10. CU102 Groundwater Force Main Plan & Profile B.pdf
PDF 2 MB Posted
- Solicitation number
- 36C24222B0037
About this file
This document package includes construction plans and specifications for a federal construction contract opportunity. The plans detail the installation of a new 3-inch force main pipeline and associated site utilities at the Veterans Affairs Medical Center in Batavia, New York to improve groundwater mitigation under building 30. Key aspects of the project include installing approximately 270 linear feet of 3-inch high-density polyethylene force main with a minimum burial depth of 4.5 feet, concrete structures, 24-inch steel casing, two 2-inch electrical handhole conduits, and abandoning existing pumps in place. Bidders must adhere to technical specifications for materials, testing, trenching and backfilling. The pre-bid site walkthrough date is not provided.
View the file
Other files
Show 40 more
Latest 50 of 76 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RICHMOND AVE.
VA HOSPITAL DR.
MEMORIAL DR.
RED
FIE
LD
PK
WY.
PA
RK
R D.
VETERANSA
B
C
3" HDPE FORCE MAIN PIPE
4' [1.
2m
3 4
L=9.39' R=20.00'
L=17.60' R=20.00'
L=46.52' R=100.00'
L=39.00' R=100.00'
L=37.63' R=75.00'
L=26.18' R=150.00'
N6° 08' 33.86"W 38.84' N44° 16' 14.57"E
241.75'
N70° 55' 29.14"E 28.48'
S86° 43' 56.71"E 25.31'
N64° 31' 03.29"E 44.56'
N74° 31' 03.29"E 94.22'
24" Ø, 10' LONG, SCHEDULE 40 STEEL PIPE
CONTRACTOR SHALL INSTALL RHINO HIDEOUT
WATER PIPELINE MARKER AT ALL FOUR PIPE ENDS
OR APPROVED EQUIVALENT. CONTRACTOR SHALL
PROVIDE VA NORTHING AND EASTING AT THE EACH
END OF THE STEEL PIPES.
CONTRACTOR TEST
HOLE #2 LOCATION
(2)-2" PVC
CONDUITS
(2)-2" PVC
EHH
E
EHH
E
EHH
E
EHH
D
5'Ø FLAT TOP
STORM MH W/ AIR
RELEASE VALVE A3
RIM:908.39
INV. IN:903.85(SW)
INV. OUT:903.85
ST
ST
ST
4" CI GAS LINE~
30" TREE
30" TREE
24"
TREE
30"
TREE
16"
TREE
BITUMINOUS PAVING
EDGE OF PAVEMENT
EDGE OF PAVEMENT
EDGE OF PAVEMENT
STS
12" RCP
LP
LP
BOLLARD
(TYP)
24"
TREE
VA HOSPITAL DR.
CONC. ROAD BASE
APPROXIMATE
LOCATION
3" HDPE FORCE MAIN PIPE
4' [1.
2m
3 4
L=9.39' R=20.00'
L=17.60' R=20.00'
L=46.52' R=100.00'
L=39.00' R=100.00'
L=37.63' R=75.00'
L=26.18' R=150.00'
N6° 08' 33.86"W 38.84' N44° 16' 14.57"E
241.75'
N70° 55' 29.14"E 28.48'
S86° 43' 56.71"E 25.31'
N64° 31' 03.29"E 44.56'
N74° 31' 03.29"E 94.22'
24" Ø, 10' LONG, SCHEDULE 40 STEEL PIPE
CONTRACTOR SHALL INSTALL RHINO HIDEOUT
WATER PIPELINE MARKER AT ALL FOUR PIPE ENDS
OR APPROVED EQUIVALENT. CONTRACTOR SHALL
PROVIDE VA NORTHING AND EASTING AT THE EACH
END OF THE STEEL PIPES.
CONTRACTOR TEST
HOLE #2 LOCATION
(2)-2" PVC
CONDUITS
(2)-2" PVC
EHH
E
EHH
E
EHH
E
EHH
D
5'Ø FLAT TOP
STORM MH W/ AIR
RELEASE VALVE A3
RIM:908.39
INV. IN:903.85(SW)
INV. OUT:903.85
CS502
CS502
CS502
CS502
SE
E
SH
EE
T C U1
SE
E
SH
EE
T C U1
LmA OnB LmA
OnB
BE
GIN
P
IP
E
DROP
FO
R
FU
TU
RE
W
AT
ER
M
AI
N
ST
A.
6+
.00
EN
D
PI
PE
D
RO
P
FO
R
FU
TU
RE
W
AT
ER
M
AI
N
ST
A.
+5
0.
HORIZONTAL SCALE: 1'=20"
VERTICAL SCALE: 1'=2"
STATION 2+50 TO 8+50 PROFILE
1.
