These are 100% construction documents for a Health Fitness Center renovation project at the Canandaigua VA Medical Center (VAMC) in New York, issued on January 8, 2026. The project involves converting an existing facility into a fitness center with an occupancy classification of Business (NFPA 101 3.3.178) and occupant load of 407 across 17,391 square feet. The facility features 13 primary spaces including warm-up area, locker area, storage, two offices, group room, office, work-out area, additional storage, toilet room, electric room, entry, and utility room. Construction is Type IIIA (IBC 2012) with active/sprinklered fire suppression and fire alarm systems. Travel distances are limited to 300 feet total, 50 feet dead end, with 100-foot business use and 75-foot assembly requirements for areas under 50 occupants.

The architectural scope includes new partition construction (multiple wall types utilizing metal studs and gypsum board), flooring systems with rubber gym roll, vinyl composition tile, and ceramic tile finishes, interior finishes with paint and wood veneer panels, door and hardware installation, and ceiling modifications with acoustical tile and lighting coordination. Mechanical work involves HVAC modifications including duct routing, supply diffusers, return registers, exhaust systems, and thermostat relocation while maintaining existing unit heaters. Electrical work includes new lighting fixtures (LED troffers and pendant lights), power distribution, data circuits, emergency power integration, and access control systems. Plumbing scope covers domestic hot and cold water connections, wall-mounted fixtures (toilet, sink, bottle filling station), and drainage modifications. Fire protection includes existing automatic wet-pipe sprinkler system modifications and fire alarm device relocations. The project includes security camera installation connected to the facility network and PIV reader relocation for door access control. All work requires coordination with existing building systems, infection control protocols, and VA operational requirements with minimum three-week advance notice for system shutdowns.

View the file

Other files

File Type Posted
36C24226B0038 0006.docx DOCX document
RFI -2.docx DOCX document
36C24226B0038 0005.docx DOCX document
36C24226B0038 0004.docx DOCX document
PRE BID SITE VISIT SIGN IN SHEET - HFC AND WH - CAN.pdf PDF
36C24226B0038 0003.docx DOCX document
OPC Floor 2 OIT Locations.pdf PDF
OPC Floor 1 Fire Panel Location.pdf PDF
RFI 1 - Answered.pdf PDF
36C24226B0038 0002.docx DOCX document
36C24226B0038 0001.docx DOCX document
BUY AMERICAN ACT CERTIFICATE 52.225-2.docx DOCX document
HFC and WH combined SPECS.pdf PDF
P07 - WAGE DETERMINATION.pdf PDF
LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.docx DOCX document
Construction Drawings.pdf PDF
36C24226B0038_1.docx DOCX document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

114 PAVILION COURT 2

124 TRASH HUT - B.6

94 GARAGE (SCHOOL LEASE)

80 S.T.P. CONTROL HOUSE (WASTE WATER TREATMENT)

73 (SCHOOL LEASE)

39 ENGINEERING STORAGE

37 FORMER PATIENT CARE, IS

36 FORMER PATIENT CARE, DAY TREATMENT CENTER

34 SPD, A&MMS, DAYCARES, NETWORK STORAGE

14 VACANT

13 EMERGENCY GENERATOR

5 AUDITORIUM, RECREATION SVC.

NO. BUILDING SCHEDULE 1

4 ADMINISTRATIVE, CANTEEN

18 (SCHOOL LEASE)

1 OUTPATIENT SERVICES, MAIN ADMIN

2 FORMER MAIN KITCHEN, DINING RM., OUTPATIENT PHARMACY

3 GEC OFFICES, PATIENT CARE

6 SUBSTANCE ABUSE OFFICES, EMS

7 NHCU, VOLUNTARY SVC., HRMS

9 PATIENT CARE/DOM, LIBRARY, MAIL RM.

11 WAREHOUSE

12 BOILER PLANT/BIOMASS

16 FIRE STATION, GARAGE, GROUNDS MTN.

24 VALOR HEADQUARTERS

33 PATIENT CARE NHCU, INPATIENT PHARMACY

40 GATE HOUSE

41 OUTDOOR FIREPLACE

42 STONE GRANDSTAND

46 WAREHOUSE POLE BARN

70 MISCELLANEOUS STORAGE

81 SLUDGE DIGESTORS

82 SLUDGE BED

76 STORAGE

8 NHCU, ADULT DAYCARE

10 LAUNDRY

20 VA POLICE STATION

75 OIL HOUSE

77 STORAGE

125 TRASH HUT - B.36/37

123 TRASH HUT - B.8

122 OIL STORAGE TANKS

113 PATIENT'S TOILET, COURT 2

121 SWITCHGEAR

118 ENGINEERING SHOPS & OFFICES

112 PATIENT'S TOILET, COURT 1

111 TRANSFORMERS X-RAY B.1

109 AERATION TANKS

108 PRIMARY TANKS

106 TRICKLING FILTER

107 PUMP HOUSE S.T.P.

110 PAVILION COURT 2

120 FIRE PUMP BLDG., BKFLOW PREVENTOR

115 RECREATION STORAGE, COURT 1

17 CADENCE SQUARE

35 RELOCATED DIETETICS, KITCHEN

43 SALT STORAGE BARN (COVER)

44 GROUNDS AND TRANSPORTATION

45 CHILLER PLANT

50 LOADING DOCK

38 FUTURE TEMPORARY OFFICE

105 SECONDARY TANKS

65 TEMPORARY TRAILERS (OFFICES)

4 ' - 0 "x 1 0' - 0 'C O N C . P AD

FO R

P R O P AN E

T AN K

CO URTYARD 2

CO URTYARD 2

35T

BIOMASS

8182 80 107

105109

2 HRV

ISITOR

BUSHWOOD LN.

LOOP RD.

L O

O P

R D

EAST STREET

PARKING

PARKING

PARKING

WATER TOWER

C H

A P

E L

S T

R E

E T

PARK

EXERCISE

EAST STREET

NORTH

CAMPUS SITE PLAN

VAMC Canandaigua

RAMP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

D

21 4 5 6 7 8 9

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

NOTE:

USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING

EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD

DRAWING INDEX

LIST OF ABBREVIATIONS

A/C AIR CONDITION(ING) (ED)

ACC ACCESSIBLE

ACI AMERICAN CONCRETE INSTITUTE

ACT ACOUSTICAL CEILING TILE

ACM ASBESTOS CONTAINING MATERIAL

ACS PNL ACCESS PANEL

ADDL ADDITIONAL

ADJ ADJUSTABLE, ADJACENT

ADH ADHESIVE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

AISI AMERICAN IRON AND STEEL

INSTITUTE

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECT(URAL)

ASTM AMERICAN SOCIETY FOR TESTING

AND MATERIALS

AWP ACOUSTICAL WALL PANEL

AWS AMERICAN WELDING SOCIETY

B BD BASE BOARD

BITUM BITUMINOUS

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BR BEDROOM

BRG BEARING

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT UP ROOFING

CCTV CLOSED CIRCUIT TELEVISION

CAB CABINET

CB CATCH BASIN, CORNER BEAD

CH BD CHALKBOARD

CEM CEMENT

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/

CONTRACTOR INSTALLED

CF/OI CONTRACTOR FURNISHED/

OWNER INSTALLED

CG CORNER GUARD

CI CAST IRON

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CLR CLEAR, COLOR

CMT CERAMIC MOSAIC TILE

CMU CONCRETE MASONRY UNIT

CO CLEANOUT, CASED OPENING,

COMPANY

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CONN CONNECT(ION)

CONSTR CONSTRUCTION

CONT CONTINUE(OUS)

CONTR CONTRACT(OR)

COORD COORDINATE

CPT CARPET

CT CERAMIC TILE, COUNT, CURRENT

TRANSFORMER

CTR CENTER

CU CUBIC

CUH CABINET UNIT HEATER

CU YD CUBIC YARD

D DEEP, DEPTH

DEG DEGREE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA OR ø DIAMETER

DIAG DIAGONAL, DIAGRAM

DIM DIMENSION

DIFF DIFFUSER

DIR DIRECTION

DISP DISPENSER

DIV DIVISION

DN DOWN

DR DOOR, DRIVE

DS DOWNSPOUT

DWG DRAWING

DWL DOWEL

E EAST

EA EACH

EC ELECTRICAL CONTRACTOR

EF EACH FACE

EIFS EXTERIOR INSULATION AND FINISH

SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EM ENTRY MAT, EXPANDED METAL

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

EOS EDGE OF SLAB

EP ELECTRIC PANEL

EQ EQUAL

EQUIP EQUIPMENT

ES EMERGENCY SHOWER

ETC ET CETERA

ETR EXISTING TO REMAIN

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXC EXCAVATION, EXCAVATE

EXP EXPAND, EXPANSION

F/F FACE TO FACE

FAAP FIRE ALARM ANNUNCIATOR

PANEL

FACP FIRE ALARM CONTROL PANEL

FD FLOOR DRAIN

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FHC FIRE HOSE CABINET

FIN FINISH(ED)

FIXT FIXTURE

FLASH FLASHING

FLEX FLEXIBLE

FLG FLOORING, FLANGE

FO FINISHED OPENING

FP FIRE PROTECTION, FIREPROOF

FRTW FIRE RETARDANT TREATED

WOOD

FT FOOT, FEET

FTG FOOTING

FTR FINNED TUBE RADIATION

FURN FURNACE, FURNITURE, FURNISH

GA GAGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACT(OR)

GFRC GLASS FIBER REINFORCED

CONCRETE

GFRG GLASS FIBER REINFORCED

GYPSUM

GL GLASS, GROUND LEVEL

GL BLK GLASS BLOCK

GLU LAM GLUED LAMINATED BEAM

GR GRADE, GROSS

GWT GLAZED WALL TILE

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

HB HOSE BIBB

HC HOLLOW CORE, HOSE CABINET

HCP HANDICAPPED

HDW HARDWARE

HDWD HARDWOOD

HM HOLLOW METAL

HO HOLD OPEN

HORIZ HORIZONTAL

HP HIGH POINT, HORSEPOWER

HSS HOLLOW STRUCTURAL SECTION

HT HEIGHT

HTG HEATING

HTR HEATER

HVAC HEATING, VENTILATING AND AIR

CONDITIONING

HW HOT WATER

HYD HYDRANT

IN INCHES

INCL INCLUDED

INCAND INCANDESCENT

INFO INFORMATION

INSUL INSULATION

INTERM INTERMEDIATE

INT INTERIOR

JAN JANITOR

KIP 1000 POUNDS

KIT KITCHEN

KO KNOCKOUT

KPL KICK PLATE

LAM LAMINATE(D)

LAU LAUNDRY

LAV LAVATORY

LB POUND

LBL LABEL

LD LOAD

LF LINEAR FEET (FOOT)

