11. CU103 Groundwater Force Main Plan & Profile C.pdf

PDF 2 MB Posted

Attached to
Z1DA--528A4-18-203 GROUND WATER MITIGATION BUILDING 30
Solicitation number
36C24222B0037
Issued by

About this file

This document package includes engineering design plans and a related federal contract solicitation. The design plans depict site plans, profiles, and details for a groundwater force main and stormwater collection system at the Batavia VA Medical Center in Batavia, New York. The plans show the layout of approximately 250 feet of 12-inch reinforced concrete pipe, 131 feet of 24-inch ductile iron pipe, and 3-inch high-density polyethylene force main pipe. The solicitation is for a construction contract to implement the groundwater mitigation improvements depicted in the engineering plans. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 2 for project number 528A4-18-203 to address groundwater issues at Building 30 on the Batavia VA Medical Center campus.

View the file

Other files

File Type Posted
36C24222B0037 0005.docx DOCX document
014529-Testing_Laboratory.pdf PDF
333000 - Sanitary Sewer Utilities.pdf PDF
079200-Joint_Sealant.pdf PDF
12. CG101 Erosion and Sedimentation Control Plan A.pdf PDF
260519-Low-Voltage_EPower_Cond_and_Cables.pdf PDF
040100-Maintenance_of_Masonry.pdf PDF
15. CS501 Construction Details.pdf PDF
220523-General_Duty_Valves_for_Plumbing_Piping.pdf PDF
022113-Site_Survey.pdf PDF
13. CG102 Erosion and Sedimentation Control Plan B.pdf PDF
015719-Temporary_Enviromental_Controls.pdf PDF
3. GI003 Contractor Submittal List.pdf PDF
23. EP101 Power Basement New Work Plan.pdf PDF
101400-Signage.pdf PDF
312011-Earthwork_Short_Form.pdf PDF
018113-Sustanabile_Construction_Requirements.pdf PDF
36C24222B0037 0004.pdf PDF
220511-Common_Work_Results_for_Plumbing.pdf PDF
010000-General_Requirements.pdf PDF
329000-Planting.pdf PDF
4. CD100 Overall Existing Features Plan.pdf PDF
16. CS502 Construction Details.pdf PDF
260526-Grounding_and_Bonding_for_Electrical_Systems.pdf PDF
024100-Demolition.pdf PDF
055000-Metal_Fabrication.pdf PDF
6. CD102 Existing Features and Demolition Plan B.pdf PDF
000115-List_of_Drawings.pdf PDF
260541-Underground_Electrical_Construction.pdf PDF
262911-Motor_Controllers.pdf PDF
Drawings Amendment 2.pdf PDF
1. GI001 Title Sheet.pdf PDF
321723-Pavement_Markings.pdf PDF
18. PP101 Plumbing Piping Plan.pdf PDF
320523-Cement_and_Conc_for_Ext_Imp.pdf PDF
040513-Masonry_Mortaring.pdf PDF
321216-Asphalt_Paving.pdf PDF
2. GI002 General Notes Sheet.pdf PDF
17. CS503 Construction Details.pdf PDF
220512-General_Motor_Requirements_for_Plumbing_Equipment.pdf PDF
334000-Storm_Sewer_Utilities.pdf PDF
20. ED101 Electrical Systems Demolition Plan.pdf PDF
312319-Dewatering.pdf PDF
14. CG103 Erosion and Sedimentation Control Plan C.pdf PDF
014219-Reference_Standards.pdf PDF
10. CU102 Groundwater Force Main Plan & Profile B.pdf PDF
_CoverBatavia.pdf PDF
033053-Concrete_Short_Form.pdf PDF
323113-Chain_Link_Fences_and_Gates.pdf PDF
21. ES101 Electrical Systems New Work Plan.pdf PDF
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RICHMOND AVE.

VA HOSPITAL DR.

MEMORIAL DR.

RED

FIE

LD

PK

WY.

PA

RK

R D.

VETERANSA

B

C

FES A1

INV. 898.75

EARTHEN LEVEL SPREADER

(SEE DETAIL )

D

4'Ø FLAT TOP

STORM MH A2

RIM:906.59

INV. IN:902.78(SW)

INV. OUT:901.25

250' of 12" RCP S=0.010

[6 .5 m]

[4

.3 m]

PROPOSED TREE LINE

3" HDPE FORCE

MAIN PIPE

11 12 13

L=24.54' R=125.00'

L=16.58' R=50.00'

N74° 31' 03.29"E 94.22'

N63° 16' 03.29"E 85.77' N44° 16' 14.57"E

51.83' N32° 23' 23.06"E

272.67'

CONTRACTOR TEST

HOLE #3 LOCATION

(2)-2" PVC

CONDUITS

EHH

EHH

E

E

STATION=13+68.05

NORTHING=1,098,836.0300

EASTING=1,251,518.4280

4" C

.I.

