36C24420R0017-0003006.pdf
PDF Posted
- Attached to
- 460-322 | CONSTRUCT A NEW ADMIN BUILDING Federal contract opportunity
- Solicitation number
- 36C24420R0017
About this file
This document contains a federal contract opportunity for construction services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4 is seeking a firm fixed price construction contract for Project number 460-322 to construct a new administrative building at the Wilmington Veterans Affairs Medical Center in Wilmington, Delaware. The contract value is between $5 million to $10 million and work must be completed within 545 calendar days of the notice to proceed. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The solicitation number is 36C24420R0017 and interested contractors should monitor the Federal Business Opportunities website for the full solicitation release on or around December 13, 2019. The pre-proposal conference will be held on-site and attendance is strongly encouraged. The opportunity is in NAICS code 236220 with a size standard of $33.5 million.
36C24420R0017 0003 Attachment #6 S102 2nd Floor Framing Plan.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24420R0017-0005001.pdf | ||
| 36C24420R0017-0005000.docx | DOCX document | |
| 36C24420R0017-0004000.docx | DOCX document | |
| 36C24420R0017-0003002.pdf | ||
| 36C24420R0017-0003000.docx | DOCX document | |
| 36C24420R0017-0003001.pdf | ||
| 36C24420R0017-0003004.pdf | ||
| 36C24420R0017-0003007.doc | DOC document | |
| 36C24420R0017-0003003.pdf | ||
| 36C24420R0017-0003005.pdf | ||
| 36C24420R0017-0003010.pdf | ||
| 36C24420R0017-0003008.pdf | ||
| 36C24420R0017-0003009.pdf | ||
| 36C24420R0017-0002000.docx | DOCX document | |
| 36C24420R0017-0001002.docx | DOCX document | |
| 36C24420R0017-0001001.docx | DOCX document | |
| 36C24420R0017-0001000.docx | DOCX document | |
| 36C24420R0017-012.pdf | ||
| 36C24420R0017-007.pdf | ||
| 36C24420R0017-008.pdf | ||
| 36C24420R0017-013.docx | DOCX document | |
| 36C24420R0017-011.pdf | ||
| 36C24420R0017-006.docx | DOCX document | |
| 36C24420R0017-009.pdf | ||
| 36C24420R0017-010.pdf |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Project No. 460-322 Wilmington VAMC
AE Works Project No. 16025 New Administrative Building
01-29-2020
02-01-16
ASPHALT SHINGLES
07 31 13 - 1
SECTION 07 31 13
ASPHALT SHINGLES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Fiberglass asphalt shingles over underlayment nailed to roof sheathing.
1.2 RELATED REQUIREMENTS
A. Counterflashing and Flashing of Roof Projections: Section 07 60 00, FLASHING AND SHEET METAL.
B. Shingle Color: To be selected.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. ASTM International (ASTM):
1. D226/D226M-09 - Asphalt-Saturated Organic Felt Used in Roofing and
Waterproofing.
2. D1970/D1970M-15a - Self-Adhering Polymer Modified Bituminous Sheet
Materials Used as Steep Roofing Underlayment for Ice Dam Protection.
3. D3018/D3018M-11 - Class A Asphalt Shingles Surfaced with Mineral
Granules.
4. D3161/D3161M-15 - Wind-Resistance of Steep Slope Roofing Products
(Fan-Induced Method).
5. D3462/D3462M-10a - Asphalt Shingles Made from Glass Felt and
Surfaced with Mineral Granules.
6. F1667-05(2011) - Driven Fasteners: Nails, Spikes, and Staples.
C. UL LLC (UL):
1. 790-14 - Fire Tests of Roof Coverings.
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Manufacturer's Literature and Data:
1. Description of each product.
2. Installation instructions.
3. Warranty.
C. Samples:
01-29-2020
02-01-16
ASPHALT SHINGLES
07 31 13 - 2
1. Shingles: Full size each type, color and texture.
D. Sustainable Construction Submittals:
1.5 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, manufacture date, and the label of
Underwriters Laboratories.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.6 STORAGE AND HANDLING