LH LEFT HAND, LATENT HEAT

LIN LINEAR

LKR LOCKER

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LOC LOCATION

LRFD LOAD & RESISTANCE FACTOR

DESIGN

LT LIGHT

LTG LIGHTING

LWC LIGHT-WEIGHT CONCRETE

MACH MACHINE

MAINT MAINTENANCE

MAS MASONRY

MATL MATERIAL

MAX MAXIMUM

MDO MEDIUM DENSITY OVERLAY

MDF MEDIUM DENSITY FIBERBOARD

MECH MECHANICAL

MEP MECHANICAL, ELECTRICAL,

PLUMBING AND FIRE

PROTECTION

MEZZ MEZZANINE

MFR MANUFACTURER

MH MANHOLE

MM MILLIMETER

MIN MINIMUM

MISC MISCELLANEOUS

MLWK MILLWORK

MO MASONRY OPENING

MTD MOUNTED

MTL METAL

MULL MULLION

N NORTH

NAT NATURAL

NCOMBL NONCOMBUSTIBLE

NIC NOT IN CONTRACT

NO OR # NUMBER

NOM NOMINAL

NORM NORMAL

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

NWC NORMAL WEIGHT CONCRETE

O/O OUT TO OUT

OA OVERALL, OUTSIDE AIR

OC ON CENTER

OD OUTSIDE DIAMETER

OF/CI OWNER FURNISHED, CONTACTOR

INSTALLED

OF/OI OWNER FURNISHED, OWNER

INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPNG OPENING

OPP OPPOSITE

OPH OPPOSITE HAND

OPT OPTIONAL, OPTIMUM

OZ OUNCE

PBD PARTICLEBOARD

PCC PRECAST CONCRETE

PCT PORCELAIN CERAMIC TILE

PED PEDESTAL

PEND PENDANT

PERF PERFORATED

PL PLATE, PROPERTY LINE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLB PLUMBING

PLYWD PLYWOOD

PNL PANEL

POL POLISHED

PORC PORCELAIN

POS POSITIVE, POSITION

PPT PRESSURE-PRESERVATIVE

TREATED

PR PAIR

PREFAB PREFABRICATE

PREFIN PREFINISH

PREP PREPARATION

PROJ PROJECT

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, POST TENSION

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

PVG PAVING

QT QUARRY TILE

QTR QUARTER

QTY QUANTITY

RB RUBBER BASE, RESILIENT BASE

RCP REINFORCED CONCRETE PIPE,

REFLECTED CEILING PLAN

RD ROOF DRAIN, ROAD

REC RECESSED

REF REFRIGERATOR

REFL REFLECT

REG REGISTER, REGULATION

REINF REINFORCED

REQD REQUIRED

RESIL RESILIENT

REV REVISION

RF RESILIENT FLOORING

RFG ROOFING

RH RIGHT HAND, ROOF HATCH

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RTU ROOF TOP UNIT

RV ROOF VENT

RWB RUBBER WALL BASE

S SOUTH

SAB SOUND ATTENUATION BATTS

SAN SANITARY

SC SOLID CORE, SHADING

COEFFICIENT

SCHED SCHEDULE

SEAL SEALER ON FLOOR (FINISH)

SECT SECTION

SF SQUARE FOOT, SAFETY FACTOR

SHT SHEET

SHR SHOWER

SIM SIMILAR

SOG SLAB ON GRADE

SPA SPACES

SPKR SPEAKER

SPEC SPECIFICATION

SQ SQUARE

SRD SECONDARY ROOF DRAIN

SS SERVICE SINK

SSM SOLID SURFACE MATERIAL

SSP STAINLESS STEEL PIPE

SST STAINLESS STEEL

STA STATION

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STOR STORAGE

STR STRAIGHT, STRINGERS

STRUCT STRUCTURAL

SUSP SUSPENDED

SV SHEET VINYL

SY SQUARE YARD

TEL TELEPHONE

THRES THRESHOLD

TEMP TEMPORARY

TER TERRAZZO

THK THICK(NESS)

TK BD TACK BOARD

TMPD TEMPERED

TOC TOP OF CONCRETE

TOM TOP OF MASONRY

TOPO TOPOGRAPHY, TOPOGRAPHIC

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TSTAT THERMOSTAT

TYP TYPICAL

U HEAT TRANSFER COEFFICIENT

UCL UNDER CABINET LIGHTING

UGND UNDERGROUND

UH UNIT HEATER

UL UNDERWRITER'S

LABORATORIES

UNEX UNEXCAVATED

UNFIN UNFINISHED

UON UNLESS OTHERWISE NOTED

UTIL UTILITY

VARN VARNISH(ED)

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VIN VINYL

VOL VOLUME

VT VINYL TILE

V SHT VINYL SHEET

W/ WITH

WC WATER CLOSET

W/O WITHOUT

WD WOOD

WDW WINDOW

WH WATER HEATER

WI WROUGHT IRON

WM WIRE MESH

WP WATERPROOFING, WORKING

POINT

C12 A

C12

A-XXX

A-XXX

A-XXX

X

X

SCALE: X"=1'-0"

TITLE

B

A

8'-0" AFF

BATT INSULATION

RIGID INSULATION

WOOD BLOCKING OR SHIMSTONE

GRAVEL OR CRUSHED STONE

WOOD FRAMING (CONTINUOUS)

FINISH WOOD

STEEL-LARGE-SCALE

STEEL-SMALL-SCALE

PLYWOOD

CONCRETE

CONCRETE MASONRY UNIT BRICK

(Other metals as noted)

NOTATION

SECTION CUT OFFSET CUT

WALL SECTION CUT

DETAIL-BLOW UP

ELEVATION

INTERIOR ELEVATIONS

DETAIL-CUT

PARTITION TYPE

ROOM NUMBER

DOOR NUMBERS

WINDOW TYPES

REVISION

AND

ANGLE

SQUARE

NUMBER OR

POUND

DIAMETER

Lor

AT

OR

OR

ø

UNDISTURBED EARTH

001 100-A

DETAIL NO.

STRUCTURAL

GRID

DETAIL NO.

DRAWING NO.

VIEWING

DIRECTION

DETAIL NO.

DRAWING NO.

DETAIL NO.

DRAWING NO.

VIEWING DIRECTION

DETAIL NO.

DRAWING NO.

DRAWING NO.

ELEVATIO

N

NO.

PLAN KEY NOTE

DEMOLITION KEY NOTE

CEILING TYPE AND ELEVATION

DRAWING SYMBOLS

MATERIAL SYMBOLS

(Other metals as noted)

A-XXX

X

A-XXX

X

A-XXX

X

GYPSUM, SAND, MORTAR

A-XXX

X

DRAWING NO.

ELEVATION NO.

PROJECT DATA

TITLE SHEET

G-0011/8/2026

HEALTH FITNESS CENTER

OPC (B2)

100% CONSTRUCTION

DOCEUMENTS

528A5-25-509

CANANDAIGUA VAMC

HEALTH FITNESS CENTER

100% CONSTRUCTION DOCEUMENTS

G SERIES

G001 TITLE SHEET

A SERIES

A001 GENERAL NOTES AND WALL TYPES

A002 FLOOR PLAN

A003 REFLECTED CEILING PLAN

A004 TOILET ROOM PLAN AND DETAILS

A005 ELEVATIONS, SECTIONS, AND DETAILS

A006 DOOR AND FINISH SCHEDULE

A007 EQUIPMENT AND FURNITURE LAYOUT PLAN

E SERIES

E001 ELECTRICAL NOTES AND LEGENDS AND SCHEDULES

E002 ELECTRICAL DEMO PLAN

E003 ELECTRICAL LIGHTING PLAN

E004 ELECTRICAL POWER PLAN

F SERIES

F001 FIRE ALARM DEVICE PLAN

F002 SPRINKLER PLAN AND NOTES

H SERIES

H001 DEMO HVAC PLAN

H002 HVAC PLAN

H003 HVAC PIPING AND CONTROLS

P SERIES

P001 PLUMBING PLAN - DOMESTIC

P002 PLUMBING PLAN - DRAINAGE

TY SERIES

TY001 SECURITY PLAN

REVISIONS

no. date description

OCCUPANCY CLASSIFICATION

CONSTRUCTION CLASSIFICATION

NFPA TYPE

OCCUPANCY LOAD

SPRINKLERED

FLOOR AREA

FLOOR AREA PER OCCUPANT

OCCUPANT LOAD

TRAVEL DISTANCE REQ.

TOTAL

DEAD END

COMMON

BUISNESS - B (NFPA 101 3.3.178

OUTPATIENT CLINIC)

TYPE IIIA (IBC 2012)

TYPE III (211)

LEVEL 1 (NFPA 101, TABLE 7.3.1.2)

YES / ACTIVE

17,391 SF

100 GROSS

300' 50'

100' (BUISNESS)

75' (ASSEMBLY <50 OCC)

GYPSUM BOARD / METAL STUD SERIES PARTITIONS

(1) LAYER 5/8" CEMENT BOARD LAMINATED AND SECURED

TO EXISTING PARTITION.

3 5/8" METAL STUDS AT 16" O.C.

(1) LAYER 5/8" GYPSUM BOARD AT ROOM SIDE ONLY.

4 7/8" 3 5/8" METAL STUDS AT 16" O.C.

(1) LAYER 5/8 " GYPSUM BOARD EACH SIDE.

1 HOUR FIRE RESISTANT RATED WHEN INDICATED

(WITH OR WITHOUT INSULATION) PER UL U465

A3

7 1/4" 6" METAL STUDS AT 16" O.C.

(1) LAYER 5/8" GYPSUM BOARD EACH SIDE.

A6

UNBALANCED SERIES PARTITIONS

4 1/4"U8

PARTITION LEGEND

INDICATES PARTITION TYPE

INDICATES PARTITION HEIGHT ABOVE

FINISHED FLOOR:

"X" AFC PARTITION TO X" ABOVE

FINISHED CEILING

UFC PARTITION TO UNDERSIDE OF

FINISHED CEILING

X'-X" WHERE HEIGHT IS NOTED,

CONSTRUCT WALL TO THAT

HEIGHT INCLUDING TOP OF

WALL CAP

XX

A3

INDICATES PARTITION TYPE

INDICATES ADDITIONAL SOUND ATTENUATION

BLANKETS FOR ACOUSTICAL PURPOSES

(REFER TO GENERAL PARTITION NOTES)

WALL

INDICATES PARTITION TYPE

INDICATES FIRE RATED WALL &

RATING OF WALL CONSTRUCTION IN

HOURS

A

ALL STUD PARTITIONS NOT INDICATED WITH A

PARTITION TYPE SHALL BE TYPE A3.

PARTITIONS WITH SOUND ATTENUATION BLANKETS:

GYPSUM BOARD TO BE "TYPE X" UNLESS OTHERWISE NOTED

ALL PARTITIONS ARE TO BE TO THE UNDERSIDE OF DECK UNLESS OTHERWISE NOTED

DIMENSIONS SHOWN FOR EACH PARTITION DESCRIPTION INDICATE FACE-TO-FACE

THICKNESS OF MATERIALS LISTED FOR THAT PARTITION

PROVIDE LISTED U.L. FIRE-RESISTANT JOINT ASSEMBLIES @ TOP OF

ALL WALLS INDICATED TO BE FIRE-RESISTANT RATED

THE TOP OF ALL PARTITIONS FRAMED AGAINST THE UNDERSIDE OF

STRUCTURES SHALL HAVE PROVISIONS FOR DEFLECTION & RESTRAINT

ALL METAL STUD PARTITIONS TO RECIEVE CERAMIC TILE SHALL BE

CONSTRUCTED USING 20 GUAGE METAL STUDS @ 16" O.C.

PROVIDE CONTROL JOINTS IN GYPSUM BOARD WALLS & CEILINGS.

CONTROL JOINTS SHALL BE INSTALLED IN CEILINGS EXCEEDING 30 LF.

