3. STERIS Mobile SPD Deployment Guide 8-1-2023.pdf

PDF 25 MB Posted

Attached to
Z1DA--SPS Modification - Construction WNY HEALTHCARE SYSTEMS - BUFFALO VAMC
Solicitation number
36C24225B0007
Issued by

About this file

This file appears to be a deployment guide from STERIS regarding mobile Sterile Processing Department (SPD) services, though the actual contents of the PDF are not provided in the source text. The associated contract opportunity is for commissioning services at the Buffalo VA Medical Center related to SPD construction, with an estimated value between $5-10 million.

The solicitation (36C24225Q0184) will be posted around December 20, 2024, as a 100% SDVOSB set-aside under NAICS code 541690 (Other Scientific and Technical Consulting Services). The commissioning agent will verify installation and performance of systems, develop specifications and plans, and provide a commissioning report. The work is needed because existing SPD equipment has exceeded its service life and lacks adequate HVAC capacity. Award is anticipated in January 2025. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 is the contracting agency, with contracting officer Idalia Algarin managing the solicitation.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STERIS Mobile SPD Site Planning and Utility Connections Guide

800-548-4873 www.STERIS.com

STERIS MOBILE SPD

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Introduction and Disclaimer

The purpose of this document is to provide the basic information needed for site planning. Please note that some STERIS Mobile SPD units have slight variations in dimensions, equipment layout, product portfolio, ancillary cooling packages and means of egress.

Once a specific SPD has been assigned if there are any variations from the site guide STERIS will provide any additional requirements.

Buff alo g packa en assigne will provi

VAe the ba at some ions, e

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Symbol Definitions

May result in personal injury or damage to the equipment

May result in additional charges or delays

Important note that must be followed

Buff alo damage y VA

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Special Notes:

1. Prior to deployment, STERIS will perform a site visit and/or teleconference to review mechanical, electrical and plumbing (MEP) requirements with all parties involved to ensure a successful project.

2. Customer is responsible for all licenses, permits and any government approvals.

3. Customer is responsible to make all utility connections.

4. Power must be with 50’ of the front/nose of the unit, readily available upon unit arrival and all utilities must be stubbed out to the deployment location.

5. STERIS can provide steps for emergency exit door only. STERIS requires the facility to provide a deck or connecting corridor to transport instruments into and out of the unit. Any connecting structure must be constructed AFTER the Mobile SPD arrives on site.

6. Any anchor tie down points must be constructed/installed after the Mobile SPD arrives onsite.

ency exit doo instruments PD arriv oints must be

VAons.

unit, re

Pre-Deployment Activities

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Sample Mobile SPD Commission Schedule Provided by STERIS

Equipment Layout

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Any connecting structure must be constructed AFTER the Mobile SPD arrives on site. Failure to meet STERIS delivery requirements will result in additional delivery charges.

Equipment Layout

Customer is responsible for providing a deck or connecting corridor to transport instruments into and out of the unit.

a

Site Preparation

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Operational Envelope

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Operational Envelope Driver Side View

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Operational Envelope Passenger Side View

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Operational Envelope Rear View

The Dimensions based on 45” minimum leveling height

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Operational Envelope Front View

The Dimensions based on 45” minimum leveling height

Shelton, Nicholas <Nicholas_Shelton@steris.com>; Munroe, Mark <Mark_Munroe@steris.com>; Fleming, John <John_Fleming@steris.com>

STERIS MOBILE SPD

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Mobile SPD Weight Distribution4’ x 8’ by 1” steel road plates are needed to support and distribute weight accordingly. STERIS can advise if these plates are NOT needed once a formal site visit is performed

If necessary, and based on individual site conditions, three 4’ x 8’ by 1” steel road plates may be needed. Plates provided by others.

STERIS MOBILE SPD

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Touch Points and Weight Distribution PhotosTotal unit weight is approximately 70,000 lbs.

Front Unit Stabilizers

Rear Unit Stabilizers

Rear Axle Stabilizers

ReReearara UUUnininitt StStababbililizizererss Buffff aloar Axle Stabilizear Axle Stabiliar Axle Stabili

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Unit Tie-Down Images and Capacities

Unit Anchoring / Tie Downs 2 per corner (8 total) at 9,200 lb. capacity (6,500 lb horizontal/vertical capacity)

- Locations are field specific

- Anchor points to be located approximately 45 degrees from the ground

- STERIS will provide straps needed to secure the unit.

1. Ground penetrations are the responsibility of the Customer.

2. The requirement for tie downs is at the discretion of the Authority Having Jurisdiction (AHJ).

BBuf o uffBuffuf VAmately 45 deg ed to secure th

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Mobile SPD Anchor Point Locations

It is required that anchor tie downs are placed after the Mobile SPD arrives. Although STERIS does not penetrate the ground, Installation Specialists will be on site and can provide guidance regarding tie down locations.

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

The Customer is responsible for providing a pad based on ground conditions, unit weight, unit dimensions, and/or local AHJ requirements.

Support Pad Recommendations

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

The Customer is responsible for providing a pad based on ground conditions, unit weight, unit dimensions, and/or local AHJ requirements.

Support Pad Recommendations Continued

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Maximum Pitch and Slope for Delivery

The Customer is responsible for providing an appropriate delivery path and ramp to accommodate the Mobile SPD.

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Maximum Pitch and Slope for Deployment

The Customer is responsible for providing an appropriate delivery path and ramp to accommodate the Mobile SPD.

Failure to meet STERIS delivery requirements will result in project delays and additional delivery charges

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

ND IS THEHE RR ii ii 19

Dunnage Blocks

MSPD LEVELING AND THRESHOLD HEIGHTS

Assuming level ground, the minimum threshold height is 45” and the maximum height is 54” with dunnage. Additional height requirements need to be approved by STERIS.

VA

I

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Connecting Corridor

Step 1:

STERIS Site Walk

Step 2:

Document Sharing (Customer to provide elevation drawings)

Step 3:

Unit Arrival

Step 4:

Connecting Corridor Construction BeginsSTSTERERISIS SSititee WaWW lkklk

Step 5:

Connecting Corridor

Construction Completes

Any connecting structure must be constructed AFTER the Mobile SPD arrives on site. Failure to meet STERIS delivery requirements will result in additional delivery charges.

alo Arriva

VAVAl arges.

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Proper Site Preparation Procedure

Deck elevations are required to be sent to STERIS for approval prior to unit arrival. Customer should not build the deck until after the unit arrives on site.

The Mobile SPD has the capability to raise and lower to meet various height challenges, however, the connecting structure must be built after unit arrival as there are limitations to the maximum height of the unit.

The connecting corridor should be constructed AFTER the Mobile SPD arrives on site as there must be enough room to expand the unit and ensure an exact alignment to the connecting structure. The structure must be built to the unit (STERIS will not manipulate the unit to align with a pre-existing structure).

Bu o V

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Connecting Corridor Bumper Protection

Customer is responsible for ensuring the protection of the exterior of the SPD unit. When installing a deck/connecting structure, please incorporate a bumper or protective rail/barrier to prevent the unit from being damaged by transfer carts.

Customer is responsible for any damage as a result of cart transfer cart damage to the Mobile SPD or improper installation of bumpers/rails that fail to protect the SPD. Buf

VAA

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Connecting Corridor and Weather Sealing

It is the responsibility of the Customer/contractor to ensure that all connecting corridors are installed with a sealer/expansion foam. Seals shall be installed to prevent water leaks and insects from enter the transition space between the corridor and the Mobile SPD.

Example of Proper Weather Seal oo VAAA b

Weather S

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Connecting Corridor Roof Extension

When designing a connecting corridor, the facility is responsible for constructing an extension over the unit and sealing the structure to ensure that water/snow does not penetrate this connecting area.

Damage caused as a result of the installation of the connecting corridor will be the responsibility of the

Customer.

B

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

STERIS Storage Container

A STERIS storage container travels with every Mobile SPD. The storage container must reside within close proximity to the Mobile SPD and have a clear path to the SPD. STERIS will assess location areas for this container during the site visit.

92” Wide

99” Tall

240” Deep

AVAVA

Utility Connection Drawings and Connection Points

Customer/contractor is responsible for all utility connections. STERIS Mobile Installation Specialists will be on site to provide guidance as needed.

Water Fire Protection

Power Waste Drain

Buer

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Plan View - Utility Connection Points

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Driver Side Utility Connection Points

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Passenger Side Utility Connection Points

B

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Front and Rear Utility Connection Points

Utility Connections Detail and Images

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Facility/Contractor is responsible for making the final power connection from the Mobile

SPD to the disconnect.

Shoreline Cable: (2) up to 75’ lengths (provided)

Power Connection Images and Requirements

480VAC, 3-Phase, (2) 250 AMP

Configuration 4 wire (L1,L2,L3,G) Frequency: 60hz

Facility end hard wired (Customer Connection Point)

Strain ReliefMale Connection (unit) Female Connection (shoreline)

FrFreqequeuencncy:y: 660h0hzqqq

A Neutral is NOT needed in this configuration.

Buff aloreline Cable: (2) vided

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Power Connection Images and RequirementsDisconnect must be within 50’ of the front/nose of the unit.

Main 480V 3PH (2) 250 Amp Connection

-2 up to 75’ cables provided by STERIS -Facility to provide disconnect -4 wire configuration (L1, L2, L3, G) -No Neutral Required

B lo

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Ground Point Images and Requirements

- Earth ground provided; installation per NEC Article 250

- (1) single point ground stud

- (1) 20’ ground cable with (2) clamps provided

Failure to install the ground stud and cable could result in damage to the STERIS Mobile SPD and

STERIS equipment.

A

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Power Load Calculations

If switch gear with adjustable settings (aka “smart Breakers”) are used, it is the facilities responsibility to ensure they are setup correctly.

STERIS Mobile power requirements must be followed. Failure to follow power requirements could result in damage to the STERIS Mobile SPD and STERIS equipment.

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Power Load Calculations Continued

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Power Load Calculations Continued

Buff al

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Power Connection Images and Requirements

Product Construction:

• Conductor:

• 8 AWG through 500 kcmil fully annealed stranded bare copper

• Insulation:

• Premium-grade, color-coded 90 C

EPDM

• Color code: see chart

• Jacket:

• Super Vu-Tron 90 C, black

• Temperature range: -40 C to + 90 C

• Jacket Marking:

• Carol Super VU-Tron (size) Type W portable power cable (UL) 2000V dry 90 C wet 75 C sun res CSA (-40 C) FT-

5 P-7K-123049 MSHA

(Super Vu-Tron Multi-Conductor Type W Round)

90 C (UL) Type W 2000 Volt Portable Power Cable)

Specifications may vary by unit.

(Units 104-107 are 2/0 and units

108+ are 3/0

Customer installer to trim raw end of pig tail only. Keep cable length as long as possible.

Buff

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Hot and Cold Water Supply Images and Requirements

Water Manifold (Customer Connection Point) 1 1/2-inch NPT Fresh - Water Fill Port - Cold

1. Connection sizes indicate the equipment termination sizes only.

2. Size of supply piping is dependent on length of pipe run to ensure adequate supply service pressure and demand flow at equipment terminals.

3. Effect of coincident draw of multiple unit installations must also be considered.

Cold Water Supply Requirements -1 /1/2-inch connection (#5 Roadside Belly Box, reducer to 1 1/4-inch may be required) -External lines must be facility protected -Dynamic pressure 50-60 psi at MSPD -Facility to provide pressure reducer if required -Temperature: 40°F Min, 70°F Max -700 GPH average (70 GPM peak)

Hot Water Supply Requirements -1 1/4-inch connection (#5 Roadside Belly Box) -External lines must be facility protected -Dynamic pressure 50-60 psi at MSPD -Facility to provide pressure reducer if required -Temperature: 120°F Min, 140°F Max -300 GPH average (20 GPM peak)

Water Manifold (Customer Connection Point) 1 1/4-inch NPT Fresh - Water Fill Port - Hot

Buff alo o VVVAate and flow at of multiple u idered.

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Waste Water

• 4-inch wastewater connection

• 1,000 GPH average (75GPM peak flow)

• Waste water line must be facility protected

• Waste connection can be connected through the side of the belly box door or the bottom of the floor.

Belly Box Waste Water Access Point ( Belly box location)

4” Waste Water Connection (Belly box door option)

Waste Water Images and Requirements

Drain can’t be connected to a grease trap or grease interceptor line.

Waste flow will vary depending on the frequency of equipment operation in the unit.

It is highly recommended that a P-Trap be installed on the waste line to minimize the potential for foul odors.

dooooooooooooooorrrrrr r opopoppopopopoppptiittititititiononononononon)))))))))))

4” Waste Water Connection (Belly box floor option) ffa lo e fa can be conn ly box door

Waste Water Co (B(B(B(B(B(B(B(B(((( eleleleelelellylylylylylylyyyyy bbbbbbboxoxoxxoxoxoxox dddddddoooooBBB leleleee llyyy bbbboo dddddooo

VAion ak flow

AA

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Fire Sprinkler Images and Requirements

Fire Sprinkler Requirements

- External lines must be facility protected

- Supply required:

Residual Pressure 46 PSI minimum at SPD Flow Rate: 143 GPM at SPD

2-inch Victaulic coupling

Consider a close source such as a fire hydrant where allowed by local municipalities and follow local laws and codes prior to making any connections.