A. Store shingles according to manufacturer's instructions. Store roll goods on end in upright position.
B. Protect products from damage during handling and construction operations.
C. Keep materials dry, covered completely and protected from weather.
1.7 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
B. Manufacturer's Warranty: Warrant asphalt shingles against material and manufacturing defects.
1. Material Warranty Period: 25 years.
2. Wind-Speed Warranty Period: Resist wind speeds up to (115 mph)
3. Algae-Resistance Warranty Period: No discoloration for 15 years.
PART 2 - PRODUCTS
2.1 PRODUCTS - GENERAL
A. Basis of Design: GAF Royal Sovereign.
B. Provide each product from one manufacturer.
1. Provide each product exposed to view from one production run.
C. Sustainable Construction Requirements:
1. Asphalt Shingle Recycled Content: 25 percent post-consumer recycled content, minimum.
2.2 ASPHALT SHINGLES
A. Asphalt Shingles: Fiberglass reinforced, laminated type, square butt.
1. ASTM D3462/D3462M and ASTM D3018/D3018M, Type I, self-sealing.
01-29-2020
02-01-16
ASPHALT SHINGLES
07 31 13 - 3
2. ASTM D3161/D3161M, Class F wind-resistant.
3. UL 790 Class A fire resistance.
4. Minimum Weight: 10.3 kg/sq. m (210 lbs./100 sq. ft.).
2.3 ROOFING NAILS
A. ASTM F1667, Type I, Style 20, galvanized steel, deformed shanks, heads
10 mm to 11 mm (3/8 inch to 7/16 inch) diameter.
1. Nails for Shingles: 32 mm (1-1/4 inches) long.
2. Nails for Felt: 19 mm (3/4 inch) long.
2.4 ROOFING UNDERLAYMENT
A. Organic Felt: 30 lb felt, ASTM D226/D226M, Type l.
B. Self-Adhering Modified Bituminous Underlayment: ASTMD1970/D1970M.
Install 3-feet above gutter and roof sides as indicated.
2.5 METAL FLASHING
A. Provide metal roof flashings, including apron flashings, step flashings, valley flashings, drip edges, and vent pipe flashings specified in Section 07 60 00, FLASHING AND SHEET METAL.
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for roofing installation.
1. Verify roof substrates are sound, within manufacturer's tolerances, and free from defects which would interfere with roofing installation.
2. Verify roof accessories, vent pipes and other projections through roof are in place and roof flashing is installed, or ready for installation, before installing shingles.
B. Protect existing construction and completed work from damage.
3.2 INSTALLATION - GENERAL
A. Install products according to manufacturer's instructions and approved submittal drawings.
1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.
01-29-2020
02-01-16
ASPHALT SHINGLES
07 31 13 - 4
3.3 METAL DRIP EDGE INSTALLATION
A. At eaves and rakes, install stainless steel drip edges specified in
Section 07 60 00, FLASHING AND SHEET METAL.
1. Rakes: Install metal drip edge after underlayment.
B. Secure metal drip edges with compatible nails spaced maximum 250 mm
(10 inches) on center along inner edges.
3.4 FLASHING INSTALLATION
A. Install metal flashings specified in Section 07 60 00, FLASHING AND
SHEET METAL at intersections of roofs, adjoining walls, or projections through deck such as chimneys and vent stacks.
B. Install metal valley flashing shown and as specified under Section
07 60 00, FLASHING AND SHEET METAL.
1. Secure valley flashing according to shingle manufacturer's instructions.
2. Expose flashing in open portion of valley 125 mm (5 inches) minimum, and lap shingles over flashing 125 mm (5 inches) minimum.
3.5 UNDERLAYMENT INSTALLATION
A. Install self-adhering sheet underlayment, working from low point to high point. Lap sides 90 mm (3-1/2 inches) minimum, and lap ends 150 mm
(6 inches) minimum. Install at the following locations:
1. Eaves and Rakes: From edge of eave and rake to 600 mm (24 inches) minimum beyond inside face of exterior wall.
a. Lap underlayment over eave metal drip edge.
2. Firmly roll underlayment to ensure adhesion to roof deck and metal flashings.
B. Install organic felt underlayment on roof deck not covered by self-adhering sheet underlayment, with 100 mm (4 inches) minimum end laps, 50 mm (2 inches) minimum head laps, and 300 mm (12 inches) minimum ridge laps. Nail felt 125 mm (5 inches) on centers along laps.
3.6 ROOF ACCESSORY INSTALLATION
A. Lap underlayment and asphalt shingles over upslope base flanges of roof accessory flashings.
B. Install underlayment and asphalt shingles over sideslope base flanges of roof accessory flashings.
C. Install downslope base flanges of roof accessories over asphalt shingles.
01-29-2020
02-01-16
ASPHALT SHINGLES
07 31 13 - 5
3.7 ASPHALT SHINGLE INSTALLATION
A. Install shingles aligned parallel to roof eave, nailed to roof sheathing.
1. Exposure: 125 mm (5 inches) maximum.
2. Headlap: 50 mm (2 inches) minimum.
B. Install asphalt-shingle starter strip with tabs removed, and overhanging lower edge of roof 13 mm (1/2 inch).
- - E N D - -