PROVIDE JOINT WHERE CEILING FRAMING OR FURRING CHANGES

DIRECTION AND WHERE CONTROL JOINTS OCCUR IN EXTERIOR WALL

FOR STUD CONSTRUCTION NOT EXTENDING TO THE STRUCTURE, PROVIDE

DIAGONAL BRACING FROM TOP OF WALL TO STRUCTURE ABOVE. INSTALL

AT 12'-0" MAX SPACING AND @ EACH DOOR JAMB

MOISTURE RESISTANT GYPSUM BOARD TO BE USED IN ALL TOILET AND

WET ARES. SUBSTITUTE CEMENT BACKING BOARD FOR GYPSUM BOARD

DIRECTLY BEHIND ALL WALLS/SURFACES TO RECEIVE CERAMIC TILE

GENERAL PARTITION NOTES:

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

GENERAL NOTES:

ALL GENERAL NOTES PERTAIN TO ALL ARCHITECTURAL (A-SERIES) DRAWINGS IN THIS SET

PROVIDE CONCEALED STEEL STUD BLOCKING OR 2" x 18 GA CONTINUOUS STEEL STRAPPING

ATTACHED TO FACE OF STUDS BEHIND ALL WALL MOUNTED ITEMS SUCH AS: WALL CABINETS,

SHELVING, COAT RODS, GRAB BARS, HANDRAILS, TOILET ACCESSORIES, TV MOUNTS ETC.

SEE INTERIOR ELEVATIONS & FURNITURE PLANS FOR ADDITIONAL INFORMATION AND LOCATIONS

EXTERIOR PERIMETER OF ALL WINDOWS, DOORS, CURTAINWALL, STOREFRONT, LOUVERS,

OR OTHER ITEMS INSERTED IN OR PENETRATING AN EXTERIOR WALL SHALL BE SEALED WITH

BACKER ROD AND SEALANT WHETHER INDICATED ON DRAWINGS OR NOT

FLOOR FINISH TRANSITIONS/CHANGES SHALL OCCUR BELOW THE DOOR

DIMENSIONS LOCATING INTERIOR PARTITIONS ARE TO THE FACE OF WALL (EXCLUDING FINISH

MATERIALS SUCH AS - BUT NOT LIMITED TO: CERAMIC TILE, AND WOOD PANELING) UNLESS

NOTED

OTHERWISE. SEE PARTITION SCHEDULE FOR WALL THICKNESS

ALL EXISTING DIMENSIONS ARE APPROXIMATE AND FOR CONTRACTORS VERIFICATIONS. IF

DISCREPANCIES ARISE, NOTIFY THE ARCHITECT (AND/OR CONSTRUCTION MANAGER) PRIOR

TO PROCEEDING WITH THE WORK THAT MAY BE AFFECTED BY THE DIMENSION CHANGE

EVERY ATTEMPT HAS BEEN MADE TO INDICATE PERTINENT EXISTING UTILITIES AND CONDITIONS

AS ACCURATELY AS POSSIBLE FROM EXISTING SURVEYS, DRAWINGS AND OTHER DATA. PRIOR

TO THE BID OPENING, CONTRACTORS SHALL WALK THE JOB SITE AND SATISFY THEMSELVES

TO EXISTING CONDITIONS. THE ARCHITECT SHALL BE CONSULTED WHEN ANY QUESTION

ARISES RELATIVE TO MATERIALS NOT SPECIFICALLY SHOWN OR SPECIFIED

ALL EXISTING WORK (CEILINGS, FLOORS, WALLS, PARTITIONS, FINISHES, ETC.) DISTURBED BY

NEW CONSTRUCTION, INCLUDING MECHANICAL, PLUMBING, AND ELECTRICAL, SHALL BE

PATCHED AND REPAIRED TO RESTORE SURFACES TO THE ORIGINAL CONDITION AFTER

INSTALLATION OF OTHER WORK AT THE EXPENSE OF THE CONTRACTOR.

PENETRATIONS THROUGH FIRE-RESISTANT CONSTRUCTION SHALL BE BUILT IN ACCORDANCE

WITH U.L. LISTED THROUGH-PENETRATION FIRESTOP SYSTEMS. SEE CODE COMPLIANCE PLAN

FOR PARTITION LOCATIONS. PENETRATIONS THROUGH NON FIRE-RESISTANT RATED

HORIZONTAL ASSEMBLIES, NOT PROTECTED BY A SHAFT ENCLOSURE, SHALL HAVE ITS

ANNULAR SPACE FILLED WITH NON-COMBUSTIBLE MATERIAL TO PREVENT THE PASSAGE OF

FLAME, SMOKE FUMES, AND HOT GASES. NON-COMBUSTIBLE PENETRATING ITEMS SHALL NOT

PENETRATE MORE THAN 3 FLOOR ASSEMBLIES. COMBUSTIBLE PENETRATING ITEMS SHALL NOT

PENETRATE MORE THAN 1 FLOOR ASSEMBLY

ALL WORKERS ARE SUBJECT TO BADGING WHILE WORKING IN THE FACILITY. THE

SUPERINTENDENT SHALL PROVIDE A FULL AND COMPREHENSIVE LIST OF ALL GC AND SUB

WORKERS TO THE COR IN A TIMELY MANNER TO ALLOW FOR PROCESSING AND PRODUCTION OF

BADGES.

1.

2.

3.

4.

5.

6.

7.

8.

9.

PROVIDE SOUND ATTENUATION BLANKETS IN ALL CAVITY SPACES IN WALL

FULL HEIGHT

THICKNESS OF BLANKETS IN STUD WALLS SHALL BE EQUAL TO THICKNESS

OF CAVITY TO NEAREST 1/2", UNLESS INDICATED OTHERWISE

PARTITIONS TO BE SEALED @ THE PERIMETER, BEHIND CONTROL JOINTS,

AROUND OPENINGS AND AT ALL PENETRATIONS WITH EACH LAYER OF

BOARD TO RECIEVE A BEAD OF SEALANT

SEE WALL TYPE DESCRIPTIONS FOR CONDITIONS REQUIRING MINERAL

FIBER SAFING INSULATION BATTS

1.

2.

3.

4.

U1 5/8"

ICRA AND COMPLIANCE PLAN KEYNOTES

PROVIDE NON-COMBUSTIBLE HARD BARRIER DURING REMOVAL,

INSTALL AND FINISHING OF WORK WITHIN ADJACENT SPACE.

BARRIER TO BE REMOVED POST COMPLETION OF SAID WORK OR

UPON APPROVAL TO FACILITATE FINISHES. BARRIER SHALL BE

SECURE AND CONTRACTOR SHALL REPAIR ANY DAMAGES AND

CLEAN AT ITS OWN EXPENSE.

PROVIDE NON-COMBUSTIBLE HARD BARRIER WITH SECURE ACCESS

DURING REMOVAL, INSTALL AND FINISHING OF WORK WITHIN

COORDIDOR. BARRIER TO BE REMOVED POST COMPLETION OF SAID

WORK OR UPON APPROVAL TO FACILITATE FINISHES. BARRIER

SHALL BE SECURE AND CONTRACTOR SHALL REPAIR ANY DAMAGES

AND CLEAN AT ITS OWN EXPENSE. PRIOR TO REMOVAL AND POST

INSTALL OF NEW WORK, THE COORDIOR DOOR MAY ACT AS SECURE

ENTRY TO THE CONSTRUCTION AREA.

ICRA AND COMPLIANCE PLAN GENERAL NOTES:

CONTRACTOR SHALL FOLLOW ALL DIRECTIVES BY THE VAMC

INFECTIOUS CONTROL AND VAFD INCLUDING THE ACQUISITION OF

PERMITS AND REQUIREMENTS FOR OPERATION.

ALL BARRIERS SHALL BE NON-COMBUSTIBLE MATERIALS, NOT

IMPEDE THE ACCESS OR EGRESS OF OTHER SPACES, OR DAMAGE

ANY EXISTING FINISHES.

ALL MATERIALS AND TOOLS TO BE TRANSPORTED THROUGH

FACILITY IN CLEAN AND COVERED CARTS AND SHALL NOT

OBSTRUCT DAILY ACTIVITIES.

TACK MATS SHALL USED AND MAINTAINED AT ENTRANCE / EXIT OF

WORK AREA AT ALL TIMES. ANY NOTABLE DEBRIS OR DIRT DUE TO

CONSTRUCTION ACTIVITIES OR PERSONNEL SHALL BE CLEANED AT

THE EXPENSE OF THE CONTRACTOR.

ANY ACTIVITIES REQUIRING LOUD NOISES OR WHICH MAY PRODUCE

DETECTABLE ODORS SHALL BE NOTIFIED TO THE COR 1 WEEK

PRIOR TO COMMENCEMENT OF SAID WORK.

THE VAFD PROVIDES HOT WORK PERMITS ON A DAILY BASIS AND IS

THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN.

COORDINATE WITH THE COR FOR ALL OTHER REQUIRED PERMITS

AND REGULATIONS TO PERFORM ANY OR ALL FEATURES OF THE

WORK DESCRIBED HERE IN.

ACTIVE PERMITS ARE REQUIRED TO BE DISPLAYED AT ENTRANCE

OF WORK AREA IN CLEANABLE SLEEVES. EXPIRED OR CLOSED

PERMITS SHALL BE KEPT WITH PROJECT DRAWINGS AND INFO

MAINTAINED BY THE CONTRACTOR WITHIN THE WORK AREA.

1HR 1HR

1HR

H

R

H

R H

R

H

R

1HR

1HR

278'

WORK OUT AREA

GROUP ROOM

OFFICE

OFFICE

ENTRY

WARM-UP AREA

STORAGE

ELECTRIC ROOM

TOILET ROOM

10 LOCKER AREA

OFFICE

1HR

1HR

H

R

H

R

PROJECT TITLEPHASE

NOTE:

THESE DRAWINGS ARE THE OWNERSHIP OF THE VA AND SHALL NOT

BE USED OR REPRODUCED WITHOUT APPROVAL

APPROVED USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR

VERIFYING EXISTING DIMENSIONS AND CONDITIONS IN FIELD FOR ALL

ELEMENTS DEPICTED OR REFERED WITHIN THE CONSTRUCTION

DOCUMENTS

DRAWING TITLE

APPROVED:

U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

STAMPARCHITECT / ENGINEER OF RECORDCONSULTANTREVISIONS

NO. DATE DESCRIPTION GENERAL NOTES AND WALL TYPES

Author A-0011/8/2026

HEALTH FITNESS CENTER100% CONSTRUCTION

DOCEUMENTS

528A5-25-509

CANANDAIGUA VAMC

OPC (B2)

1/8" = 1'-0"

NEW WORK CODE ICRA AND

COMPLIANCE PLAN

1/16" = 1'-0"

EXISTING CODE COMPLIANCE PLAN

NOTE: TRAVEL PATTERN LIGHTLY ADJUSTED WITHIN SPACE. EXIT PATH OUTSIDE SPACE REMAINS THE SAME. TOTAL EXIT DISTANCE REMAINS THE SAME.

PLAN KEYNOTES

PROVIDE CAP ON HALF WALL PER DETAILS

EXISTING STRUCTURAL COLUMN (TO REMAIN) PROTECT ALL FIRE

PROTECTION MATERIAL. PATCH ANY DAMAGED PROTECTANT TO

MAINTAIN FIRE RATING/SYSTEM

PROVIDE WALL MOUNTED LOCKERS

PROVIDE FLOOR MOUNTED BENCH

PROVIDE BLOCKING FOR WALL MOUNTED TV (COORDINATE WITH E

DRAWINGS) MARK BLOCKING FOR INSTALLATION OF TV BY OTHERS.

OPEN EXISTING PARTITIONS WHERE NEEDED TO PROVIDE

BLOCKING AND PATCH TO MATCH.

PROVIDED RATED PARTITION INFILL AT DOOR REMOVAL PER

DETAILS. FINISH FACE SHALL BE FLUSH WITH EXISTING ON BOTH

SIDES AND FINISHED TO MATCH EXISTING TEXTURE AND COLOR.

REMOVE FLOOR BASE TO EXTENTS SHOWN AND PROVIDE NEW TO

MATCH EXISTING. PATCH ANY DAMAGED FLOORING AS NEEDED.

PROVIDE 4"X4"X8' SS CORNER GUARD

PROVIDE 6'X8' WALL MOUNTED MIRROR

PROVIDE RECESSED FIRE EXTINGUISHER CABINET (EXTINGUISHER

TO BE PROVIDED BY VA)

HALF PARTITION HSS INTERNAL SUPPORT PER DETAILS (SHOWN ON

PLAN FOR LOCATION ONLY, SUPPORTS SHALL BE CONCEALED IN

HALF PARTITION)

PROVIDE SS END WALL GUARD TO MATCH WALL THICKNESS AND

EXTEND 2.5" FROM CORNER. INSTALL 8' GUARDS WHERE WALL IS

FULL HEIGHT OR TO MATCH HEIGHT OF PARTIAL PARTITIONS.

PATCH WALL AREA AT REMOVED HEAT RADIATOR PER H DRAWINGS.

EXISTING VERTICAL STEAM PIPE OR ROOF DRAIN TO REMAIN.

EXISTING VERTICAL ROOF DRAIN TO REMAIN.

PROVIDE DRINKING BOTTLE FILLING STATION. COORDINATE WITH P

AND E DRAWINGS.

PROVIDE TRANSITION STRIP BETWEEN FLOOR FINISHES THAT

MEETS ALL ACCESSIBILITY REQUIREMENTS.

PLAN DEMO KEYNOTES

REMOVE EXISTING HM DOOR AND FRAME AND ASSOCIATED

SECURITY AND CONTROLS.

SALVAGE EXISTING RECESSED FIRE EXTINGUISHER CABINET TO BE

REINSTALLED. PATCH PARTITION AT REMOVAL TO MATCH EXISTING.

EXISTING DOOR CONTAINS 2 UNEVEN LEAFS. THE SMALLER LEAF TO

REMAIN AND LARGER LEAF TO BE REMOVED AND TURNED OVER TO

VA. EXISTING FRAME TO REMAIN.

PLAN GENERAL NOTES:

CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS SHOWN IN

THESE DRAWINGS PRIOR TO PREPARING SUBMITTALS AND UPON

COMPLETION OF ALL SELECTIVE REMOVALS AND NOTIFY VA COR

IMMEDIATELY OF ANY DISCREPANCIES

EXISTING CONCRETE SLAB SHALL BE PREPARED AS NEEDED FOR

SCHEDULED FLOOR FINISH INCLUDING PATCHING AND REPAIRING AS

NEEDED.

EXISTING FIRE AND SMOKE BARRIERS SHALL REMAIN. ANY DAMAGE TO

OR PENETRATION THROUGH SHALL BE SEALED TO MAINTAIN RATING.

ALL PARTITIONS SHALL BE FRAMED TO THE UNDERSIDE OF DECK AND

BE SEALED AROUND ALL PIPING AND DUCTWORK.

ALL MATERIALS AND TOOLS SHALL BE TRANSPORTED ON CLEAN AND

COVERED CARTS THROUGH COORDIORS TO ENSURE CLEANLINESS IN

PATIENT CARE AREAS.

EXISTING SPRAY ON FIRE PROTECTIVE MATERIAL SHALL REMAIN.

DAMAGE TO MATERIAL SHALL BE PATCHED IN COMPATIBLE SYSTEM TO

MEET REQUIRED RATING AT CONTRACTOR EXPENSE.

WORK REQUIRING SHUTDOWNS TO ANY BUILDING SYSTEMS AFFECTING

MORE THAN THE IMMEDIATE SPACE SHALL BE PERFORMED OFF HOURS

OR ON WEEKENDS AS TO NOT IMPACT PATIENT CARE.

9' - 10 1/4"

2' - 4"11' - 2" 9' - 8" 12' - 9 3/4"

2' - 5"

12' - 3"

3' - 3" VIF

10' - 1 3/4"

EQ EQ

9' - 0"

V

IF

8' - 0"

40' - 11 3/4"

VIF

20' - 9"

11' - 4 1/2" 3' - 10"

11' - 9"

WARM-UP AREA

LOCKER AREA

STORAGE

OFFICE

OFFICE

GROUP ROOM

OFFICE

WORK OUT AREA

5' - 2"

ALLIGN

ALLIGN

EXISTING CHASE

ENCLOSURE

STORAGE

TOILET ROOM

ELECTRIC ROOM

ENTRY

A-005

A-005

/4

V

IF

6A

6B

4 5

W1

W1

W1

/4

UTILITY

/4

5' - 2"

0' - 6 1/4"

1' - 9 1/2"

A3 A3

U8

U8U8

A3

A3

A3A3A3

A3A3A3 A3A3

A3

A3A3

U8U8

A6

U8

U8U8U8U8U8U8

U8

U8U8 U8U8

U8

U8

U8U8

A3 A3

4' 0" 4' 0"

A3 A

A A

A A

A3 A

(ABOVE

STOREFRONT)

U8A3

A6

U8

EQ EQ

11 11

U1U1

ALLIGN

0' - 7"

4' - 4"

A-005

A-005

A-005 9

A A

U8

A-004

VIF

1' - 9"

V

IF

U8U8

U8

PROJECT TITLEPHASE

NOTE:

THESE DRAWINGS ARE THE OWNERSHIP OF THE VA AND SHALL NOT

BE USED OR REPRODUCED WITHOUT APPROVAL

APPROVED USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR

VERIFYING EXISTING DIMENSIONS AND CONDITIONS IN FIELD FOR ALL

ELEMENTS DEPICTED OR REFERED WITHIN THE CONSTRUCTION

DOCUMENTS

DRAWING TITLE

APPROVED:

U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

STAMPARCHITECT / ENGINEER OF RECORDCONSULTANTREVISIONS

NO. DATE DESCRIPTION FLOOR PLAN

EJM

A-0021/8/2026

HEALTH FITNESS CENTER100% CONSTRUCTION

DOCEUMENTS

528A5-25-509

CANANDAIGUA VAMC

OPC (B2)

1/4" = 1'-0"

FLOOR PLAN

9'-0" AFF

9'-0" AFF

9'-0" AFF

9'-0" AFF

9'-0" AFF

9'-0" AFF

8'-10" AFF

CEILING PLAN LEGEND

HEXAGONAL LED PENDANT LIGHT

CEILING MOUNTED FAN

LINEAR LED PENDANT LIGHT

2 X 2 LED LIGHT FIXTURE

2 X 2 AIR SUPPLY

CAN LED PENDANT LIGHT

2X2 DROP CEILING

CEILING TYPE (SEE FINISH SCHED)

HEIGHT ABOVE FINISHED FLOOR

X'-X" AFF

CEILING TYPES

ACT 1 - 2X2 CEILING NON-TEGULAR1

NOT USED

GYP BOARD BULKHEAD

4 EXPOSED, OPEN TO ABOVE

SPRINKLER LOCATION (PROPOSED)

*COORDINATE WITH F SERIES FOR

EXISTING LAYOUT. MODIFY AS

REQUIRED PER DELIGATED DESIGN.

EXISTING

NEW

EXISTING SPEAKER, RELOCATE

TO ACT CEILING

2 X 2 RETURN / EXHAUST

WIRE HANGER

SUSPENDED ACT ASSEMBLY

CORNER BEAD BOTH SIDES

GYP BOARD ON MTL STUDS

DIAGONAL BRACING 24" OC C CHANNEL

PERIMETER ACT ANGLE

CAULK JOINT AT DECK ABOVE

STRUCTURAL DECK (EXISTING)

RCP GENERAL NOTES:

REFER TO ALL PLANS FOR MECHANICAL, ELECTRICAL AND OTHER

ITEMS TO BE COORDINATED INTO CEILING GRIDS

ALL FIXTURES IN OPEN AREAS TO BE 10' 0" ABOVE FINISHED FLOOR

ALL BULKHEADS AND PARTITIONS SHALL BE FRAMED AROUND EXISTING

MECHANICAL DUCTWORK AND OTHER UTILITIES AND SHALL BE SEALED

WITH FIRE CAULK REGARDLESS OF PARTITION RATING

ALL EXPOSED CEILING, STRUCTURE, UTILITIES (EXCEPT LIFE SAFETY /

FIRE PROTECTION) AND PARTITIONS ABOVE 10' 0" TO BE PAINTED PER

FINISH SCHEDULE

WHERE DUCTWORK OR OTHER UTILITIES OBSTRUCT CLEAR

CONNECTION TO STRUCTURAL DECK FOR HANGING FIXTURES,

PROVIDE SECURE SUPPORTS MOUNTED TO STRUCTURAL DECK TO

SPAN DUCT WORK AND SUPPORT FIXTURES AS NEEDED.

ALL FIXTURES TO BE PLACED ON EMERGENCY POWER

ALL CONDUITS TO LIGHT AND OTHER CEILING MOUNTED FIXTURES

SHALL BE SECURED TO STRUCTURAL ELEMENTS AND SHALL BE

PAINTED OR PROVIDED IN A COLOR TO MATCH CEILING FINISH

EXISTING SPEAKERS TO BE RELOCATED TO ACT CEILING. PROVIDE

NECESSARY MODIFICATIONS TO WIRING AS NEEDED. TEST SYSTEM

WITH VA TO ENSURE OPERATIONAL.

PROJECT TITLEPHASE

NOTE:

THESE DRAWINGS ARE THE OWNERSHIP OF THE VA AND SHALL NOT

BE USED OR REPRODUCED WITHOUT APPROVAL

APPROVED USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR

VERIFYING EXISTING DIMENSIONS AND CONDITIONS IN FIELD FOR ALL

ELEMENTS DEPICTED OR REFERED WITHIN THE CONSTRUCTION

DOCUMENTS

DRAWING TITLE

APPROVED:

U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

STAMPARCHITECT / ENGINEER OF RECORDCONSULTANTREVISIONS

NO. DATE DESCRIPTION REFLECTED CEILING PLAN

Author A-0031/8/2026

HEALTH FITNESS CENTER100% CONSTRUCTION

DOCEUMENTS

528A5-25-509

CANANDAIGUA VAMC

OPC (B2)

1/4" = 1'-0"

REFLECTED CEILING PLAN

1 1/2" = 1'-0"

BULK HEAD DETAIL

12A

11A

12A

15A

2' - 6" 3' - 0"

3A

1A

5A

8A

HCP

ø 5' - 6"

1' - 6" 4' - 5"

4' - 11 3/4" HCP

H C

P

2' - 6" HCP

H C

P 19A

ADA MARBLE THRESHOLD

4A

TOP OF

RIM

NOTE: HCP URINAL TO HAVE

ELONGATED RIM 1'-2" FROM

FACE OF WALL

FINISH

FLOOR

FLUSH

CONTROL

DISPENSING

HEIGHT

DISPENSING

HEIGHT

MAINT. SINK

TOILET PARTITION

(HUNG /WALL BRACED)

NAPKIN DISPOSAL

(NON-HCP)

WASTE RECEPTACLE

(NON-HCP)

PAPER TOWEL DISPENSERSOAP DISPENSER

(NON-HCP)

URINAL SCREEN

TO REFLECTIVE

SURFACE

SHELF

ELECTRIC HAND DRYER

MIRROR (NON-HCP)

MIRROR (HCP)

INSULATE EXPOSED

HOT WATER SUPPLY

AND WASTE PIPES

LAVATORY (NON-HCP)

NOTE:

LAVATORY (HCP)

SOAP

DISPENSER

(HCP)

ELECTRIC HAIR DRYER

PAPER TOWEL DISP. (HCP)

ELEC. HAND DRYER (HCP)

ELEC. HAIR DRYER (HCP)

4/4A 5/5A

6/6A

WASTE

RECEPTACLE (HCP)

URINAL (NON-HCP)

URINAL (HCP)

NOTE: MOUNT NON-HCP

URINAL TO MATCH EXIST.

URINALS IN EXIST. TOILET

RMS

TO RIM TOP OF

SEAT

WATER CLOSET (NON-HCP)

TOILET PAPER DISPENSER

(NON-HCP)

WATER CLOSET (HCP)

TOILET PAPER

DISPENSER (HCP)

GRAB BARS (HCP)

(WOMENS ROOM ONLY)

NAPKIN DISPOSAL

(HCP)

ROBE HOOK (ALL

STALLS) (HCP)

ROBE HOOK (ALL

STALLS) (NON-HCP)

BROOM & MOP

HOLDER (NON-HCP)

BROOM & MOP

HOLDER (HCP)

HOOK

UR

WC

UR

WC

WC

TOILET ROOM MOUNTING LEGEND:

M A

X (H

C P

M A

X (H

C P

M

IN

(H C

P

M F

R S

T D

(N O

N

H C

P

M A

X (H

C P

M

IN

M F

R S

T D

(N O

N -H

C P

M A

X

(H C

P

M F

R S

T D

(N O

N -H

C P

M A

X (H

C P

M F

R S

T D

(N O

N -H

C P

M A

X (H

C P

M F

R S

T D

(N O

N -H

C P

M F

R S

T D

(N O

N -H

C P

TOILET ROOM FIXTURE & ACCESSORY MOUNTING LEGEND

SHELF

MIRROR (NON-HCP)

MIRROR (HCP)

LAVATORY (NON-HCP)

LAVATORY (HCP)

SOAP DISPENSER (NON-HCP)

SOAP DISPENSER (HCP)

PAPER TOWEL DISPENSER

ELECTRIC HAND DRYER

ELECTRIC HAIR DRYER

PAPER TOWEL DISP. (HCP)

ELEC. HAND DRYER (HCP)

ELEC. HAIR DRYER (HCP)

WASTE RECEPTACLE (NON-HCP)

WASTE RECEPTACLE (HCP)

URINAL SCREEN

URINAL (NON-HCP)

URINAL (HCP)

WATER CLOSET (NON-HCP)

TOILET PAPER DISPENSER (NON-HCP)

WATER CLOSET (HCP)

TOILET PAPER DISPENSER (HCP)

GRAB BARS (HCP)

NAPKIN DISPOSAL (NON-HCP)

NAPKIN DISPOSAL (HCP)

TOILET PARTITION (HUNG /WALL BRACED)

ROBE HOOK (ALL STALLS) (HCP)

ROBE HOOK (ALL STALLS) (NON-HCP)

MAINT. SINK

BROOM & MOP HOLDER (NON-HCP)

BROOM & MOP HOLDER (HCP)

DRINKING FOUNTAIN (NON-HCP)(WALL MOUNTED)

DRINKING FOUNTAIN (HCP)(WALL MOUNTED)

DRINKING FOUNTAIN (NON-HCP) (FULLY RECESSED)

DRINKING FOUNTAIN (HCP) (FULLY RECESSED)

SANITARY NAPKIN/TAMPON DISPENSER (NON-HCP)

SANITARY NAPKIN/TAMPON DISPENSER (HCP)

SANITARY NAPKIN/WASTE RECEPTACLE (NON-HCP)

SANITARY NAPKIN/WASTE RECEPTACLE (HCP)

M F

R S

T D

M

A X

8" MIN 6" MAX

EQ EQ

/4

/4

(H C

P

M A

X

MAX

3' - 0" to to to

3' - 6" 1' - 0"

3'-3" to 3'-5"

3' - 0" MAX

3' - 0" MAX

/2

2' - 8"

(H C

P

M A

X

(N O

N -H

C P

M A

X

(N O

N

H C

P

/4

DEPTH

17" MIN

M

IN

1A

3 3A 4

4A

5A

6A

7A

8A

9A

11A

12A

14A

15A

18A

1A

3A

4A

5A

6A

7A

8A

9A

11A

12A

14A

15A

18A

19A

20A

21A

22A

FINISH

FLOOR

SPOUT

OUTLET

HEIGHT

DRINKING FOUNTAIN

(FULLY RECESSED)

(NON-HCP)

SPOUT

OUTLET

HEIGHT

COIN

SLOT

TOP OF

HANDLE

AA

SECTION "A"

DRINKING FOUNTAIN (NON-

HCP) (WALL MOUNTED)

DRINKING FOUNTAIN

(HCP) (WALL

MOUNTED)

DRINKING FOUNTAIN

(FULLY RECESSED)

(HCP)

SANITARY NAPKIN/

TAMPON DISPENSER

(NON-HCP)

SANITARY NAPKIN/

TAMPON DISPENSER

(HCP)

SANITARY NAPKIN/

TAMPON DISPENSER/

WASTE RECEPTACLE

(NON-HCP)

SANITARY NAPKIN/

TAMPON DISPENSER/

WASTE RECEPTACLE

(HCP)

WHEN:X=3" Y=30 DEG MAX

3"<X<5" Y=15 DEG MAX

DEPTH (HCP)

17" MIN

M A

X (H

C P

M

IN

(H C

P

M A

X (H

C P

M A

X (H

C P

M A

X (H

C P

M F

R S

T D

(N O

N -H

C P

M F

R S

T D

(N O

N -H

C P

M F

R S

T D

(N O

N

H C

P

M F

R S

T D

(N O

N -H

C P

M F

R S

T D

(N O

N -H

C P

/2

(HCP)

0' - 8" MIN

(HCP)

0' - 6" MAX

1' - 7"

M

IN

X

/4

19A

20A

21A

22A

NOTES:

1. BLOCKING TO BE PROVIDED FOR ALL ACCESSORIES AND

SECURED TO MEET ALL REQUIREMENTS OF THE ADA AND ABAAS.

2. DRINKING FOUNTAIN AS NOTED TO BE BOTTLE FILLING STATION.

ACCESSORY PROVIDED BY INSTALLED BY

1/1A CONTRACTOR CONTRACTOR

2/2A CONTRACTOR CONTRACTOR

3/3A CONTRACTOR CONTRACTOR

4/4A VA CONTRACTOR

5/5A VA CONTRACTOR

8/8A CONTRACTOR CONTRACTOR

11/11A VA CONTRACTOR

12/12A CONTRACTOR CONTRACTOR

13/13A CONTRACTOR CONTRACTOR

14/14A CONTRACTOR CONTRACTOR

15/15A CONTRACTOR CONTRACTOR

19/19A CONTRACTOR CONTRACTOR

CEILING

9'-0" AFF

FINISH FLOOR

0'-0" AFF

NOTE: ALL TILE TO BE HORIZONTAL 1/3 RUNNING BOD.

ALL INSIDE AND OUTSIDE CORNERS SHALL UTILIZE SS TRIM.

ALL TERMINATIONS SHALL USE SS TRIM AND CAULK JOINT

CT-1 12X24

CT-1 12X24

CT-1 12X24

CT-1 12X24

CT-1 12X24

CT-1 12X24

CT-1 12X24

CT-1 12X24

CT-2 6X24

CT-2 6X24 COVE BASE

CT-2 6X24

CERAMIC WALL TILE

AS SCHEDULED

5/8" CEMENT BOARD

6" CERAMIC TILE COVE

BASE AS SCHEDULED

CERAMIC FLOOR TILE

AS SCHEDULED

MARBLE THRESHOLD

GYM FLOORING AS

SCHEDULED

DOOR AS SCHEDULED

CONCRETE SLAB

CFMF STUD

NOTE: COORDINATE WITH FINISH SCHEDULE AND

DETAILS FOR THICKNESS AND SIZE OF TILES

PROJECT TITLEPHASE

NOTE:

THESE DRAWINGS ARE THE OWNERSHIP OF THE VA AND SHALL NOT

BE USED OR REPRODUCED WITHOUT APPROVAL

APPROVED USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR

VERIFYING EXISTING DIMENSIONS AND CONDITIONS IN FIELD FOR ALL

ELEMENTS DEPICTED OR REFERED WITHIN THE CONSTRUCTION

DOCUMENTS

DRAWING TITLE

APPROVED:

U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

STAMPARCHITECT / ENGINEER OF RECORDCONSULTANTREVISIONS

NO. DATE DESCRIPTION TOILET ROOM PLAN AND DETAILS

Author A-0041/8/2026

HEALTH FITNESS CENTER100% CONSTRUCTION

DOCEUMENTS

528A5-25-509

CANANDAIGUA VAMC

OPC (B2)

1" = 1'-0"

ENLARGED TOILET ROOM PLAN

1/2" = 1'-0"

TOILET ROOM FINISH ELEVATION

3" = 1'-0"

TILE COVE BASE AND MARBLE

THRESHOLD DETAIL

1/2" SOLID SURFACE

COUNTERTOP ON 2

LAYERS OF 3/8" PLYWOOD

2X4 WD BLOCKING

CFMF TRACK

CFMF TRACK

WALL BASE AS SCHEDULED

CFMF STRUD @ 16" OC

PARTITION W/ 5/8" GYP BD

BOTH SIDES

FLOOR FINISH AS SCHEDULED

EXISTING FLOOR SLAB

A F

F

A-005

A-005

1/4" THICK TOP AND BASE PLATE WELDED TO

VERTICAL 3"X3"X1/4" HSS. SEE PLAN FOR LOCATIONS.

CFMF STUD 16" OC

5/8" GYP BD

DOUBLE CFMF STUD AT END OF PARTITION

AND AT CORNERS.

1/4" MASONRY SCREW EMBEDDED 1 1/2" INTO

CONCRETE FLOOR SLAB AT BASE AND 1/4"

WOOD SCREW EMBEDDED INTO WOOD BLOCKING

AND CFMF TRACK AT TOP.

CORNER BEAD AND SS CORNER GUARD TYP

1/2" SOLID SURFACE

COUNTERTOP

2X4 WD BLOCKING

CFMF TRACK

CFMF STRUD @ 16" OC

PARTITION W/ 5/8" GYP BD

BOTH SIDES

LAYERS OF 3/8" PLYWOOD

0' - 0 1/2"

1/4" RADIUS

CAULK JOINT

WD BLOCKING SECURED TO WALL STRUCTURE

FOR TV MOUNT. COORDINATE WITH TV MOUNTING

HEIGHT AND CLEARLY MARK FOR INSTALL BY OTHERS

WALL BASE AS SCHEDULED

FLOOR FINISH AS SCHEDULED

EXISTING FLOOR SLAB

TV (BY OTHERS)

WD VENEER ON 1/2" WD CORE

Z CLIPS HORIZONTAL AT 24" OC MAX

O

.F .F

. M

IN

T O

P A

N D

B O

T T

O M

M A

X

CEILING AS / WHERE SCHEDULED

1/4" THICK HDWD TRIM

STAIN TO MATCH VENEER

A-005

ACT 9' - 0"

/4

S E

E E

L E

V A

T

IO

N

WD VENEER ON 1/2" WD CORE

ON HORIZONTAL Z CLIPS

1/4" THICK HDWD TRIM

STAIN TO MATCH VENEER

1/4" THICK HDWD TRIM

STAIN TO MATCH VENEER

PARITION (EXISTING OR AS SCHEDULED)

A-005

TOP OF WALL 10' - 0"

ACT 9' - 0"

LOCKERS AS SCHEDULED

(PROVIDE SPACER PANELS AS

NEEDED TO INFILL BETWEEN WALLS)

DIAGONAL TOP PANEL, WALL

TO WALL

TOE KICK W/ WALL BASE AS

SCHEDULED

STOREFRONT AS SCHEDULED

WOOD VENEER WALL PANELSWOOD VENEER WALL PANELS

CENTERED

12' - 0 3/4" 3' - 0"

WALL MOUNTED TV

POWER / DATA

WALL MOUNTED TV

POWER / DATA

WALL BASE AS SCHEDULED

SS CORNER GUARD

TV MOUNTTV MOUNT

SS WALL END GUARD

A-005

A-005

CENTERED

10' - 6 3/4"

2' - 6" 2' - 9"

SS CORNER GUARDSS CORNER GUARD SS CORNER GUARD

SS CORNER GUARD

WALL BASE AS SCHEDULED

WALL CAP PER DETAILS

A-005

8' - 0"

T Y

P

EQUAL EQUAL

WALL MOUNTED MIRROR

SS CORNER GUARD

11' - 4 1/2"

3' - 4"0' - 9" 1' - 0"

HM VIEW WINDOW

2' - 6"

W1

DOOR AS SCHEDULE

WALL BASE

A-006

A-006

2' - 6"

W1

A-005

A-006

11' - 7"

4' - 0"

SS CORNER GUARD

HM VIEW WINDOW

WALL BASE

PROJECT TITLEPHASE

NOTE:

THESE DRAWINGS ARE THE OWNERSHIP OF THE VA AND SHALL NOT

BE USED OR REPRODUCED WITHOUT APPROVAL

APPROVED USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR

VERIFYING EXISTING DIMENSIONS AND CONDITIONS IN FIELD FOR ALL

ELEMENTS DEPICTED OR REFERED WITHIN THE CONSTRUCTION

DOCUMENTS

DRAWING TITLE

APPROVED:

U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

STAMPARCHITECT / ENGINEER OF RECORDCONSULTANTREVISIONS

NO. DATE DESCRIPTION ELEVATIONS, SECTIONS AND DETAILS

Author A-0051/8/2026

HEALTH FITNESS CENTER100% CONSTRUCTION

DOCEUMENTS

528A5-25-509

CANANDAIGUA VAMC

OPC (B2)

1 1/2" = 1'-0"

HALF PARTITION SECTION

3" = 1'-0"

HALF PARTITION PLAN DETAIL

3" = 1'-0"

HALF PARTITION CAP

1 1/2" = 1'-0"

WD VENEER WALL PANEL SECTION 1

1 1/2" = 1'-0"

WD VENEER WALL PANEL SECTION 2

1/2" = 1'-0"

INTERIOR ELEVATION - ENTRY LOBBY

AND TRAINING

1/2" = 1'-0"

INTERIOR ELEVATION @ HALF

PARTITION

1/2" = 1'-0"

INTERIOR ELEVATION 1 @ OFFICE

1/2" = 1'-0"

INTERIOR ELEVATION 2 @ OFFICE

NUMBER

DOOR SCHEDULE

LEAFS WIDTH HEIGHT THICKNESS HARDWARE TYPE MATERIAL FINISH TYPE MATERIAL FINISH HEAD/JAMB GLASS COMMENTS

DOORS FRAMES

DEPTH

6A 6B

3'-4"1

2" D1 ALUM A1 6" GL-1

3'-4" D4 A2 3'-4" A2 3'-4" A2 3'-4" A2 10'-0" A3

D2

3'-4"

8'-0"

7'-0"

7'-0" 7'-0" 7'-0" 7'-0"

D3 D3 D2 D4

D4 D4

D4

WD

PRE FIN

PRE FIN

PRE FIN

PRE FIN

HM

HM

HM

HM

ALUM

HM

HM

HM

HM

GWB

6" 6" 6" 6"

NA

CLR ANO

PT

PT

PT

PT

PT

GL-2

GL-2

GL-1

2" 2" 2" 2" 2" 2" 2" 2"

2"

HM

ALUM

GENERAL

DOOR SPECIFIC NOTES:

1. EXISTING FRAME TO REMAIN. LARGE LEAF TO BE REPLACED WITH NEW DOOR WITH LITE, SMALL LEAF TO BE SOLID. COORDINATE WITH EXISTING FRAME, DOOR, AND HARDWARE TO ENSURE COMPATABILITY OF NEW DOOR WITH EXISTING SET-UP. PROVIDE CLOSURE WITH ABILITY TO REMAIN OPEN DURING OPERATING HOURS.

GENERAL NOTES:

1. HARDWARE MOUNTING HEIGHT TO MEET VA/ADA REQUIREMENTS

2. PROVIDE AND PREPARE FRAMES/DOOR/HARDWARE FOR ELECTRICAL COMPONENTS AS NECESSARY TO MEET DOOR OPERATIONS / FUNCTIONAL DESCRIPTION. ALL WIRING SHALL BE RUN WITHIN FRAMES, DOORS AND FRAMES SHALL BE PREPARED FOR ANY INTEGRAL HARDWARE.

3. ALL CORES WILL BE PROVIDED BY VA. LOCKSETS SHALL CONTAIN BEST COMPATIBLE CORES S.F.I.C 7 PIN. TEMPORARY CORES SHALL BE PROVIDED BY CONTRACTOR UNTIL

FINAL CORE INSTALLATION.

4. ALL HINGED DOORS SHALL USE CONTINUOUS HINGES

5. ALL DOORS TO BE QUATERED WHITE ASH - CLEAR FINISH TO MATCH ADJACENT AREAS. DOOR SPECIALTIES BASIS OF DESIGN. (QUARTERED WHITE ASH, GARDALL CLEAR

FINISH, ARCHITECTURAL WOOD DOORS)

3'-4" 6'-8"

3'-4"

7'-0" 7'-0" 7'-0"

7'-0"

WD

WD

WD

WD

WD

WD

WD

WD

PRE FIN

PRE FIN

PRE FIN

PRE FIN

PRE FIN

CLR ANO

A2 A2 A2

EX

6" 6" 6"

PT

PT

PT

PT

HM

HM

HM

HM

HM

HM

PER MANUF

GL-1

4'-0" 7'-0" 2" 3 D2/D4

WD PRE FIN A2 6"

GL-1 1

HM PT HM

ROOM

NUMBER NAME

FLOOR

FINISH

NORTH

FINISH

WALL

SOUTH EAST WESTBASE

FINISH FINISH FINISH FINISH

CEILING

MATERIAL FINISH

NOTES

SURFACE SURFACE SURFACE SURFACE SURFACE

WARM-UP AREA

LOCKERS

STORAGE

WH OFFICE

WH OFFICE

GROUP ROOM

KY OFFICE

WORK OUT AREA

STORAGE

TOILET ROOM

ELECTRIC ROOM

ENTRY

UTILITY

FINISH SCHEDULE

RT

RT

CON

LVT

LVT

RT

LVT

RT

RT

CT-2

CON

LVT

CON

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

RB

RB

RB

RB

RB

RB

RB

RB

RB

CT

RB

RB

PT

PT

PT

PT

PT

PT

PT

PT

PT

CT

PT

PT

ACT1

ACT1

ACT1

ACT1

ACT1

ACT1

ACT1

ACT1

PT-3

PT-3

PT-3

PT-3

PT-3

1, 2, 3

FINISH LEGEND

RT

LVT-1

CT-1

CT-2

PT-1

PT-2

PT-3

RB

ACT-1

CON

WD

SS

RUBBER GYM ROLL 4' WIDE

VINYL FLOOR TILE 7.25"X48"

CERAMIC TILE

CERAMIC TILE

PAINT

PAINT

PAINT

RUBBER WALL BASE

CEILING TILE 2'X2'

CONCRETE (EXISTING)

WOOD VENEER

SOLID SURFACE

AMERICAN FLOOR MATS

MANGINTON - SPACIA

CROSSVILLE - ARGENT 2.0

CROSSVILLE - ARGENT 2.0

SHERWIN WILLIAMS

SHERWIN WILLIAMS

SHERWIN WILLIAMS

ROPPE - 4" COVE 700 SERIES

TO MATCH EXISTING IN ADJACENT OPC SPACES

SHERWIN WILLIAMS CONC PAINT, COLOR TBD VA

FROMICA AGED ASH / 8844 WOODBRUSH

CORIAN LINEN

TYPE MATERIAL MANUFACTURER

3/8" 20% BLUE GREY

SS5W2536 - SMOKED CEDAR

WHITE TIGER

MARBLE FAUN

SW 7008 ALABASTER

SW 6711 PARAKEET

SW 2848 ROYCROFT PEWTER

193 - BLACK BROWN

COLOR PATTERN

SEE NOTES

1/3 RUNNING

SEE NOTES

SEE NOTES

SEE NOTES

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

GWB

PT

PT

PT

PT

PT

PT

PT

PT

PT

CT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

CT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

PT

CT

PT

PT

NOTES:

1. PROVIDE ADA COMPLIANT THRESHOLD AT TOILET ROOM FLOOR TRANSITION TO LOCKER ROOM.

2. PROVIDE SEALANT AND SS ESCUTCHEON PLATES AND TRIM AROUND PENETRATIONS, OPENINGS AND AT ALL CERAMIC TILE TERMINATIONS AND INSIDE AND OUTSIDE CORNERS.

3. SEE INTERIOR ELEVATIONS AND FINISH PLANS FOR MORE INFORMATION.

FINISH SCHEDULE GENERAL NOTES:

1. ALL PT FINISH TO BE PT-1 UNLESS NOTED OTHERWISE ON THE FINISH PLAN.

2. ALL WALLS ABOVE 12'-0" AND ALL EXPOSED CEILINGS, STRUCTURE, MECHANICAL AND PLUMBING EXCEPT FOR FIRE PROTECTION TO BE PAINTED PT-3.

3. PROVIDE ADA COMPLAINT TRANSITION STRIPS BETWEEN DIFFERENT FLOOR TYPES AT ALL LOCATIONS COMPATIBLE WITH ABUTTING FLOOR TYPES.

4. ALL FRAMES SHALL BE PAINT CUSTOM COLOR "VA BRONZE" SITE STANDARD

5. ALL WALLS WITH OPEN CEILINGS TO BE PT-3 ABOVE 9'

SIGNAGE LEGEND

IN-02.04.03 - BUISNESS HOURS

IN-04.02

IN-04.02

IN-04.02

IN-04.02

IN-04.02

IN-04.02

IN-04.02

IN-03.01

IN-09.03

IN-03.01

2E001 2E003 2E005 2E001D 2E001E 2E001C 2E001F 2E001B 2E001A 2E001G

TYPE ROOM NUMBER

HEALTH FITNESS CENTER

OFFICE

OFFICE

OFFICE

GROUP ROOM

STORAGE

STORAGE

RESTROOM

ROOM NAME#

NOTES

NOTES:

1. COORDINATE WITH VAMC FOR HOURS OF OPERATIONS FOR SIGNAGE

2. SIGNAGE SHALL INDICATE UNISEX AND HANDICAP ACCESSIBLE

3. SIGNS MOUNTED TO GLASS SHALL BE DONE ACCORDING TO MANUFACTURER REQUIREMENTS AND SHALL

INCLUDE COVER PLATE ON OPPOSITE SIDE OF GLASS TO HID ADDHESION.

GLAZING TYPES

GL-1 CLEAR, LAMINATED, SAFETY IMPACT RATED

GL-2 TRANSLUCENT, LAMINATED, SAFETY IMPACT RATED

NOTES:

1. ORIENT RUBBER FLOORING ROLLS TO MINIMIZE NUMBER OF JOINTS. SEAL JOINTS PER MANUFACTURER.

2. WOOD VENEER FINISH TO MATCH EXISTING IN BUILDING - WOOD VENEER IS TO BE PLASTIC LAMINATE WITH WOOD

VENEER TEXTURE, TRIM PIECES SHALL BE TO MATCH.

