36C24419R0064-012.docx

DOCX document 40 KB Posted

Attached to
Lebanon and Altoona Construction MATOC
Solicitation number
36C24419R0064
Issued by

About this file

This document contains an exhibit and federal contract opportunity notice. The exhibit outlines requirements for calculating self-performed work to be submitted in response to solicitation number 36C24419R0064 for a Multiple Award Task Order Contract for construction projects at the Lebanon and Altoona VA Medical Centers. Contractors must clearly describe the work to be self-performed and show related calculations. The federal contract opportunity is for said MATOC with an estimated value between $2,000,000 to $5,000,000. The scope of work includes construction, renovations and maintenance projects. This is a 100% SDVOSB set-aside and the period of performance is 365 days from notice to proceed. The solicitation will be available on July 25, 2019 and a pre-proposal conference will be held within two weeks thereafter. The ceiling is $250,000,000 with individual task orders not exceeding $5,000,000 and a minimum guarantee of $5,000 per contractor.

36C24419R0064 EXHIBIT D - CALCULATION OF SELF-PERFORMED WORK.docx

View the file

Other files

File Type Posted
36C24419R0064-0004000.docx DOCX document
36C24419R0064-0003001.docx DOCX document
36C24419R0064-0003000.docx DOCX document
36C24419R0064-0003002.docx DOCX document
36C24419R0064-0002005.pdf PDF
36C24419R0064-0002004.pdf PDF
36C24419R0064-0002000.docx DOCX document
36C24419R0064-0002002.pdf PDF
36C24419R0064-0002001.docx DOCX document
36C24419R0064-0002003.pdf PDF
36C24419R0064-0001000.docx DOCX document
36C24419R0064-0001001.docx DOCX document
36C24419R0064-005.pdf PDF
36C24419R0064-013.docx DOCX document
36C24419R0064-003.pdf PDF
36C24419R0064-001.docx DOCX document
36C24419R0064-014.docx DOCX document
36C24419R0064-010.docx DOCX document
36C24419R0064-011.docx DOCX document
36C24419R0064-007.pdf PDF
36C24419R0064-002.docx DOCX document
36C24419R0064-008.pdf PDF
36C24419R0064-009.docx DOCX document
36C24419R0064-006.pdf PDF
36C24419R0064-004.pdf PDF
36C24419R0064-000.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT D - CALCULATION OF SELF-PERFORMED WORK

SUBMITTED IN RESPONSE TO RFP 36C24419R0064

Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

Clearly describe the work to be self-performed:

Show Calculation of Self-Performed work:

B.1 Total Offer Price: $

B.2 If applying for consideration as a General Contractor subtract Specialty Trades (Unless being self performed)

B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($)

B.4 Remainder is “Total amount of work to be performed under the Contract” = $

B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

B.6 15 % Self-performed Work = Line B.5 / B.4 X 100% = %