This document package includes an existing features and demolition plan drawing and details for a federal contract opportunity to improve groundwater mitigation at Building 30 on the Batavia VA Medical Center campus.

The drawing depicts existing site features to be removed or retained, including trees, pavement, fences and utilities. A test hole log provides soil data. Notes require the contractor to conduct test pits, stabilize soil after tree removal, and report any undiscovered conditions. A tree removal schedule specifies 18 trees of various diameters to be cut down, ground, and hauled off-site along with debris. Six additional trees may require removal if encountered during excavation of relatively rocky soil, which must also be removed from campus.

The related federal contract opportunity is solicitation number 36C24222B0037 to mitigate groundwater at Building 30 for the Department of Veterans Affairs Veterans Health Administration VISN 2. No other opportunity details are provided.

View the file

Other files

File Type Posted
36C24222B0037 0005.docx DOCX document
014529-Testing_Laboratory.pdf PDF
333000 - Sanitary Sewer Utilities.pdf PDF
079200-Joint_Sealant.pdf PDF
12. CG101 Erosion and Sedimentation Control Plan A.pdf PDF
260519-Low-Voltage_EPower_Cond_and_Cables.pdf PDF
040100-Maintenance_of_Masonry.pdf PDF
15. CS501 Construction Details.pdf PDF
220523-General_Duty_Valves_for_Plumbing_Piping.pdf PDF
022113-Site_Survey.pdf PDF
13. CG102 Erosion and Sedimentation Control Plan B.pdf PDF
015719-Temporary_Enviromental_Controls.pdf PDF
3. GI003 Contractor Submittal List.pdf PDF
23. EP101 Power Basement New Work Plan.pdf PDF
101400-Signage.pdf PDF
312011-Earthwork_Short_Form.pdf PDF
018113-Sustanabile_Construction_Requirements.pdf PDF
36C24222B0037 0004.pdf PDF
220511-Common_Work_Results_for_Plumbing.pdf PDF
010000-General_Requirements.pdf PDF
329000-Planting.pdf PDF
4. CD100 Overall Existing Features Plan.pdf PDF
16. CS502 Construction Details.pdf PDF
260526-Grounding_and_Bonding_for_Electrical_Systems.pdf PDF
024100-Demolition.pdf PDF
055000-Metal_Fabrication.pdf PDF
000115-List_of_Drawings.pdf PDF
260541-Underground_Electrical_Construction.pdf PDF
262911-Motor_Controllers.pdf PDF
Drawings Amendment 2.pdf PDF
1. GI001 Title Sheet.pdf PDF
321723-Pavement_Markings.pdf PDF
18. PP101 Plumbing Piping Plan.pdf PDF
320523-Cement_and_Conc_for_Ext_Imp.pdf PDF
040513-Masonry_Mortaring.pdf PDF
11. CU103 Groundwater Force Main Plan & Profile C.pdf PDF
321216-Asphalt_Paving.pdf PDF
2. GI002 General Notes Sheet.pdf PDF
17. CS503 Construction Details.pdf PDF
220512-General_Motor_Requirements_for_Plumbing_Equipment.pdf PDF
334000-Storm_Sewer_Utilities.pdf PDF
20. ED101 Electrical Systems Demolition Plan.pdf PDF
312319-Dewatering.pdf PDF
14. CG103 Erosion and Sedimentation Control Plan C.pdf PDF
014219-Reference_Standards.pdf PDF
10. CU102 Groundwater Force Main Plan & Profile B.pdf PDF
_CoverBatavia.pdf PDF
033053-Concrete_Short_Form.pdf PDF
323113-Chain_Link_Fences_and_Gates.pdf PDF
21. ES101 Electrical Systems New Work Plan.pdf PDF
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4" CI GAS LINE

CHAINLINK FENCE

TH #10 TH #11

TH #12

TH #13

30" TREE

30" TREE

24"

TREE

30"

TREE

24"

TREE

16"

TREE

36" TREE

24"

TREE

24"

TREE

18" TREE

24"

TREE

30" TREE

15" TREE32"

