This document contains construction drawings and details for upgrading an existing permanent pump station at the Batavia VA Medical Center in Batavia, New York. The scope of work includes removing the existing submersible pumps and control panel and replacing them with new Flygt NP3085SH255 pumps rated at 4 inches, 4 HP, with a mix-flush valve attachment and a new duplex control panel. Additional upgrades include replacing check valves, ball valves, discharge and suction piping, vent piping, lift chains and rails to accommodate the new pumps. Modifications are also specified to an existing air release manhole. The related federal contract opportunity is solicitation number 36C24222B0037 for ground water mitigation work at Building 30 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2.

View the file

Other files

File Type Posted
36C24222B0037 0005.docx DOCX document
014529-Testing_Laboratory.pdf PDF
333000 - Sanitary Sewer Utilities.pdf PDF
079200-Joint_Sealant.pdf PDF
12. CG101 Erosion and Sedimentation Control Plan A.pdf PDF
260519-Low-Voltage_EPower_Cond_and_Cables.pdf PDF
040100-Maintenance_of_Masonry.pdf PDF
15. CS501 Construction Details.pdf PDF
220523-General_Duty_Valves_for_Plumbing_Piping.pdf PDF
022113-Site_Survey.pdf PDF
13. CG102 Erosion and Sedimentation Control Plan B.pdf PDF
015719-Temporary_Enviromental_Controls.pdf PDF
3. GI003 Contractor Submittal List.pdf PDF
23. EP101 Power Basement New Work Plan.pdf PDF
101400-Signage.pdf PDF
312011-Earthwork_Short_Form.pdf PDF
018113-Sustanabile_Construction_Requirements.pdf PDF
36C24222B0037 0004.pdf PDF
220511-Common_Work_Results_for_Plumbing.pdf PDF
010000-General_Requirements.pdf PDF
329000-Planting.pdf PDF
4. CD100 Overall Existing Features Plan.pdf PDF
16. CS502 Construction Details.pdf PDF
260526-Grounding_and_Bonding_for_Electrical_Systems.pdf PDF
024100-Demolition.pdf PDF
055000-Metal_Fabrication.pdf PDF
6. CD102 Existing Features and Demolition Plan B.pdf PDF
000115-List_of_Drawings.pdf PDF
260541-Underground_Electrical_Construction.pdf PDF
262911-Motor_Controllers.pdf PDF
Drawings Amendment 2.pdf PDF
1. GI001 Title Sheet.pdf PDF
321723-Pavement_Markings.pdf PDF
18. PP101 Plumbing Piping Plan.pdf PDF
320523-Cement_and_Conc_for_Ext_Imp.pdf PDF
040513-Masonry_Mortaring.pdf PDF
11. CU103 Groundwater Force Main Plan & Profile C.pdf PDF
321216-Asphalt_Paving.pdf PDF
2. GI002 General Notes Sheet.pdf PDF
220512-General_Motor_Requirements_for_Plumbing_Equipment.pdf PDF
334000-Storm_Sewer_Utilities.pdf PDF
20. ED101 Electrical Systems Demolition Plan.pdf PDF
312319-Dewatering.pdf PDF
14. CG103 Erosion and Sedimentation Control Plan C.pdf PDF
014219-Reference_Standards.pdf PDF
10. CU102 Groundwater Force Main Plan & Profile B.pdf PDF
_CoverBatavia.pdf PDF
033053-Concrete_Short_Form.pdf PDF
323113-Chain_Link_Fences_and_Gates.pdf PDF
21. ES101 Electrical Systems New Work Plan.pdf PDF
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8/1/2022

Batavia VA Medical Center Batavia, NY

528A4-18-203

CHRIS GEARY PE# 099085

Schadler/Waldron Geary

Project Number

Building Number

Sheet Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

REVISED PER CONFERENCE CALL ON MARCH 9, 2021

REVISED PER 60% DESIGN REVIEW LETTERS

REVISED PER 90% DESIGN REVIEW LETTERS

REVISED PER FONT ISSUE/LINE ISSUE

5/11/2021 9/10/2021 2/4/2022 7/26/2022

CS503

17 23

Construction Details Bid Documents For Construction

Improve Ground Water, Building 30

MODIFICATION TO EXISTING PERMANENT PUMP STATION DETAIL & NOTES

NTS

PUMP STATION

SIDE VIEW

PUMP STATION LEGEND

EXISTING 6' DIAMETER PRECAST REINFORCED CONCRETE MANHOLE RISERS, FLAT SLAB

COVER AND BASE ASTM C-478 WITH ROUND RUBBER GASKET JOINTS ASTM C-443 (APPLY

FLEXIBLE JOINT SEALER TO JOINTS) . INTERIOR AND EXTERIOR TO BE COATED WITH 2

COATS KOPPERS BITUMASTIC SUPER SERVICE BLACK OR APPROVED EQUAL.

REMOVE EXISTING DUPLEX SUBMERSIBLE PUMPS FLYGT, MODEL NP 3085 MP3 4" DISCHARGE

60 HZ, 3 PHASE, 2.2 HP, 7.6 AMPS, 208 VOLTS, AND RETURN TO VA . REPLACE WITH NEW

DUPLEX SUBMERSIBLE PUMPS FLYGT, MODEL NP 3085 SH255 4" DISCHARGE 60 HZ, 3 PHASE,

4 HP, 11 AMPS, 208 VOLTS WITH MIX-FLUSH VALVE ATTACHMENT (OR APPROVED EQUAL) .

CONTRACTOR SHALL REPLACE EXISTING CHAINS AND RAILS WITH NEW LIFT CHAINS AND

RAILS SIZED TO FIT NEW PUMPS

EXISTING 4" STEEL VENT PIPE WITH BIRD SCREEN

FINISH PAINT WITH 2 COATS BATTLESHIP GRAY RUST PROOF PAINT

NEW 4" DISCHARGE PIPING (D.I.P. CL 52 FLANGE JOINT PIPE AND FITTINGS)

EXISTING 3" SUCTION PIPE HOSE FITTING (D.I.P. CL 52 FLANGED JOINT PIPE AND FITTINGS), PIPE SUPPORTS WITH STAINLESS STEEL ANCHOR BOLTS, FLAIR FITTING 6" FROM BOTTOM

AND SCREWED FLANGE, SHORT NIPPLE AND BRONZE CAP ABOVE CONCRETE SLAB COVER

EXISTING 3" DISCHARGE PIPING (D.I.P. CL 52 FLANGE JOINT PIPE AND FITTINGS) TO REMAIN

EXISTING 4"X3" REDUCER TO BE REPLACED

NEW 4" CHECK VALVE

NEW 4" BALL VALVE

TABLE OF INVERTS ELEVATION

3" DISCHARGE PIPES - INVERT ELEVATION(EXISTING) 898.33

HIGH WATER ALARM LEVEL - ELEVATION 891.50

TURN ON TWO PUMPS - ELEVATION 891.00

TURN ON ONE PUMP - ELEVATION 890.50

TURN OFF LEVEL - ELEVATION 886.70

BOTTOM OF WET WELL - ELEVATION (EXISTING) 885.70

INFLUENT - INVERT ELEVATION (EXISTING) 890.60

TOP OF HATCH/TOP OF SLAB - ELEVATION (EXISTING) 903.80

BUILDING

WALL

PUMP STATION NOTES:

1. NEW PUMP AND CONTROL POWER: REFER TO ELECTRICAL DRAWINGS.

2. CONTRACTOR SHALL REPLACE EXISTING CONTROL PANEL AND INSTALL NEW DUPLEX

CONTROL PANEL (TYPE 4X OUTDOOR WATER & DUST-TIGHT) PER PUMP MANUFACTURE

SPECIFICATIONS. REFER TO ELECTRICAL DRAWINGS.

8 7

9 9

PUMP STATION

FRONT VIEW

REPLACEMENT PUMP DESIGN CRITERIA:

G.P.M.=125 MINIMUM

T.D.H.=62 FT. MINIMUM

PUMP STATION

TOP VIEW

A

B

C

D

E

F

G

H

G

B

C

D

E F

H

6"

MIN.

5.0' 6"

MIN.

1" AIR RELEASE VALVE W/

WATERTIGHT CONNECTION

FILL OPENING FOR PIPE

WITH BEDDING

MATERIAL

8" THICK OPENING TO BE

OFFSET AS REQUIRED FOR

STEPS. DO NOT CAST FRAME &

COVER INTO ROOF OPENING

MANHOLE

STEPS 12" O.C.

BEDDING (NYSDOT TYPE 2)

UNDISTURBED/UNEXCAVATED

EARTH

BUTYL ROPE SEALANT

BETWEEN PRECAST

CONCRETE SECTIONS

(TYP.)

24" MIN (TYP.)

ADJUST MANHOLE FRAME TO

GRADE WITH MIN. 4000 PSI

CONCRETE RISER SECTION OR

GRADE RINGS WITH

NON-SHRINKING CEMENT MORTAR

(NYSDOT ITEM NO. 705-21). GRADE

RINGS TO BE 3" MIN TO 12" MAX.

CEMENT FILLET AROUND

PERIMETER OF FRAME

LIGHT DUTY FRAME AND VENTED

COVER LABELED "STORM"

FINISHED GRADE

3" HDPE

PRE-CAST

HOLE

NON WOVEN

SEPARATION FABRIC

4000 PSI MIN. REINFORCED

CONCRETE MANHOLE BY FORT

MILLER CO., OR APPROVED

EQUAL. ASPHALT

WATERPROOFING COMPOUND

APPLIED TO ENTIRE EXTERIOR

SURFACE STRUCTURE, 3 MIL DFT.

26" MIN.

OPENING ECCENTRIC

OVER STEPS

PRECAST CONCRETE AIR RELEASE MANHOLE

NTS14

15"x15"

CONCRETE BASE

CONCRETE BLOCK

OR PIPE STAND

BASIS OF DESIGN FOR AIR RELEASE VALVE:

1" UNIVERSAL AIR RELEASE VALVE CRISPIN MODEL UL10,

UNIVERSAL TYPE, 1" NPT INLET & OUTLET, 3/16" AVO, S/S

TRIM, BUNA-N SEAT, STEEL BOLTS & NUTS, LINED AND

COATED WITH 8 +/-4 MILS DFT OF TNEMEC 141 EPOXY,

2-40 PSI WORKING PRESSURE. VALVE TO HAVE

PROTECTOP OPTION INSTALLED.

2'

PIPE SUPPORT SHALL BE

BOLTED/EPOXY GLUED INTO WALL

3"x3"x1 BUTT FUSION

REDUCER TEE

1' M

IN

1" BUTT FUSION x 1"

MALE STAINLESS STEEL

THREADED TRANSITION

1" THREADED

STAINLESS STEEL PIPE

BASIS OF DESIGN FOR PIPE SUPPORT:

-WALL ROD HANGER PLATE, 38" ROD

-3/8"-16 THREAD ROD

-1" STAINLESS STEEL SPLIT RING HANGER

16"