36C24419B0044-018.docx
DOCX document 23 KB Posted
- Solicitation number
- 36C24419B0044
About this file
36C24419B0044 Attachment 17 - 11 73 00 Ceiling Mounted Patient Lift Systems.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24419B0044-0001006.pdf | ||
| 36C24419B0044-0001003.xlsx | XLSX spreadsheet | |
| 36C24419B0044-0001004.xlsx | XLSX spreadsheet | |
| 36C24419B0044-0001005.pdf | ||
| 36C24419B0044-0001000.docx | DOCX document | |
| 36C24419B0044-0001001.pdf | ||
| 36C24419B0044-0001002.pdf | ||
| 36C24419B0044-012.docx | DOCX document | |
| 36C24419B0044-017.docx | DOCX document | |
| 36C24419B0044-005.pdf | ||
| 36C24419B0044-016.docx | DOCX document | |
| 36C24419B0044-015.docx | DOCX document | |
| 36C24419B0044-004.pdf | ||
| 36C24419B0044-007.pdf | ||
| 36C24419B0044-003.xlsx | XLSX spreadsheet | |
| 36C24419B0044-011.docx | DOCX document | |
| 36C24419B0044-019.docx | DOCX document | |
| 36C24419B0044-020.docx | DOCX document | |
| 36C24419B0044-001.docx | DOCX document | |
| 36C24419B0044-002.pdf | ||
| 36C24419B0044-010.docx | DOCX document | |
| 36C24419B0044-014.docx | DOCX document | |
| 36C24419B0044-008.pdf | ||
| 36C24419B0044-006.pdf | ||
| 36C24419B0044-013.doc | DOC document | |
| 36C24419B0044-009.docx | DOCX document | |
| 36C24419B0044-000.docx | DOCX document |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01-01-17
SECTION 11 73 00
ceiling mounted patient lift system
PART 1 - GENERAL
1.1 DESCRIPTION
Ceiling Mounted Patient Lift Systems for the transfer of physically challenged patients are specified in this section.
1.2 RELATED WORK
A. Section 01 00 00, GENERAL REQUIREMENTS: Requirements for pre-test of equipment.
1.3 quality assurance
| A. | Certification for compliance is required for Ceiling Mounted Patient Lift Systems. Certifications shall be provided by the manufacturer who will conduct testing to ensure that the ceiling lift and charging system are safe and in compliance with ISO 10535 & UL 60601-1 |
| B. | Inspection of equipment after installation is required prior to use for patient movement. Inspection shall be in accordance with manufacturer’s installation checklist and the facilities installation checklist (Patient Safety Alert AL14-07). |
1.4 Applicable publications
| A. | The publications listed below form a part of this specification to the extent referenced. The publications are listed in the text by the basic designation only. |
| B. | International Organization for Standardization (ISO): |
| 10535-06 | Hoist for the Transfer of Disabled Persons-Requirements and Test Methods |
| C. | Underwriters Laboratories (UL): |
| 60601-1(2003) | Medical Electrical Equipment: General Requirements for Safety |
| 94-2013 | UL Standards for Safety Test for Flammability of Plastic Materials for Parts in Devices and Appliances-Fifth Edition |
| D. | International Electromagnetic Commission (IEC): |
| 60601-1-2(2015) | Medical electrical equipment – Part 1-2: General requirements for basic safety and essential performance – Collateral Standard: Electromagnetic disturbances – Requirements and tests. |
| E. | VA Patient Safety Alert AL14-07 |
PART 2 - PRODUCTS
Ceiling Mounted Patient Lift System as manufactured by Guldmann, Inc. will be supplied to the Contractor by the VA. Equipment is currently stored on site at VAMC Wilmington, DE.
PART 3 - EXECUTION
3.1 Installation
| A. | Install ceiling mounted patient lift system as per manufacturer's instruction and under the supervision of manufacturer's qualified representative and as shown on drawings. |
| B. | If the distance in between the suspended ceiling and anchors is more than 18” consult with manufacturer to determine if lateral braces will be required. |
3.2 Instruction and personnel training
Training shall be provided for the required personnel to educate them on proper operation and maintenance for the lift system equipment.
3.3 TEST
Conduct performance test, in the presence of the Resident Engineer (RE), Inspector of Record (IOR), and a manufacturer's field representative, to show that the patient lift system equipment and control devices operate properly and in accordance with design, specification, and code requirements.
3.4 INSPECTION
1. Inspection of installed ceiling mounted patient lift systems shall be conducted in accordance with the manufacturer’s installation checklist and the facilities installation checklist (Patient Safety Alert AL14-07) prior to use for patient movement.
2. Periodic Inspection shall be provided by the manufacturer on a yearly basis in compliance with ISO 10535.
E N D 11 73 00 - 2
File details come from the government source that posted it.