36C24419B0044-0001004.xlsx

XLSX spreadsheet 47 KB Posted

Attached to
Wilmington DE VAMC, Install Ceiling Mounted Patient Lifts Project No. 460-19-010
Solicitation number
36C24419B0044
Issued by

About this file

36C24419B0044 0001 Attach 4 - ICRA Forms.xlsx

View the file

Other files

File Type Posted
36C24419B0044-0001006.pdf PDF
36C24419B0044-0001003.xlsx XLSX spreadsheet
36C24419B0044-0001005.pdf PDF
36C24419B0044-0001000.docx DOCX document
36C24419B0044-0001001.pdf PDF
36C24419B0044-0001002.pdf PDF
36C24419B0044-012.docx DOCX document
36C24419B0044-017.docx DOCX document
36C24419B0044-005.pdf PDF
36C24419B0044-016.docx DOCX document
36C24419B0044-015.docx DOCX document
36C24419B0044-004.pdf PDF
36C24419B0044-007.pdf PDF
36C24419B0044-003.xlsx XLSX spreadsheet
36C24419B0044-011.docx DOCX document
36C24419B0044-019.docx DOCX document
36C24419B0044-020.docx DOCX document
36C24419B0044-001.docx DOCX document
36C24419B0044-002.pdf PDF
36C24419B0044-010.docx DOCX document
36C24419B0044-014.docx DOCX document
36C24419B0044-008.pdf PDF
36C24419B0044-006.pdf PDF
36C24419B0044-013.doc DOC document
36C24419B0044-018.docx DOCX document
36C24419B0044-009.docx DOCX document
36C24419B0044-000.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ICRA Blank Wilmington VA Medical Center Infection Control Risk Assessment (ICRA)

Project #:
Project Name:
Date:
Step 1. Use the following chart to identify the Type of Construction Project Activity (Type A-D)
Type AInspect and Non-invasive Activities: Includes, but not limited to:
Removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet
Painting (but not sanding)
Wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type BSmall scale, short duration activities which create minimal dust: Includes, but not limited to:
Installation of telephone and computer cabling
Access to chase spaces
Cutting of walls or ceiling where dust migration can be controlled
Type CWork that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies: Includes, but not limited to:
Sanding of walls for painting or wall covering
Removal of floor covering, ceiling tiles and casework
New wall construction
Minor duct work or electrical work above ceilings
Major cabling activities
Any activity which cannot be completed within a single work shift
Type DMajor demolition and construction projects: Includes, but not limited to:
Activities that require consecutive work shifts.
Requires heavy demolition or removal of a complete cabling system.
New construction
Is it likely the Contractor's staff will be placed at risk for infection with tuberculosis?YESNO
Is it likely there will be physical disruption of the water system/lines during activity?YESNO

Selected Type of Construction:

Step 2. Using the following table, identify the Patient Risk Group that will be affected.

If more than one group is affected, select the higher risk group.

Low RiskMedium RiskHigh RiskHighest Risk
Office areasCardiologyCCUAny area caring for immunocompromised patients
EchocardiographyEmergency RoomCardiac Cath Lab
EndoscopyLaboratoriesCentral Supply
Nuclear MedicineOutpatient SurgeryIntensive Care Units
Physical TherapyPharmacyMedical Units
Radiology/MRIPost Anesthesia Care UnitNegative airflow rooms
Respiratory TherapySurgical UnitsOncology
Operating Rooms

Select Patient Risk Group:

Step 3. Match the Patient Risk Group with the planned Construction Project Type (A, B, C, D) on the following matrix, to find the Class of Precautions (I, II, III, and IV) or level of infection control activities required.

Patient Risk GroupType AType BType CType D
Low riskIIIIIIII/IV
Medium riskIIIIIIIV
High riskIIIIII/IVIV
Highest riskIIIII/IVIII/IVIV
During Construction ProjectUpon Completion of Projects
Class I1. Execute work by method to minimize raising dust from

construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

1. Clean work upon completion of task.
Class II1. Provide active means to prevent airborne dust from dispersing into

atmosphere.

2. Water mist work surfaces to control dust while cutting.

3. Seal unused doors with duct tape.

4. Block off and seal air vents.

5. Place dust mat at entrance and exit of work area.

6. Remove or isolate HVAC system in areas where work is being performed.

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop &/or vacuum before leaving work area.

4. Remove isolation of HVAC system in area where work is being performed.

Class III 1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers, i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering & sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within worksite utilizing HEPA-equipped air filtration units.

4. Contain construction waste before transportation in tightly covered containers.

5. Cover transport receptacles or carts. Tape covering unless solid lid is used.

1. Do not remove barriers from work area until completed project is inspected by Safety Management & Infection Control & thoroughly cleaned by Environmental Management.