G

AS

L

IN

E

4" C.I. GAS LINE

4" C.I. GAS LINE

E.O.P.

30"

TREE

24"

TREE

D

STORM MH

RIM: 911.69

STS24" D.I.P.

D

STORM MH

RIM: 908.50

STS

STS

STS24" D.I.P.

D

STORM MH

RIM: 901.51

INV. IN: 893.54 (S)

INV. OUT: 893.34

STS

STS

STS

STS

131' of 24" D.I.P. S=0.010

24" RCP

30" TREE

30"

TREE

24"

TREE

903904 906907908909

903904

STORMWATER COLLECTION SYSTEM

POTENTIALLY NOT ACTIVE

36"

36"

TREE

CHAINLINK

FENCE

VA HOSPITAL DR.

FES A1

INV. 898.75

EARTHEN LEVEL SPREADER

(SEE DETAIL )

D

4'Ø FLAT TOP

STORM MH A2

RIM:906.59

INV. IN:902.78(SW)

INV. OUT:901.25

250' of 12" RCP S=0.010

[6 .5 m]

[4

.3 m]

PROPOSED TREE LINE

3" HDPE FORCE

MAIN PIPE

11 12 13

L=24.54' R=125.00'

L=16.58' R=50.00'

N74° 31' 03.29"E 94.22'

N63° 16' 03.29"E 85.77' N44° 16' 14.57"E

51.83' N32° 23' 23.06"E

272.67'

CONTRACTOR TEST

HOLE #3 LOCATION

(2)-2" PVC

CONDUITS

EHH

EHH

E

E

STATION=13+68.05

NORTHING=1,098,836.0300

EASTING=1,251,518.4280

CS502

CS502

CS502

CS502

CS502

CS502

LdLm A

LmAOnB

SE

E

SH

EE

T C

U1

HORIZONTAL SCALE: 1'=20"

VERTICAL SCALE: 1'=2"

STATION 8+50 TO 13+68 PROFILE

7.

9.

0.

1.

0.

5.

3.

1.

0.

9.

8.

250' of 12" RCP S=0.010

4'Ø F

LA

T

TO

P

ST

OR

M M

H A2

RI

M

:9

.5

ST

A:

+9

5.

IN

V.

IN

:9

.7

8(

SW

IN

V.

O

UT

:9

.2

GAS

(4" METAL PIPE - 2.6' FROM SURFACE)

EARTHEN LEVEL SPREADER

(SEE DETAIL 13 SHEET CS502)

3" HDPE FORCE MAIN PIPE

(VARIABLE DEPTH - MINIMUM 4.5' COVER)

EXISTING

GRADE

4.

5'

[1 .4 m]

EXISTING

GRADE

FE

S

A1

ST

A:

+4 5.

IN

V.

:8

.7

0.

5'

M

IN

PROPOSED

GRADE

HORIZONTAL SCALE: 1'=20"

VERTICAL SCALE: 1'=2"

STATION 8+50 TO 13+68 PROFILE

7.

9.

0.

1.

0.

5.

3.

1.

0.

9.

8.

250' of 12" RCP S=0.010

4'Ø F

LA

T

TO

P

ST

OR

M M

H A2

RI

M

:9

.5

ST

A:

+9

5.

IN

V.

IN

:9

.7

8(

SW

IN

V.

O

UT

:9

.2

GAS

(4" METAL PIPE - 2.6' FROM SURFACE)

EARTHEN LEVEL SPREADER

(SEE DETAIL 13 SHEET CS502)

3" HDPE FORCE MAIN PIPE

(VARIABLE DEPTH - MINIMUM 4.5' COVER)

EXISTING

GRADE

4.

5'

[1 .4 m]

EXISTING

GRADE

FE

S

A1

ST

A:

+4 5.

IN

V.

:8

.7

0.

5'

M

IN

PROPOSED

GRADE

SITE SYMBOL - IMPROVEMENTS

TREE LINE

PROPOSED PIPE

SITE SYMBOLS - EARTHWORK

GRASS RESTORATION AREA

SITE SYMBOL - UTILITIES

AVOID LIGHT POLE. DISCONNECT AND RESET AFTER PIPE INSTALLATION

IF NECESSARY.

REMOVE TREES/BRUSH AS NECESSARY TO INSTALL PROPOSED PIPE.

ANY TREE THAT ROOTS ARE IMPACTED BY THE CONSTRUCTION SHALL BE

REMOVED ENTIRELY INCLUDING THE STUMP. REFER TO NOTES ON GI002

AND THE TREE REMOVAL SCHEDULE ON CD101 THROUGH CD104 ITEMS 47

THROUGH 52.

REMOVE EXISTING DUPLEX SUBMERSIBLE PUMPS , AND RETURN TO VA.

REPLACE WITH NEW DUPLEX SUBMERSIBLE PUMPS ( 2 EXISTING PUMPS,

REPLACE WITH 2 NEW PUMPS).

RECONFIGURATION OF INTERNAL PLUMBING AND NEW BUILDING

PENETRATION THROUGH EXISTING BUILDING WALL. THE CONTRACTOR

SHALL INSTALL A PIPE TRANSITION FOR PVC/HDPE FITTING. THE FITTING

SHALL BE A POLY-CAM SERIES 730 TRANSITION FOR PVC/HDPE OR

APPROVED EQUAL.

DRAINAGE MANHOLE

REMOVE & REINSTALL FENCE AS NECESSARY TO INSTALL PROPOSED

IMPROVEMENTS. FENCE POSTS SHALL BE REINSTALLED TO AVOID

UNDERGROUND PIPING.

IT IS UNKNOWN IF THE SYSTEM IN ACTIVE. THE STORM CONVEYANCE PIPE

OUTFALL COULD NOT BE LOCATED. THE CONTRACTOR SHALL VERIFY THE

LOCATION AND ANY POTENTIAL CONFLICTS PRIOR TO CONSTRUCTION AND

ORDERING OF THE STRUCTURES.

D

FLARED END SECTION

MAJOR CONTOUR

MINOR CONTOUR

RIP-RAP

PROPOSED ELECTRIC LINE

8/1/2022

Batavia VA Medical Center Batavia, NY

528A4-18-203

CHRIS GEARY PE# 099085

Schadler/Waldron Geary

811 OR 1-800-962-7962

Project Number

Building Number

Sheet Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

KEY MAP

1"=800'

SCALE: 1"=20'

40'20'0'

PLAN VIEW

SCALE 1"=20'

NOTES:

1. THE 3" FORCE MAIN SHALL HAVE A MINIMUM COVER OF 4.5 FEET

(54 INCHES).

2. ALL CONNECTIONS / FITTINGS FOR THE 3" SHALL HAVE, AT A

MINIMUM, THE SAME PRESSURE RATING AS THE PIPE.

3. WHEREVER PIPE MUST BE DEFLECTED FROM A STRAIGHT LINE

(IN EITHER THE VERTICAL OR HORIZONTAL PLANE) IN ORDER TO

AVOID OBSTRUCTIONS, OR WHEREVER LONG RADIUS CURVES

ARE PERMITTED, THE AMOUNT OF DEFLECTION SHALL NOT

EXCEED THE PIPE MANUFACTURER’S RECOMMENDATIONS, AND

SHALL BE APPROVED BY THE COR. BEND FITTINGS SHALL ONLY

BE USED WHEN THE PIPE DEFLECTIONS ARE INADEQUATE,

ACCORDING TO MANUFACTURER'S RECOMMENDATIONS, OR AS

DIRECTED BY COR.

4. THE CONTRACTOR SHALL INSTALL THE PIPE ACCORDING TO

ASTM D2321, "STANDARD PRACTICE FOR UNDERGROUND

INSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND

OTHER GRAVITY FLOW APPLICATIONS” AND ASTM D2774

“STANDARD PRACTICE FOR UNDERGROUND INSTALLATION OF

THERMOPLASTIC PRESSURE PIPING” UNLESS DIRECTED

OTHERWISE BY THE COR.

(SEE SHEET CS503 DETAIL #13 FOR PUMP INFORMATION.)

5. THE CONTRACTOR SHALL PRESSURE TEST THE PIPE IN

ACCORDANCE WITH ASTM F2164 AND PROVIDE RESULTS TO THE

COR. THE VA COR SHALL INSPECT PRESSURE TEST AND

CONTRACTOR SHALL NOT PROCEED UNTIL ACCEPTED BY THE

VA COR.

(SEE SHEET NUMBER PP101 - DETAIL # 4 FOR PIPE PENETRATION

THROUGH EXISTING BUILDING WALL. )

6. THE CONTRACTOR SHALL CONTACT THE COR TWO WEEKS

PRIOR TO CLOSING OF ANY TRENCH. THE COR AND ENGINEER

OF RECORD SHALL INSPECT THE TRENCH PRIOR TO CLOSING.

7. AREA WHERE TREES REMOVED SHALL BE PROMPTLY

STABILIZED TO PREVENT SOIL EROSION AND METHODS OF

STABILIZATION SHALL BE SUBMITTED AS PER THE SOIL AND

EROSION CONTROL PLAN SUBMITTALS.

UTILITIES SHOWN ARE APPROXIMATE

CONTRACTOR SHALL CONFIRM LOCATION

AND DEPTH IN FIELD

REVISED PER CONFERENCE CALL ON MARCH 9, 2021

REVISED PER 60% DESIGN REVIEW LETTERS

REVISED PER 90% DESIGN REVIEW LETTERS

REVISED PER FONT ISSUE/LINE ISSUE

5/11/2021 9/10/2021 2/4/2022 7/26/2022

CU103

11 23

Groundwater Force Main Plan & Profile 'C'

Bid Documents For Construction

Improve Ground Water, Building 30

SITE SYMBOLS - GENERAL

BENCHMARK:

DRAWING BLOCK TITLE WITH GRAPHIC SCALE

(SHOWN HALF ACTUAL SIZE)

BRICK WALKWAY

PLAN

DIMENSION

A

SITE SYMBOLS - CONCRETE/MASONRY

SITE SYMBOLS - UTILITIES

NOTE:

VERTICAL TEXT INDICATES PROPOSED FEATURES (PROP.)

SLANTED TEXT INDICATES EXISTING FEATURES (EX.)

STORM SEWER LINE

UTILITY, UTILITY POLE (UP)

UTILITY, WATER MANHOLEW

UTILITY, ELECTRICAL MANHOLEE

SIGN

WATER LINE

EDGE OF PAVEMENT

CURB LINE

MINOR CONTOUR

MAJOR CONTOUR

SITE SYMBOLS - EXISTING

TREE

DRAINAGE CATCH BASIN

DETAIL NUMBER

DETAIL SHEET

SITE SYMBOLS - ABBREVIATIONS

ELECTRIC LINE

Ø DIAMETER

APPROX APPROXIMATELY

BLDG BUILDING

CIP CAST IRON PIPE

CO CLEANOUT

CONC CONCRETE

CS CURB STOP

DIP DUCTILE IRON PIPE

DS DOWN SPOUT

EB ELECTRIC BOX

ELEC ELECTRIC

EMH ELECTRIC MANHOLE

EHH ELECTRIC HANDHOLE

EOP EDGE OF PAVEMENT

FES FLARED END SECTION

GOVT GOVERNMENT

GV GAS VALVE

HDPE HIGH DENSITY POLY ETHYLENE

INSP INSPECTION

INV STORMWATER PIPE END

IP IRON PIN

LF LINEAR FEET

MH MANHOLE

N/F NOW OR FORMERLY

NRCS NATIONAL RESOURCE CONSERVATION SERVICE

PLCC PLAIN CEMENT CONCRETE

PVC POLYVINYL CHLORIDE

PVMT PAVEMENT

RCP REINFORCED-CONCRETE PIPE

S'WALK SIDEWALK

SF SQUARE FEET

SAN CO SANITARY CLEANOUT

STMH STEAM MANHOLE

TELE TELEPHONE

TEMP TEMPORARY

TMH TELEPHONE MANHOLE

TH TEST HOLE

TYP TYPICAL

WMH WATER MANHOLE

Y/4" 4" WIDE YELLOW PAINT LINE

DRAINAGE MANHOLE (DMH)D

GAS VALVE

HYDRANT, FIRE (FH)

UTILITY, SANITARY MANHOLE - (SAN MH)S

WATER VALVE (WV)

COMMUNICATION LINE

FIBER OPTIC LINE

GAS LINE

SANITARY SEWER LINE

STS

STEAM LINE

TELEPHONE LINE

UNKNOWN LINE

CENTERLINE

CHAINLINK FENCE

X X METAL FENCE

NRCS SOIL LINE

VEGETATION

LAMP POST

LIGHT POST (LP)

BOLLARD

CONCRETE

APPROXIMATE PROPERTY LINE

E UTILITY, ELECTRICAL HANDHOLE

COMM

GAS

SAN

ST

CONTRACTOR TEST HOLE RESULTS

TEST HOLE

NUMBER STATION

DEPTH TO

UTILITY

(FEET)

UTILITY

PIPE

SIZE

(INCHES)

REMARKS

1 0+14

2 5+15

3 12+47

4 TBD

5 TBD

6 TBD

CONTRACTOR SHALL WORK WITH VA COR TO SELECT TEST HOLE LOCATIONS 4 THROUGH 6 AND VA COR SHALL WITNESS TEST HOLE DIG. CONTRACTOR SHALL PROVIDE SUBMITTAL WITH TEST HOLE RESULTS TO VA COR FOR REVIEW AND APPROVAL AS

PER THIS CHART.

AutoCAD SHX Text 200'

AutoCAD SHX Text 100'

AutoCAD SHX Text 50'

AutoCAD SHX Text

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

TU

File details come from the government source that posted it. Updated .