TREE

24"

TREE

BITUMINOUS PAVING

EDGE OF PAVEMENT

EDGE OF PAVEMENT

EDGE OF PAVEMENT

STS

12" RCP

24" TREE

LP

LP

BOLLARD

(TYP)

LAWN REMOVAL

LAWN REMOVAL

STUMP

24"

TREE

30"

TREE

10"

TREE

24"

TREE

28"

TREE

24"

TREE

36" TREE

12 13

9 10

20" TREE

4" CI GAS LINE

CHAINLINK FENCE

TH #10 TH #11

TH #12

TH #13

30" TREE

30" TREE

24"

TREE

30"

TREE

24"

TREE

16"

TREE

36" TREE

24"

TREE

24"

TREE

18" TREE

24"

TREE

30" TREE

15" TREE32"

TREE

24"

TREE

BITUMINOUS PAVING

EDGE OF PAVEMENT

EDGE OF PAVEMENT

EDGE OF PAVEMENT

STS

12" RCP

24" TREE

LP

LP

BOLLARD

(TYP)

LAWN REMOVAL

LAWN REMOVAL

STUMP

24"

TREE

30"

TREE

10"

TREE

24"

TREE

28"

TREE

24"

TREE

36" TREE

12 13

9 10

20" TREE

LmA OnB LmA

OnB

VA HOSPITAL DR.

LANDS N/F

CITY OF BATAVIA

159 PARK ROAD

CONC. ROAD BASE

APPROXIMATE

LOCATION

24"

TREE

24"

SE

E

SH

EE

T C D1

SE

E

SH

EE

T C D1

SEE SHEET CD104

RICHMOND AVE.

VA HOSPITAL DR.

MEMORIAL DR.

RED

FIE

LD

PK

WY.

PA

RK

R D.

VETERANSA

B

C D

SITE SYMBOL - DEMOLITION

EXISTING LAWN AREA TO BE REMOVED

AND RESTORED

SITE SYMBOL

TEST HOLE #TH#

TREES TO BE REMOVED AS PART OF THIS

CONTRACT, SEE TREE REMOVAL SCHEDULE

EXISTING TREELINE TO BE REMOVED

8/1/2022

Batavia VA Medical Center Batavia, NY

528A4-18-203

CHRIS GEARY PE# 099085

Schadler/Waldron Geary

811 OR 1-800-962-7962

Project Number

Building Number

Sheet Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

KEY MAP

1"=800'

SCALE: 1"=20'

40'20'0'

TEST HOLE RESULTS BY ENGINEER

TEST HOLE

NUMBER

DEPTH TO

UTILITY

(FEET)

UTILITY

PIPE

SIZE

(INCHES)

REMARKS

10 4.5 - -

PIECE OF REBAR FOUND AT FOUR FEET,

EXCAVATION CONTINUED TO 54 INCHES.

THERE ARE NO UTILITIES EXPECTED AND

THE GROUND PENETRATING RADAR PICKED

UP REBAR AND NOT A UTILITY.

11 4.5 - - NO UTILITIES FOUND, STOPPED

EXCAVATION AT 54".

12 4.5 - - NO UTILITIES FOUND, STOPPED

EXCAVATION AT 54".

13 4.5 - - NO UTILITIES FOUND, STOPPED

EXCAVATION AT 54".

GENERAL NOTES:

1. THE CONTRACTOR SHALL CONDUCT SIX (6) TEST PITS WITH THE COR WITNESSING TO

VERIFY EXISTING CONDITIONS. TEST PITS SHALL BE CONDUCTED AFTER COORDINATION

WITH VA COR AND INSPECTED BY THE VA COR FOR ACCEPTANCE. THE CONTRACTOR SHALL

PROVIDE A SUBMITTAL WITH DOCUMENTATION OF THE TEST PITS CONDUCTED.

2. REFER TO TREE REMOVAL SCHEDULE ON THIS DRAWING. AREA WHERE TREES REMOVED

SHALL BE PROMPTLY STABILIZED TO PREVENT SOIL EROSION AND METHODS OF

STABILIZATION SHALL BE SUBMITTED AS PER THE SOILD AND EROSION CONTROL PLAN

SUBMITTALS.

3. AS PER THE 010000 GENERAL REQUIREMENTS, THE CONTRACTOR SHALL REPORT ANY PRE-EXISTING

CONDITIONS TO VA COR PRIOR TO COMMENCEMENT OF WORK OR THE CONTRACTOR SHALL

RESUME RESPONSIBILITY OF ANY ISSUES DISCOVERED.

SITE SYMBOLS - GENERAL

BENCHMARK:

DRAWING BLOCK TITLE WITH GRAPHIC SCALE

(SHOWN HALF ACTUAL SIZE)

BRICK WALKWAY

PLAN

DIMENSION

A

SITE SYMBOLS - CONCRETE/MASONRY

SITE SYMBOLS - UTILITIES

NOTE:

VERTICAL TEXT INDICATES PROPOSED FEATURES (PROP.)

SLANTED TEXT INDICATES EXISTING FEATURES (EX.)

STORM SEWER LINE

UTILITY, UTILITY POLE (UP)

UTILITY, WATER MANHOLEW

UTILITY, ELECTRICAL MANHOLEE

SIGN

WATER LINE

EDGE OF PAVEMENT

CURB LINE

MINOR CONTOUR

MAJOR CONTOUR

SITE SYMBOLS - EXISTING

TREE

DRAINAGE CATCH BASIN

DETAIL NUMBER

DETAIL SHEET

SITE SYMBOLS - ABBREVIATIONS

ELECTRIC LINE

Ø DIAMETER

APPROX APPROXIMATELY

BLDG BUILDING

CIP CAST IRON PIPE

CO CLEANOUT

CONC CONCRETE

CS CURB STOP

DIP DUCTILE IRON PIPE

DS DOWN SPOUT

EB ELECTRIC BOX

ELEC ELECTRIC

EMH ELECTRIC MANHOLE

EHH ELECTRIC HANDHOLE

EOP EDGE OF PAVEMENT

FES FLARED END SECTION

GOVT GOVERNMENT

GV GAS VALVE

HDPE HIGH DENSITY POLY ETHYLENE

INSP INSPECTION

INV STORMWATER PIPE END

IP IRON PIN

LF LINEAR FEET

MH MANHOLE

N/F NOW OR FORMERLY

NRCS NATIONAL RESOURCE CONSERVATION SERVICE

PLCC PLAIN CEMENT CONCRETE

PVC POLYVINYL CHLORIDE

PVMT PAVEMENT

RCP REINFORCED-CONCRETE PIPE

S'WALK SIDEWALK

SF SQUARE FEET

SAN CO SANITARY CLEANOUT

STMH STEAM MANHOLE

TELE TELEPHONE

TEMP TEMPORARY

TMH TELEPHONE MANHOLE

TH TEST HOLE

TYP TYPICAL

WMH WATER MANHOLE

Y/4" 4" WIDE YELLOW PAINT LINE

DRAINAGE MANHOLE (DMH)D

GAS VALVE

HYDRANT, FIRE (FH)

UTILITY, SANITARY MANHOLE - (SAN MH)S

WATER VALVE (WV)

COMMUNICATION LINE

FIBER OPTIC LINE

GAS LINE

SANITARY SEWER LINE

STS

STEAM LINE

TELEPHONE LINE

UNKNOWN LINE

CENTERLINE

CHAINLINK FENCE

X X METAL FENCE

NRCS SOIL LINE

VEGETATION

LAMP POST

LIGHT POST (LP)

BOLLARD

CONCRETE

APPROXIMATE PROPERTY LINE

E UTILITY, ELECTRICAL HANDHOLE

COMM

GAS

SAN

ST

REVISED PER CONFERENCE CALL ON MARCH 9, 2021

REVISED PER 60% DESIGN REVIEW LETTERS

REVISED PER 90% DESIGN REVIEW LETTERS

REVISED PER FONT ISSUE/LINE ISSUE

5/11/2021 9/10/2021 2/4/2022 7/26/2022

CD102

6 23

Improve Ground Water, Building 30

Existing Features And Demolition Plan 'B' Bid Documents For Construction

TREE REMOVAL NOTES:

A. THE LOCATION AND DIAMETER OF THE TREES SHOWN IN THE CHART, PROVIDED ON DRAWINGS CD-101

THROUGH CD-104, ARE AN APPROXIMATE LOCATION AND BASE SIZE. ALL OF THE TREES ON CAMPUS ARE MARKED WITH YELLOW TAGS AND THE CORRESPONDING NUMBER. BIDDERS SHALL VERIFY TREES ON

CAMPUS PRIOR TO BIDDING ON PROJECT.

B. TREES SHALL BE CUT DOWN, STUMPS AND ROOTS GROUND DOWN MINIMUM OF 6 INCHES BELOW SURFACE, ALL DEBRIS REMOVED FROM SITE (WOOD AND SAW DUST), PROVIDE 6 INCHES OF CLEAN AND SCREENED TOPSOIL, HYDROSEEDED AND WATER DAILY AS PER THIS CONTRACT (USING A WATER TRUCK).

SAWDUST SHALL NOT BE BURIED, ALL SAW DUST SHALL BE REMOVED FROM SITE AND INSPECTED BY VA COR PRIOR TO TOPSOIL. THESE REQUIREMENTS ARE FURTHER OUTLINED IN THE NOTES ON DRAWING

GI002.

C. GRIND STUMP, NO TREE TO CUT AT THIS LOCATION.

D. MISCELLANEOUS TREE(S) TO BE REMOVED DURING THE PROJECT IDENTIFIED BY THE VA COR. THE TREES

THAT SHALL BE REMOVED IN ADDITION TO WHAT IS IDENTIFIED ON THE DRAWINGS ARE UP TO 36 INCHES

IN DIAMETER AT THE BASE OF THE TREE.

TREE REMOVAL SCHEDULE

DRAWING ITEM #

BASE

DIAMETER

(INCHES)

NOTES

CD-102 2 24 A,B

CD-102 3 32 A,B

CD-102 4 15 A,B

CD-102 5 30 A,B

CD-102 6 24 A,B

CD-102 7 36 A,B

CD-102 8 24 A,B

CD-102 9 24 A,B

CD-102 10 24 A,B

CD-102 11 24 A,B

CD-102 12 28 A,B

CD-102 13 24 A,B

CD-102 14 10 A,B

CD-102 15 30 A,B

CD-102 16 24 A,B,C

CD-102 17 18 A,B

CD-102 18 20 A,B

CD-102 19 36 A,B

NA 47 36 A,B,D

NA 48 36 A,B,D

NA 49 36 A,B,D

NA 50 36 A,B,D

NA 51 36 A,B,D

NA 52 36 A,B,D

IF TREE ROOTS ARE ENCOUNTERED DURING

EXCAVATION, THE CONTRACTOR SHALL CUT

DOWN TREE AND REMOVE THE STUMP AS

PART OF THIS CONTRACT. REFER TO TREE

REMOVAL SCHEDULE AS THERE ARE SIX (6)

ADDITIONAL TREES (47 THROUGH 52) TO BE

REMOVED AS PART OF THIS CONTRACT

DURING EXCAVATION THE CONTRACTOR WILL

ENCOUNTER RELATIVELY ROCKY SOIL. THE

CONTRACTOR SHALL REMOVE ALL OF THE ROCKS

FROM THE CAMPUS THAT ARE EXCAVATED LARGER

THAN A SOFTBALL IN SIZE. THE ROCKS SHALL NOT BE

RE-BURIED WHERE THEY CAN DAMAGE THE FORCE

MAIN PIPE OR TWO (2) PVC CONDUITS.

AutoCAD SHX Text 200'

AutoCAD SHX Text 100'

AutoCAD SHX Text 50'

AutoCAD SHX Text

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

TU

File details come from the government source that posted it. Updated .