AE102C_2023.01.06.pdf
PDF 527 KB Posted
- Solicitation number
- 36C24223B0004
About this file
This floor plan drawing and related federal contract opportunity provide details for renovating Building 13CD at the Montrose VA Medical Center in Montrose, New York. The renovation project involves upgrading several rooms in Area C of the second floor to accommodate residential substance abuse programs. Key work includes installing new windows, furring exterior walls, and adding impact-rated glass. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 2 for project number 620-20-106 to renovate the building for the residential programs. The submission date for bids was January 6, 2023.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C R
C R
G F E D C B A
GROUP RM. 2
GROUP RM. 1
PUBLIC TOILET
TELEHEALTH
EVS
LINEN (CLEAN)
LINEN (SOILED
HOLD)
STAFF TOILET
OFFICE
OFFICE
STAFF TOILET
STAFF
LOUNGE
OFFICE
NORTHWEST
STAIR
AE503
A11
249 251
C
8'
1/
2" 5'
5'
9"
9'
8" 7'
1/ 2"
9'
1/
2"
11' - 5" 6' - 6" TYP. 11' - 11"
5' - 6" CLR MIN
MIN
1' - 5 7/8"
/A16 AE102DMATCHLINE SEE:
A
A
E
2A M
A
TC
H
LI
N E
S E
E
AE502
E16
2' - 11"
A1 A1
A2.3 A2.5
A2.5
A2.7
A1.3
A1.3
A1.3
A1
A1
A1
A1
A1
A1.3
AE503
A16
FEC
A4
A4
A4 A4 A4
A4
32' - 0"
/2
7' - 6" 3' - 11 3/8" 6' - 5 3/4" 11' - 11"
7'
6" 6'
0"
1'
1" 7'
2"
7'
5'
5" 7'
1/ 8"
9'
3/
8"
9 3/4"
11' - 11" 6' - 0" 11' - 11"
A5 A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A2.5
A2.5 A2.1
A2.3
A2.5
A2.1
A2.3
A1
A1
A1
A2.1
A2.1
A2.1
A2.1
A2.1A1
C1 C1
A2.1
A2.1 A2.1
A2.1
A2.1 A2.1
A2.1 A1 A1
A1
A2.1
A1.3 A2.1
A2.1
A2.1
A1
A2.3
A1
A1
A1
C1
A5
G13
AE303
AE303
E10 E10 E10
E10
E9
E9
C1
A2.1
A2.1
A2.1
A2.1
A2.1
C1
A2.1
A2.1
C1
C1
C1
C1
A2.1C1C1C1C1A2.1
3'
1/
2"
5' - 8 1/4"
5' - 0 1/2"
3'
6"
5' - 2 1/2"
3'
1/
2"
5' - 2 1/2"
3'
1/
2"
A4
AE303
A2.1
A4
A4
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF. ALL
WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE SEALED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF SEALANT MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED.
CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING SUBFLOORING.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE PATHWAY SHALL
BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED OPERATION, ACCESS, MAINTENANCE AND / OR
VISIBILITY.
K. INFILL & FLOAT FLOORS AT DEMO WALL LOCATIONS, TYPICAL ALL INTERIOR WALLS.
L. REPAIR AND PATCH ALL HOLES, SCRATCHES, DENTS, ETC. IN EXISTING WALLS AND COLUMNS PRIOR TO FINISHING. FEATHER JOINTS BETWEEN NEW AND
EXISTING WALLS TO ACHIEVE SMOOTH TRANSITION.
M. REFER TO FINISH PLANS FOR TRANSITION TYPE AT PATIENT SHOWERS.
N. AFTER DEMOLITION IS COMPLETED, AND BEFORE ANY NEW CONSTRUCTION WORK, GC RESPONSIBLE TO INSPECT AND SOUND OUT EXISTING CONCRETE SLAB
FOR CRACKS< HOLLOWS AND PLUMB LEVEL. SLAB IS TO BE REPAIRED AS NEEDED AND BROUGHT BACK TO LEVEL (1/8" WITHIN 10'-0") PRIOR TO STARTING ANY
NEW WORK OR FRAMING.