3. FOR CERAMIC TILE WALL PATTERN, SEE ELEVATIONS. FLOOR TILE TPATTERN SHALL BE 1/3 RUNNING BOND 12"X24".

4. SS CORNER GUARDS SHALL BE STAINLESS STEEL AND NOT SOLID SURFACE.

A S

S C

H E

D

0' - 2"

AS SCHED

0' - 2"

A S

S C

H E

D

0' - 2"

AS SCHED

0' - 2"

+/- 2' - 3 1/4"

0' - 2"

GL1

10' - 0"

PERIMETER SS TRIM

A1 A2 A3

0' - 2"PER MANUFACTURER

CAVITY FOR DOOR

(BOTH SIDES)

"A S

S C

H E

D

0' - 6" 0' - 6"

AS SCHED

" GL1

D1

A S

S C

H E

D

0' - 9" 0' - 9"

AS SCHED

GL1

D2

A S

S C

H E

D

0' - 9" 0' - 9"

AS SCHED

GL2

D3

A S

S C

H E

D

AS SCHED

D4

4 5

PT-2

WD

PT-2

PT-2

PT-2 WD

PT-2

1 1

1 1

3 4

PT-2

PT-2

PT-2

PLAN KEYNOTES

PROVIDE 8'-0" STAINLESS STEEL CORNER GUARD

PROVIDE 4'-0" STAINLESS STEEL CORNER GUARD

PROVIDE ADA COMPLIANT TRANSITION STRIP

PROVIDE ADA COMPLIANT MARBLE THRESHOLD

PROVIDE SOLID SURFACE WALL CAP

PROVIDE STAINLESS STEEL TRIM AROUND OPENING

(VERTICAL AND HORIZONTAL) BOTH SIDES

0' - 9"

0' - 9"0

0' - 9"

0' - 9"

RM NUMBER

RM NUMBER

RM NUMBER

RM NAME

RM NAME

(PICTOGRAM)

BUISNESS HRS

IN-03.01

IN-04.02

IN-09.03

IN-02.04.03

GENERAL NOTES:

1. COORDINATE WITH VA SIGN DESIGN GUIDE FOR SIGNAGE TYPE DETAILS AND MOUNTING HEIGHTS

2. BASIS OF DESIGN 2/90 SLIDE

3. ALL ROOM NUMBERS AND TOILET ROOM SIGNAGE SHALL BE TACTILE RAISED TEXT AND MATCHING

BRAILLE. ROOM NAME SHALL UTILIZE UPDATEBLE TEXT INSERT WITH CLEAR COVER

(HRS)

HARDWARE TYPES

HARDWARE SET 1: ENTRY

ENTRANCE LOCK SET (HANDICAP ACCESS)

PANIC DEVICE

KEYED LEVER

POWERED CLOSER WITH OVERHEAD STOP

ELECTRIC STRIKE

ACCESS CONTROL (RELOATED PIV READER)

SILENCERS

ACTUATORS

WALL STOP

KICKPLATES

OVERRIDE BUTTON (GRANT ACCESS)

DOOR SHALL HAVE POWERED OPENER

AND STRIKE INITIATED BY ACTUATOR

(BOTH SIDES). CONFIGURATION SHOULD

ALLOW FOR OPTIONAL OPERATIONS:

1. LOCKED WITH RELOCATED PIV OR

HARD KEY ACCESSIBILITY TO SPACE.

ACTUATOR ON SWING SIDE TO BE

DISABLED UNLESS PIV GRANTS ACCESS

TO SPACE. ROOM SIDE SHALL ALLWAYS

ALLOW OPERATION TO EXIT.

2. OVERRIDE BUTTON SHALL BE

LOCATED IN KT OFFICE AND WHEN

PRESSED WILL ILLUMINATE AND SIGNAL

DOOR TO GRANT ACCESS FREELY AND

ACTIVATE SWING SIDE ACTUATOR.

OVERRIDE BUTTON SHALL MAINTAIN

FREE ACCESS UNTIL PRESSED AGAIN

TO RETURN ACCESS TO PIV READER.

BUTTON ILLUMINATION SHALL INDICATE

FREE ACCESS AT DOOR.

HARDWARE SET 2: STORAGE

STORAGE ROOM LOCK

CLOSER

KICK PLATE

MOP PLATE

SILENCERS

DOOR SHALL BE LOCKED AT ALL

TIMES WITH KEYED ACCESS ONLY.

FREE EXIT AT ALL TIMES

HARDWARE SET 4: POCKET

PER DOOR

MANUFACTURER

POCKET DOORS SHALL HAVE STANDARD

HARDWARE FOR OPERATIONS, LOCKABLE

W/ THUMB TUrN CLASS SIDE AND KEYED

LOCK OUTSIDE. INTEGRATED DOOR PULLS.

HARDWARE SET 3: OFFICE

OFFICE LOCK

CLOSER WITH OVERHEAD STOP

KICK PLATES

WALL STOP

SILENCERS

OFFICE LOCK WITH LOCKED / UNLOCKED

TOGGLE ON JAMB AND INTERIOR LOCK

CONTROL AND EXTERIOR KEYED ACCESS.

HARDWARE SET 5: BATHROOM

PUBLIC RESTROOM LOCK

CLOSER

KICK PLATE

MOP PLATE

SILENCERS

RESTROOM LOCK SHALL BE EQUIP

INTERIOR LOCK WITH EXTERIOR

OCCUPANCY INDICATOR AND EXTERIOR

KEYED LOCK FOR EMERGENCY ACCESS TO

ROOM

ADD. 16 GA. STUD @

OPENINGS OVER 4'-0" WIDE.

STUD FULL HT. TO BOT. OF

STRUCT. ABOVE

16 GA (OR DOUBLE

20 GA.) JAMB STUD FULL

HT. TO BOT. OR STRUC.

ABOVE

DOOR AND FRAME AS

SCHEDULED

FRAME ANCHOR

5/8" GWB EA. SIDE (TYP)

5/8" GWB EA. SIDE (TYP)

20 GA. DBL. STUD

HEADER W/ TRACK

PERIMETER SEALANT

BOTH SIDES

0' - 2"

H.M. FRAME (DW TYPE)

PERIMETER SEALANT

BOTH SIDES (TYP)

SCHEDULE

SEE PARTITION

S C

H E

D U

L E

S E

E P

A R

T

IT

IO

N

DOOR AS SCHED

BACKER ROD AND PERIMETER

SEALANT

0' - 2"

A S

S C

H E

D

DOOR AS SCHED

AS SCHED

SS J-TRIM ENTIRE PERIMTER (BOTH SIDES)

FRAME ANCHOR

5/8" GWB EA. SIDE (TYP)

16 GA (OR DOUBLE 20 GA.)

JAMB STUD FULL HT. TO BOT.

OR STRUC. ABOVE

20 GA. DBL. STUD

HEADER W/ TRACK

5/8" GWB EA. SIDE (TYP)

PERIMETER SEALANT

BOTH SIDES (TYP)

SS J-TRIM ENTIRE

PERIMTER (BOTH SIDES)

HM DOOR AND FRAMEALUM DOOR AND FRAME

ACOUSTICAL INSULATION

ACOUSTICAL INSULATION

2X 16 GA JAMB STUD FULL

HT. TO BOT. OR STRUC.

ABOVE

STEEL FRAME

FRAME ANCHOR

5/8" GWB EA. SIDE (TYP)

5/8" GWB EA. SIDE (TYP)

20 GA. DBL. STUD

HEADER W/ TRACK

PERIMETER SEALANT

BOTH SIDES

0' - 2"

H.M. FRAME (DW TYPE)

PERIMETER SEALANT

BOTH SIDES (TYP)

SCHEDULE

SEE PARTITION

S C

H E

D U

L E

S E

E P

A R

T

IT

IO

N

ACOUSTICAL INSULATION

/2

V

IF

REMOVABLE STOPS

GLAZING AS SCHEDULED

REMOVABLE STOPS

GLAZING AS SCHEDULED

OFFICE SIDE CLINIC SIDE

OFFICE SIDE

CLINIC SIDE

** HM VIEW WINDOW SHALL USE GLAZING GL-1

PROJECT TITLEPHASE

NOTE:

THESE DRAWINGS ARE THE OWNERSHIP OF THE VA AND SHALL NOT

BE USED OR REPRODUCED WITHOUT APPROVAL

APPROVED USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR

VERIFYING EXISTING DIMENSIONS AND CONDITIONS IN FIELD FOR ALL

ELEMENTS DEPICTED OR REFERED WITHIN THE CONSTRUCTION

DOCUMENTS

DRAWING TITLE

APPROVED:

U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

STAMPARCHITECT / ENGINEER OF RECORDCONSULTANTREVISIONS

NO. DATE DESCRIPTION DOOR AND FINISH SCHEDULE

Author A-0061/8/2026

HEALTH FITNESS CENTER100% CONSTRUCTION

DOCEUMENTS

528A5-25-509

CANANDAIGUA VAMC

OPC (B2)

1/4" = 1'-0"

DOOR FRAME TYPES

1/4" = 1'-0"

DOOR TYPES

3/16" = 1'-0"

FINISH AND SIGNAGE PLAN

3" = 1'-0"

SIGNAGE TYPES

3" = 1'-0"

DOOR FRAME DETAILS

3" = 1'-0"

INTERIOR HM VIEW WINDOW DETAILS

3' - 0"

3' - 0"

3' - 0"

5' - 0"

4' - 11 3/4"

/2

E1

E2E3

E4

E5

E6

E7

E8

E9

E10

E11

E12

E13 E14

E15

E16

E17

E18 E19 E20E21

E22E23

E24

E2E3

E4

E5

E7E7

E8E8

1' - 9"

F1

F2

F3

F4

F5

F4

F5

F1

F2

F5F5

F1

F2

F1

F2

F2

F1

1' - 0"

1' - 6" 1' - 0" 1' - 6"

E25

EQUIPMENT SCHEDULE:

STEPPER

ELLIPTICAL

UPRIGHT BIKE

RECUMBENT BIKE

ARC TRAINER

ARM ERGOMETER

NUSTEP

TREADMILL

ROWER

LEG PRESS

CHEST PRESS

SHOULDER PRESS

LAT PULL MACHINE

PECK DECK

E1 TRICEP MACHINE

ABDOMINAL MACHINE

MULTI STATION HI-LO

OLYMPIC PLATFORM

FLAT BENCH

INCLINE BENCH

DECLINE BENCH

BUMBELL RACK

KETTLEBELL RACK

BAR HOLDER

BACK EXTENSION

E2

E3

E4

E5

E6

E7

E8

E9

E10

E11

E12

E13

E14

E15

E16

E17

E18

E19

E20

E21

E22

E23

E24

NOTE: ALL EQUIPMENT TO BE PROVIDED AND INSTALLED BY VA

FURNITURE SCHEDULE:

NOTE: ALL FURNITURE TO BE PROVIDED AND INSTALLED BY VA

UNLESS NOTED OTHERWISE

CFCI - CONTRACTOR FUNISHED CONTRACTOR INSTALLED

VFCI - VA FURNISHED CONTRACTOR INSTALLED

VFVI - VA FURNISHED VA INSTALLED

HI LO DESK 60"X30" (VFVI)

OFFICE DESK CHAIR (VFVI)

LOCKERS (CFCI)

BENCH (CFCI)

CHAIR (VFVI)

F1

F2

F3

F4

F5

E25

PROJECT TITLEPHASE

NOTE:

THESE DRAWINGS ARE THE OWNERSHIP OF THE VA AND SHALL NOT

BE USED OR REPRODUCED WITHOUT APPROVAL

APPROVED USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR

VERIFYING EXISTING DIMENSIONS AND CONDITIONS IN FIELD FOR ALL

ELEMENTS DEPICTED OR REFERED WITHIN THE CONSTRUCTION

DOCUMENTS

DRAWING TITLE

APPROVED:

