542-25-105 - Contractor Questions and Answers updated.docx
DOCX document 17 KB Posted
- Attached to
- Z2DA--542-25-105 | Replace Pitched Roof Building 1 | NCO 4 Construction East (VA-25-00008811)
- Solicitation number
- 36C24425B0003
About this file
The file is a Contractor Questions and Answers document for solicitation 36C24425B0003, relating to a roof replacement project at the Coatesville VA Medical Center. The document provides detailed clarifications on project specifications, including replacing the pitched shingled roof of Building 1 with GAF Timberline HDZ shingles, replacing dormer roofs with copper, cleaning and lining gutters connected to the pitched roof, and addressing wood decking replacement (approximately 1,000 square feet). Key clarifications include no requirement for snow guards, no infrared moisture scan needed, and confirmation that dormer roofs will be replaced with copper instead of existing tin sheets.
The project involves comprehensive roof replacement with specific safety and logistical requirements, including phased work with prior notice to the Contracting Officer's Representative (COR), ensuring no debris falls during demolition, and maintaining patient safety. The contractor must coordinate extensively with VA medical staff, work Monday to Friday from 6:30 am to 5 pm, potentially conduct some after-hours work, and complete the project within 160 days of Notice to Proceed. A second site visit is scheduled for 11 April 2025, and architectural drawings and specifications were provided with the amendment. The project is being conducted by the Department of Veterans Affairs Veterans Health Administration at the Coatesville VA Medical Center in Pennsylvania.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| INSTRUCTIONS to bidders.docx | DOCX document | |
| 36C24425B0003 0004.docx | DOCX document | |
| Sign in sheet Replace roof building 1 4 March 2025.pdf | ||
| 542-25-105 - Contractor Questions and Answers Site Visit No. 2 10 April 2025.docx | DOCX document | |
| 36C24425B0003 0003.docx | DOCX document | |
| Sign in sheet Replace roof building 1 10 April 2025.pdf | ||
| PA VA DORMER DRAWINGS.pdf | ||
| Building 1 Roof - 2.pdf | ||
| Building 1 Roof - 1.pdf | ||
| 089000 - Louvers and Vents - Edited.pdf | ||
| 099100 - Painting - Edited.pdf | ||
| 36C24425B0003 0002.docx | DOCX document | |
| Sign in sheet for Replace Roof building 1 2.pdf | ||
| 36C24425B0003 0001.docx | DOCX document | |
| Attachment 5 - GEMS Contractor training.doc | DOC document | |
| Attachment 6 - Bldg 1 Roof - Construction Safety Standards.pdf | ||
| 542-25-105 Specifications.pdf | ||
| 542-25-105 Replace Pitched Roof Building 1 - Drawings - Updated.pdf | ||
| 36C24425B0003_1.docx | DOCX document | |
| 542-25-105 Additional Specs.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Questions and Answers 542-25-105 Replace Pitched Roof Building 1
1. After the site visit on 3/4/2025 there is some confusion as to what areas are to be replaced. The drawing supplied is boxed in showing the areas to be replaced with new shingles, but the center area has no shingles, can you please clarify?
a. The cupola is not within the scope of this project and is to be left out of construction.
2. The dormers have shingled sides, and the roofs looks like “tin” sheets with soldered seams are they to be replaced with the same material, please clarify.
a. The dormers are to have the shingles and tin “roof” replaced with copper.
3. The SOW states to clean, seal, and line the existing gutters system. Is the area just around the pitched shingled roof to receive the gutter lining, please clarify?
a. That is correct. Only the gutters connected to the pitched shingled roof being replaced are to be cleaned, sealed, and lined.
4. Spec section 07 31 13 page 3-- 2.7 and page 5--3.9------Snow guards. -----Do they want snow guards installed?
a. No, the building no longer requires snow guards.
5. Spec section 07-60-00 Page 3—1.4 B—wind design standards—The ES-1 standard applies only to Low sloped roofing systems. Are the edge metals to have a cleat as ES-1 requires even though this is a Steep roof?
a. No, this is not required.
6. Spec section 07 01 50.19-page 4 Part 3 3.1—Calling for an infrared moisture scan. Also Typically applies to low slope roofing as well. Is this required?
a. No, this is not required.
7. Can I have another Site Visit?
a. A second site visit will be held on 11 April 2025.
8. Do you have any more detailed pictures?
a. No additional pictures are to be provided as all faces of the roof were visible to the contractors during the site visit to take pictures and investigate.
9. Can you publish the sign in sheet for the site visit?
a. See attached sign in sheet published with amendment.
10. What is on the existing dormers on the top part (Roof portion)? What goes on after? The Sika Coating in the specs? (SEE ATTACHED DRAWING)
a. The trim is to be replaced and painted to match existing.
b. No, the louvers are to remain as is and are not to be painted.
c. The siding of the dormers is made of shingles and are to be replaced in kind with the same shingle type as the pitched roof.
d. Yes, all flashing involved with replacing the roof is to be replaced with copper.
11. Could you please clarify if the dormer roofs are to be replaced? They are currently flat seam metal with metal valleys, dormer tops cannot be replaced with shingles.
a. Please see the answer to question number 2 previously. The dormer rooves are made of tin and are to be replaced with copper.
12. How much wood is to be included for the bad decking?
a. 1,000 square feet.
13. What brand or style of shingles are specified?
a. GAF Timberline HDZ. This is the existing brand that is used on new installed roofs.
14. Could the VA provide architectural drawings for the roof of Building 1?
a. Yes, see attached drawings and specs included in this amendment.