This document is a series of Internal Examination Reports for Sprinkler System Piping & Valves at VA Medical Center, 1111 East End Blvd, Wilkes-Barre, PA 18702.
The reports document systematic inspections of various sprinkler systems throughout the facility, conducted between May and June 2021. Multiple systems were examined across different floors and locations, including drug systems, warehouse storage systems, boiler room systems, main sprinkler systems, penthouse sectional systems, elevator room systems, and miscellaneous wet sectional systems distributed throughout Stairwells 1-6, Floors 2-12. Each examination form identifies the specific system location, number of branchlines and feed mains examined, and inspection results. All systems examined passed their internal inspections, with checkmarks indicating successful completion. The examination forms consistently note that systems requiring flushing/cleaning should have materials removed to prevent piping or sprinkler orifice blockage during fire events. Each report is signed by examiners Chris Galiano and Brian London, with dates ranging from May 19, 2021 to June 2, 2021, and witnessed by Brett Smullen on corresponding dates. The reports recommend forwarding copies to insurance carriers for rating purposes.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .