PERFORMANCE WORK STATEMENT - REVISED.docx
DOCX document 28 KB Posted
- Solicitation number
- 36C24224Q0203
About this file
This performance work statement outlines the requirements for leasing, delivering, installing, connecting, servicing, and supporting a mobile 1.5T MRI system and trailer at the VA New Jersey Healthcare System's Toms River CBOC location. Key requirements include leasing an MRI unit and 12'x48' transportable trailer unit, delivering and installing them on site, and providing corrective and preventive maintenance throughout the life of the contract. The contractor must maintain a 98% uptime guarantee for the equipment and respond to repair requests within 4 business hours. Preventative maintenance is to be scheduled in advance. The contractor will also handle any necessary software or hardware upgrades, recalls, and removal of equipment at end of contract.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR LEASE, SERVICE AND SUPPORT OF
MRI AND MRI TRAILER EQUIPMENT
A. BACKGROUND
With the new activation of the Toms River CBOC, there is a request to lease an MRI and MRI Trailer as part of the new activation. The activation was designed, and narrative completed in calendar year 2020. Without this equipment, the Radiology Department will not have the ability to perform MRIs at the Toms River CBOC.
B. OBJECTIVES
The contract effort goals are to deliver, install, connect, ensure functionality, service and support all components of the equipment listed in Section G, inclusive of components of the host systems, throughout the total contract period at the VA New Jersey Healthcare System. Objectives to meet the service and support goal may include, but are not limited to, replacement parts coverage, service support, telephone support, software and hardware support, continuing education for VA staff and support service, full maintenance coverage by providing all replacement parts, labor, travel expenses, tools, test equipment and other incidentals necessary to maintain or restore the listed equipment to operating specifications according to the manufacturer’s recommendations throughout the term of the contract.
C. DEFINITIONS/ACRONYMS
· CO – Contracting Officer.
· COR – Contracting Officer Representative
· FSE – Field Service Engineer. A person who is authorized be the contractor to perform maintenance (scheduled{preventive} or unscheduled{corrective}) services on the VAMC premises.
· SR – Service Report. Documentation of the services rendered for each incidence of work performance under the terms and condition of the contract.
· Acceptance Signature – Signature of VA employee who indicates FSE demonstrated service conclusion/status and User has accepted work as complete/pending in SR.
· Authorization Signature – COR’s signature; indicates COR accepts work status as stated in SR.
· HTM – Healthcare Technology Management
· OEM – Original Equipment Manufacturer
· POC – Point of Contact
· Downtime – Aggregate hours within Normal VA Business Hours during a contract year when the equipment is inoperable due to system failure resulting in inability of patient treatment.
D. PERIOD OF PERFORMANCE
After the contract has been awarded, the period of performance will be defined within the following time parameters.
· Base Year – One year beginning after delivery and installation.
· Option Year One – One year from Base Year End
· Option Year Two - One year from Option Year One End
· Option Year Three - One year from Option Year Two End
· Option Year Four - One year from Option Year Three End
E. PLACE OF PERFORMANCE
Delivery of services in this case will be conducted virtual and/or at the following addresses:
· VA New Jersey Healthcare System – Toms River CBOC – Radiology Department
· 1055 Hooper Avenue, Toms River, NJ 08753
F. SCOPE OF WORK (TASKS FOR SERVICES)
The work requirements for this contract performance period are introduced as stated in the preceding sections. However, it is here within the scope of work they will be captured explicitly. Documented failure to comply with the requirements in the scope of work can result in withheld payment. The contractor will meet the following requirements as bulleted below, THE CONTRACTOR WILL:
· PERSONNEL
· The Field Service Engineer is required to be OEM training, and the Contractor shall provide the certification upon request.
· The FSE is required to contact the provided HTM POC to coordinate all Unscheduled and Scheduled maintenance.
· The FSE is required to check in with the HTM POC when arriving at the Facility AND prior to leaving the Facility.
· The FSE is required to give the HTM POC a synopsis of the work performed prior to leaving the Facility.
· REPAIRS
· All Field Engineer on site visits shall be performed within four (4) business hours during the normal VA business hours.
· 8:00am-5:00pm, Monday through Friday, excluding Federal holidays.
· On-site response time shall be within four (4) business hours of request.
· All telephone technical support shall be provided at no additional cost and within 30 minutes.
· Repair parts shall be provided and shipped, next day 10:30 am
· All replacement parts will be of OEM quality and guaranteed against defects and/or failure for a period of ninety (90) days from the date of installation.
· Approval must be received from the COR or HTM POC prior to use of any refurbished parts and/or components.
· Work to be performed, which is not covered under this contract, must be pre-approved by the contract specialist/officer and a separate purchase order will be issued for the work to be performed. Failure to obtain prior authorization will result in non-payment of charges incurred.
· Post repair, the repaired equipment shall be returned to OEM standards.
· If a repair requires a device to leave the Facility, the Contractor shall provide an equivalent loaner at no charge.
· PARTS
· All parts will be provided and replaced as necessary at no additional charge.
· Usage of refurbished parts will be subject to the approval of the COR or designee.
· UPTIME
· The Contractor shall maintain an INDIVIDUAL Uptime Guarantee of 98% for each identified device in Section G
· Uptime percentage shall be calculated over a 3-month period utilizing the following formula:
· Uptime = ((Normal VA Business Hours – Downtime [in hours]) /Normal VA Business Hours) *100
· Uptime percentage calculation shall not include agreed upon down time for scheduled events (e.g., scheduled maintenance)
· If the Facility determines that it is unsafe to utilize the equipment due to component failure, this shall also constitute Downtime.
· Downtime calculation shall begin when the Facility attempts to contact the Contractor for support, either phone call or email. It is independent of whether the Contractor answers the phone call or acknowledges the sent email.
· Downtime continues until the equipment repair is completed and validated by the HTM POC, AND the equipment passes QA procedures initiated by the Facility.
· SCHEDULE MAINTENANCE (PREVENTIVE MAINTENANCE)
· Preventive maintenance shall be scheduled during normal VA business hours as identified above.
· The preventive maintenance schedule shall be determined and documented at the start of the contract with a meeting between the Contractor and the Facility
· The schedule is inclusive of the frequency of schedule maintenance, the duration of an individual preventive maintenance event, the exact month(s) that the schedule maintenance will be performed.
· The Facility reserves the right to revisit the preventive maintenance schedule at a minimum of the starting month of each Option Year.
· All parts and equipment necessary to complete the preventive maintenance shall be provided and shipped, next day 10:30 am
· The full preventive maintenance procedure documentation inclusive of step-by-step guide and anticipated values (if applicable), shall be provided at the request of the COR and/or CO.
· SOFTWARE
· All software upgrades/updates, inclusive of installation of any minor patches or major revisions, shall be included.
· The Contractor shall assist in any/all software and/or network vulnerabilities identified by the Government that need remediation as expressed by the Government.
· HARDWARE
· Hardware upgrades of components deemed End of Life shall be included.
· Individual and Serial Number changes due to Hardware Upgrades shall be compiled and provided to the Facility by the Contractor
· Hard Drive removal and destruction shall be completed at the termination of the contract, prior to the MRI and MRI Trailer being removed from site per VA guidelines.
· The Contractor shall remove the hard drive(s) in the presence of the appropriate VA personnel.
· The Contractor shall surrender the hard drive(s) to the VA personnel.
· The VA personnel shall perform the sanitization of the hard drive(s) as per VA Handbook 6500.1
· HAZARD ALERTS
· The Contractor is required to provide and complete the remediation of any and all Government identified Hazard Alerts and/or FDA Voluntary/Un-Voluntary Recall Alerts inclusive of travel, labor and parts required.
· SERVICE DOCUMENTATION
· At the conclusion of each repair and scheduled maintenance call, the Contractor shall provide a written service report within 3 business days indicating:
· Date(s) of service
· Make, model, serial number, and barcode/ID number of the equipment serviced.
· Name of FSE who performed the work.
· Hours worked.
· Description of the reported problem, the services performed, and parts replaced.
· Make, model, serial number, barcode/ID number, and proof of up-to-date calibration of the test equipment used in the repair or preventive maintenance service.
· Quantifiable measurement results, inclusive of range and tolerance, for all tests conducted.
· SITE INSPECTION
· The Contractor is required to complete a site visit to inspect the location the MRI Trailer will need to be located when delivered to the site.
· The Contractor shall work with the VA Project Manager in determining the appropriate connections, thoroughfare layout, electrical, HVAC and any other installation and connection related items pertaining to the MRI and MRI Trailer.
G. EQUIPMENT LIST
| Item |
| Requirement |
| Quantity |
| 1 |
| 12’x48’ Transportable unit for a 1.5T MRI System |
| 1 |
| 1a |
| Magnetic and RF Shielding |
| 1b |
| Front mounted Northern Air combination HVAC/Chiller System |
| 1c |
| Hydraulic Handicapped Lift capable of accommodating a bariatric patient on a gurney and lays flush to ground at its lowest position |
| 1d |
| Prep unit for Bayer/Medrad patient injector |
| 1e |
| Install supplied patient injector |
| 1f |
| SKY FACTORY SKY LIGHT – 6ft x 4ft |
| 1g |
| Wall Mural on both scan room walls |
| 1h |
| Code Blue Button |
| 1i |
| Nurses Call Button |
| 1j |
| Hard walled Patient Changing Area, changing room in use light to illuminate when patient is in room |
| 1k |
| Extra Coil Storage Cabinet – Located in scan room behind magnet |
| 1l |
| Wave guide pass through in scan room wall |
| 1m |
| 44” Gaven Scan Room Door |
| 1n |
| MRI Always on light at Scan Room Door |
| 1o |
| Underbelly compartments – All utilities terminate in underbelly compartment, inclusive of power, telecommunications and water. |
| 1p |
| Fire Suppression System – Gas Suppression System |
| 1q |
| Combination lock access at main entry door |
| 1r |
| Lunos Fresh Air Exchange System |
| 1s |
| Merv 14 Filtration |
| 1t |
| PE Stamped Drawings |
| 1u |
| 42” wide stairs with handrails on both sides of step |
| 1v |
| Transportation to site |
| 1w |
| In Service Applications Training at Site upon delivery |
| 1x |
| Wiring installation for two (2) voice lines |
| 1y |
| Wiring installation for six (6) data lines |
| 1z |
| Wiring installation for fire alarm system |
| 1ab |
| On board Generator capable of powering MRI and HVAC during power outage |
| 1ac |
| Aluminum Stairs for entering and exiting of the MRI Trailer |
| 1ad |
| Americans with Disabilities Act Compliant Aluminum ramp for entering and exiting of the MRI Trailer |
| 2 |
| 1.5T MRI Unit |
| 1 |
| 2a |
| Advanced Applications: 3D processing for all modality datasets, Neuro, Ortho, Body, Cardiovascular, Muscular, Oncology, Vascular, MRA, Elastography, Spectroscopy, Phase contrast MRI and Flow analysis, Parametric prostate imaging, Fiber tracking software |
| 2b |
| Coil Requirements: Torso, Knee, Shoulder, Head/neck/spine/array, Neuro vascular, Run-off, Foot/ankle, Wrist, Elbow, Prostate imaging, Functional MRI head, Carotid, periphery vascular, Extremity; flexible, transmit/receive, adjustable neurovascular head, whole body imaging |
| 2c |
| Compatibility with Philips Stenor and AGFA PACS |
| 3 |
| Corrective (Unscheduled) and Preventive (Scheduled) Maintenance for the MRI and MRI Trailer during the life of the contract |
| 4 |
| Delivery and Installation of Mobile MRI and Trailer |
| 1 |
| 5 |
| De-installation and removal of Mobile MRI and Trailer |
| 1 |
File details come from the government source that posted it. Updated .