Questions and Answers.docx

DOCX document 13 KB Posted

Attached to
H363--Damper Accessibility & Testing in support of the Pittsburgh VAMC
Solicitation number
36C24422Q0117
Issued by

View the file

Other files

File Type Posted
36C24422Q0117 0003.docx DOCX document
36C24422Q0117 0003_1.docx DOCX document
Questions and Answers part II.docx DOCX document
SOW Damperrevised.docx DOCX document
36C24422Q0117 0002 posting.pdf PDF
36C24422Q0117 0002_1.docx DOCX document
P03 SSJ JCI element of Damper inspectionsrlk redacted.pdf PDF
Site Visit Information.docx DOCX document
36C24422Q0117 0001_1.docx DOCX document
36C24422Q0117 0001.pdf PDF
Wage Determination No 2015 4235 PITTSBURGH.txt TXT text file
Attachment - B - Life Safety Drawings - Phase II_Rev210812.pdf PDF
36C24422Q0117.docx DOCX document
SOL 36C24422Q0117_1.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

1.) After reviewing the SOW I would respectfully request a Site Visit. To provide a fair and accurate quote I would need to physically view all involved dampers due to the Project Scope - General (Page 4) stating that there are ten (10) deficiencies, also stated in Attachment C Action Plan Summary (Page 9-10). Then under Attachment A (Page 7) the listed total deficiencies in Phase 2 add up to a total of fifteen (15), the addition of five (5) additional deficiencies. Will the Medical Center approve the request for a site visit? VAPHS can accommodate and encourages a prewalk to ensure all bidders have a full understanding of the areas they will be working.

2.) I would also request that an ICRA Representative be present during the Site Visit to address any ICRA related concerns. VPHS Projects can coordinate to have Infectious Prevention rep participate in prewalk.

3.) Will the VAPHS hire Johnson Controls directly? Or will the JCI subcontractor cost be carried by the contractor? The fire alarm system at UD is a JCI System, hence the requirement for vendor to “coordinate and contract with JCI Fire/ JCI Controls Inc. for all building integration and control wiring for Fire Monitoring System and BMS”, inclusive of Commissioning and testing of the dampers.

ALL QUESTIONS HAVE BEEN ANSWERED VIA THIS AMENDMENT.