Contractor Pre-Award OSHA Evaluation Form.pdf

PDF 40 KB Posted

Attached to
Z1DA--LOCAL minimum guarantee base Construction MATOC| Lebanon-Altoona Construction MATOC (VA-26-00000908)
Solicitation number
36C24425R0084
Issued by

About this file

The document is a Pre-Award Contractor Evaluation Form designed to assess a contractor's safety performance and qualifications. The form requires detailed safety information including historical data on man-hours, workplace injury cases, Days Away, Restricted, or Transferred (DART) rates, and OSHA violations for the years 2021-2024. Key evaluation criteria include: attaching OSHA 300 and 300a Forms, describing the company's safety philosophy, providing industry classification codes, identifying the administrator of the company's Safety and Health Program, and reporting the Insurance Experience Modification Rate (EMR). Contractors can be disqualified for having four serious violations, one repeat violation, one willful violation, or an EMR greater than 1.0.

View the file

Other files

File Type Posted
S02-P01-Seed Project - Narrative - Building 1 Entrance Enclosure redacted.pdf PDF
S02 EXHIBIT C Past Performance Questionnaire 10.15.25.docx DOCX document
S02-Seed Project - Drawings - Building 1 Entrance Enclosure.pdf PDF
36C24425R0084 0002.pdf PDF
36C24425R0084 0002_1.docx DOCX document
MATOC Sitewalk SignIn 9-24-25.pdf PDF
36C24425R0084 0001_1.docx DOCX document
36C24425R0084 0001.pdf PDF
S02-P01-Seed Project - Narrative - Building 1 Entrance Enclosure redacted.pdf PDF
S02-Hot Work Permit - Lebanon.doc DOC document
S02-S02-EXHIBIT D Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
36C24425R0084_2.docx DOCX document
S02-S02-EXHIBIT A - Statement of Prior Experience.docx DOCX document
S02-S02-EXHIBIT B Subcontractor Information and Consent Form 5.29.25.docx DOCX document
S02-P01-Seed Project - Narrative - Building 1 Entrance Enclosure.pdf PDF
S02-Seed Project - Drawings - Building 1 Entrance Enclosure.pdf PDF
S02-S02-EXHIBIT C Past Performance Questionnaire 5.29.25.docx DOCX document
S02-112713-010000-General Requirements -Lebanon.pdf PDF
S02-P11-MCR Altoona - Medical Center Requirements 8.15.25.pdf PDF
S02-P11-013526 Lebanon Safety Requirements Spec.docx DOCX document
S02-Seed Project Task Order Package 7.17.25f.docx DOCX document
S02-Davis Bacon Act WD PA20250093 _01.pdf PDF
36C24425R0084 9.22.25 R1.pdf PDF
36C24425R0084 9.22.25.pdf PDF
36C24425R0084_3.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Award Contractor Evaluation Form

Pre-Award Contractor Evaluation Form Company Name: ______________________________________________ Address: _____________________________________________________ Telephone: ______________________ Fax: ________________________ Email: __________________________ Contact: ______________________________________________________ Utilizing your OSHA 300 Forms, please complete the following information:

Category 2021

Current year - 4

Current year - 3

Current year - 2

Current year - 1

Number of man hours (jobsite and office).

Number of cases involving days away from work, restricted activity, or both (Column H and I of OSHA 300).

Days away, restricted, or transferred rate (# of days away, restricted, or transferred cases x 200,000/# of man hours) (DART Rate).

Number of serious, willful, or repeat violations from OSHA within the last 3 years. Please attach explanation for any violations. (Four serious, one repeat, or one willful disqualifies the contractor.)

Please attach copies of the following documents: OSHA 300 and 300a Forms. These forms can be accessed through the OSHA publications search page:

http://www.osha.gov/pls/publications/publication.html.

1. Describe the safety philosophy of your company:

2. Provide your four-digit Standard Industrial Classification (SIC) or six-digit North American Industrial Classification System (NAICS) Code: __________________________________

3. Who administers your company’s Safety and Health Program?

4. Company’s Insurance Experience Modification Rate (EMR) for the past 3 years (an EMR of greater than 1.0 disqualifies the contractor): ______________ http://www.osha.gov/pls/publications/publication.html

File details come from the government source that posted it. Updated .