2.
4.
5.
7.
8.
6.
5.
5.
5.
6.
1.
2.
+5
0 4
4.
5.
+5
0 5
7.
8.
+5
0 6
6.
5.
+5
0 7
5.
5.
+5
0 8
6.
3" HDPE FORCE MAIN PIPE
(VARIABLE DEPTH - MINIMUM 4.5' COVER)
EXISTING
GRADE
4.
5'
[1 .4 m
3" HDPE FORCE MAIN PIPE
(VARIABLE DEPTH - MINIMUM 4.5' COVER)
ELECTRIC
(UNKNOWN PIPE - 4.5' FROM SURFACE)EXISTING
GRADE
1.
5'
MI
N.
24" Ø SCHEDULE 40 STEEL PIPE
CONTRACTOR SHALL INSTALL RHINO
HIDEOUT WATER PIPELINE MARKER AT ALL
FOUR PIPE ENDS OR APPROVED
EQUIVALENT. CONTRACTOR SHALL PROVIDE
VA NORTHING AND EASTING AT THE EACH
END OF THE STEEL PIPES.
1.
5'
M
IN
4.
5' M
IN
5' Ø
F
LA
T
TO
P S
TO
R
M M
H W
AI
R R
EL
EA
SE
V
AL
VE
A
R
IM
: 9
.3
ST
A.
+5
9.
IN
V.
IN
: 9
.8
5(
SW
IN
V.
O
U T:
.8
HORIZONTAL SCALE: 1'=20"
VERTICAL SCALE: 1'=2"
STATION 2+50 TO 8+50 PROFILE
1.
2.
4.
5.
7.
8.
6.
5.
5.
5.
6.
1.
2.
+5
0 4
4.
5.
+5
0 5
7.
8.
+5
0 6
6.
5.
+5
0 7
5.
5.
+5
0 8
6.
3" HDPE FORCE MAIN PIPE
(VARIABLE DEPTH - MINIMUM 4.5' COVER)
EXISTING
GRADE
4.
5'
[1 .4 m
3" HDPE FORCE MAIN PIPE
(VARIABLE DEPTH - MINIMUM 4.5' COVER)
ELECTRIC
(UNKNOWN PIPE - 4.5' FROM SURFACE)EXISTING
GRADE
1.
5'
MI
N.
24" Ø SCHEDULE 40 STEEL PIPE
CONTRACTOR SHALL INSTALL RHINO
HIDEOUT WATER PIPELINE MARKER AT ALL
FOUR PIPE ENDS OR APPROVED
EQUIVALENT. CONTRACTOR SHALL PROVIDE
VA NORTHING AND EASTING AT THE EACH
END OF THE STEEL PIPES.
1.
5'
M
IN
4.
5' M
IN
5' Ø
F
LA
T
TO
P S
TO
R
M M
H W
AI
R R
EL
EA
SE
V
AL
VE
A
R
IM
: 9
.3
ST
A.
+5
9.
IN
V.
IN
: 9
.8
5(
SW
IN
V.
O
U T:
.8
SITE SYMBOL - IMPROVEMENTS
TREE LINE
PROPOSED PIPE
SITE SYMBOLS - EARTHWORK
GRASS RESTORATION AREA
SITE SYMBOL - UTILITIES
AVOID LIGHT POLE. DISCONNECT AND RESET AFTER PIPE INSTALLATION
IF NECESSARY.
REMOVE TREES/BRUSH AS NECESSARY TO INSTALL PROPOSED PIPE.
ANY TREE THAT ROOTS ARE IMPACTED BY THE CONSTRUCTION SHALL BE
REMOVED ENTIRELY INCLUDING THE STUMP. REFER TO NOTES ON GI002
AND THE TREE REMOVAL SCHEDULE ON CD101 THROUGH CD104 ITEMS 47
THROUGH 52.
REMOVE EXISTING DUPLEX SUBMERSIBLE PUMPS , AND RETURN TO VA.
REPLACE WITH NEW DUPLEX SUBMERSIBLE PUMPS ( 2 EXISTING PUMPS,
REPLACE WITH 2 NEW PUMPS).
RECONFIGURATION OF INTERNAL PLUMBING AND NEW BUILDING
PENETRATION THROUGH EXISTING BUILDING WALL. THE CONTRACTOR
SHALL INSTALL A PIPE TRANSITION FOR PVC/HDPE FITTING. THE FITTING
SHALL BE A POLY-CAM SERIES 730 TRANSITION FOR PVC/HDPE OR
APPROVED EQUAL.
