20. ED101 Electrical Systems Demolition Plan.pdf
PDF 478 KB Posted
- Solicitation number
- 36C24222B0037
About this file
This document package includes an electrical systems demolition plan drawing and related federal contract opportunity notice. The demolition plan drawing provides details for removing ground water pump supervisory points from an existing fire alarm system and transitioning them to a building management system. It specifies removing relay boards and conductors from pumps to disconnect them from the fire alarm control panel and notes where existing conduit and relays can be reused. The opportunity notice is for project 528A4-18-203 to perform ground water mitigation work at the Batavia VA Medical Center in Batavia, New York. The solicitation number is 36C24222B0037 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2.
View the file
Other files
Show 40 more
Latest 50 of 76 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
B001
DATA
B002
ELEC
B003
CRAWL SPACE
CRAWL SPACE
AREAWAY
AREAWAY
B
B
D
D
L
L
P
PE K
QC M
A
F
F
G
G
H
H
J
J N
MECHANICAL
ROOM
CR7 CR7
FA RELAYS
FA
C
P
P3 P4 P5 P6
P7
EX. VAV
TUB-2
EX. BMS
PANEL
1 6
P2
PUMP-2
P1
PUMP-1
DEMOLITION GENERAL NOTES
1. THE VA PRESENTLY HAS GROUND WATER PUMPS IN BUILDING 30 THAT REPORT TO
THE BUILDING 11 BOILER PLANT VIA THE FIRE ALARM SYSTEM OWNED BY JOHNSON
CONTROLS (SIMPLEX) FOR PUMPS (P3, P4, P5, P6 AND P7). PUMPS P1 AND P2 ARE
CURRENTLY ON THE EXISTING BUILDING MANAGEMENT SYSTEMS (BMS) OPERATED BY
U&S SERVICES. THE OBJECTIVE IS TO REMOVE THE SUPERVISORY POINTS ON THE
EXISTING FIRE ALARM SYSTEM OPERATED BY JOHNSON CONTORLS FOR THE GROUND
WATER PUMPS IN BUILDING 30 AND ADD THESE TO THE BMS OPERATED BY U&S
SERVICES. ALL OF GROUND WATER PUMPS FOR BUILDING 30 AT THE END OF THIS
PROJECT SHALL BE OFF THE EXISTING FIRE ALARM SYSTEM AND ON THE BMS SYSTEM
ONLY.
2. THE SUPERVISORY NODES ON THE FIRE ALARM CONTROL PANEL ADDRESSES THAT
SHALL BE REMOVED AND PROGRAMMED OFF OF THE VA FIRE ALARM SYSTEM CAMPUS
WIDE SYSTEM ARE AS FOLLOWS: OUTDOOR WELL PUMP 30:M1-96-0, SANITARY PUMP
30:M1-97-0, DRAIN PUMP 30:M1-98-0.
3. JOHNSON CONTROLS IS THE SERVICE PROVIDER TO THE WNY VA BATAVIA FOR THE
FIRE ALARM SYSTEM. AS OF JUNE 2021 THE VA HAS A 5-YEAR WARRANTY/SERVICE
AGREEMENT WITH JOHNSON CONTROLS THAT WILL NOT EXPIRE UNTIL MAY 2026. THE
POINT OF CONTACT AT JOHNSON CONTROLS IS SCOTT SPONHOLTZ AT(585) 475-1710.
4. ALL WORK PERFORMED ON THE FIRE ALARM SYSTEM SHALL NOT VOID THE 5-YEAR
SERVICE AGREEMENT THAT THE VA HAS WITH JOHNSON CONTROLS. THE
CONTRACTOR SHALL PROVIDE A LETTER FROM JOHNSON CONTROLS THAT THE WORK
PERFORMED ON THIS CONTRACT WILL NOT VOID ANY EXISTING SERVICE AGREEMENT /
WARRANTY WITH THE VA.
5. THE EXISTING FIRE ALARM CONTROL PANEL (FACP) IS A SIMPLEX 4100 ES INSTALLED IN
2013 BY JOHNSON CONTROLS/SIMPLEX.
6. U&S SERVICES IS THE SERVICE PROVIDER FOR THE BATAVIA BUILDING MANAGEMENT
SYSTEM (BMS) AND HAS A SERVICE AGREEMENT AS OF DECEMBER 2021. THE POINT OF
CONTACT IS DAN FAES AT (716) 693-4490 EXT 1202. 95 STARK ROAD, BUFFALO, N.Y.
14150. ANY WORK PERFORMED ON THE BMS SYSTEM SHALL NOT VOID ANY EXISTING
CONTRACT THAT THE VA HAS WITH U&S SERVICES.
7. ALL WORK FOR THE FIRE ALARM SYSTEM AND BUILDING MANAGEMENT SYSTEM SHALL
BE ADDED TO THE EXISTING AGREEMENT THAT THE VA HAS WITH BOTH JOHNSON
CONTROLS AND U&S SERVICES AND EACH VENDOR SHALL PROVIDE DOCUMENTATION
TO THE VA COR AGREEING TO THE CONTRACT REQUIREMENTS THAT ARE
PRE-EXISTING WITH ADDING THESE SERVICES IN THIS CONTRACT.
8. PHASING: THE CONTRACTOR SHALL COORDINATE WITH JOHNSON CONTROLS, U&S
SERVICES AND THE VA COR FOR THE CROSSOVER OF THESE TWO SYSTEMS. THE VA
WILL NEED TO KEEP A SYSTEM OPERATIONAL SO AT THE BOILER PLANT (BUILDING 11)
A PUMP SHOULD GO DOWN IN BUILDING 30. THE CROSSOVER BETWEEN JOHNSON
CONTROLS AND U&S SERVICES WILL HAVE TO BE COMPLETED IN ONE BUSINESS DAY
SO THAT THE VA WILL NOT LOSE COVERAGE OF THE EXISTING PUMPS.
9. A PAIR OF CONDUCTORS (WIRES) FOR CONTROL PURPOSES ON THIS CONTRACT
CONSISTS OF A BLACK AND WHITE INSULATED AND SHIELDED. COORDINATE WITH U&S
SERVICES AND PROVIDE A SUBMITTAL TO THE VA FOR APPROVAL PRIOR TO
INSTALLING ANY BMS CONDUCTORS.
10. ALL NEW CONTROL SYSTEMS ON THIS CONTRACT SHALL RECEIVE NEW CONDUCTORS
FROM THE PUMPS TO THE TERMINATING POINTS IN EITHER THE BMS PANEL OR VAV
TUB-2 AS INDICATED. THE CONDUIT SHALL BE NEW WITH THE EXCEPTION PUMP P7.
PUMP P7 WILL SALVAGE SOME EXISTING CONDUIT, PROVIDE A JUNCTION BOX AND ADD
CONDUIT TO ITS TERMINATING POINT. IF THE CONTRACTOR BELIEVES THAT EXISTING
CONDUIT CAN BE RE-USED THIS SHALL BE REVIEWED AND APPROVED BY THE VA COR
IN WRITING PRIOR TO PROCEEDING.
11. ANY CONDUIT THAT IS REMOVED, IF THERE IS A HOLE IN A WALL OR CEILING SHALL BE
FILLED AS PER THE MATERIAL THAT PERTAINS TO THAT SYSTEM. EXAMPLE: CONCRETE
TO BE FILLED WITH CONCRETE OR DRYWALL WITH A DRYWALL PATCH OF SIMILAR
THICKNESS AND TYPE. THERE SHALL BE NO PENETRATIONS THAT ARE NOT FILLED AND
SEALED TO BE REVIEWED AND INSPECTED BY VA COR FOR ACCEPTANCE.
ELECTRICAL GENERAL NOTES
THE EXISTING FIRE ALARM SYSTEM HAS SUPERVISORY POINTS IN BUILDING 30 FOR THE
PUMPS SHOWN ON THIS DRAWING (P3, P4, P5, P6 AND P7). THE SUPERVISORY POINTS ON
THE FIRE ALARM CONTROL PANEL (FACP) FOR THE GROUND WATER AND SUMP PUMPS
IDENTIFIED SHALL BE REMOVED FROM THE FIRE ALARM SYSTEM CAMPUS WIDE. THE
ENTIRE FIRE ALARM SYSTEM CAMPUS WIDE SHALL BE RE-PROGRAMMED TO REMOVE THE
SUPERVISORY POINTS FOR THESE SUBJECT PUMPS.
THE EXISTING RELAYS IN EACH BOX IDENTIFIED AS CR7 AND CURRENTLY BEING USED FOR
THE FACP SUPERVISORY NODE. THESE RELAYS SHALL BE SAVED AND WILL BE USED BY
U&S SERVICES (ANDOVER CONTROLS) TO CONNECT TO THE VA BUILDING MANAGEMENT
SYSTEM (BMS).
REMOVE THE FIRE ALARM RELAYS AND CONDUCTORS THAT CONNECT PUMPS P3 THROUGH
P6 TO THE FACP.
THE PUMPS P1 AND P2 ARE PRESENTLY CONNECTED TO THE EXISTING BMS SYSTEM WITH
U&S SERVICES CAMPUS WIDE THROUGH THE EXISTING VAV TUB-2 BOX LOCATED ON THIS
DRAWING.
REMOVE CONDUCTORS FROM EXISTING VAV TUB-2 TO THE PUMPS IN PUMPS STATION, P1
AND P2. IF THE CONDUIT OR THE CONDUIT PENETRATION CAN BE RE-USED FOR NEW
CONDUIT, REFER TO GENERAL NOTES 10 AND 11 ON DRAWING ESD101, OTHERWISE REFER
TO DRAWING ES101 FOR NEW WORK.
REMOVE CONDUCTORS FROM PUMP P7 BACK TO FIRE ALARM CONTROL PANEL. CONDUIT
SHALL REMAIN TO BE RE-USED.
DISENGAGE THE LOCAL AUDIBLE ALARM ON THESE BOES AFTER THE ALARMS FOR THE BMS
SYSTEMS ARE SET UP. REFER TO DRAWINGS ES101 AND ES102.
8/1/2022
Batavia VA Medical Center Batavia, NY
528A4-18-203
CHRIS GEARY PE# 099085
Schadler/Waldron Geary
Project Number
Building Number
Sheet Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
REVISED PER CONFERENCE CALL ON MARCH 9, 2021
REVISED PER 60% DESIGN REVIEW LETTERS
REVISED PER 90% DESIGN REVIEW LETTERS
REVISED PER FONT ISSUE/LINE ISSUE
5/11/2021 9/10/2021 2/4/2022 7/26/2022
ED101
20 23
Improve Ground Water, Building 30
Electrical Systems Demolition Plan Bid Documents For Construction
N
File details come from the government source that posted it. Updated .