9. CU101 Groundwater Force Main Plan & Profile A.pdf
PDF 2 MB Posted
- Solicitation number
- 36C24222B0037
About this file
This document package includes construction plans and specifications for a federal construction project to improve groundwater mitigation at Building 30 of the Batavia VA Medical Center in Batavia, New York. The project involves installing approximately 1,150 linear feet of 3-inch high-density polyethylene force main pipe with a minimum burial depth of 4.5 feet to connect existing duplex submersible pumps to the sanitary sewer system. Additional work includes site restoration, utility relocations, and building penetrations. Contractors must submit test hole results from six locations for agency review and approval. The solicitation number is 36C24222B0037 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 for the project titled "Z1DA--528A4-18-203 GROUND WATER MITIGATION BUILDING 30."
View the file
Other files
Show 40 more
Latest 50 of 76 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE SYMBOL - IMPROVEMENTS
TREE LINE
PROPOSED PIPE
SITE SYMBOLS - EARTHWORK
GRASS RESTORATION AREA
SITE SYMBOL - UTILITIES
AVOID LIGHT POLE. DISCONNECT AND RESET AFTER PIPE INSTALLATION
IF NECESSARY.
REMOVE TREES/BRUSH AS NECESSARY TO INSTALL PROPOSED PIPE.
ANY TREE THAT ROOTS ARE IMPACTED BY THE CONSTRUCTION SHALL BE
REMOVED ENTIRELY INCLUDING THE STUMP. REFER TO NOTES ON GI002
AND THE TREE REMOVAL SCHEDULE ON CD101 THROUGH CD104 ITEMS 47
THROUGH 52.
REMOVE EXISTING DUPLEX SUBMERSIBLE PUMPS , AND RETURN TO VA.
REPLACE WITH NEW DUPLEX SUBMERSIBLE PUMPS ( 2 EXISTING PUMPS,
REPLACE WITH 2 NEW PUMPS).
RECONFIGURATION OF INTERNAL PLUMBING AND NEW BUILDING
PENETRATION THROUGH EXISTING BUILDING WALL. THE CONTRACTOR
SHALL INSTALL A PIPE TRANSITION FOR PVC/HDPE FITTING. THE FITTING
SHALL BE A POLY-CAM SERIES 730 TRANSITION FOR PVC/HDPE OR
APPROVED EQUAL.
DRAINAGE MANHOLE
REMOVE & REINSTALL FENCE AS NECESSARY TO INSTALL PROPOSED
IMPROVEMENTS. FENCE POSTS SHALL BE REINSTALLED TO AVOID
UNDERGROUND PIPING.
IT IS UNKNOWN IF THE SYSTEM IN ACTIVE. THE STORM CONVEYANCE PIPE
OUTFALL COULD NOT BE LOCATED. THE CONTRACTOR SHALL VERIFY THE
LOCATION AND ANY POTENTIAL CONFLICTS PRIOR TO CONSTRUCTION AND
ORDERING OF THE STRUCTURES.
D
FLARED END SECTION
MAJOR CONTOUR
MINOR CONTOUR
RIP-RAP
PROPOSED ELECTRIC LINE
RICHMOND AVE.
VA HOSPITAL DR.
MEMORIAL DR.
RED
FIE
LD
PK
WY.
PA
RK
R D.
VETERANSA
B
C
GRASS
RESTORATION
Y/4"
3" HDPE FORCE MAIN PIPE
L=11.46' R=20.00'
L=19.81' R=20.00'
L=18.75' R=20.00'
L=9.39' R=20.00'
N21° 41' 05.88"E 18.54'
N56° 39' 24.07"E 23.33'
N23° 49' 08.57"E 14.11'
N32° 56' 32.76"W 6.26'
N20° 46' 03.29"E 142.71'
EHH
CONTRACTOR TEST
HOLE #1 LOCATION
(2)-2" PVC CONDUITS
STATION=0+00.00
NORTHING=1,097,939.3909
EASTING=1,250,639.8130
4' [1.
2m
L=12.21' R=20.00'
E
ST
ST
ST
ST
ST
ST
ST
ST
STS
DMH WITH EMERGENCY PUMP
RIM: 904.49
BOT.: 886.54
D
30" TREE
24" TREE
3" TREE
3" TREE
VA HOSPITAL DRIVE
WATER MH
RIM: 903.74
T CONNECTION
4" PIPE INV.: 898.94
DIRECTION
SIGN
BLDG. 30
FFE: 904.04
SHED
LP
LP
LP
LP
LP
#14
DS
DS
DS
3" DRAIN
DS
PAVILION
ELEC.
