36C24419B0044-0001005.pdf
PDF 57 KB Posted
- Solicitation number
- 36C24419B0044
About this file
36C24419B0044 0001 Attach 5 - PRE-BID Mtg Minutes - Patient Lifts.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24419B0044-0001006.pdf | ||
| 36C24419B0044-0001003.xlsx | XLSX spreadsheet | |
| 36C24419B0044-0001004.xlsx | XLSX spreadsheet | |
| 36C24419B0044-0001000.docx | DOCX document | |
| 36C24419B0044-0001001.pdf | ||
| 36C24419B0044-0001002.pdf | ||
| 36C24419B0044-012.docx | DOCX document | |
| 36C24419B0044-017.docx | DOCX document | |
| 36C24419B0044-005.pdf | ||
| 36C24419B0044-016.docx | DOCX document | |
| 36C24419B0044-015.docx | DOCX document | |
| 36C24419B0044-004.pdf | ||
| 36C24419B0044-007.pdf | ||
| 36C24419B0044-003.xlsx | XLSX spreadsheet | |
| 36C24419B0044-011.docx | DOCX document | |
| 36C24419B0044-019.docx | DOCX document | |
| 36C24419B0044-020.docx | DOCX document | |
| 36C24419B0044-001.docx | DOCX document | |
| 36C24419B0044-002.pdf | ||
| 36C24419B0044-010.docx | DOCX document | |
| 36C24419B0044-014.docx | DOCX document | |
| 36C24419B0044-008.pdf | ||
| 36C24419B0044-006.pdf | ||
| 36C24419B0044-013.doc | DOC document | |
| 36C24419B0044-018.docx | DOCX document | |
| 36C24419B0044-009.docx | DOCX document | |
| 36C24419B0044-000.docx | DOCX document |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-BID MEETING AND SITE VISIT
AGENDA
WILMINGTON VAMC INSTALL CEILING MOUNTED
PATIENT LIFTS
CONSTRUCTION PROJECT #460-19-010
SOLICITATION #36C24419B0044
JUNE 26, 2019, 10:00 AM
BUILDING 10, CONFERENCE ROOM
1. The solicitation was posted to www.FBO.gov on June 14, 2019 and included the scope of work and any specifications and drawings. All contractors should have reviewed the entire solicitation before this meeting.
2. Discuss Scope of Work: 120 days to complete this project and the Construction
Magnitude is between $250,000.00 and $500,000.00. There are no proposal alternates for this project.
3. This is a construction project that will utilize FAR 13, Simplified Acquisition Procedures
(SAP) and will be awarded as Lowest Price Technically Acceptable as the only award factor for this project will be price along with conformance to the solicitation.
4. This is 100% set-aside for SDVOSB
5. All bids must be submitted by Monday July 15, 2019, 3:00 PM (EST). Bids should be addressed to Department of Veterans Affairs, Network Contracting Office 4, Attn:
Maureen Long, 20 Montchanin Road (Montchanin Corporate Center), Greenville, DE
19807. Bids will be opened on Monday July 15, 2019, 3:00 PM (EST) at the Wilmington
Contracting Office located at 20 Montchanin Rd. Greenville, DE 19807.
6. All questions pertaining to this project must be sent to Maureen Long, Contract Specialist
(CS), and Jake Spruance, Contracting Officer’s Representative (COR), by e-mail no later than cob Friday June 28, 2019. Answers to all questions will be answered via solicitation amendment by Wednesday July 3, 2019.
7. All questions during the site visit should be directed to Maureen Long (CS) or Jake
Spruance (COR) and also e-mailed to the CS and COR. All questions and answers from the Pre-proposal Meeting/Site Visit will be answered via solicitation amendment by
Wednesday July 3, 2019.
http://www.fbo.gov/
a. Maureen Long: Maureen.Long2@va.gov or (302) 994-2511 x7573
b. Jake Spruance: Jacob.Spruance@va.gov or (302) 994-2511 x4013
8. Any additional site visits must be scheduled and approved through Jake Spruance (COR).
9. Questions, Comments or Notes?