This document package includes construction drawings and details for the Batavia VA Medical Center project in Batavia, New York, as well as the associated federal contract opportunity on FedBizOpps.

The construction drawings provide site plans, elevations, sections, and details for ground water mitigation work at Building 30. The drawings specify erosion and sediment control measures such as filter bags, compost filter socks, silt fencing, concrete washouts, and tree protection fencing. Seeding mixtures, temporary fencing requirements, and general notes are also included. The related federal contract opportunity is solicitation number 36C24222B0037 for ground water mitigation services at Building 30. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 is the contracting agency. No further details are provided on the opportunity in FedBizOpps.

View the file

Other files

File Type Posted
36C24222B0037 0005.docx DOCX document
014529-Testing_Laboratory.pdf PDF
333000 - Sanitary Sewer Utilities.pdf PDF
079200-Joint_Sealant.pdf PDF
12. CG101 Erosion and Sedimentation Control Plan A.pdf PDF
260519-Low-Voltage_EPower_Cond_and_Cables.pdf PDF
040100-Maintenance_of_Masonry.pdf PDF
220523-General_Duty_Valves_for_Plumbing_Piping.pdf PDF
022113-Site_Survey.pdf PDF
13. CG102 Erosion and Sedimentation Control Plan B.pdf PDF
015719-Temporary_Enviromental_Controls.pdf PDF
3. GI003 Contractor Submittal List.pdf PDF
23. EP101 Power Basement New Work Plan.pdf PDF
101400-Signage.pdf PDF
312011-Earthwork_Short_Form.pdf PDF
018113-Sustanabile_Construction_Requirements.pdf PDF
36C24222B0037 0004.pdf PDF
220511-Common_Work_Results_for_Plumbing.pdf PDF
010000-General_Requirements.pdf PDF
329000-Planting.pdf PDF
4. CD100 Overall Existing Features Plan.pdf PDF
16. CS502 Construction Details.pdf PDF
260526-Grounding_and_Bonding_for_Electrical_Systems.pdf PDF
024100-Demolition.pdf PDF
055000-Metal_Fabrication.pdf PDF
6. CD102 Existing Features and Demolition Plan B.pdf PDF
000115-List_of_Drawings.pdf PDF
260541-Underground_Electrical_Construction.pdf PDF
262911-Motor_Controllers.pdf PDF
Drawings Amendment 2.pdf PDF
1. GI001 Title Sheet.pdf PDF
321723-Pavement_Markings.pdf PDF
18. PP101 Plumbing Piping Plan.pdf PDF
320523-Cement_and_Conc_for_Ext_Imp.pdf PDF
040513-Masonry_Mortaring.pdf PDF
11. CU103 Groundwater Force Main Plan & Profile C.pdf PDF
321216-Asphalt_Paving.pdf PDF
2. GI002 General Notes Sheet.pdf PDF
17. CS503 Construction Details.pdf PDF
220512-General_Motor_Requirements_for_Plumbing_Equipment.pdf PDF
334000-Storm_Sewer_Utilities.pdf PDF
20. ED101 Electrical Systems Demolition Plan.pdf PDF
312319-Dewatering.pdf PDF
14. CG103 Erosion and Sedimentation Control Plan C.pdf PDF
014219-Reference_Standards.pdf PDF
10. CU102 Groundwater Force Main Plan & Profile B.pdf PDF
_CoverBatavia.pdf PDF
033053-Concrete_Short_Form.pdf PDF
323113-Chain_Link_Fences_and_Gates.pdf PDF
21. ES101 Electrical Systems New Work Plan.pdf PDF
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8/1/2022

Batavia VA Medical Center Batavia, NY

528A4-18-203

CHRIS GEARY PE# 099085

Schadler/Waldron Geary

Project Number

Building Number

Sheet Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

REVISED PER CONFERENCE CALL ON MARCH 9, 2021

REVISED PER 60% DESIGN REVIEW LETTERS

REVISED PER 90% DESIGN REVIEW LETTERS

REVISED PER FONT ISSUE/LINE ISSUE

5/11/2021 9/10/2021 2/4/2022 7/26/2022

CS501

15 23

Construction Details Bid Documents For Construction

Improve Ground Water, Building 30

PROPERTY TEST METHOD MINIMUM STANDARD

AVG. WIDE WIDTH STRENGTH ASTM D-4884 60 lb/in

GRAB TENSILE ASTM D-4632 205 lb PUNCTURE ASTM D-4833 110 lb

MULLEN BURST ASTM D-3786 350 psi

UV RESISTANCE ASTM D-4355 70%

AOS % RETAINED ASTM D-4751 80 Sieve

ELEVATION VIEW

PLAN VIEW

WELL VEGETATED, GRASSY AREA

FILTER BAG

WELL VEGETATED, GRASSY AREA

LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS.

HIGH VOLUME FILTER BAGS SHALL BE MADE FROM WOVEN GEOTEXTILES THAT MEET THE FOLLOWING STANDARDS:

1. A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES SHALL BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2 FULL OF SEDIMENT. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. BAGS SHALL BE PLACED ON STRAPS TO FACILITATE REMOVAL UNLESS BAGS COME WITH LIFTIING STRAPS ALREADY ATTACHED.

2. BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND

NON-POLLUTING MATERIAL MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE STEEPNESS.

3. NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST FILTER ROCK SHALL BE INSTALLED BELOW BAGS LOCATED WITHIN 50 FEET OF ANY RECEIVING SURFACE WATER OR WHERE GRASSY AREA IS NOT AVAILABLE.

4. THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. A

PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE.

5. THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP

INTAKES SHALL BE FLOATING AND SCREENED.

6. FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY AND NOT RESUME UNTIL THE PROBLEM

IS CORRECTED.

7. LOCATION OF DISCHARGE SHALL BE APPROVED BY THE COR.

DISCHARGE HOSE

CLAMPS (TYP)

INTAKE HOSE

PUMP

HEAVY DUTY LIFTING STRAPS

(RECOMMENDED)

DISCHARGE HOSECLAMPS (TYP)

INTAKE HOSE

PUMP

FILTER BAG

PUMPED WATER FILTER BAG

NTS

GENERAL NOTES

SEEDING SPECIFICATIONS4 NTS

SOURCE: NEW YORK STATE STANDARDS AND SPECIFICATIONS FOR

EROSION AND SEDIMENT CONTROL (2016)

MIX #4 SHALL BE USED FOR

PERMANENT SEEDING

MIX #6 SHALL BE USED FOR

TEMPORARY SEEDING

NOTES:

1. THE PHYSICAL PARAMETERS OF THE COMPOST SHOULD COMPLY WITH THE

STANDARDS IN TABLE 5.2.

2. THE CONTRACTOR SHALL USE A SOCK WITH THE APPROPRIATE MATERIAL

CHARACTERISTICS, BASED ON THE TIME REQUIRED TO BE IN PLACE.

ON SOIL

ON PAVEMENT

DISTURBED AREA

UNDISTURBED AREA

COMPOST FILTER SOCK

BLOWN/PLACED

FILTER MEDIA

CONCRETE BLOCK

(MIN 6"X6"X6")

SECTION

UNDISTURBED AREA

DISTURBED AREA

PLAN VIEW - PAVED AREAS

COMPOST FILTER

SOCK

EXISTING

CONTOURS

CONCRETE BLOCKS SPACED 3'

(TYP) C TO C

FL

OW FLOW

PLAN VIEW - GRASS AREAS

COMPOST FILTER SOCK5

2 IN. x 2 IN.

WOODEN STAKES

PLACED 10 FT ON

CENTER

EXISTING

CONTOURS

COMPOST

FILTER SOCK

NTS

SOURCE: NEW YORK STATE STANDARDS AND SPECIFICATIONS FOR

EROSION AND SEDIMENT CONTROL (2016)

NOTES:

SOCK FABRIC SHALL MEET STANDARDS OF TABLE 5.1 OF THE NEW YORK STATE STANDARDS AND

SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL.

COMPOST SHALL MEET THE STANDARDS OF TABLE 5.2 OF THE NEW YORK STATE STANDARDS AND

SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL.

COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE BARRIER SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN BARRIER ALIGNMENT.

MAXIMUM SLOPE LENGTH ABOVE ANY BARRIER SHALL NOT EXCEED THAT SPECIFIED FOR THE SIZE OF

THE SOCK AND THE SLOPE OF ITS TRIBUTARY AREA.

TRAFFIC SHALL NOT BE PERMITTED TO CROSS COMPOST FILTER SOCKS.

ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES 1/2 THE ABOVE GROUND HEIGHT OF

THE BARRIER AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.

COMPOST FILTER SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER’S SPECIFICATIONS OR REPLACED WITHIN

24 HOURS OF INSPECTION.

BIODEGRADABLE COMPOST FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO MANUFACTURER’S

RECOMMENDATIONS.

UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT

OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.

FL

OW

FLO

W

DISTURBED AREA

UNDISTURBED AREA

DISTURBED AREA

UNDISTURBED AREA

IN

M

IN

2 IN. x 2 IN. WOODEN STAKES

PLACED 10 FT ON CENTER

COMPOST FILTER SOCK

BLOWN/PLACED

FILTER MEDIA

14-IN. OR LESS

15-IN. TO 19-IN.

20-IN. OR MORE

10-FT.

12-FT.

15-FT.

TREE DIAMETER

(DBH)

DISTANCE OF FENCING

FROM FACE OF TREE

TRUNK

4-

FT

ORANGE

CONSTRUCTION

SAFETY FENCE

APPLICATION NOTES:

1. TO PRESERVE EXISTING VEGETATION DETERMINED TO BE

IMPORTANT FOR SOIL EROSION CONTROL, WATER QUALITY

PROTECTION, SHADE, SCREENING, BUFFERS, WILDLIFE

HABITAT, WETLAND PROTECTION, AND OTHER VALUES.

CONSTRUCTION SPECIFICATIONS:

1. CONSTRUCT STURDY FENCE, OR BARRIER AROUND EACH

TREE TO BE PRESERVED WITHIN THE DISTURBED AREA.

2. PLACE FENCE AT THE DRIP LINE OF THE TREE CANOPY OR AT

THE DISTANCE LISTED IN THE CHART BELOW, WHICHEVER IS

GREATER.

3. DO NOT LEAVE CONSTRUCTION EQUIPMENT RUNNING OR

IDLING UNDER THE TREE CANOPIES.

4. THERE SHALL BE NO STORAGE OF CONSTRUCTION

MATERIALS BENEATH THE TREE CANOPIES.

MAINTENANCE NOTES:

1. MAINTENANCE OF FENCES AROUND TREES AS NEEDED OR

DIRECTED BY THE OWNERS REPRESENTATIVE.

2. UPON STABILIZATION OF THE SITE REMOVE THE TREE

PROTECTION FENCES.

TREE PROTECTION

NTS

10 mil PLASTIC LINING

NOTES:

1. ACTUAL LAYOUT DETERMINED IN THE FIELD.

2. CONCRETE WASHOUT SIGN (SEE FIG. 4-15) SHALL BE INSTALLED WITHIN 10m OF THE

TEMPORARY CONCRETE WASHOUT FACILITY.

PLAN

NOT TO SCALE

STRAW BALE (TYP.)

3m MIN.

VA

RI

ES

B B

10 mil PLASTIC LINER

NATIVE MATERIAL

(OPTIONAL)

SECTION B-B

NOT TO SCALE

CONCRETE WASHOUT SIGN DETAIL

(OR EQUIVALENT)

NOT TO SCALE

CONCRETE

WASHOUT

PLYWOOD

1200mm x 610 mm

PAINTED WHITE

BLACK LETTERS

150mm HEIGHT

LAG SCREWS

(12.5mm)

WOOD POST

(89mm x 89mm x 2.4m) mm mm

TYPE "ABOVE GRADE"

WITH STRAW BALES

STAKE

(TYP.)

STAPLES (2

PER BALE)

WOOD OR METAL

STAKES (2 PER

BALE)

STRAW BALE

BINDING WIRE

STAPLE DETAIL

m m

50 mm

3.05 mm DIA.

STEEL WIRE

CONCRETE WASHOUT DETAIL1 NTS

SOURCE: NEW YORK STATE STANDARDS AND SPECIFICATIONS FOR

EROSION AND SEDIMENT CONTROL (2016)

MFPP SHALL BE USED FOR

COMPOST FILTER SOCKS

NOTES:

1. THE CONTRACTOR SHALL USE HYDRO-SEEDING FOR

APPLICATION OF SEED MIXTURE.

2. REFER TO GENERAL NOTE 8 ON DRAWING GI002.

TEMPORARY CONSTRUCTION FENCE

NTS6

1. ALL AREAS SHALL BE PROTECTED BY FENCING UNTIL WORK HAS BEEN

COMPLETED AND ACCEPTED BY THE COR.

2. THE FENCING MUST REMAIN IN PLACE DURING ALL PHASES OF CONSTRUCTION;

ANY CHANGE OF THE FENCING MUST BE APPROVED BY THE COR.

3. REFER TO FENCING ON PLANS CG101 THROUGH CG103.

4. REFER TO DEMOLITION NOTE 2 AND NOTE 3 ON DRAWING GI002.

6' M

IN

IM

UM

H

EI

GH

T

12' MAXIMUM LENGTH

INSTALL SANDBAGS ON

EACH POST FOOTING

GALVANIZED HEAVY DUTY

TEMPORARY PANEL FENCE PER

ASTM A392-06

CONSTRUCTION SECURITY SIGN

SHALL PER PLACED ON EVERY 3RD

PANEL. SIGN TO BE SUBMITTED TO

COR FOR APPROVAL PRIOR TO

CONSTRUCTION.

File details come from the government source that posted it. Updated .