36C24420R0017-0005001.pdf

PDF Posted

Attached to
460-322 | CONSTRUCT A NEW ADMIN BUILDING Federal contract opportunity
Solicitation number
36C24420R0017
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

This solicitation package describes a firm fixed-price construction contract opportunity for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4. The scope of work involves demolishing three existing buildings and constructing a new administrative building at the Wilmington Veterans Affairs Medical Center campus in Wilmington, Delaware. The new building is required to house tenants from the demolished structures and an administrative annex, allowing termination of the annex's lease. The construction cost is estimated between $5-10 million, with a 545 calendar day performance period. The solicitation and drawings will be available on December 13, 2019. A pre-proposal site visit will be held, as attendance is strongly encouraged. The opportunity is 100% set aside for service-disabled veteran-owned small businesses. Proposals are due 120 days from issuance. Payment and performance bonds are mandatory.

36C24420R0017 0005 Attachment #6 S102 2nd Floor Framing Plan.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 460-322 | CONSTRUCT A NEW ADMIN BUILDING, newest first.
File Type Posted
36C24420R0017-0005000.docx DOCX document
36C24420R0017-0004000.docx DOCX document
36C24420R0017-0003006.pdf PDF
36C24420R0017-0003004.pdf PDF
36C24420R0017-0003007.doc DOC document
36C24420R0017-0003003.pdf PDF
36C24420R0017-0003002.pdf PDF
36C24420R0017-0003000.docx DOCX document
36C24420R0017-0003001.pdf PDF
36C24420R0017-0003005.pdf PDF
36C24420R0017-0003010.pdf PDF
36C24420R0017-0003008.pdf PDF
36C24420R0017-0003009.pdf PDF
36C24420R0017-0002000.docx DOCX document
36C24420R0017-0001001.docx DOCX document
36C24420R0017-0001002.docx DOCX document
36C24420R0017-0001000.docx DOCX document
36C24420R0017-013.docx DOCX document
36C24420R0017-011.pdf PDF
36C24420R0017-006.docx DOCX document
36C24420R0017-009.pdf PDF
36C24420R0017-012.pdf PDF
36C24420R0017-007.pdf PDF
36C24420R0017-008.pdf PDF
36C24420R0017-010.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7

A

B

C

D

E

F

6.54.42.71.5

B.6

NOTE 4

W

X

W

X

W

X

W

X

W

X

W

X

W18X35 [20] W27X94 [24] W24X76 [28] W18X35 [14]

W21X48 [18]W16X31 [18]W24X55 [22]W14X22 [10]W24X76 [26]W18X35 [20]

W27X84 [16]W24X117 [28]

W

X

W12X19 [9]

W 7X

W

X

C A N T

W24X62 [16]

W

X

W18X35 [20]

W X

W

X

W

X

W

X

W

X

[1

W

X

W18X60 [20]

W18X35 [20] W21X44 [20]

W

X

W12X19 [9] W12X19 [9]

W

X

W14X22 [10]

W16X26 [10]

W

X

W18X35 [20]

W16X26 [15]

W

X

W

X

W

X

W

X

] W

X

W X

W X

W

X

W

X

W

X

W

X

W

X

W

X

[1

W

X

[1

W

X

W

X

W X

W

X

W16X26 [14]

W X

W X

W X

W 1X

W 1X

] FOLDING PARTITION

STRUCTURAL SUPPORT

BELOW. SEE 11/S500.

CMU STAIR WALLS. SEE

TYPICAL DETAILS FOR

REINFORCING.

CMU STAIR WALLS. SEE TYPICAL

DETAILS FOR REINFORCING.

METAL PAN STAIRS. ATTACHMENT

TO WALLS BY STAIR PROVIDER.

CONTRACTOR COORDINATE CMU

GROUT LOCATIONS WITH STAIR

PROVIDER.

METAL PAN STAIRS. ATTACHMENT

TO WALLS BY STAIR PROVIDER.

CONTRACTOR COORDINATE CMU

GROUT LOCATIONS WITH STAIR

PROVIDER.

CMU ELEVATOR WALLS, TYP.

SEE TYPICAL DETAILS FOR

REINFORCING. GROUT

SOLID.

10' - 7" 11' - 0" 7' - 2" 14' - 5" 11' - 4" 15' - 8" 10' - 9" 19' - 8" 21' - 4" 18' - 0" 10' - 7"

1'

1"

9'

TOP OF

CANOPY STEEL

= (-1'-3 1/2")

2.3

D.5

W X

W X

W

X

W

X

W

X

W

X

[1 7]

W

X

[1 7]

W

X

W

X

W

X

W

X

W

X

W

X

[1

W

X

[1

W

X

[1

W

X

W14X22

W X

W X

W X

W X

W

X

W24X55 [16]

W18X40 [14]

(B)

(B)

(B) (B) (B)

(B)

NOTE 4

W

X

W8x15

W8X15 [6]

W X

W X

W X

S504

S504

S505

S505

S505

S505

S505

S505

S505

S505

S504

S504

S504

S504

S504

S504

S505

1'

/4

(B)

W X

W X

W X

W X

W X

W X

W8X58W8X31

S505

NOTE 12

NOTE 1212

S505

W10X22

W10X22

W10X60

W

X

W

X

TOP OF

CANOPY STEEL

= (-1'-4")

S505

C5x9, TYP.

OF 6 AT

DECK EDGE.

W X

1'

7"

11 7/8"

W10X22

W10X60

" 6' - 4"

2' - 0 3/8"

/8

PROVIDE ADD'L. 2 1/2" LWC

TO BE POURED MONOLITHICALLY

w/ COMPOSITE SLAB. REINF. w/ ADD'L. LAYER 6x6 - W1.4 x W1.4 W.W.F.

S505

1'

TYP.

S500

S500

S505

S505

(SIM.)

1'

7"

(T

K-

FT

SECOND FLOOR PLAN NOTES:

1. TOP OF SLAB ELEVATION = +13'-4" AS MEASURED FROM REFERENCE DATUM. SEE S101 FOR REFERENCE DATUM ELEVATION.

2. ELEVATIONS NOTED THUS (-0") IN PLAN ARE MEASURED FROM TOP OF SLAB ELEVATION.

3. TOP OF STEEL ELEVATION = (-5-1/4"), UNLESS NOTED OTHERWISE IN PLAN.

4. FLOOR SLAB SHALL BE 3-1/4" L.W. CONCRETE TOPPING ON 2"x20ga. GALV. COMPOSITE METAL DECK (5-1/4" TOTAL THICK.) REINFORCE SLAB WITH 6x6 - W1.4 x W1.4

W.W.F. DRAPE PER TYPICAL DETAILS.

5. (XX) IN PLAN INDICATES NUMBER OF EQUALLY SPACED 3/4" DIAM. x 4-1/2" LONG HEADED SHEAR STUDS. STUDS SHALL BE PROVIDED FOR ALL BEAMS SUPPORTING CONCRETE.

6. ALL STEEL SHALL BE ASTM A992, UNLESS NOTED OTHERWISE.

7. PROVIDE AVERAGE OF 3/4" ADDITIONAL CONCRETE TO ACCOUNT FOR DEAD LOAD DEFLECTION IN AREAS WITH CONCRETE.

8. IN PLAN INDICATES MOMENT CONNECTION.

9. IN PLAN INDICATES DECK SPAN DIRECTION.

10. SEE ARCHITECTURAL AND/OR MECHANICAL DRAWINGS FOR:

A. LOCATION OF FLOOR DRAINS AND SLOPE OF FINISHED FLOOR.

B. SIZE AND LOCATION OF SLAB OPENINGS AND/OR MECHANICAL SLEEVES. PROVIDE ADDITIONAL FRAMING IN ACCORDANCE WITH 'TYPICAL FLOOR OPENING' DETAIL.

C. EQUIPMENT PADS AND/OR SUPPORTS.

11. VERIFY ALL DIMENSIONS WITH THE ARCHITECTURAL DRAWINGS. REPORT ANY DISCREPANCIES TO THE ARCHITECT FOR REVIEW.

12. CANOPY ROOF SHALL BE 1-1/2"x20ga. GALVANIZED TYPE 'B' METAL DECK.

13. COLUMNS INDICATED (B) STOP AT THIS LEVEL.

CONSULTANTS: Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Dwg. of

Building Number

Project Number Office of

Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

FULLY SPRINKLERED

A

B

C

D

E

F

6"

6"

6"

6 " on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot th re e in ch es o ne fo ot

6587 Hamilton Avenue Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com

AE Works Project Number:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

SITE RESOURCES, INC.

14315 JARRETTSVILLE PIKE

P.O. BOX 249

PHOENIX, MD 21131

HOPE FURRER ASSOCIATES

700 EAST BEAVER AVENUE

SUITE 9

STATE COLLEGE, PA 16801

NOT FOR CONSTRUCTION CONSTRUCTION DOCUMENTS SUBMISSION

6/1 4/2

8 4

:21 :27

P

M WILMINGTON VAMC

NEW ADMINISTRATIVE BUILDING

460-322

SLS MTH

1601 KIRKWOOD HIGHWAY WILMINGTON, DE 19805

S102

SECOND FLOOR FRAMING PLAN

06/15/18

NORTH

1/8" = 1'-0"

1 SECOND FLOOR FRAMING PLAN

tmantey Rectangle

File details come from the government source that posted it. Updated .