPROVED.

DOWNSPOUTDOWNSPOUTDOWNSPOUTDOWNSPOUTDSDSDSDS

CONTROL JOINTCONTROL JOINTCONTROL JOINTCONTROL JOINTCJCJCJCJ

ELECTRIC DRINKING FOUNTAINELECTRIC DRINKING FOUNTAINELECTRIC DRINKING FOUNTAINELECTRIC DRINKING FOUNTAINEDFEDFEDFEDF

FIRE RETARDANT TREATEDFIRE RETARDANT TREATEDFIRE RETARDANT TREATEDFIRE RETARDANT TREATEDFRTFRTFRTFRT

EXTERIOR INSULATION FINISHING SYSTEMEXTERIOR INSULATION FINISHING SYSTEMEXTERIOR INSULATION FINISHING SYSTEMEXTERIOR INSULATION FINISHING SYSTEMEIFSEIFSEIFSEIFS

WATER RESISTANTWATER RESISTANTWATER RESISTANTWATER RESISTANTWRWRWRWR

J1J1J1J1

SECTION CUTSECTION CUTSECTION CUTSECTION CUT

HEAD/JAMB/SILL DETAIL NUMBERHEAD/JAMB/SILL DETAIL NUMBERHEAD/JAMB/SILL DETAIL NUMBERHEAD/JAMB/SILL DETAIL NUMBER

MOUNTING HEIGHTS

NOTE: NOT ALL ITEMS ARE INCLUDED IN THE WORK.NOTE: NOT ALL ITEMS ARE INCLUDED IN THE WORK.NOTE: NOT ALL ITEMS ARE INCLUDED IN THE WORK.NOTE: NOT ALL ITEMS ARE INCLUDED IN THE WORK.

ACCESSIBILITY REQUIREMENTS

FRONT APPROACHES

HINGE-SIDE APPROACHES

LATCH-SIDE APPROACHES

USE EITHERUSE EITHERUSE EITHERUSE EITHER

OPTION 1 OROPTION 1 OROPTION 1 OROPTION 1 OR

OPTION 2OPTION 2OPTION 2OPTION 2

ALL DOOR ASSEMBLIES SHALL BE CONSTRUCTED TO MEET THEALL DOOR ASSEMBLIES SHALL BE CONSTRUCTED TO MEET THEALL DOOR ASSEMBLIES SHALL BE CONSTRUCTED TO MEET THEALL DOOR ASSEMBLIES SHALL BE CONSTRUCTED TO MEET THE INDICATED MINIMUM CLEARANCES AS APPLICABLE.INDICATED MINIMUM CLEARANCES AS APPLICABLE.INDICATED MINIMUM CLEARANCES AS APPLICABLE.INDICATED MINIMUM CLEARANCES AS APPLICABLE.

1'-0" IF DOOR HAS1'-0" IF DOOR HAS1'-0" IF DOOR HAS1'-0" IF DOOR HAS

BOTH A CLOSERBOTH A CLOSERBOTH A CLOSERBOTH A CLOSER

AND A LATCHAND A LATCHAND A LATCHAND A LATCH

5' 0"

5' 0"

5' 0"

5' 0"

1'-6"1'-6"1'-6"1'-6"

3' 6"

3' 6"

3' 6"

3' 6"

4'-6"4'-6"4'-6"4'-6"

4' 0"

4' 0"

4' 0"

4' 0"

O

PT

IO

N

O

PT

IO

N

O

PT

IO

N

O

PT

IO

N

5' 0"

5' 0"

5' 0"

5' 0"

OPTION 1OPTION 1OPTION 1OPTION 1

3'-0"3'-0"3'-0"3'-0"

O

PT

IO

N

O

PT

IO

N

O

PT

IO

N

O

PT

IO

N

4' 6"

4' 6"

4' 6"

4' 6"

OPTION 2OPTION 2OPTION 2OPTION 2

3'-6"3'-6"3'-6"3'-6"

2'-0"2'-0"2'-0"2'-0"

4' 0"

4' 0"

4' 0"

4' 0"

2'-0"2'-0"2'-0"2'-0"

3' 6"

3' 6"

3' 6"

3' 6"

4' 0"

4' 0"

4' 0"

4' 0"

4' 6"

4' 6"

4' 6"

4' 6"

W C

LO

SE

R

W C

LO

SE

R

W C

LO

SE

R

W C

LO

SE

R

4' 0"

4' 0"

4' 0"

4' 0"

W C

LO

SE

R

W C

LO

SE

R

W C

LO

SE

R

W C

LO

SE

R

W C

LO

SE

R

W C

LO

SE

R

W C

LO

SE

R

W C

LO

SE

R

AN

D

LA

TC

H

AN

D

LA

TC

H

AN

D

LA

TC

H

AN

D

LA

TC

H

ALL WORK SHALL COMPLY WITH FEDERAL ABA,ALL WORK SHALL…