Amend 6 - Updated Pricing Sheet.pdf
PDF 64 KB Posted
- Solicitation number
- 36C24424R0007
About this file
This document is a Pricing Sheet for the 9th Floor Mental Health Unit Project 693-19-106. It outlines the bid items and associated pricing for the general construction, electrical work, and mechanical work required for the project. The total price is provided, as well as two alternate pricing scenarios that involve deducts for the construction of a sunroom and the installation of replacement windows. This Pricing Sheet must be completed and submitted as part of the Volume 2 - Price Proposal for the federal contract opportunity identified as Solicitation Number 36C24424R0007, which is for the Renovation of the 9th Floor Mental Health Unit at a Department of Veterans Affairs (VA) facility. The federal agency involved is the Veterans Integrated Service Network 4 (VISN 4) of the VA.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICING SHEET FOR TOTAL PROJECT
9th Floor Mental Health Unit
Project 693-19-106
CLIN BID ITEMS PRICE (in even dollars)
CLIN 001
GENERAL CONSTRUCTION
Work includes general construction on the 9th Floor and in the existing Warehouse including necessary removal of existing structures.
CLIN 002
ELECTRICAL WORK
Work includes all labor, material, equipment, and supervision to perform the required electrical construction work on this project.
CLIN 003
MECHANICAL WORK
Work includes all labor, materials, equipment, and supervision to perform the required Mechanical construction work on this project.
TOTAL PRICE:
ALT NO. 1
DEDUCT
Delete the construction of the
Sunroom (C9-01). Space will remain as an open roofed area.
ALTERNATE NO. 1
ADJUSTED TOTAL PRICE:
ALT NO. 2
DEDUCT
Delete installation of replacement windows in Patient
Rooms and Treatment areas.
ALTERNATE NO. 2
ADJUSTED TOTAL PRICE:
REDUCTIONS 1 AND 2 TOTAL PRICE:
This pricing sheet must be completed and submitted for Volume 2 – Price Proposal.
Bid items are described in Section 01 00 00 General Requirements.
File details come from the government source that posted it. Updated .