This is Amendment 0002 to solicitation 36C24425R0001, which provides responses to contractor questions and requested pictures related to a power deficiencies correction project at the Erie VA Medical Center. The amendment includes 12 technical questions and responses covering specifications for concrete pads, distribution panels, duct bank requirements, manhole specifications, circuit breaker installations, generator demolition, and work schedule requirements. Key clarifications include that all four generators will have platforms constructed, new distribution panels need to be supplied along with Automatic Transfer Switches, and any work impacting patient care must be completed during off-hours with appropriate ICRA requirements.
The amendment also includes multiple photographs of existing electrical equipment nameplates and configurations for PP-1 panel, E-SWGR-1 switchgear, SWBD-2A and SWBD-2B equipment. These photos were provided to help contractors properly specify replacement components and integration requirements. The proposal due date remains unchanged from the original solicitation.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
12-19-2024
562-21-708 00244 Department of Veterans Affairs Network Contracting Office 4
00244 Department of Veterans Affairs Network Contracting Office 4
To all Offerors/Bidders
36C24425R0001
X
This amendment is issued to provide responses to questions and requested pictures.
The proposal due date remains unchanged.
Alll other Terms and Conditions remain unchanged.
***** Begin Inserted Word Document - ' S05 Question and Responses 36C24425R0001 12-19-24' ***** Questions and Responses Correct Power Deficiencies EEPG 3 for Proposal 36C24425R0001 Date of Responses – 12/19/2024
Question #1 Will all five (5) concrete pads and access decks between the generators be part of the contract or only the two (2) either side of the new install?
Response: See Drawing SS101 Sheet Keynote #3 & 11-EP101. All (4) generators (3)E + (1)N will have platforms constructed per drawing.
Question #2 All but three (3) of the distribution panels (N) “DPEQ1” and (N) “EQ-92E” on drawing E-6-15 are marked with keynote #3. Keynote #3 states “the distribution panel was pre-purchased in an earlier phase of the project. These three panels do not have Keynote #3 designation. Are these panels NEW to be supplied in this contract or have they been pre-purchased?
Response: NEW to be supplied in this contract along with their associated Automatic Transfer Switches (ATS-EQ1 & ATS-EQ2). This will allow for the new 480/277V EM distribution capabilities.
Question #3 Should the new duct bank on drawing 11-EP101 from building #11 to the new generator be concrete encased?
Response: No
Question #4 Drawing 11-EP101 and 12-EP101 say to remove the existing duct bank between the new manhole and building #12. Can we abandon the conduit, or must we dig it up?
Response: Per drawing 12-ED101 note at manhole, “Remove remaining duct bank”
Question #5 What size should the new manhole be?
Response: A 48” X 48” (approximation) underground enclosure (Quazite as example) rated for driveway, parking lot subject to occasional non-deliberate heavy vehicular traffic. Open bottom for drainage on gravel base.
Question #6 What exactly is required in the new manhole since it will be a spare with no cable in it? Just grounding and a ladder?
Response: See response #5
Question #7 We are to install a new 60A-2P circuit breaker in existing panel PP-1 for the generator auxiliary systems connection. Can a picture of the nameplate and existing circuit breaker in PP-1 be provided?
Response: Pic will be provided. Panel schedule provided.
Question #8 We are to install new switchgear sections for E-SWGR-1 in building #11. Can pictures of existing gear with the nameplate and manufacturer information be provided so we can give more information to our Eaton Vendor?
Response: Pic will be provided.
Question #9 We are to install 600AF/600AT breakers in both the SWBD-2A and SWBD-2B. Can pictures of this gear and existing breakers be provided?
Response: Pics will be provided.
Question #10 For the two generators that are to be demolished, can they be craned out from the parking lot to the south, or must we crane them out from the parking lot to the west?
Response: What ever means/direction is easiest and safest for the contractor.
Question #11 We are to install (2) 800AF/600AT circuit breakers in E-SWBD-2A. Can a picture of this gear and existing breakers be provided?
Response: Pics will be provided
Question #2 How much electrical work for this project will be able to be completed during normal hours? Will we need to work out of an ICRA cart for any of the work in the hallways?
Response: Any work that does not impact patient care (i.e. electrical outages, having to block corridors) can be completed during “normal” business hours. Patient care potential impact tasks must be completed “off hours”. ICRA requirements must be followed, each task may be unique and will have to be reviewed for appropriate level of control.
***** End Inserted Word Document - ' S05 Question and Responses 36C24425R0001 12-19-24' ***** ***** Begin Inserted Word Document - ' SG-PP1' ***** See attached document: SG-PP1.
***** End Inserted Word Document - ' SG-PP1' ***** ***** Begin Inserted .jpg file - ' E-SWBD-2A BREAKER 1' ***** See attached document: E-SWBD-2A BREAKER 1.
***** End Inserted .jpg file - ' E-SWBD-2A BREAKER 1' ***** ***** Begin Inserted .jpg file - ' E-SWBD-2A BREAKER 2' ***** See attached document: E-SWBD-2A BREAKER 2.
***** End Inserted .jpg file - ' E-SWBD-2A BREAKER 2' ***** ***** Begin Inserted .jpg file - ' E-SWBD-2A NAME PLATE' ***** See attached document: E-SWBD-2A NAME PLATE.
***** End Inserted .jpg file - ' E-SWBD-2A NAME PLATE' ***** ***** Begin Inserted .jpg file - ' E-SWGR-1 BREAKER' ***** See attached document: E-SWGR-1 BREAKER.
***** End Inserted .jpg file - ' E-SWGR-1 BREAKER' ***** ***** Begin Inserted .jpg file - ' E-SWGR-1 NAME PLATE' ***** See attached document: E-SWGR-1 NAME PLATE.
***** End Inserted .jpg file - ' E-SWGR-1 NAME PLATE' ***** ***** Begin Inserted .jpg file - ' E-SWGR-1 LINE UP' ***** See attached document: E-SWGR-1 LINE UP.
***** End Inserted .jpg file - ' E-SWGR-1 LINE UP' ***** ***** Begin Inserted .jpg file - ' PNL. PP-1 NAME PLATE' ***** See attached document: PNL. PP-1 NAME PLATE.
***** End Inserted .jpg file - ' PNL. PP-1 NAME PLATE' ***** ***** Begin Inserted .jpg file - ' PP-1 LINE UP' ***** See attached document: PP-1 LINE UP.
***** End Inserted .jpg file - ' PP-1 LINE UP' ***** ***** Begin Inserted .jpg file - ' SWBD-2A 600A SPARE' ***** See attached document: SWBD-2A 600A SPARE.
***** End Inserted .jpg file - ' SWBD-2A 600A SPARE' ***** ***** Begin Inserted .jpg file - ' SWBD-2B NAME PLATE' ***** See attached document: SWBD-2B NAME PLATE.
***** End Inserted .jpg file - ' SWBD-2B NAME PLATE' ***** ***** Begin Inserted .jpg file - ' SWBD-2A LINEUP' ***** See attached document: SWBD-2A LINEUP.
***** End Inserted .jpg file - ' SWBD-2A LINEUP' ***** ***** Begin Inserted .jpg file - ' SWBD-2A NAME PLATE' ***** See attached document: SWBD-2A NAME PLATE.
***** End Inserted .jpg file - ' SWBD-2A NAME PLATE' ***** ***** Begin Word Document - ' SOLICITATION-DESCRIPTION' ***** Solicitation 36C24425R0001 Correct Power Deficiencies ***** End Word Document - ' SOLICITATION-DESCRIPTION' ***** End of Document