DRAINAGE MANHOLE
REMOVE & REINSTALL FENCE AS NECESSARY TO INSTALL PROPOSED
IMPROVEMENTS. FENCE POSTS SHALL BE REINSTALLED TO AVOID
UNDERGROUND PIPING.
IT IS UNKNOWN IF THE SYSTEM IN ACTIVE. THE STORM CONVEYANCE PIPE
OUTFALL COULD NOT BE LOCATED. THE CONTRACTOR SHALL VERIFY THE
LOCATION AND ANY POTENTIAL CONFLICTS PRIOR TO CONSTRUCTION AND
ORDERING OF THE STRUCTURES.
D
FLARED END SECTION
MAJOR CONTOUR
MINOR CONTOUR
RIP-RAP
PROPOSED ELECTRIC LINE
(2)-2" PVC
EHH
E
CHAINLINK FENCE
30"
TREE
24"
TREE
(2)-2" PVC
EHH
E
8/1/2022
Batavia VA Medical Center Batavia, NY
528A4-18-203
CHRIS GEARY PE# 099085
Schadler/Waldron Geary
811 OR 1-800-962-7962
Project Number
Building Number
Sheet Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
SCALE: 1"=20'
40'20'0'
PLAN VIEW
SCALE 1"=20'
UTILITIES SHOWN ARE APPROXIMATE
CONTRACTOR SHALL CONFIRM LOCATION
AND DEPTH IN FIELD
KEY MAP
1"=800'
REVISED PER CONFERENCE CALL ON MARCH 9, 2021
REVISED PER 60% DESIGN REVIEW LETTERS
REVISED PER 90% DESIGN REVIEW LETTERS
REVISED PER FONT ISSUE/LINE ISSUE
5/11/2021 9/10/2021 2/4/2022 7/26/2022
CU102
10 23
Groundwater Force Main Plan & Profile 'B'
Bid Documents For Construction
Improve Ground Water, Building 30
NOTES:
1. THE 3" FORCE MAIN SHALL HAVE A MINIMUM COVER OF 4.5 FEET
(54 INCHES).
2. ALL CONNECTIONS / FITTINGS FOR THE 3" SHALL HAVE, AT A
MINIMUM, THE SAME PRESSURE RATING AS THE PIPE.
3. WHEREVER PIPE MUST BE DEFLECTED FROM A STRAIGHT LINE
(IN EITHER THE VERTICAL OR HORIZONTAL PLANE) IN ORDER TO
AVOID OBSTRUCTIONS, OR WHEREVER LONG RADIUS CURVES
ARE PERMITTED, THE AMOUNT OF DEFLECTION SHALL NOT
EXCEED THE PIPE MANUFACTURER’S RECOMMENDATIONS, AND
SHALL BE APPROVED BY THE COR. BEND FITTINGS SHALL ONLY
BE USED WHEN THE PIPE DEFLECTIONS ARE INADEQUATE,
ACCORDING TO MANUFACTURER'S RECOMMENDATIONS, OR AS
DIRECTED BY COR.
4. THE CONTRACTOR SHALL INSTALL THE PIPE ACCORDING TO
ASTM D2321, "STANDARD PRACTICE FOR UNDERGROUND
INSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND
OTHER GRAVITY FLOW APPLICATIONS” AND ASTM D2774
“STANDARD PRACTICE FOR UNDERGROUND INSTALLATION OF
THERMOPLASTIC PRESSURE PIPING” UNLESS DIRECTED
OTHERWISE BY THE COR.
(SEE SHEET CS503 DETAIL #13 FOR PUMP INFORMATION.)
5. THE CONTRACTOR SHALL PRESSURE TEST THE PIPE IN
ACCORDANCE WITH ASTM F2164 AND PROVIDE RESULTS TO THE
COR. THE VA COR SHALL INSPECT PRESSURE TEST AND
CONTRACTOR SHALL NOT PROCEED UNTIL ACCEPTED BY THE
VA COR.
(SEE SHEET NUMBER PP101 - DETAIL # 4 FOR PIPE PENETRATION
THROUGH EXISTING BUILDING WALL. )
6. THE CONTRACTOR SHALL CONTACT THE COR TWO WEEKS
PRIOR TO CLOSING OF ANY TRENCH. THE COR AND ENGINEER
OF RECORD SHALL INSPECT THE TRENCH PRIOR TO CLOSING.
7. AREA WHERE TREES REMOVED SHALL BE PROMPTLY
STABILIZED TO PREVENT SOIL EROSION AND METHODS OF
STABILIZATION SHALL BE SUBMITTED AS PER THE SOIL AND
EROSION CONTROL PLAN SUBMITTALS.