2. Remove barrier materials carefully to minimize spreading of dirt & debris associated with construction.

3. Vacuum work area with HEPA-filtered vacuums.

4. Wet mop with disinfectant.

5. Remove isolation of HVAC system in areas where work is being performed.

Class IV 1. Isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering & sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within worksite utilizing HEPA-equipped air filtration units.

4. Seal holes, pipes, conduits and punctures appropriately.

5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site; or the can wear cloth or paper coveralls that are removed each time they leave the work site.

6. All personnel entering the work site are required to wear shoe covers.

Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by Safety Management & Infection Control & thoroughly cleaned by Environmental Management.

1. Remove barrier materials carefully to minimize spreading of dirt & debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering unless solid lid.

4. Vacuum work area with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

Class of Precautions:

COR Signature Date

Chief FES Signature Date

Safety Officer Signature Date

Infection Prevention Practitioner SignatureDate
Note: Infection Control approval will be required when Construction Activity and Risk Level indicate that Class III or Class IV control procedures are necessary, when disruption in the water lines is a planned part of the activity (beyond water not being used for a period of time) or when it is likely contractor staff will be exposed to a patient with possible tuberculosis.

ICRA Type A Wilmington VA Medical Center Infection Control Risk Assessment (ICRA)

Project #:460-19-010
Project Name:Install Ceiling Patient Lifts
Date:
Step 1. Use the following chart to identify the Type of Construction Project Activity (Type A-D)
Type AInspect and Non-invasive Activities: Includes, but not limited to:
Removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet
Painting (but not sanding)
Wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type BSmall scale, short duration activities which create minimal dust: Includes, but not limited to:
Installation of telephone and computer cabling
Access to chase spaces
Cutting of walls or ceiling where dust migration can be controlled
Type CWork that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies: Includes, but not limited to:
Sanding of walls for painting or wall covering
Removal of floor covering, ceiling tiles and casework
New wall construction
Minor duct work or electrical work above ceilings
Major cabling activities
Any activity which cannot be completed within a single work shift
Type DMajor demolition and construction projects: Includes, but not limited to:
Activities that require consecutive work shifts.
Requires heavy demolition or removal of a complete cabling system.
New construction
Is it likely the Contractor's staff will be placed at risk for infection with tuberculosis?YESNOx
Is it likely there will be physical disruption of the water system/lines during activity?YESNOx

Selected Type of Construction: C

Step 2. Using the following table, identify the Patient Risk Group that will be affected.

If more than one group is affected, select the higher risk group.

Low RiskMedium RiskHigh RiskHighest Risk
Office areasCardiologyCCUAny area caring for immunocompromised patients
EchocardiographyEmergency RoomCardiac Cath Lab
EndoscopyLaboratoriesCentral Supply
Nuclear MedicineOutpatient SurgeryIntensive Care Units
Physical TherapyPharmacyMedical Units
Radiology/MRIPost Anesthesia Care UnitNegative airflow rooms
Respiratory TherapySurgical UnitsOncology
Operating Rooms

Select Patient Risk Group: High

Step 3. Match the Patient Risk Group with the planned Construction Project Type (A, B, C, D) on the following matrix, to find the Class of Precautions (I, II, III, and IV) or level of infection control activities required.

Patient Risk GroupType AType BType CType D
Low riskIIIIIIII/IV
Medium riskIIIIIIIV
High riskIIIIII/IVIV
Highest riskIIIII/IVIII/IVIV
During Construction ProjectUpon Completion of Projects
Class I1. Execute work by method to minimize raising dust from

construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

1. Clean work upon completion of task.
Class II1. Provide active means to prevent airborne dust from dispersing into

atmosphere.

2. Water mist work surfaces to control dust while cutting.

3. Seal unused doors with duct tape.

4. Block off and seal air vents.

5. Place dust mat at entrance and exit of work area.

6. Remove or isolate HVAC system in areas where work is being performed.

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop &/or vacuum before leaving work area.

4. Remove isolation of HVAC system in area where work is being performed.

Class III 1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers, i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering & sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within worksite utilizing HEPA-equipped air filtration units.

4. Contain construction waste before transportation in tightly covered containers.

5. Place dust mat at entrance and exit of work area.

6. Cover transport receptacles or carts. Tape covering unless solid lid is used.

1. Do not remove barriers from work area until completed project is inspected by Safety Management & Infection Control & thoroughly cleaned by Environmental Management.

2. Remove barrier materials carefully to minimize spreading of dirt & debris associated with construction.

3. Vacuum work area with HEPA-filtered vacuums.

4. Wet mop with disinfectant.

5. Remove isolation of HVAC system in areas where work is being performed.

Class IV 1. Isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering & sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within worksite utilizing HEPA-equipped air filtration units.

4. Seal holes, pipes, conduits and punctures appropriately.

5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site; or the can wear cloth or paper coveralls that are removed each time they leave the work site.

