20. ED101 Electrical Systems Demolition Plan.pdf

PDF 478 KB Posted

Attached to
Z1DA--528A4-18-203 GROUND WATER MITIGATION BUILDING 30
Solicitation number
36C24222B0037
Issued by

About this file

This document package includes an electrical systems demolition plan drawing and related federal contract opportunity notice. The demolition plan drawing provides details for removing ground water pump supervisory points from an existing fire alarm system and transitioning them to a building management system. It specifies removing relay boards and conductors from pumps to disconnect them from the fire alarm control panel and notes where existing conduit and relays can be reused. The opportunity notice is for project 528A4-18-203 to perform ground water mitigation work at the Batavia VA Medical Center in Batavia, New York. The solicitation number is 36C24222B0037 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2.

View the file

Other files

File Type Posted
36C24222B0037 0005.docx DOCX document
014529-Testing_Laboratory.pdf PDF
333000 - Sanitary Sewer Utilities.pdf PDF
079200-Joint_Sealant.pdf PDF
12. CG101 Erosion and Sedimentation Control Plan A.pdf PDF
260519-Low-Voltage_EPower_Cond_and_Cables.pdf PDF
040100-Maintenance_of_Masonry.pdf PDF
15. CS501 Construction Details.pdf PDF
220523-General_Duty_Valves_for_Plumbing_Piping.pdf PDF
022113-Site_Survey.pdf PDF
13. CG102 Erosion and Sedimentation Control Plan B.pdf PDF
015719-Temporary_Enviromental_Controls.pdf PDF
3. GI003 Contractor Submittal List.pdf PDF
23. EP101 Power Basement New Work Plan.pdf PDF
101400-Signage.pdf PDF
312011-Earthwork_Short_Form.pdf PDF
018113-Sustanabile_Construction_Requirements.pdf PDF
36C24222B0037 0004.pdf PDF
220511-Common_Work_Results_for_Plumbing.pdf PDF
010000-General_Requirements.pdf PDF
329000-Planting.pdf PDF
4. CD100 Overall Existing Features Plan.pdf PDF
16. CS502 Construction Details.pdf PDF
260526-Grounding_and_Bonding_for_Electrical_Systems.pdf PDF
024100-Demolition.pdf PDF
055000-Metal_Fabrication.pdf PDF
6. CD102 Existing Features and Demolition Plan B.pdf PDF
000115-List_of_Drawings.pdf PDF
260541-Underground_Electrical_Construction.pdf PDF
262911-Motor_Controllers.pdf PDF
Drawings Amendment 2.pdf PDF
1. GI001 Title Sheet.pdf PDF
321723-Pavement_Markings.pdf PDF
18. PP101 Plumbing Piping Plan.pdf PDF
320523-Cement_and_Conc_for_Ext_Imp.pdf PDF
040513-Masonry_Mortaring.pdf PDF
11. CU103 Groundwater Force Main Plan & Profile C.pdf PDF
321216-Asphalt_Paving.pdf PDF
2. GI002 General Notes Sheet.pdf PDF
17. CS503 Construction Details.pdf PDF
220512-General_Motor_Requirements_for_Plumbing_Equipment.pdf PDF
334000-Storm_Sewer_Utilities.pdf PDF
312319-Dewatering.pdf PDF
14. CG103 Erosion and Sedimentation Control Plan C.pdf PDF
014219-Reference_Standards.pdf PDF
10. CU102 Groundwater Force Main Plan & Profile B.pdf PDF
_CoverBatavia.pdf PDF
033053-Concrete_Short_Form.pdf PDF
323113-Chain_Link_Fences_and_Gates.pdf PDF
21. ES101 Electrical Systems New Work Plan.pdf PDF
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

B001

DATA

B002

ELEC

B003

CRAWL SPACE

CRAWL SPACE

AREAWAY

AREAWAY

B

B

D

D

L

L

P

PE K

QC M

A

F

F

G

G

H

H

J

J N

MECHANICAL

ROOM

CR7 CR7

FA RELAYS

FA

C

P

P3 P4 P5 P6

P7

EX. VAV

TUB-2

EX. BMS

PANEL

1 6

P2

PUMP-2

P1

PUMP-1

DEMOLITION GENERAL NOTES

1. THE VA PRESENTLY HAS GROUND WATER PUMPS IN BUILDING 30 THAT REPORT TO

THE BUILDING 11 BOILER PLANT VIA THE FIRE ALARM SYSTEM OWNED BY JOHNSON

CONTROLS (SIMPLEX) FOR PUMPS (P3, P4, P5, P6 AND P7). PUMPS P1 AND P2 ARE

CURRENTLY ON THE EXISTING BUILDING MANAGEMENT SYSTEMS (BMS) OPERATED BY

U&S SERVICES. THE OBJECTIVE IS TO REMOVE THE SUPERVISORY POINTS ON THE

EXISTING FIRE ALARM SYSTEM OPERATED BY JOHNSON CONTORLS FOR THE GROUND

WATER PUMPS IN BUILDING 30 AND ADD THESE TO THE BMS OPERATED BY U&S

SERVICES. ALL OF GROUND WATER PUMPS FOR BUILDING 30 AT THE END OF THIS

PROJECT SHALL BE OFF THE EXISTING FIRE ALARM SYSTEM AND ON THE BMS SYSTEM

ONLY.

2. THE SUPERVISORY NODES ON THE FIRE ALARM CONTROL PANEL ADDRESSES THAT

SHALL BE REMOVED AND PROGRAMMED OFF OF THE VA FIRE ALARM SYSTEM CAMPUS

WIDE SYSTEM ARE AS FOLLOWS: OUTDOOR WELL PUMP 30:M1-96-0, SANITARY PUMP

30:M1-97-0, DRAIN PUMP 30:M1-98-0.

3. JOHNSON CONTROLS IS THE SERVICE PROVIDER TO THE WNY VA BATAVIA FOR THE

FIRE ALARM SYSTEM. AS OF JUNE 2021 THE VA HAS A 5-YEAR WARRANTY/SERVICE

AGREEMENT WITH JOHNSON CONTROLS THAT WILL NOT EXPIRE UNTIL MAY 2026. THE

POINT OF CONTACT AT JOHNSON CONTROLS IS SCOTT SPONHOLTZ AT(585) 475-1710.

4. ALL WORK PERFORMED ON THE FIRE ALARM SYSTEM SHALL NOT VOID THE 5-YEAR

SERVICE AGREEMENT THAT THE VA HAS WITH JOHNSON CONTROLS. THE

CONTRACTOR SHALL PROVIDE A LETTER FROM JOHNSON CONTROLS THAT THE WORK

PERFORMED ON THIS CONTRACT WILL NOT VOID ANY EXISTING SERVICE AGREEMENT /

WARRANTY WITH THE VA.

5. THE EXISTING FIRE ALARM CONTROL PANEL (FACP) IS A SIMPLEX 4100 ES INSTALLED IN

2013 BY JOHNSON CONTROLS/SIMPLEX.

6. U&S SERVICES IS THE SERVICE PROVIDER FOR THE BATAVIA BUILDING MANAGEMENT

SYSTEM (BMS) AND HAS A SERVICE AGREEMENT AS OF DECEMBER 2021. THE POINT OF

CONTACT IS DAN FAES AT (716) 693-4490 EXT 1202. 95 STARK ROAD, BUFFALO, N.Y.

14150. ANY WORK PERFORMED ON THE BMS SYSTEM SHALL NOT VOID ANY EXISTING

CONTRACT THAT THE VA HAS WITH U&S SERVICES.

7. ALL WORK FOR THE FIRE ALARM SYSTEM AND BUILDING MANAGEMENT SYSTEM SHALL

BE ADDED TO THE EXISTING AGREEMENT THAT THE VA HAS WITH BOTH JOHNSON

CONTROLS AND U&S SERVICES AND EACH VENDOR SHALL PROVIDE DOCUMENTATION

TO THE VA COR AGREEING TO THE CONTRACT REQUIREMENTS THAT ARE

PRE-EXISTING WITH ADDING THESE SERVICES IN THIS CONTRACT.

8. PHASING: THE CONTRACTOR SHALL COORDINATE WITH JOHNSON CONTROLS, U&S

SERVICES AND THE VA COR FOR THE CROSSOVER OF THESE TWO SYSTEMS. THE VA

WILL NEED TO KEEP A SYSTEM OPERATIONAL SO AT THE BOILER PLANT (BUILDING 11)

A PUMP SHOULD GO DOWN IN BUILDING 30. THE CROSSOVER BETWEEN JOHNSON

CONTROLS AND U&S SERVICES WILL HAVE TO BE COMPLETED IN ONE BUSINESS DAY

SO THAT THE VA WILL NOT LOSE COVERAGE OF THE EXISTING PUMPS.

9. A PAIR OF CONDUCTORS (WIRES) FOR CONTROL PURPOSES ON THIS CONTRACT

CONSISTS OF A BLACK AND WHITE INSULATED AND SHIELDED. COORDINATE WITH U&S

SERVICES AND PROVIDE A SUBMITTAL TO THE VA FOR APPROVAL PRIOR TO

INSTALLING ANY BMS CONDUCTORS.

10. ALL NEW CONTROL SYSTEMS ON THIS CONTRACT SHALL RECEIVE NEW CONDUCTORS

FROM THE PUMPS TO THE TERMINATING POINTS IN EITHER THE BMS PANEL OR VAV

TUB-2 AS INDICATED. THE CONDUIT SHALL BE NEW WITH THE EXCEPTION PUMP P7.

PUMP P7 WILL SALVAGE SOME EXISTING CONDUIT, PROVIDE A JUNCTION BOX AND ADD

CONDUIT TO ITS TERMINATING POINT. IF THE CONTRACTOR BELIEVES THAT EXISTING

CONDUIT CAN BE RE-USED THIS SHALL BE REVIEWED AND APPROVED BY THE VA COR

IN WRITING PRIOR TO PROCEEDING.

11. ANY CONDUIT THAT IS REMOVED, IF THERE IS A HOLE IN A WALL OR CEILING SHALL BE

FILLED AS PER THE MATERIAL THAT PERTAINS TO THAT SYSTEM. EXAMPLE: CONCRETE

TO BE FILLED WITH CONCRETE OR DRYWALL WITH A DRYWALL PATCH OF SIMILAR

THICKNESS AND TYPE. THERE SHALL BE NO PENETRATIONS THAT ARE NOT FILLED AND

SEALED TO BE REVIEWED AND INSPECTED BY VA COR FOR ACCEPTANCE.

ELECTRICAL GENERAL NOTES

THE EXISTING FIRE ALARM SYSTEM HAS SUPERVISORY POINTS IN BUILDING 30 FOR THE

PUMPS SHOWN ON THIS DRAWING (P3, P4, P5, P6 AND P7). THE SUPERVISORY POINTS ON

THE FIRE ALARM CONTROL PANEL (FACP) FOR THE GROUND WATER AND SUMP PUMPS

IDENTIFIED SHALL BE REMOVED FROM THE FIRE ALARM SYSTEM CAMPUS WIDE. THE

ENTIRE FIRE ALARM SYSTEM CAMPUS WIDE SHALL BE RE-PROGRAMMED TO REMOVE THE

SUPERVISORY POINTS FOR THESE SUBJECT PUMPS.

THE EXISTING RELAYS IN EACH BOX IDENTIFIED AS CR7 AND CURRENTLY BEING USED FOR

THE FACP SUPERVISORY NODE. THESE RELAYS SHALL BE SAVED AND WILL BE USED BY

U&S SERVICES (ANDOVER CONTROLS) TO CONNECT TO THE VA BUILDING MANAGEMENT

SYSTEM (BMS).

REMOVE THE FIRE ALARM RELAYS AND CONDUCTORS THAT CONNECT PUMPS P3 THROUGH

P6 TO THE FACP.

THE PUMPS P1 AND P2 ARE PRESENTLY CONNECTED TO THE EXISTING BMS SYSTEM WITH

U&S SERVICES CAMPUS WIDE THROUGH THE EXISTING VAV TUB-2 BOX LOCATED ON THIS

DRAWING.

REMOVE CONDUCTORS FROM EXISTING VAV TUB-2 TO THE PUMPS IN PUMPS STATION, P1

AND P2. IF THE CONDUIT OR THE CONDUIT PENETRATION CAN BE RE-USED FOR NEW

CONDUIT, REFER TO GENERAL NOTES 10 AND 11 ON DRAWING ESD101, OTHERWISE REFER

TO DRAWING ES101 FOR NEW WORK.

REMOVE CONDUCTORS FROM PUMP P7 BACK TO FIRE ALARM CONTROL PANEL. CONDUIT

SHALL REMAIN TO BE RE-USED.

DISENGAGE THE LOCAL AUDIBLE ALARM ON THESE BOES AFTER THE ALARMS FOR THE BMS

SYSTEMS ARE SET UP. REFER TO DRAWINGS ES101 AND ES102.

8/1/2022

Batavia VA Medical Center Batavia, NY

528A4-18-203

CHRIS GEARY PE# 099085

Schadler/Waldron Geary

Project Number

Building Number

Sheet Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

REVISED PER CONFERENCE CALL ON MARCH 9, 2021

REVISED PER 60% DESIGN REVIEW LETTERS

REVISED PER 90% DESIGN REVIEW LETTERS

REVISED PER FONT ISSUE/LINE ISSUE

5/11/2021 9/10/2021 2/4/2022 7/26/2022

ED101

20 23

Improve Ground Water, Building 30

Electrical Systems Demolition Plan Bid Documents For Construction

N

File details come from the government source that posted it. Updated .