18. PP101 Plumbing Piping Plan.pdf
PDF 2 MB Posted
- Solicitation number
- 36C24222B0037
About this file
This document includes a plumbing piping plan drawing and related federal contract solicitation. The plumbing piping plan drawing provides details for installing new 3-inch PVC piping in the basement and crawl space of Building 30 at the Batavia VA Medical Center in Batavia, New York. It specifies pipe routing and supports, notes confined space entry requirements, and provides penetration details.
The related federal contract solicitation is seeking offers to perform ground water mitigation work at Building 30, including installing the new piping shown in the plan drawing. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2. No other details are provided about response dates, award dates, pricing terms, set asides or incumbent contractors. The solicitation and drawing provide information needed by offerors to prepare proposals for the ground water mitigation and plumbing work at Building 30.
View the file
Other files
Show 40 more
Latest 50 of 76 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L
P
K L M
BASEMENT PLAN - PLUMBING PIPING PLAN
1/8" = 1'-0"
N P Q
EXISTING PERMANENT
PUMP STATION
INVERT ELEVATION
898.33'
EX. 3"Ø SCH 80
PVC PIPE
DISCONNECTED
AND REMOVED
CO
EXISTING SUMP
PUMPS AND PIT
NEW 3"Ø FORCEMAIN. SEE
CIVIL PLANS FOR
CONTINUATION
NEW 3"Ø SCH 80
PVC PIPE 45 UP
OVER DUCT WORK
NEW 3"Ø SCH 80 PVC PIPE DN. EXTEND
THROUGH 14" CONCRETE WALL. OPENING
IN WALL IS EXISTING.
NEW 3"Ø SCH 80 PVC
PIPE CONNECT TO EX.
3"Ø SCH 80 PIPE
NEW 3"Ø SCH 80 PVC PIPE AT CRAWL
SPACE FLOOR LVL HUNG FROM CRAWL
SPACE CEILING
CAP
'-6
NEW 3"Ø SCH 80
PVC PIPE 45 DN
V.
I.F
'-6
1/8" SLOPE SEE NOTES 1/8" SLOPE SEE NOTES
1/ 8"
S
LO
PE
S
EE
N
OT
ES
DUCT WORK T.O.D. IS ABOUT AT
BOTTOM OF STEEL I-BEAM.
DUCT WORK IS INSTALLED JUST ABOVE
NEW 3" PVC GROUND WATER PIPE INSTALL
& WILL NOT AFFECT NEW PIPE INSTALL.
4" STEEL SANITARY PIPE UP
4" STEEL SANITARY PIPE
4" STEEL FIRE
PREVENTION PIPE
4" STEEL DOMESTIC
CHILLED WATER
8"Ø DUCT UP
HOT WATER
PIPE UP
HOT WATER
PIPE UP
PIPE RACK
PP101
PP101
CRAWL SPACE
FULL HEIGHT
BASEMENT
8/1/2022
Batavia VA Medical Center Batavia, NY
528A4-18-203
CHRIS GEARY PE# 099085
Schadler/Waldron Geary
Project Number
Building Number
Sheet Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
PP101
18 23
DIRECTION OF FLOW
PIPE DROP
CONTINUE OF PIPE
PIPE RISE
NOTES:
1. SUPPORT PIPING IN METAL CEILING AND HANG OFF METAL
i-BEAMS AS SHOWN IN DETAIL.
2. ALL NEW 3"Ø SCHEDULE 80 PIPING SHALL TO BE SLOPED CODE
COMPLIANT. "REFER TO IPC SECTION 704".
3. IN CRAWL SPACE WHEN HANGING PIPE FROM CEILING, THE
CONTRACTOR SHALL ADJUST AROUND OTHER PIPING AND DUCT
WORK.
4. NEW 3" PVC SCHEDULE 80 PIPE SHALL RUN FROM MAIN
BASEMENT TO CRAWL SPACE THROUGH AN EXISTING DRILLED
HOLE NEXT TO STAIRS.
5. NEW 3"Ø SCHEDULE 80 PVC PIPE SHALL BE SUPPORTED EVERY
4 FEET. REFER TO IPC 308 "PIPE SUPPORT".
6. CONTRACTOR SHALL INSTALL NEW 3"Ø SCHEDULE PIPE
BETWEEN THE FIRE PREVENTION PIPE AND DUCT WORK.
7. THE NEW 3" PVC PIPE SHALL BE INSTALLED AT THE SAME HEIGHT
AS FIRE PREVENTION MAIN.
8. NEW 3"Ø SCH 80 PVC PIPE SHALL BE SUPPORTED TO IPC 308
"PIPE SUPPORT" SECTION.
9. CONTRACTOR SHALL PROVIDE A CONFINED SPACE WORK PLAN
TO WORK IN PUMP STATION OUTSIDE OF BUILDING 30. THE
CONTRACTOR IS REQUIRED TO HAVE A FOREMAN WITH A 30
HOUR OSHA CARD AND ALL WORKERS WITH 10 HOUR OSHA
CARDS. THE OSHA TRAINING SHALL BE COMPLETED WITHIN THE
PAST THREE YEARS FOR FOREMAN AND WORKERS. THE
FOREMAN AND WORKERS SHALL ALSO HAVE CONFINED SPACE
TRAINING DOCUMENTATION COMPLETED WITHIN THE PAST
YEAR. THIS CONFINED SPACE SYSTEM SHALL INCLUDE BUT IS
NOT LIMITED TO HAVING A LIFT SYSTEM TO REMOVE ANY
WORKERS IN THE EVENT OF AN EMERGENCY. THIS PLAN IS
REQUIRED FOR VA SAFETY TO REVIEW AND APPROVE. PROVIDE
THIS PLAN AS SOON AS THE PROJECT IS AWARDED. THE
CONTRACTOR SHALL MEASURE THE PUMP STATION TRACKS AND
SPACE FOR THE NEW PUMPS TO VERIFY PRIOR TO OPERATING
NEW PUMPS.
10. CONTRACTORS SHALL SURVEY BOTH THE BASEMENT AND
CRAWL SPACE TO VERIFY EXISTING MECHANICAL AND
ELECTRICAL CONDITIONS PRIOR TO BIDDING TO UNDERSTAND
WHAT IS ENTAILED IN ROUTING THE NEW PIPE. ALL EXISTING
CONDITIONS ARE NOT SHOWN ON PLANS. CALL VA FOR SITE
VISIT PRIOR TO BIDDING.
11. THERE IS AN EXISTING STEAM AND STEAM CONDENSATE
RETURN PIPING IN THE CRAWL SPACE THAT THE CONTRACTOR
SHALL WORK AROUND TO INSTALL 3" SCHEDULE 80 PVC PIPING.
THE CRAWL SPACE HAS A GRAVEL FLOOR AND IS NOT
ILLUMINATED.
LEGEND:
TOLCO
BUILDING STEEL
HOLDING
SCREW
'C' CLAMP
1/2" THREADED ROD
CLEVIS HANGER
TYPICAL CLEVIS PIPE HANGER DETAIL I-BEAMTYPICAL CLEVIS PIPE HANGER DETAIL
GROUND WATER PIPING
ATTACH TO UNDERSIDE OF STRUCTURE
DOUBLE NUT
CLEVIS HANGER
1/2" THREADED ROD
PIPE
3"Ø SCHEDULE 80
PVC PIPE
GASKETING SYSTEM
SEE NOTE 2 BELOW
NOTES
1. CONTRACTOR RESPONSIBLE FOR ALL CORE DRILL THAT PERTAINS TO THIS WORK, COORDINATE
WITH ALL TRADES IN FIELD.
2. CONTRACTOR SHALL INSTALL WATER TIGHT WALL PENETRATION SEAL. MANUFACTURE SHALL BE:
GARLOCK SEAL LINK PRODUCT OR APPROVED EQUAL.
3. CONTRACTOR TO REFER TO SECTION 308 (PIPING SUPPORT) AND TABLE 308.5 (HANGER SPACING)
IN THE IPC.
4. CONTRACTOR TO INSTALL PIPE PENETRATION COMPLIANT TO SECTION 315 OF THE IPC.
5. ALL HARDWARE FOR ANCHOR SUPPORT SHALL BE SUPPLIED BY CONTRACTOR.
6. THE CONTRACTOR SHALL INSTALL A PIPE TRANSITION FOR PVC/HDPE FITTING. THE FITTING SHALL
BE A POLY-CAM SERIES 730 TRANSITION FOR PVC/HDPE OR APPROVED EQUAL.
STEEL CEILING PLATE 1 3/8" X 3 5/16" X 1/2" THICK W/TREADED
ROD RECEIVER AND (2) 3/16" X 1 3/4" SELF TAPPING CONCRETE
SCREWS
1/2" TREADED ROD
TYPICAL CLEVIS PIPE HANGER DETAIL METAL CEILING
SEE NOTE 5
Bid Documents For Construction
Plumbing Piping Plan
DETAIL NUMBER
DETAIL SHEET
CLEVIS HANGER
Improve Ground Water, Building 30
TYPICAL PIPE PENETRATION DETAIL
3" 4'
PIPE SIZE HORIZONTAL
IPC - TABLE 308.5
MAX.
10'
VERTICAL
MAX.
POINT OF CONNECTION
BETWEEN NEW & EXISTING
ABBREVIATIONS:
CO CLEANOUT
DN DOWN
EX EXISTING
IPC INTERNATIONAL PLUMBING CODE
LVL LEVEL
PVC POLYVINYL CHLORIDE
SCH SCHEDULE
TOD TOP OF DUCT
VIF VERIFY IN FIELD
EXTERIOR SIDE OF
BUILDING WALL
INTERIOR SIDE OF
BUILDING WALL
CO
RE
D
RI
LL
O
PE
NI
NG
IN
E
XI
ST
IN
G
CO
NC
RE
TE
A
T
SI
ZE
R
EC
OM
M
EN
DE
D
BY
GA
SK
ET
IN
G
SY
ST
EM
S
MA
NU
FA
CT
UR
ER
CO
RE
D
RI
LL
O
PE
NI
NG
IN
E
XI
ST
IN
G
CO
NC
RE
TE
A
T
SI
ZE
R
EC
OM
ME
ND
ED
B
Y
GA
SK
ET
IN
G
SY
ST
EM
S
M
AN
UF
AC
TU
RE
R. 2"Ø SCHEDULE 40
PVC PIPE (2 TOTAL)
EXTERIOR SIDE OF
BUILDING WALL
INTERIOR SIDE OF
BUILDING WALL
GASKETING SYSTEM
SEE NOTE 2 BELOW
3" PVC PENETRATION SIDE VIEW 2" PVC PENETRATION SIDE VIEW
NTS NTS NTS
NTS
2"Ø SCHEDULE 40 PVC
PIPE W/ WATER TIGHT
GASKETING SYSTEM
3"Ø SCHEDULE 80 PVC
PIPE W/ WATER TIGHT
GASKETING SYSTEM
12"4.
5'
MI
N.
C
OV
ER
FR
OM
E
XI
ST
IN
G
GR
AD
E
3' M
IN
. C
OV
ER
FR
OM
EX
IS
TI
NG
GR
AD
E
FRONT VIEW OF EXTERIOR WALL
END CAP
THE CRAWL IS A CONFINED SPACE. ALL LOCAL,
STATE AND FEDERAL PERMITS SHALL APPLY. THE
CONTRACTOR IS RESPONSIBLE TO OBTAIN ANY
NECESSARY PERMITS TO ENTER THE SPACE.
AutoCAD SHX Text
REVISED PER CONFERENCE CALL ON MARCH 9, 2021
AutoCAD SHX Text
REVISED PER 60% DESIGN REVIEW LETTERS
AutoCAD SHX Text
REVISED PER 90% DESIGN REVIEW LETTERS
AutoCAD SHX Text
REVISED PER FONT ISSUE/LINE ISSUE
AutoCAD SHX Text 5/11/2021
AutoCAD SHX Text 9/10/2021
AutoCAD SHX Text 2/4/2022
AutoCAD SHX Text 7/26/2022
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HANGER SPACING
File details come from the government source that posted it. Updated .