This document appears to be an ICRA (Infection Control Risk Assessment) drawing and permit requirements for a 9th Floor Mental Health renovation project at the Department of Veterans Affairs Medical Center in Wilkes-Barre, PA.
The key details include:
- ICRA barrier walls with airtight construction, 36" steel doors, and negative air monitoring are required for the 9th West, 9th East, and warehouse areas.
- 6 mil plastic sheeting is required on stairwells and elevator doors.
- HEPA negative air units vented to the outside are needed, with the number determined by the work area.
- All furniture and supplies in the work areas must be moved, covered, and returned to their original locations.
- An ICRA permit is required, which the VA has the right to modify for patient safety.
- The related federal contract opportunity is for the overall 9th Floor Mental Health unit renovation project, solicitation number 36C24424R0007.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF VETERANS AFFAIRS
Medical Center
1111 East End Boulevard
Wilkes-Barre, PA 18711
July 9, 2024
SUBJECT: 9th Floor Mental Health Project - ICRA
ICRA drawings and permit
• Drawings. 3 drawings are of different locations: 9 west, 9 east and warehouse. All marked areas are in red on the drawing.
1. ICRA barrier wall. Wall from floor to underdeck. 2x4 metal stud, 5/8 drywall both sides, taped and painted with base. Top, bottom and side shall be airtight.
36” steel door and jamb, Yale door lock 522 core, self-closer, gasket around door jamb, door sweep. Sticky pad outside the door.
2. 6 mil plastic shall be installed on all stairwells exit with a zipper. And the elevator door shall be plastic over.
3. Electric negative air monitor shall be mounted outside the door. The monitor shall be recorded every hour during working hours.
4. HEPA Negative air unit shall be vented to the outside through a window. The number of units that will be needed depends on how many it will take to get the work area negative.
• Working on the 8th floor will need ICRA for each areas/ room. All furniture and supplies in the room are moved, will need to be covered when working, and removed when work is completed for the night. The room shall be clean, and all furniture and supplies are returned to their original location. The COR can make change to what needs to be done to accommodate a clean and safe environment.
• An ICRA permit is needed for this project. The VA has the right to make changes to the permit for patient safety.
Sincerely, Michael Somoga