SITE SYMBOLS - GENERAL
BENCHMARK:
DRAWING BLOCK TITLE WITH GRAPHIC SCALE
(SHOWN HALF ACTUAL SIZE)
BRICK WALKWAY
PLAN
DIMENSION
A
SITE SYMBOLS - CONCRETE/MASONRY
SITE SYMBOLS - UTILITIES
NOTE:
VERTICAL TEXT INDICATES PROPOSED FEATURES (PROP.)
SLANTED TEXT INDICATES EXISTING FEATURES (EX.)
STORM SEWER LINE
UTILITY, UTILITY POLE (UP)
UTILITY, WATER MANHOLEW
UTILITY, ELECTRICAL MANHOLEE
SIGN
WATER LINE
EDGE OF PAVEMENT
CURB LINE
MINOR CONTOUR
MAJOR CONTOUR
SITE SYMBOLS - EXISTING
TREE
DRAINAGE CATCH BASIN
DETAIL NUMBER
DETAIL SHEET
SITE SYMBOLS - ABBREVIATIONS
ELECTRIC LINE
Ø DIAMETER
APPROX APPROXIMATELY
BLDG BUILDING
CIP CAST IRON PIPE
CO CLEANOUT
CONC CONCRETE
CS CURB STOP
DIP DUCTILE IRON PIPE
DS DOWN SPOUT
EB ELECTRIC BOX
ELEC ELECTRIC
EMH ELECTRIC MANHOLE
EHH ELECTRIC HANDHOLE
EOP EDGE OF PAVEMENT
FES FLARED END SECTION
GOVT GOVERNMENT
GV GAS VALVE
HDPE HIGH DENSITY POLY ETHYLENE
INSP INSPECTION
INV STORMWATER PIPE END
IP IRON PIN
LF LINEAR FEET
MH MANHOLE
N/F NOW OR FORMERLY
NRCS NATIONAL RESOURCE CONSERVATION SERVICE
PLCC PLAIN CEMENT CONCRETE
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
RCP REINFORCED-CONCRETE PIPE
S'WALK SIDEWALK
SF SQUARE FEET
SAN CO SANITARY CLEANOUT
STMH STEAM MANHOLE
TELE TELEPHONE
TEMP TEMPORARY
TMH TELEPHONE MANHOLE
TH TEST HOLE
TYP TYPICAL
WMH WATER MANHOLE
Y/4" 4" WIDE YELLOW PAINT LINE
DRAINAGE MANHOLE (DMH)D
GAS VALVE
HYDRANT, FIRE (FH)
UTILITY, SANITARY MANHOLE - (SAN MH)S
WATER VALVE (WV)
COMMUNICATION LINE
FIBER OPTIC LINE
GAS LINE
SANITARY SEWER LINE
STS
STEAM LINE
TELEPHONE LINE
UNKNOWN LINE
CENTERLINE
CHAINLINK FENCE
X X METAL FENCE
NRCS SOIL LINE
VEGETATION
LAMP POST
LIGHT POST (LP)
BOLLARD
CONCRETE
APPROXIMATE PROPERTY LINE
E UTILITY, ELECTRICAL HANDHOLE
COMM
GAS
SAN
ST
CONTRACTOR TEST HOLE RESULTS
TEST HOLE
NUMBER STATION
DEPTH TO
UTILITY
(FEET)
UTILITY
PIPE
SIZE
(INCHES)
REMARKS
1 0+14
2 5+15
3 12+47
4 TBD
5 TBD
6 TBD
CONTRACTOR SHALL WORK WITH VA COR TO SELECT TEST HOLE LOCATIONS 4 THROUGH 6 AND VA COR SHALL WITNESS TEST HOLE DIG. CONTRACTOR SHALL PROVIDE SUBMITTAL WITH TEST HOLE RESULTS TO VA COR FOR REVIEW AND APPROVAL AS
PER THIS CHART.
8. CONTRACTOR SHALL COORDINATE WITH VA COR TO INSPECT THE TRENCH
PRIOR TO BACKFILLING TO SHOW THAT THE FORCE MAIN AND TWO (2) 2”
EMPTY PVC CONDUITS DROP DOWN AND THEN RISE BACK UP AS PER THE
DIMENSIONS NOTED ON THIS PLAN. CONTRACTOR SHALL PROVIDED GPS
COORDINATES TO VA COR FOR THE LOCATIONS ON THE DROP AND RISE OF THE
PIPE AND CONDUITS. THIS WILL BE A FUTURE LOCATION FOR A DOMESTIC
WATER SUPPLY TO THE CAMPUS.
AutoCAD SHX Text 200'
AutoCAD SHX Text 100'
AutoCAD SHX Text 50'
AutoCAD SHX Text
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
TU
File details come from the government source that posted it. Updated .