Buff alo lic coup

VAt SPD

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Fire Alarm System Drawing

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Fire Evacuation Plan

Aluminum stairs are provided by STERIS for use at the emergency exit door. If the provided stairs do not meet local code or preference requirements, the Customer is responsible for providing stairs for the emergency exit door

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Fire Extinguisher Bracket Locations

There are two fire extinguisher brackets installed in the SPD, one at each door. It is the Customer’s responsibility for providing fire extinguishers and any incoming and routine inspections required by local code or policies.

ABC Type Dry Chemical

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Fire Alarm System Drawing

Fire Alarm Panel al

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Fire Alarm Matrix

Facility Remote

Activation

Manual Pull Stations

Area Smoke/Heat

Detectors

Sprinkler Waterflow

Switch

Sprinkler Shut Off Tamper

Switch

Unit Power

Alarm Battery Back-Up

General Alarm System Errors

Alarm X X X X

Supervisory X Trouble X X X

Activate Audio/Visual Alarm Signals Throughout Unit

X X X X

Unit Alarm Panel Tone and Signal X X X X

Export To Alarm Contact X X X X

Export To Supervisory Contact X

Export to Trouble Contact X X X

BBuffffffff affa lo ffaa lo aaloff Bu

X

X

VVAVVVAVAVAAVAVAX

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Fire Alarm Images and Requirements Fire Alarm Connection

Customer Connection Point Fire Alarm Remote Dry Contacts

- Conventional analog fire alarm system with local audible-visual, horn-strobe alarm devices for occupant warning.

- Unit alarm system configured with:

- 2 zones with detection and pull stations

- 1 zone with supervisory tamper switch on sprinkler water control valve

- 1 zone for water flow switch on sprinkler system

- System exports trouble, supervisory and alarm conditions to three dry contacts available at the rear of the unit.

The fire alarm system has no capability to repeat or react to external alarms or external

PA systems.

Buff alo system with ces for occup igured with:

etection and pu pervisory tam ol valve e for water flow exports trouble, contacts a

VAVAto external

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Data Images and Requirements Data Connection Box

Customer Connection Point (Rear of Unit)(( ) Data Connection Box (Interior)

Two RJ45 Connection Points

RJ45 Connections Provided Throughout the Unit

Customer must extend their IT network to the Mobile SPD for their IT provided equipment.

If fiber optic cable is required, STERIS coordination for cable routing will be required.

ffa lo

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Data Connections DrawingRJ45 data connections are available at several locations throughout the unit to support network, voice and POTS (phone).

IT Patch Panel TOR Series Part # TOR-4-20RP

Interior Connections (shown below)

STERIS will not connect the Mobile SPD to the hospital IT network.

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

HVAC Condensate Images and Connections Rear of Unit

Heating and Cooling Connections/ HVAC Condensate Drain Terminations

- Nominal ¾” drain at front and rear of unit

Front of Unit

If condensate from the HVAC units is not captured, the condensate will drain to ground. HVAC drains must be run with a Customer installed air gap.

Buff alo

” drain at fro ng ConneVAed

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Cold Weather Package

I

CONNTATAININEDED HHERERIEIENN ISIS CCONONFIFIDEDENNTIA

Power Requirements

- Electrical Service:

- 208VAC, 2 pole, total of 70 amps, 60 HZ, Single Phase or 240VAC, 2 pole, total of 80 amps, 60 HZ, Single Phase

- STERIS will supply (4) 4,000 watt 240V heaters with NEMA 6-30 plugs

- Customer is responsible to provide one 208V or 240V single phase 60 Hz 70/80 amp feed (hard wired to lugs in panel) to STERIS provided panel.

When deploying the Mobile SPD in climates where the ambient temperature routinely drops and stays below 40 degrees Fahrenheit, the cold weather insulation package is a requirement.

STERIS Provided Heaters Customer Provided Power

Utility Connection Inside the Mobile SPD

Buff afal o S Provided Hea

VAters with NEM de one 208V o s in p

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Ancillary Cooling Package

The ancillary cooling package is required in locations where the heat index consistently exceeds

100 degrees. Air inlets are 6”x24”.

Power Requirements

- Electrical Service: 480 VAC, 3-phase, 60hz

- (1) 30 AMP breakers

Unit Information STERIS will supply HVAC pre-cooling capability

- HVAC Pre-cool unit dimensions and weight:

- Width = 32”

- Length = 48”

- Height = 52”

- Weight = 685 lbs

Buff

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Site Guide Revision Log

Date Rev

Update

1/18/2023 19 Updated all drawing, facility requirement pages, utility connection pages

Buff alo lofaff Bu

VAAVAVA

nt p

SITE PLANNING

UTILITY GUIDE

THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE

PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,

TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS

CORPORATION.

Revision 19 8/1/2023

Site Guide Revision Log