This request for information pertains to a solicitation for the construction of a new administrative building at the Wilmington Veterans Affairs Medical Center in Wilmington, Delaware. The solicitation involves demolishing existing Buildings 2, 3, and 4 and constructing a new administrative building to house the tenants of the demolished buildings and an administrative annex. The construction value is between $5 million and $10 million and must be completed within 545 calendar days of the notice to proceed. The requirement is set aside 100% for service-disabled veteran-owned small businesses. The best value tradeoff process will be used for source selection. Interested contractors should monitor the website for solicitation number 36C24420R0017 and any amendments. The North American Industry Classification System code is 236220 and the small business size standard is $33.5 million.
36C24420R0017 0003 Attachment #8 RFI #01 Doors and Siding.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24420R0017-0005001.pdf | ||
| 36C24420R0017-0005000.docx | DOCX document | |
| 36C24420R0017-0004000.docx | DOCX document | |
| 36C24420R0017-0003006.pdf | ||
| 36C24420R0017-0003002.pdf | ||
| 36C24420R0017-0003000.docx | DOCX document | |
| 36C24420R0017-0003001.pdf | ||
| 36C24420R0017-0003004.pdf | ||
| 36C24420R0017-0003007.doc | DOC document | |
| 36C24420R0017-0003003.pdf | ||
| 36C24420R0017-0003005.pdf | ||
| 36C24420R0017-0003010.pdf | ||
| 36C24420R0017-0003009.pdf | ||
| 36C24420R0017-0002000.docx | DOCX document | |
| 36C24420R0017-0001001.docx | DOCX document | |
| 36C24420R0017-0001002.docx | DOCX document | |
| 36C24420R0017-0001000.docx | DOCX document | |
| 36C24420R0017-013.docx | DOCX document | |
| 36C24420R0017-012.pdf | ||
| 36C24420R0017-007.pdf | ||
| 36C24420R0017-008.pdf | ||
| 36C24420R0017-011.pdf | ||
| 36C24420R0017-006.docx | DOCX document | |
| 36C24420R0017-009.pdf | ||
| 36C24420R0017-010.pdf |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
405 St. John's Church Road, Suite 106 Camp Hill, PA 17011
Phone: (717) 502-6680 Facsimile: (717) 502-6681
RFI No. Request Date Requested Response Responded By Response Date
On the First Floor Plan (Sheet A101) door # 109A-2 appears as a double door opening. The Door Schedule (Sheet A601) specifies only a single leaf door and frame.
4-Feb-20
Door 115-1 is noted as having hardware set #15 on the Door
Schedule (Sheet A601) and set #2 in the specifications (08 71
00, page 25).
4-Feb-20
Door 215-2 has no finish hardware set assigned to it in either the Door Schedule (Sheet A601) or the specifications (08 71
00)
4-Feb-20
On the Second Floor Plan (Sheet A102) doors # 210-1 and 211-
1 appear as double door openings. The Door Schedule (Sheet
A601) specifies only a single leaf door and frame for these.
4-Feb-20
On the First Floor Plan (Sheet A101) doors # 100-1 and 100-2 appear to be double door openings. The Door Schedule
(Sheet A601) specifies only a single leaf door and frame.
4-Feb-20
On the Door Schedule (Sheet A601) Door 111-1 is shown as a single opening with a type S5 (8'-0" wide) frame. First Floor
Plan (Sheet A101) shows a double door and frame in a 6'-8" opening. The vestibule is 6'-8 1/4" wide.
4-Feb-20
Are the Modular Walls and Doors (System not Specified) under a separate contract?
4-Feb-20
Is the Access Floor System (System not Specified) under a separate contact?
4-Feb-20
Is the Folding Partition (Multi-purpose Room 115) under a separate contract (Not Specified)?
4-Feb-20
In reference to the Standing Seam wall panels, could we get the following information? Panel width, seam height, seam type (snap lock, field lock, etc.), pencil ribs or striations, and thickness required.
4-Feb-20
In reference to the Metal Siding, could we get the following information? Exposed fasteners or concealed, Panel widths and heights, panel profiles.
4-Feb-20
Alternate No. 4 substitutes shingles for the metal roofing. Is there any additional information you could provide or a "basis of design" for them?
4-Feb-20
Request For Information New Administrative Building
1601 Kirkwood Highway, Wilmington, DE, 19805
Door 109A-2: Add designation 'PR' to Size / Pair column of door schedule on A601
Door 115-1: Provide hardware set #2.
Door 210-1 and 211-1: Add designation 'PR' to Size / Pair column of door schedule on A601
Door 100-1 and 100-2: Add designation 'PR' to Size / Pair column of door schedule on A601
Modular walls and doors are provided by the VA
Access floor system is provided by the VA
Folding partition is provided by the VA
Architect provided an asphalt shingle specification to the VA
Storefront Type S5: Change overall frame width dimension to 6'-8" and frame clear width dimension to 6'-4".
Door 111-1: Add designation 'PR' to Size / Pair column and change to 3'-2" in AAOS Panel 1 Width column
Refer to Sheet A701, List of Exterior Finish Materials for basis-of-design products for horizontal and corrugated metal siding and for metal soffit panels.
Refer to updated spec sections 07 41 13 Standing Seam Metal Roof and 07.42.13.23 Metal Composite Material Wall Panels
Door 215-2: Provide hardware set #18. In lieu of Door Stop, provide Surface Overhead Stop RF 10-X36 - 689 (this door only)