6. All personnel entering the work site are required to wear shoe covers.

Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by Safety Management & Infection Control & thoroughly cleaned by Environmental Management.

1. Remove barrier materials carefully to minimize spreading of dirt & debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering unless solid lid.

4. Vacuum work area with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

Class of Precautions: III/IV

COR Signature Date

Chief FES Signature Date

Safety Officer Signature Date

Infection Prevention Practitioner SignatureDate
Note: Infection Control approval will be required when Construction Activity and Risk Level indicate that Class III or Class IV control procedures are necessary, when disruption in the water lines is a planned part of the activity (beyond water not being used for a period of time) or when it is likely contractor staff will be exposed to a patient with possible tuberculosis.

ICRA Type B Wilmington VA Medical Center Infection Control Risk Assessment (ICRA)

Project #:460-19-010
Project Name:Install Ceiling Patient Lifts
Date:
Step 1. Use the following chart to identify the Type of Construction Project Activity (Type A-D)
Type AInspect and Non-invasive Activities: Includes, but not limited to:
Removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet
Painting (but not sanding)
Wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type BSmall scale, short duration activities which create minimal dust: Includes, but not limited to:
Installation of telephone and computer cabling
Access to chase spaces
Cutting of walls or ceiling where dust migration can be controlled
Type CWork that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies: Includes, but not limited to:
Sanding of walls for painting or wall covering
Removal of floor covering, ceiling tiles and casework
New wall construction
Minor duct work or electrical work above ceilings
Major cabling activities
Any activity which cannot be completed within a single work shift
Type DMajor demolition and construction projects: Includes, but not limited to:
Activities that require consecutive work shifts.
Requires heavy demolition or removal of a complete cabling system.
New construction
Is it likely the Contractor's staff will be placed at risk for infection with tuberculosis?YESNOx
Is it likely there will be physical disruption of the water system/lines during activity?YESNOx

Selected Type of Construction: B

Step 2. Using the following table, identify the Patient Risk Group that will be affected.

If more than one group is affected, select the higher risk group.

Low RiskMedium RiskHigh RiskHighest Risk
Office areasCardiologyCCUAny area caring for immunocompromised patients
EchocardiographyEmergency RoomCardiac Cath Lab
EndoscopyLaboratoriesCentral Supply
Nuclear MedicineOutpatient SurgeryIntensive Care Units
Physical TherapyPharmacyMedical Units
Radiology/MRIPost Anesthesia Care UnitNegative airflow rooms
Respiratory TherapySurgical UnitsOncology
Operating Rooms

Select Patient Risk Group: Medium

Step 3. Match the Patient Risk Group with the planned Construction Project Type (A, B, C, D) on the following matrix, to find the Class of Precautions (I, II, III, and IV) or level of infection control activities required.

Patient Risk GroupType AType BType CType D
Low riskIIIIIIII/IV
Medium riskIIIIIIIV
High riskIIIIII/IVIV
Highest riskIIIII/IVIII/IVIV
During Construction ProjectUpon Completion of Projects
Class I1. Execute work by method to minimize raising dust from

construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

1. Clean work upon completion of task.
Class II1. Provide active means to prevent airborne dust from dispersing into

atmosphere.

2. Water mist work surfaces to control dust while cutting.

3. Seal unused doors with duct tape.

4. Block off and seal air vents.

5. Place dust mat at entrance and exit of work area.

6. Remove or isolate HVAC system in areas where work is being performed.

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop &/or vacuum before leaving work area.

4. Remove isolation of HVAC system in area where work is being performed.

Class III 1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers, i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering & sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within worksite utilizing HEPA-equipped air filtration units.

4. Contain construction waste before transportation in tightly covered containers.

5. Cover transport receptacles or carts. Tape covering unless solid lid is used.

1. Do not remove barriers from work area until completed project is inspected by Safety Management & Infection Control & thoroughly cleaned by Environmental Management.

2. Remove barrier materials carefully to minimize spreading of dirt & debris associated with construction.

3. Vacuum work area with HEPA-filtered vacuums.

4. Wet mop with disinfectant.

5. Remove isolation of HVAC system in areas where work is being performed.

Class IV 1. Isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering & sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within worksite utilizing HEPA-equipped air filtration units.

4. Seal holes, pipes, conduits and punctures appropriately.

5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site; or the can wear cloth or paper coveralls that are removed each time they leave the work site.

6. All personnel entering the work site are required to wear shoe covers.

Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by Safety Management & Infection Control & thoroughly cleaned by Environmental Management.

1. Remove barrier materials carefully to minimize spreading of dirt & debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering unless solid lid.