PANEL
SPIGOT
FLAG POLE
DS
DS
DS
DS
DS
DS
DS
12"
TREE
2" TREE
DUMPSTER
ELEC.
POSTS
ADA PARKING
SIGN
GRATE
3" DRAIN
PERMANENT
PUMP STAION
GRATE
SIAMESE
CONN.
CO
BLDG 30
SIGN
WV
WV
FH
TEMP PIPE
CO
15"HDPE
INV. 896.50
PUMP
CONNEC.
GV
CO
3" DRAIN
STSSTS
STS
STS
ST
S
ST
S
ST
S
DS
DS
CO
ST
ST
STST
STS
STS
ST
S ~
4" PVC
4" P
VC
4" CI GAS LINE
3" DIP6" DIPUNKNOWN
UTILITY
UNKNOWN
UTILITY
EDGE OF PAVEMENT
36"
TREE
30"
TREE
36"
TREE
S
SAN MH
RIM: 901.69
INV. IN: 898.44 (SW)
INV. OUT: 898.36
4" PVC
S
SAN MH
RIM: 903.02
INV. IN: 898.02 (SW)
INV. IN: 897.77 (N)
INV. IN: 897.77 (N)
INV. OUT: 987.69
6" PVC ~
6" C
IP
D
SAN MH
RIM: 902.77
INV. IN: 896.82 (NE)
INV. IN: 898.34 (E)
INV. OUT: 896.84
STS
STS
STS 12" RCP
D
SAN MH
RIM: 904.67
INV. IN: 895.89 (N)
INV. IN: 895.89 (E)
INV. OUT: 895.82
STS 12" RCP
STS
STS
12" RCP
ST
S
6" CIP
2X2 BOX, M-TOP
TG: 902.39
STS
STS
STS
8" R
CP
12" RCP
16" DIAMETER
INSULATED
STEAM PIPE
4" DRAIN
RIM: 902.48
4" PVC
2X2 BOX, M-TOP
TG: 903.51
INV. IN: 901.58 (NW)
INV. OUT: 901.16 (SW)
4" P
VC
D
STORM MH
TG: 903.50
INV. IN: 900.16 (NE)
INV. OUT: 900.06 (NW)
STS
STS
STS
STS
STS
INV. 899.98
" H
DP
E
4" DRAIN
RIM: 903.27
4" P
VC
STS
STS
STS
STS 4" PVC
D
STORM MH
TG: 903.20
INV. IN: 898.94 (N)
INV. OUT: 898.85 (SW)
4" PVC
12" HDPE
STS
STS
DS
DS
BITUMINOUS PAVING
EDGE OF PAVEMENT
CONC S'WALK
CONCRETE PATIO
CONCRETE PATIO
CONCRETE PATIO
10" TREE
BITUMINOUS PAVING
CONC S'WALK
CO
NC
S 'W
AL
K
.7'
[4.
8m
GRASS
GRASS
GRASS
GRASS
EDGE OF PAVEMENT
4" CI GAS LINE
2" CI GAS LINE
GRASS
BRICK S'W
ALK
CONC S'WALK
CRAWL SPACE
FULL
BASEMENT
DOG RUN AREA TO BE
REMOVED & REPLACED
AFTER RESTORATION AS
PART OF THIS CONTRACT
BLDG. 8
BLDG. 7
BLDG. 5
CONC. ROAD BASE
APPROXIMATE
LOCATION
CONC. ROAD BASE
APPROXIMATE
LOCATION
GRASS
RESTORATION
Y/4"
3" HDPE FORCE MAIN PIPE
L=11.46' R=20.00'
L=19.81' R=20.00'
L=18.75' R=20.00'
L=9.39' R=20.00'
N21° 41' 05.88"E 18.54'
N56° 39' 24.07"E 23.33'
N23° 49' 08.57"E 14.11'
N32° 56' 32.76"W 6.26'
N20° 46' 03.29"E 142.71'
EHH
CONTRACTOR TEST
HOLE #1 LOCATION
(2)-2" PVC CONDUITS
STATION=0+00.00
NORTHING=1,097,939.3909
EASTING=1,250,639.8130
4' [1.
2m
L=12.21' R=20.00'
E
CS502
CS503
CS502
SE
E
SH
EE
T C U1
LmA OnB
PP101
HORIZONTAL SCALE: 1'=20"
VERTICAL SCALE: 1'=2"
STATION 0+00 TO 12+50 PROFILE
4.
1.
0.
0.
0.
3.
1.
+5
0 1
0.
0.
+5
0 2
0.
