18. PP101 Plumbing Piping Plan.pdf

PDF 2 MB Posted

Attached to
Z1DA--528A4-18-203 GROUND WATER MITIGATION BUILDING 30
Solicitation number
36C24222B0037
Issued by

About this file

This document includes a plumbing piping plan drawing and related federal contract solicitation. The plumbing piping plan drawing provides details for installing new 3-inch PVC piping in the basement and crawl space of Building 30 at the Batavia VA Medical Center in Batavia, New York. It specifies pipe routing and supports, notes confined space entry requirements, and provides penetration details.

The related federal contract solicitation is seeking offers to perform ground water mitigation work at Building 30, including installing the new piping shown in the plan drawing. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2. No other details are provided about response dates, award dates, pricing terms, set asides or incumbent contractors. The solicitation and drawing provide information needed by offerors to prepare proposals for the ground water mitigation and plumbing work at Building 30.

View the file

Other files

File Type Posted
36C24222B0037 0005.docx DOCX document
014529-Testing_Laboratory.pdf PDF
333000 - Sanitary Sewer Utilities.pdf PDF
079200-Joint_Sealant.pdf PDF
12. CG101 Erosion and Sedimentation Control Plan A.pdf PDF
260519-Low-Voltage_EPower_Cond_and_Cables.pdf PDF
040100-Maintenance_of_Masonry.pdf PDF
15. CS501 Construction Details.pdf PDF
220523-General_Duty_Valves_for_Plumbing_Piping.pdf PDF
022113-Site_Survey.pdf PDF
13. CG102 Erosion and Sedimentation Control Plan B.pdf PDF
015719-Temporary_Enviromental_Controls.pdf PDF
3. GI003 Contractor Submittal List.pdf PDF
23. EP101 Power Basement New Work Plan.pdf PDF
101400-Signage.pdf PDF
312011-Earthwork_Short_Form.pdf PDF
018113-Sustanabile_Construction_Requirements.pdf PDF
36C24222B0037 0004.pdf PDF
220511-Common_Work_Results_for_Plumbing.pdf PDF
010000-General_Requirements.pdf PDF
329000-Planting.pdf PDF
4. CD100 Overall Existing Features Plan.pdf PDF
16. CS502 Construction Details.pdf PDF
260526-Grounding_and_Bonding_for_Electrical_Systems.pdf PDF
024100-Demolition.pdf PDF
055000-Metal_Fabrication.pdf PDF
6. CD102 Existing Features and Demolition Plan B.pdf PDF
000115-List_of_Drawings.pdf PDF
260541-Underground_Electrical_Construction.pdf PDF
262911-Motor_Controllers.pdf PDF
Drawings Amendment 2.pdf PDF
1. GI001 Title Sheet.pdf PDF
321723-Pavement_Markings.pdf PDF
320523-Cement_and_Conc_for_Ext_Imp.pdf PDF
040513-Masonry_Mortaring.pdf PDF
11. CU103 Groundwater Force Main Plan & Profile C.pdf PDF
321216-Asphalt_Paving.pdf PDF
2. GI002 General Notes Sheet.pdf PDF
17. CS503 Construction Details.pdf PDF
220512-General_Motor_Requirements_for_Plumbing_Equipment.pdf PDF
334000-Storm_Sewer_Utilities.pdf PDF
20. ED101 Electrical Systems Demolition Plan.pdf PDF
312319-Dewatering.pdf PDF
14. CG103 Erosion and Sedimentation Control Plan C.pdf PDF
014219-Reference_Standards.pdf PDF
10. CU102 Groundwater Force Main Plan & Profile B.pdf PDF
_CoverBatavia.pdf PDF
033053-Concrete_Short_Form.pdf PDF
323113-Chain_Link_Fences_and_Gates.pdf PDF
21. ES101 Electrical Systems New Work Plan.pdf PDF
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L

P

K L M

BASEMENT PLAN - PLUMBING PIPING PLAN

1/8" = 1'-0"

N P Q

EXISTING PERMANENT

PUMP STATION

INVERT ELEVATION

898.33'

EX. 3"Ø SCH 80

PVC PIPE

DISCONNECTED

AND REMOVED

CO

EXISTING SUMP

PUMPS AND PIT

NEW 3"Ø FORCEMAIN. SEE

CIVIL PLANS FOR

CONTINUATION

NEW 3"Ø SCH 80

PVC PIPE 45 UP

OVER DUCT WORK

NEW 3"Ø SCH 80 PVC PIPE DN. EXTEND

THROUGH 14" CONCRETE WALL. OPENING

IN WALL IS EXISTING.

NEW 3"Ø SCH 80 PVC

PIPE CONNECT TO EX.

3"Ø SCH 80 PIPE

NEW 3"Ø SCH 80 PVC PIPE AT CRAWL

SPACE FLOOR LVL HUNG FROM CRAWL

SPACE CEILING

CAP

'-6

NEW 3"Ø SCH 80

PVC PIPE 45 DN

V.

I.F

'-6

1/8" SLOPE SEE NOTES 1/8" SLOPE SEE NOTES

1/ 8"

S

LO

PE

S

EE

N

OT

ES

DUCT WORK T.O.D. IS ABOUT AT

BOTTOM OF STEEL I-BEAM.

DUCT WORK IS INSTALLED JUST ABOVE

NEW 3" PVC GROUND WATER PIPE INSTALL

& WILL NOT AFFECT NEW PIPE INSTALL.

4" STEEL SANITARY PIPE UP

4" STEEL SANITARY PIPE

4" STEEL FIRE

PREVENTION PIPE

4" STEEL DOMESTIC

CHILLED WATER

8"Ø DUCT UP

HOT WATER

PIPE UP

HOT WATER

PIPE UP

PIPE RACK

PP101

PP101

CRAWL SPACE

FULL HEIGHT

BASEMENT

8/1/2022

Batavia VA Medical Center Batavia, NY

528A4-18-203

CHRIS GEARY PE# 099085

Schadler/Waldron Geary

Project Number

Building Number

Sheet Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

PP101

18 23

DIRECTION OF FLOW

PIPE DROP

CONTINUE OF PIPE

PIPE RISE

NOTES:

1. SUPPORT PIPING IN METAL CEILING AND HANG OFF METAL

i-BEAMS AS SHOWN IN DETAIL.

2. ALL NEW 3"Ø SCHEDULE 80 PIPING SHALL TO BE SLOPED CODE

COMPLIANT. "REFER TO IPC SECTION 704".

3. IN CRAWL SPACE WHEN HANGING PIPE FROM CEILING, THE

CONTRACTOR SHALL ADJUST AROUND OTHER PIPING AND DUCT

WORK.

4. NEW 3" PVC SCHEDULE 80 PIPE SHALL RUN FROM MAIN

BASEMENT TO CRAWL SPACE THROUGH AN EXISTING DRILLED

HOLE NEXT TO STAIRS.

5. NEW 3"Ø SCHEDULE 80 PVC PIPE SHALL BE SUPPORTED EVERY

4 FEET. REFER TO IPC 308 "PIPE SUPPORT".

6. CONTRACTOR SHALL INSTALL NEW 3"Ø SCHEDULE PIPE

BETWEEN THE FIRE PREVENTION PIPE AND DUCT WORK.

7. THE NEW 3" PVC PIPE SHALL BE INSTALLED AT THE SAME HEIGHT

AS FIRE PREVENTION MAIN.

8. NEW 3"Ø SCH 80 PVC PIPE SHALL BE SUPPORTED TO IPC 308

"PIPE SUPPORT" SECTION.

9. CONTRACTOR SHALL PROVIDE A CONFINED SPACE WORK PLAN

TO WORK IN PUMP STATION OUTSIDE OF BUILDING 30. THE

CONTRACTOR IS REQUIRED TO HAVE A FOREMAN WITH A 30

HOUR OSHA CARD AND ALL WORKERS WITH 10 HOUR OSHA

CARDS. THE OSHA TRAINING SHALL BE COMPLETED WITHIN THE

PAST THREE YEARS FOR FOREMAN AND WORKERS. THE

FOREMAN AND WORKERS SHALL ALSO HAVE CONFINED SPACE

TRAINING DOCUMENTATION COMPLETED WITHIN THE PAST

YEAR. THIS CONFINED SPACE SYSTEM SHALL INCLUDE BUT IS

NOT LIMITED TO HAVING A LIFT SYSTEM TO REMOVE ANY

WORKERS IN THE EVENT OF AN EMERGENCY. THIS PLAN IS

REQUIRED FOR VA SAFETY TO REVIEW AND APPROVE. PROVIDE

THIS PLAN AS SOON AS THE PROJECT IS AWARDED. THE

CONTRACTOR SHALL MEASURE THE PUMP STATION TRACKS AND

SPACE FOR THE NEW PUMPS TO VERIFY PRIOR TO OPERATING

NEW PUMPS.

10. CONTRACTORS SHALL SURVEY BOTH THE BASEMENT AND

CRAWL SPACE TO VERIFY EXISTING MECHANICAL AND

ELECTRICAL CONDITIONS PRIOR TO BIDDING TO UNDERSTAND

WHAT IS ENTAILED IN ROUTING THE NEW PIPE. ALL EXISTING

CONDITIONS ARE NOT SHOWN ON PLANS. CALL VA FOR SITE

VISIT PRIOR TO BIDDING.

11. THERE IS AN EXISTING STEAM AND STEAM CONDENSATE

RETURN PIPING IN THE CRAWL SPACE THAT THE CONTRACTOR

SHALL WORK AROUND TO INSTALL 3" SCHEDULE 80 PVC PIPING.

THE CRAWL SPACE HAS A GRAVEL FLOOR AND IS NOT

ILLUMINATED.

LEGEND:

TOLCO

BUILDING STEEL

HOLDING

SCREW

'C' CLAMP

1/2" THREADED ROD

CLEVIS HANGER

TYPICAL CLEVIS PIPE HANGER DETAIL I-BEAMTYPICAL CLEVIS PIPE HANGER DETAIL

GROUND WATER PIPING

ATTACH TO UNDERSIDE OF STRUCTURE

DOUBLE NUT

CLEVIS HANGER

1/2" THREADED ROD

PIPE

3"Ø SCHEDULE 80

PVC PIPE

GASKETING SYSTEM

SEE NOTE 2 BELOW

NOTES

1. CONTRACTOR RESPONSIBLE FOR ALL CORE DRILL THAT PERTAINS TO THIS WORK, COORDINATE

WITH ALL TRADES IN FIELD.

2. CONTRACTOR SHALL INSTALL WATER TIGHT WALL PENETRATION SEAL. MANUFACTURE SHALL BE:

GARLOCK SEAL LINK PRODUCT OR APPROVED EQUAL.

3. CONTRACTOR TO REFER TO SECTION 308 (PIPING SUPPORT) AND TABLE 308.5 (HANGER SPACING)

IN THE IPC.

4. CONTRACTOR TO INSTALL PIPE PENETRATION COMPLIANT TO SECTION 315 OF THE IPC.

5. ALL HARDWARE FOR ANCHOR SUPPORT SHALL BE SUPPLIED BY CONTRACTOR.

6. THE CONTRACTOR SHALL INSTALL A PIPE TRANSITION FOR PVC/HDPE FITTING. THE FITTING SHALL

BE A POLY-CAM SERIES 730 TRANSITION FOR PVC/HDPE OR APPROVED EQUAL.

STEEL CEILING PLATE 1 3/8" X 3 5/16" X 1/2" THICK W/TREADED

ROD RECEIVER AND (2) 3/16" X 1 3/4" SELF TAPPING CONCRETE

SCREWS

1/2" TREADED ROD

TYPICAL CLEVIS PIPE HANGER DETAIL METAL CEILING

SEE NOTE 5

Bid Documents For Construction

Plumbing Piping Plan

DETAIL NUMBER

DETAIL SHEET

CLEVIS HANGER

Improve Ground Water, Building 30

TYPICAL PIPE PENETRATION DETAIL

3" 4'

PIPE SIZE HORIZONTAL

IPC - TABLE 308.5

MAX.

10'

VERTICAL

MAX.

POINT OF CONNECTION

BETWEEN NEW & EXISTING

ABBREVIATIONS:

CO CLEANOUT

DN DOWN

EX EXISTING

IPC INTERNATIONAL PLUMBING CODE

LVL LEVEL

PVC POLYVINYL CHLORIDE

SCH SCHEDULE

TOD TOP OF DUCT

VIF VERIFY IN FIELD

EXTERIOR SIDE OF

BUILDING WALL

INTERIOR SIDE OF

BUILDING WALL

CO

RE

D

RI

LL

O

PE

NI

NG

IN

E

XI

ST

IN

G

CO

NC

RE

TE

A

T

SI

ZE

R

EC

OM

M

EN

DE

D

BY

GA

SK

ET

IN

G

SY

ST

EM

S

MA

NU

FA

CT

UR

ER

CO

RE

D

RI

LL

O

PE

NI

NG

IN

E

XI

ST

IN

G

CO

NC

RE

TE

A

T

SI

ZE

R

EC

OM

ME

ND

ED

B

Y

GA

SK

ET

IN

G

SY

ST

EM

S

M

AN

UF

AC

TU

RE

R. 2"Ø SCHEDULE 40

PVC PIPE (2 TOTAL)

EXTERIOR SIDE OF

BUILDING WALL

INTERIOR SIDE OF

BUILDING WALL

GASKETING SYSTEM

SEE NOTE 2 BELOW

3" PVC PENETRATION SIDE VIEW 2" PVC PENETRATION SIDE VIEW

NTS NTS NTS

NTS

2"Ø SCHEDULE 40 PVC

PIPE W/ WATER TIGHT

GASKETING SYSTEM

3"Ø SCHEDULE 80 PVC

PIPE W/ WATER TIGHT

GASKETING SYSTEM

12"4.

5'

MI

N.

C

OV

ER

FR

OM

E

XI

ST

IN

G

GR

AD

E

3' M

IN

. C

OV

ER

FR

OM

EX

IS

TI

NG

GR

AD

E

FRONT VIEW OF EXTERIOR WALL

END CAP

THE CRAWL IS A CONFINED SPACE. ALL LOCAL,

STATE AND FEDERAL PERMITS SHALL APPLY. THE

CONTRACTOR IS RESPONSIBLE TO OBTAIN ANY

NECESSARY PERMITS TO ENTER THE SPACE.

AutoCAD SHX Text

REVISED PER CONFERENCE CALL ON MARCH 9, 2021

AutoCAD SHX Text

REVISED PER 60% DESIGN REVIEW LETTERS

AutoCAD SHX Text

REVISED PER 90% DESIGN REVIEW LETTERS

AutoCAD SHX Text

REVISED PER FONT ISSUE/LINE ISSUE

AutoCAD SHX Text 5/11/2021

AutoCAD SHX Text 9/10/2021

AutoCAD SHX Text 2/4/2022

AutoCAD SHX Text 7/26/2022

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HANGER SPACING

File details come from the government source that posted it. Updated .