4. Vacuum work area with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

Class of Precautions: II

COR Signature Date

Chief FES Signature Date

Safety Officer Signature Date

Infection Prevention Practitioner SignatureDate
Note: Infection Control approval will be required when Construction Activity and Risk Level indicate that Class III or Class IV control procedures are necessary, when disruption in the water lines is a planned part of the activity (beyond water not being used for a period of time) or when it is likely contractor staff will be exposed to a patient with possible tuberculosis.

ICRA Type C Wilmington VA Medical Center Infection Control Risk Assessment (ICRA)

Project #:460-19-010
Project Name:Install Ceiling Patient Lifts
Date:
Step 1. Use the following chart to identify the Type of Construction Project Activity (Type A-D)
Type AInspect and Non-invasive Activities: Includes, but not limited to:
Removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet
Painting (but not sanding)
Wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type BSmall scale, short duration activities which create minimal dust: Includes, but not limited to:
Installation of telephone and computer cabling
Access to chase spaces
Cutting of walls or ceiling where dust migration can be controlled
Type CWork that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies: Includes, but not limited to:
Sanding of walls for painting or wall covering
Removal of floor covering, ceiling tiles and casework
New wall construction
Minor duct work or electrical work above ceilings
Major cabling activities
Any activity which cannot be completed within a single work shift
Type DMajor demolition and construction projects: Includes, but not limited to:
Activities that require consecutive work shifts.
Requires heavy demolition or removal of a complete cabling system.
New construction
Is it likely the Contractor's staff will be placed at risk for infection with tuberculosis?YESNOx
Is it likely there will be physical disruption of the water system/lines during activity?YESNOx

Selected Type of Construction: C

Step 2. Using the following table, identify the Patient Risk Group that will be affected.

If more than one group is affected, select the higher risk group.

Low RiskMedium RiskHigh RiskHighest Risk
Office areasCardiologyCCUAny area caring for immunocompromised patients
EchocardiographyEmergency RoomCardiac Cath Lab
EndoscopyLaboratoriesCentral Supply
Nuclear MedicineOutpatient SurgeryIntensive Care Units
Physical TherapyPharmacyMedical Units
Radiology/MRIPost Anesthesia Care UnitNegative airflow rooms
Respiratory TherapySurgical UnitsOncology
Operating Rooms

Select Patient Risk Group: Highest

Step 3. Match the Patient Risk Group with the planned Construction Project Type (A, B, C, D) on the following matrix, to find the Class of Precautions (I, II, III, and IV) or level of infection control activities required.

Patient Risk GroupType AType BType CType D
Low riskIIIIIIII/IV
Medium riskIIIIIIIV
High riskIIIIII/IVIV
Highest riskIIIII/IVIII/IVIV
During Construction ProjectUpon Completion of Projects
Class I1. Execute work by method to minimize raising dust from

construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

1. Clean work upon completion of task.
Class II1. Provide active means to prevent airborne dust from dispersing into

atmosphere.

2. Water mist work surfaces to control dust while cutting.

3. Seal unused doors with duct tape.

4. Block off and seal air vents.

5. Place dust mat at entrance and exit of work area.

6. Remove or isolate HVAC system in areas where work is being performed.

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop &/or vacuum before leaving work area.

4. Remove isolation of HVAC system in area where work is being performed.

Class III 1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers, i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering & sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within worksite utilizing HEPA-equipped air filtration units.

4. Contain construction waste before transportation in tightly covered containers.

5. Place dust mat at entrance and exit of work area.

6. Cover transport receptacles or carts. Tape covering unless solid lid is used.

1. Do not remove barriers from work area until completed project is inspected by Safety Management & Infection Control & thoroughly cleaned by Environmental Management.

2. Remove barrier materials carefully to minimize spreading of dirt & debris associated with construction.

3. Vacuum work area with HEPA-filtered vacuums.

4. Wet mop with disinfectant.

5. Remove isolation of HVAC system in areas where work is being performed.

Class IV 1. Isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering & sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within worksite utilizing HEPA-equipped air filtration units.

4. Seal holes, pipes, conduits and punctures appropriately.

5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site; or the can wear cloth or paper coveralls that are removed each time they leave the work site.

6. All personnel entering the work site are required to wear shoe covers.

Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by Safety Management & Infection Control & thoroughly cleaned by Environmental Management.

1. Remove barrier materials carefully to minimize spreading of dirt & debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering unless solid lid.

4. Vacuum work area with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

Class of Precautions: III/IV

COR Signature Date

Chief FES Signature Date

Safety Officer Signature Date

Infection Prevention Practitioner SignatureDate
Note: Infection Control approval will be required when Construction Activity and Risk Level indicate that Class III or Class IV control procedures are necessary, when disruption in the water lines is a planned part of the activity (beyond water not being used for a period of time) or when it is likely contractor staff will be exposed to a patient with possible tuberculosis.

File details come from the government source that posted it.