O. CONTRACTOR TO INSPECT ALL AREAS REQUIRING GROUT, SELF-LEVELING CEMENT OR OTHER WET CEMENTITIOUS MATERIAL FOR ANY PENETRATIONS WHICH
MUST BE ADDRESSED BEFORE POURING.
P. PROVIDE BLOCKING AS REQUIRED TO SUPPORT WALL MOUNTED ITEMS (INCLUDING, BUT NOT LIMITED TO, MARKER BOARDS, SIGNAGE, CASEWORK, MILLWORK, AND TOILET ACCESSORIES).
Q. SIZES OF OPENINGS IN EXISTING PENTHOUSE FOR NEW DUCTS SHALL BE DETERMINED BY COORDINATING WITH MECHANICAL DRAWINGS AND SHALL
ACCOUNT FOR INSULATION, TOLERENCES, ETC.
GENERAL SHEET NOTES
FLOOR PLAN LEGEND
AREA NOT IN CONTRACT
EXISTING WALLS & DOORS TO REMAIN
NEW WALLS AND DOORSD
O
O R
WALL MOUNTED DOOR OPERATION DEVICE
CR: CARD READER
PB: PUSH BUTTON ACTUATOR PAD
CRPB
1-HR FIRE RATED BARRIER
2-HR FIRE RATED BARRIER
30-MIN FIRE RATED SMOKE PARTITION
FLOOR DRAIN
MECHANICAL PUMP (SEE MECHANICAL)
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
FIRE PROTECTION:
STANTON ENGINEERING
10280 Old Columbia Rd. Ste. 275 Columbia, MD 21046 410-290-9301
HEALTHCARE PLANNER:
LEO A. DALY
730 2nd Ave. South, Ste. 1300 Minneapolis, MN 55402 612-752-8734
ARCHITECT:
CB DESIGN GROUP
421 KING STREET
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
FDR VA Medical Center 2094 Albany Post Road Montrose, NY 10548-1454
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
MEP/STRUCTURE:
RAYMOND ENGINEERING
1224 Royal Drive Conyers, GA 30094 770-483-9592 x 110
COST ESTIMATION:
OCMI
6110 Executive Blvd. Ste. 440 Rockville, MD 20852 202-450-3843
01/06/2023
620-20-106
AADAB
RENOVATE BLDG 13CD FOR
RESIDENTIAL SUBSTANCE ABUSE
100% WORKING DRAWINGS
SUBMISSION
PARTIAL FLOOR PLAN - AREA C
AE102C
-2
-1
A E
C
/2
/2
.p d f
N
13B KEY PLAN
NTS
N
PLAN
NORTH
TRUE
NORTH
AREA A AREA C
AREA B AREA D
1/4" = 1'-0"A16
PARTIAL RENOVATION FLOOR PLAN - SECOND FLOOR - AREA C
N
PLAN
NORTH
FLOOR PLAN KEY NOTES - 2ND FLOOR
# DESCRIPTION
A4 PLACE NEW WINDOW PANE IN EXISTING FRAME
A5 PROVIDE GYPSUM BOARD FURRING WALL AT EXTERIOR WALLS, TYP. PREP EXISTING EXTERIOR WALL TO RECEIVE NEW
FINISHES.
A8 PROVIDE NEW IMPACT-RATED VISION CONTROL GLASS UNIT WINDOW.
F5 PROVIDE WINDOW FILM (WF1) AT WINDOWS
REVISION SCHEDULE
# DESCRIPTION DATE
1 PRE-BID RFI 01/06/2023
| Sheets |
| AE102C - PARTIAL FLOOR PLAN - AREA C |
File details come from the government source that posted it. Updated .