U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

STAMPARCHITECT / ENGINEER OF RECORDCONSULTANTREVISIONS

NO. DATE DESCRIPTION EQUIPMENT AND FURNITURE LAYOUT

PLAN

Author A-0071/8/2026

HEALTH FITNESS CENTER100% CONSTRUCTION

DOCEUMENTS

528A5-25-509

CANANDAIGUA VAMC

OPC (B2)

1/4" = 1'-0"

EQUIPMENT PLAN

ELECTRICAL ABBREVIATIONS

SINGLE POLE

TWO POLE

THREE POLE

FOUR-WIRE

ARCHITECT/ENGINEER

AMPERE FRAME OR AMP FUSE

ABOVE FINISHED FLOOR

AUTHORITY HAVING JURISDICTION

AMPERE INTERRUPTING CAPACITY

AMPERE

AMPERE TRIP

AUTOMATIC TRANSFER SWITCH

AUTOMATIC

BASIC INSULATION LEVEL

BUILDING

BREAKER

BY PASS

CALCULATE

CHILLED WATER PUMP

CIRCUIT

CIRCUIT BREAKER

COAX CABLE

COMMUNICATION

COMPUTER

CONCRETE

COLOR RENDERING INDEX

COPPER

DECIBEL OR DIRECT BURIAL

DIRECT CURRENT

DEGREE CELSIUS

DEGREE FAHRENHEIT

DEMOLITION

DIAGRAM

DOWN

DISCONNECT SWITCH

DRAWING

DECONTAMINATION

EQUIPMENT GROUND

ELEVATION

ELECTRIC OR ELECTRICAL

EMERGENCY

ELECTRICAL METALLIC TUBING

EQUIPMENT

ETCETERA

EXISTING

FIRE ALARM

FIRE ALARM CONTROL PANEL

FOOTCANDLE

FULL LOAD AMPS

FEET OR FOOT

FULL VOLTAGE NON-REVERSING

FULL VOLTAGE REVERSING

GROUND OR GENERATOR

GROUND FAULT CIRCUIT INTERRUPTER

HIGH INTENSITY DISCHARGE

HORSEPOWER

HERTZ

INTERMEDIATE METAL CIRCUIT

INFORMATION TECHNOLOGY

JUNCTION BOX

KILOAMPERE

KILOVOLT

KILOVOLT AMPERE

KILOVOLT AMPERE PER HOUR

KILOVOLT AMPERE REACTIVE

KILOWATT

KILOWATT KIL OWATT HOUR

KILOWATT HOUR METER

POUNDS

LIGHT EMITTING DIODE

LINEAR FEET / FOOT

LIGHTING

LOW VOLTAGE

MAXIMUM

METAL-CLAD

MINIMUM CIRCUIT AMPS

MAIN CIRCUIT BREAKER

MOTOR CONTROL CENTER

MAIN DISTRIBUTION PANEL

MANHOLE

MINIMUM

MAXIMUM OVERCURRENT PROTECTION

MAIN LUGS ONLY

MEDIUM VOLTAGE

MEGAVOLT-AMPERE

MEGAWATT MICROWAVE

NORMALLY CLOSED

NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

NEUTRAL

NATIONAL FIRE PROTECTION

ASSOCIATION

NORMALLY OPEN

NOT TO SCALE

OVERLOAD

1P 2P 3P 4W

A/E

AF

AFF

AHJ

AIC

AMP/A

AT

ATS

AUTO

BIL

BLDG

BRKR/BKR

BYP

CALC

CHWP

CKT

CK /BRKR

COAX

COMM

COMP

CONC

CRI

CU

DB

DC

DEG C

DEG F

DEMO

DIAG

DN

DS

DWG

DECON

EG

EL

ELEC

EMER

EMT

EQUIP

ETC

EXIST

FA

FACP

FC

FLA

FT

FVNR

FVR

G OR GND

GFCI

HID

HP

HZ

IMC

IT

J-BOX

KA

KV

KVA

KVAH

KVAR

KW

KWH

KWHM

LB

LED

LF

LTG

LV

MAX

MC

MCA

MCB

MCC

MDP

MH

MIN

MOCP

MLO

MV

MVA

MW

NC

NEMA

NEUT OR N

NFPA

NO

NTS

OL

[ANEL BOARD, PULL BOX, OR PUSHBUTTON

PANEL

POUNDS PER INCH

POLYVINYL CHORIDE (PLASTIC)

POWER

RIGID GALVANIZED STEEL

ROOM

SELF CONTAINED BREATHING APPARATUS

SPECIFICATION

SWITCH

SWITCHBOARD

SWITCHGEAR

TIME CLOCK

TELEVISION

TYPICAL

UNDERGROUND

UNDERWRITERS LABORATORY

UNINTERRUPTED POWER SUPPLY

VOLT

VOLT AMPERE

VOLT AMPERE REACTIVE

VARIABLE FREQUENCY DRIVE

VOLTAGE

WATT

WITH

WEATHERPROOF

TRANSFER

TRANSFORMER

PB/PNLB

PNL

PSI

PVC

PWR

RGS/GRC

RM

SCBA

SPEC

SW

SWBD

SWGR

TC

TV

TYP

UGND

UL

UPS

V

VA

VAR

VFD

VOLT

W W/

WP

XFER

XFMR

ELECTRICAL SYMBOLS - SCHEMATICS

ELECTRICAL SYMBOLS - POWER PLAN

SWITCH, NORMALLY OPEN TIME DELAY

SWITCH, SINGLE BREAK

NORMALLY CLOSED RELAY CONTACT

NORMALLY OPEN CONTACT

FUSE WITH RATING

FUSED SWITCH

MOLDED CASE CIRCUIT BREAKER

LOW VOLTAGE DRAWOUT AIR CIRCUIT BREAKER

HIG VOLTAGE OIL CIRCUIT BREAKER

HIGH VOLTAGE DRAWOUT AIR CIRCUIT BREAKER

GENERATOR POWER

TRANSFORMER

BATTERY

CAPACITOR

POTHEAD

STRESS CONE

LIGHTING ARRESTOR

AUTOMATIC TRANSFER SWITCH

WYE CONNECTION

MOTOR, SINGLE PHASE

MOTOR, THREE PHASE

METER

AMMETER

VOLTMETER

WATTMETER

WATT-HOUR METER

EARTH GROUND

OCB

G

M

A

V

W

WH

JUNCTION BOX

BRANCH CIRCUIT HOMERUN TO PANEL. NEUTRAL CONDUCTOR; SHORT LINE,

PHASECONDUCTOR WITH SWITCH LEGS; LONG LINE. ALL HOMERUNS WILL

INCLUDE GREEN INSULATED GROUND CONDUCTOR; NOT SHOWN

PULL BOX

SUBSTATION

HI VOLTAGE SWITCH ON CONCRETE PAD

LOW VOLTAGE SITCH ON CONCRETE PAD

DUAL POWER AND TELECOMMUNICATIONS MANHOLE

TRANSFORMER, PLAN

ELECTRICAL MANHOLE (EXISTING)

VERTICAL UNIT HEATER

PANELBOARD CABINET, FLUSH MOUNTED

PANELBOARD CABINET, SURFACE MOUNTED

RECEPTACLE, DUPLEX

RECEPTACLE, DUPLEX ON EMERGENCY POWER

RECEPTACLE, DUPLEX W/ GROUND FAULT CIRCUIT INTERUPTER ON

EMERGENCY POWER

RECEPTACLE, DUPLEX W/ GROUND FAULT CIRCUIT INTERUPTER

RECEPTACLE, QUADRAPLEX

RECEPTACLE, SINGLE

RECEPTACLE, SINGLE WITH SWITCH

RECEPTACLE, SPECIAL PURPOSE

A= 120V, 20A, 1 PHASE, 2 POLE, 3W, NEMA 5-20R

B= 208V, 20A, 1 PHASE, 2 POLE, 3W, NEMA 6-20R

C= 120V, 30A, 1 PHASE, 2 POLE, 3W, NEMA 5-20R

D= 208V, 30A, 1 PHASE, 2 POLE, 3W, NEMA 6-20R

E= 208V, 60A, 1 PHASE, 3 POLE, 4W, NEMA 14-20R

F= 208V, 30A, 3 PHASE, 3 POLE, 4W, NEMA 15-20R

G= 208V, 50A, 3 PHASE, 3 POLE, 4W, NEMA 15-20R

H= 208V, 60A, 3 PHASE, 3 POLE, 4W, NEMA 15-20R

RECEPTACLE, SWITCHED DUPLEX

DROP CORD, SINGLE CONVENIENCE OUTLET, 3 WIRE, GROUNDING TYPE, 20A,

W/ #12 CONDUCTORS IN FLEXIBLE CORD (CENTERLINE OF OUTLET: 6'-6" AFF

MIN)

ELECTRICAL STRIP MOLD (OUTLETS ON 2'-0" CENTERS OR AS DESIGNATED ON

PLANS), MTD 3'-6" AFF OR AS INDICATED

3-GANG COMPARTMENT BOX IN FLOOR FOR TELEPHONE, DATA & RECEPTACLE

DISCONNECT SWITCH, FUSED

DISCONNECT SWITCH, UNFUSED

STARTER, COMBINATION WITH DISCONNECT SWITCH

STARTER OR MOTOR CONTROLLER

VARIABLE FREQUENCY DRIVE

SWITCH (# SUBSCRIPT AS INDICATED BELOW)

BLANK = SINGLE POLE 2 = DOUBLE POLE

3 = THREE-WAY 4 = FOUR-WAY

D = DIMMER F = FUSED

K = KEY OPERATED L = LOCK

LM = LOW VOLT MASTER LV = LOW VOLTAGE

M = MANUAL MOTOR STARTING MC = MOMENTARY CONTACT

MO = OCCUPANCY SENSOR MP = MOTO SNAP W/ PILOT LIGHT

P = WITH PILOT LIGHT (THERMAL TYPE) PB = PUSH BUTTON STATION

RC = REMOTE CONTROL T = TIMER OPERATED

WP = WEATHER PROOF V = VARIABLE SPEED CONTROL

CEILING FAN

PUSH BUTTON / ACTUATOR

EXTERIOR LIGHT

RECESSED DOWNLIGHT FIXTURE, LETTER INDICATES TYPE

LIGHT FIXTURE, DROP IN CEILING MOUNTED, LETTER INDICATES TYPE

LIGHT FIXTURE, LINEAR PENDANT MOUNTED, LETTER INDICATES TYPE

LIGHT FIXTURE, CAN PENDANT MOUNTED, LETTER INDICATES TYPE

EXIT SIGN, WALL MOUNTED W/ DIRECTIONAL ARROWS AND FACES

EXIT SIGN, CEILING MOUNTED W/ DIRECTIONAL ARROWS AND FACES

PHOTOCELL

OCCUPANCY SENSOR, WALL MOUNTED

OCCUPANCY SENSOR, CILING MOUNTED

CEILING FAN

LIGHT FIXTURE, OCTAGON PENDANT MOUNTED, LETER INDICATED TYPE

J

PB

S

HVS

LVS

P T

T

E

GFCI

GFCI

S

S

VFD

A

A

A

A

PC

OC

OC

A

ELECTRICAL SYMBOLS - COMMUNICATIONS

AUDIO DEVICE; LETTER INDICATES AS FOLLOWS:

WP=WATER PROOF

M=MOUNT

C - CEILING D - DESK F - FLUSH H - HIDDEN

M - MULLION P…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .