Drawings2.pdf
PDF 20 MB Posted
- Solicitation number
- 36C24226B0029
About this file
Construction Document Summary
These are architectural and engineering construction documents for a federal building demolition and renovation project managed by the U.S. Department of Veterans Affairs (VA). The drawings comprise detailed plans, schedules, and specifications across multiple disciplines including structural, mechanical, electrical, plumbing, and architectural systems.
The documents include comprehensive existing equipment and utility schedules, room finish schedules, door schedules, and various plan views showing phased demolition work across ground and basement levels. Key mechanical systems documentation covers HVAC line types, valve symbols, piping symbols, and ductwork specifications. Mechanical demolition ground floor plans show phased removal of hydronic piping systems and associated equipment. Plumbing demolition plans detail sanitary and water system removal with extended instrument air views for specific work areas. Construction schedules identify mobile temporary SPS equipment requirements with corresponding contractors and timeframes. The documents specify 100% construction completion standards with detailed architectural, mechanical, and plumbing symbology legends throughout. The project involves coordination across multiple phases with defined areas of work delineated on each floor plan. All drawings are prepared by Pullenzetti and certified through the Office of Construction and Facilities Management with the VA as the contracting federal agency.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .