23. EP101 Power Basement New Work Plan.pdf
PDF 492 KB Posted
- Solicitation number
- 36C24222B0037
About this file
This document includes an electrical plan and specifications for upgrades to the basement power and pump control systems at the Batavia VA Medical Center in Batavia, New York. The project involves removing circuits for pumps P5 and P6 from one electrical panel and extending the conductors and conduits to a second panel, installing a new control panel for pumps P1 and P2, adding NEMA 3R disconnects, and ensuring the new control panel includes visual alarms and maintains emergency power connections. The related federal contract opportunity is solicitation number 36C24222B0037 for ground water mitigation work at Building 30 of the Batavia VA Medical Center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 76 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P3 P4 P5 P6
P2
PUMP-2
P1
PUMP-1
1 1
EX. PANEL
BPCL1 EX. PANEL
BLSL1
NEW CONTROL PANEL
FOR P1 AND P2
NEW NEMA 3R
240V/60A/3PH
DISCONNECTS
NEW WORK GENERAL NOTES
1. REFER TO THE PLANS FOR EQUIPMENT LAYOUT. CLOSELY COORDINATE THE EXACT
LOCATION OF ALL OUTLETS AND DEVICES WITH ELEVATIONS. ADJUST LOCATIONS AND
MOUNTING HEIGHTS WHERE NECESSARY TO PREVENT INTERFERENCE WITH
FURNITURE, FIXED CASEWORK, EQUIPMENT, ETC. VERIFY ALL CHANGES PRIOR TO
ROUGH-IN.
2. EC SHALL VERIFY ALL EQUIPMENT LOCATIONS, MOUNTING HEIGHTS, AND CONNECTION
REQUIREMENTS (RECEPTACLES, SWITCHES, DISCONNECTS, ETC.) WITH EQUIPMENT
VENDOR PRIOR TO ROUGH-IN.
3. A DEDICATED NEUTRAL SHALL BE PROVIDED FOR EACH AND EVERY 120V AND 277V
BRANCH CIRCUIT. MULTIWIRE BRANCH CIRCUITS WITH SHARED NEUTRALS ARE NOT
PERMITTED.
4. PROVIDE #10 SIZE CONDUCTORS FOR 20A-120V CIRCUITS WITH DISTANCE LENGTHS
THAT EXCEED 100 FT.
5. EC IS RESPONSIBLE FOR SUBMITTING CONDUIT ROUTING COORDINATION DRAWINGS
WITH ELECTRICAL EQUIPMENT SUBMITTAL FOR APPROVAL. ROUTING DRAWINGS
SHALL INCLUDE FIELD VERIFIED ROUTING, BENDS, PULLBOXES, CONDUIT BODIES,
PENETRATIONS, ETC. EC SHALL INCLUDE EXISTING CONDITIONS WHERE NECESSARY
TO CONVEY ROUTING INFORMATION. MAINTAIN NEC REUIRED ACCESSIBILITY TO ALL
EXISTING PULLBOXES, JUNCTION BOXES, ETC. TO REMAIN. ELECTRICAL EQUIPMENT
SUBMITTAL WILL NOT BE APPROVED WITHOUT CONDUIT ROUTING DRAWINGS.
NEW WORK KEY NOTES
REMOVE THE CIRCUIT FOR PUMP P5 AND P6 FROM PANEL BPCL1 #37, 39 ,41 BY INSTALLING
A JUNCTION BOX IN THE ELECTRICAL ROOM AND EXTEND THE CONDUCTORS AND
CONDUITS TO PANEL BSLS1. CONNECT THE CONDUCTORS TO CIRCUIT #25, 27, 29 ON PANEL
BLSL1. CONTRACTOR SHALL UPDATE THE PANEL SCHEDULE. PROVIDE (4) #12AWG, (1) #10
GR IN 3/4"C EMT THHN COPPER CONDUCTORS.
EC SHALL REUSE THE UNDERGROUND CONDUITS AND UNISTRUT FOR THE EXISTING PUMP
CONTROL PANEL. THE VISUAL ALARM SHALL BE INCLUDED IN THE FUNCTIONS OF THE NEW
PUMP CONTROL PANEL. THE AUDIO ALARM (SPEAKER) SHALL BE REMOVED. THE EXISTING
3-PHASE RECEPTACLE AND POWER CONNECTION FOR EMERGENCY ANCILLARY PUMP
SHALL REMAIN AND CONNECT TO THE NEW PUMP CONTROL PANEL EMERGENCY POWER
SOURCE (BLSL1-26,28,30). REFER TO DUAL POWER PUMP CONTROL PANEL DETAIL ON E001.
NEW PUMP CONTROL PANEL MANUFACTURER: R.C.WORST @208-664-2133, 208-667-8775
NEW PUMP CONTROL PANEL MODEL SHALL BE Q-28575-1 TR OR APPROVED EQUIVALENT.
REFER TO THE PUMP CONTROL PANEL WIRING DETAIL AND PANEL SCHEDULES ON
DRAWING E001 FOR THE POWER CONNECTIONS.
8/1/2022
Batavia VA Medical Center Batavia, NY
528A4-18-203
CHRIS GEARY PE# 099085
Schadler/Waldron Geary
Project Number
Building Number
Sheet Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
REVISED PER CONFERENCE CALL ON MARCH 9, 2021
REVISED PER 60% DESIGN REVIEW LETTERS
REVISED PER 90% DESIGN REVIEW LETTERS
REVISED PER FONT ISSUE/LINE ISSUE
5/11/2021 9/10/2021 2/4/2022 7/26/2022
EP101
23 23
Power Basement New Work Plan Bid Documents For Construction
Improve Ground Water, Building 30
N
AutoCAD SHX Text J
File details come from the government source that posted it. Updated .