3" HDPE FORCE MAIN PIPE
(VARIABLE DEPTH - MINIMUM 4.5' COVER)
EXISTING
GRADE
COORDINATE WALL PENETRATION
WITH BUILDING PLUMBING PLANS
4.
5'
[1 .4 m
4" PVC STORM PIPE
(APPROX. LOCATION)
INSTALL PVC / HDPE COUPLING POLY-CAM
SERIES 735 OR APPROVED EQUAL
BU
IL
D
IN
G W
AL
L
HORIZONTAL SCALE: 1'=20"
VERTICAL SCALE: 1'=2"
STATION 0+00 TO 12+50 PROFILE
4.
1.
0.
0.
0.
3.
1.
+5
0 1
0.
0.
+5
0 2
0.
3" HDPE FORCE MAIN PIPE
(VARIABLE DEPTH - MINIMUM 4.5' COVER)
EXISTING
GRADE
COORDINATE WALL PENETRATION
WITH BUILDING PLUMBING PLANS
4.
5'
[1 .4 m
4" PVC STORM PIPE
(APPROX. LOCATION)
INSTALL PVC / HDPE COUPLING POLY-CAM
SERIES 735 OR APPROVED EQUAL
BU
IL
D
IN
G W
AL
L
8/1/2022
Batavia VA Medical Center Batavia, NY
528A4-18-203
CHRIS GEARY PE# 099085
Schadler/Waldron Geary
811 OR 1-800-962-7962
Project Number
Building Number
Sheet Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
SITE SYMBOLS - GENERAL
BENCHMARK:
DRAWING BLOCK TITLE WITH GRAPHIC SCALE
(SHOWN HALF ACTUAL SIZE)
BRICK WALKWAY
PLAN
DIMENSION
A
SITE SYMBOLS - CONCRETE/MASONRY
SITE SYMBOLS - UTILITIES
NOTE:
VERTICAL TEXT INDICATES PROPOSED FEATURES (PROP.)
SLANTED TEXT INDICATES EXISTING FEATURES (EX.)
STORM SEWER LINE
UTILITY, UTILITY POLE (UP)
UTILITY, WATER MANHOLEW
UTILITY, ELECTRICAL MANHOLEE
SIGN
WATER LINE
EDGE OF PAVEMENT
CURB LINE
MINOR CONTOUR
MAJOR CONTOUR
SITE SYMBOLS - EXISTING
TREE
DRAINAGE CATCH BASIN
DETAIL NUMBER
DETAIL SHEET
SITE SYMBOLS - ABBREVIATIONS
ELECTRIC LINE
Ø DIAMETER
APPROX APPROXIMATELY
BLDG BUILDING
CIP CAST IRON PIPE
CO CLEANOUT
CONC CONCRETE
CS CURB STOP
DIP DUCTILE IRON PIPE
DS DOWN SPOUT
EB ELECTRIC BOX
ELEC ELECTRIC
EMH ELECTRIC MANHOLE
EHH ELECTRIC HANDHOLE
EOP EDGE OF PAVEMENT
FES FLARED END SECTION
GOVT GOVERNMENT
GV GAS VALVE
HDPE HIGH DENSITY POLY ETHYLENE
INSP INSPECTION
INV STORMWATER PIPE END
IP IRON PIN
LF LINEAR FEET
MH MANHOLE
N/F NOW OR FORMERLY
NRCS NATIONAL RESOURCE CONSERVATION SERVICE
PLCC PLAIN CEMENT CONCRETE
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
RCP REINFORCED-CONCRETE PIPE
S'WALK SIDEWALK
SF SQUARE FEET
SAN CO SANITARY CLEANOUT
STMH STEAM MANHOLE
TELE TELEPHONE
TEMP TEMPORARY
TMH TELEPHONE MANHOLE
TH TEST HOLE
TYP TYPICAL
WMH WATER MANHOLE
Y/4" 4" WIDE YELLOW PAINT LINE
DRAINAGE MANHOLE (DMH)D
GAS VALVE
HYDRANT, FIRE (FH)
UTILITY, SANITARY MANHOLE - (SAN MH)S
WATER VALVE (WV)
COMMUNICATION LINE
FIBER OPTIC LINE
GAS LINE
SANITARY SEWER LINE
STS
STEAM LINE
TELEPHONE LINE
UNKNOWN LINE
CENTERLINE
CHAINLINK FENCE
X X METAL FENCE
NRCS SOIL LINE
VEGETATION
LAMP POST
LIGHT POST (LP)
BOLLARD
CONCRETE
APPROXIMATE PROPERTY LINE
E UTILITY, ELECTRICAL HANDHOLE
COMM
GAS
SAN
ST
SCALE: 1"=20'
40'20'0'
PLAN VIEW
SCALE 1"=20'
UTILITIES SHOWN ARE APPROXIMATE
CONTRACTOR SHALL CONFIRM LOCATION
AND DEPTH IN FIELD
NOTES:
1. THE 3" FORCE MAIN SHALL HAVE A MINIMUM COVER OF 4.5 FEET
(54 INCHES).
2. ALL CONNECTIONS / FITTINGS FOR THE 3" SHALL HAVE, AT A
MINIMUM, THE SAME PRESSURE RATING AS THE PIPE.
3. WHEREVER PIPE MUST BE DEFLECTED FROM A STRAIGHT LINE
(IN EITHER THE VERTICAL OR HORIZONTAL PLANE) IN ORDER TO
AVOID OBSTRUCTIONS, OR WHEREVER LONG RADIUS CURVES
ARE PERMITTED, THE AMOUNT OF DEFLECTION SHALL NOT
EXCEED THE PIPE MANUFACTURER’S RECOMMENDATIONS, AND
SHALL BE APPROVED BY THE COR. BEND FITTINGS SHALL ONLY
BE USED WHEN THE PIPE DEFLECTIONS ARE INADEQUATE,
ACCORDING TO MANUFACTURER'S RECOMMENDATIONS, OR AS
DIRECTED BY COR.
4. THE CONTRACTOR SHALL INSTALL THE PIPE ACCORDING TO
ASTM D2321, "STANDARD PRACTICE FOR UNDERGROUND
INSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND
OTHER GRAVITY FLOW APPLICATIONS” AND ASTM D2774
“STANDARD PRACTICE FOR UNDERGROUND INSTALLATION OF
THERMOPLASTIC PRESSURE PIPING” UNLESS DIRECTED
OTHERWISE BY THE COR.
(SEE SHEET CS503 DETAIL #13 FOR PUMP INFORMATION.)
5. THE CONTRACTOR SHALL PRESSURE TEST THE PIPE IN
ACCORDANCE WITH ASTM F2164 AND PROVIDE RESULTS TO THE
COR. THE VA COR SHALL INSPECT PRESSURE TEST AND
CONTRACTOR SHALL NOT PROCEED UNTIL ACCEPTED BY THE
VA COR.
(SEE SHEET NUMBER PP101 - DETAIL # 4 FOR PIPE PENETRATION
THROUGH EXISTING BUILDING WALL. )
6. THE CONTRACTOR SHALL CONTACT THE COR TWO WEEKS
PRIOR TO CLOSING OF ANY TRENCH. THE COR AND ENGINEER
OF RECORD SHALL INSPECT THE TRENCH PRIOR TO CLOSING.
7. AREA WHERE TREES REMOVED SHALL BE PROMPTLY
STABILIZED TO PREVENT SOIL EROSION AND METHODS OF
STABILIZATION SHALL BE SUBMITTED AS PER THE SOIL AND
EROSION CONTROL PLAN SUBMITTALS.
KEY MAP
1"=800'
REVISED PER CONFERENCE CALL ON MARCH 9, 2021
REVISED PER 60% DESIGN REVIEW LETTERS
REVISED PER 90% DESIGN REVIEW LETTERS
REVISED PER FONT ISSUE/LINE ISSUE
5/11/2021 9/10/2021 2/4/2022 7/26/2022
CU101
9 23
Groundwater Force Main Plan & Profile 'A'
Bid Documents For Construction
Improve Ground Water, Building 30
CONTRACTOR TEST HOLE RESULTS
TEST HOLE
NUMBER STATION
DEPTH TO
UTILITY
(FEET)
UTILITY
PIPE
SIZE
(INCHES)
REMARKS
1 0+14
2 5+15 3 12+47
4 TBD
5 TBD
6 TBD
CONTRACTOR SHALL WORK WITH VA COR TO SELECT TEST HOLE LOCATIONS 4 THROUGH 6 AND VA COR SHALL WITNESS TEST HOLE DIG. CONTRACTOR SHALL PROVIDE SUBMITTAL WITH TEST HOLE RESULTS TO VA COR FOR REVIEW AND APPROVAL AS
PER THIS CHART.
DRILL PENETRATION HOLES
FOR 2" CONDUITS & SEAL WITH
WATERPROOF GASKET
AutoCAD SHX Text 200'
AutoCAD SHX Text 100'
AutoCAD SHX Text 50'
AutoCAD SHX Text
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
TU
File details come from the government source that posted it. Updated .