7. CD103 Existing Features and Demolition Plan C.pdf

PDF 2 MB Posted

Attached to
Z1DA--528A4-18-203 GROUND WATER MITIGATION BUILDING 30
Solicitation number
36C24222B0037
Issued by

About this file

This document includes an existing features and demolition plan drawing and related federal contract opportunity solicitation. The drawing depicts existing site features at a VA medical center campus including utilities, structures, vegetation and topographical information. It identifies various site elements that are to be removed or cleared as part of a contract to address groundwater issues at Building 30. The solicitation seeks bids for a contract to mitigate groundwater and support demolition work in accordance with the specifications in the drawing. Relevant details include the soliciting agency is the Department of Veterans Affairs, Veterans Health Administration VISN 2 for work at the Batavia VA Medical Center in Batavia, New York. The contractor will be responsible for test pits, tree removal, stump grinding, debris removal and site stabilization.

View the file

Other files

File Type Posted
36C24222B0037 0005.docx DOCX document
014529-Testing_Laboratory.pdf PDF
333000 - Sanitary Sewer Utilities.pdf PDF
079200-Joint_Sealant.pdf PDF
12. CG101 Erosion and Sedimentation Control Plan A.pdf PDF
260519-Low-Voltage_EPower_Cond_and_Cables.pdf PDF
040100-Maintenance_of_Masonry.pdf PDF
15. CS501 Construction Details.pdf PDF
220523-General_Duty_Valves_for_Plumbing_Piping.pdf PDF
022113-Site_Survey.pdf PDF
13. CG102 Erosion and Sedimentation Control Plan B.pdf PDF
015719-Temporary_Enviromental_Controls.pdf PDF
3. GI003 Contractor Submittal List.pdf PDF
23. EP101 Power Basement New Work Plan.pdf PDF
101400-Signage.pdf PDF
312011-Earthwork_Short_Form.pdf PDF
018113-Sustanabile_Construction_Requirements.pdf PDF
36C24222B0037 0004.pdf PDF
220511-Common_Work_Results_for_Plumbing.pdf PDF
010000-General_Requirements.pdf PDF
329000-Planting.pdf PDF
4. CD100 Overall Existing Features Plan.pdf PDF
16. CS502 Construction Details.pdf PDF
260526-Grounding_and_Bonding_for_Electrical_Systems.pdf PDF
024100-Demolition.pdf PDF
055000-Metal_Fabrication.pdf PDF
6. CD102 Existing Features and Demolition Plan B.pdf PDF
000115-List_of_Drawings.pdf PDF
260541-Underground_Electrical_Construction.pdf PDF
262911-Motor_Controllers.pdf PDF
Drawings Amendment 2.pdf PDF
1. GI001 Title Sheet.pdf PDF
321723-Pavement_Markings.pdf PDF
18. PP101 Plumbing Piping Plan.pdf PDF
320523-Cement_and_Conc_for_Ext_Imp.pdf PDF
040513-Masonry_Mortaring.pdf PDF
11. CU103 Groundwater Force Main Plan & Profile C.pdf PDF
321216-Asphalt_Paving.pdf PDF
2. GI002 General Notes Sheet.pdf PDF
17. CS503 Construction Details.pdf PDF
220512-General_Motor_Requirements_for_Plumbing_Equipment.pdf PDF
334000-Storm_Sewer_Utilities.pdf PDF
20. ED101 Electrical Systems Demolition Plan.pdf PDF
312319-Dewatering.pdf PDF
14. CG103 Erosion and Sedimentation Control Plan C.pdf PDF
014219-Reference_Standards.pdf PDF
10. CU102 Groundwater Force Main Plan & Profile B.pdf PDF
_CoverBatavia.pdf PDF
033053-Concrete_Short_Form.pdf PDF
323113-Chain_Link_Fences_and_Gates.pdf PDF
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4" C

.I.

G

AS

L

IN

E

4" C.I. GAS LINE

4" C.I. GAS LINE

E.O.P.

CHAINLINK FENCE

30"

TREE

30"

TREE

40"

TREE

25"

TREE

40"

TREE

24"

TREE

UNKNOWN

UTILITY

TH #14

D

STORM MH

RIM: 911.69

STS24" D.I.P.

D

STORM MH

RIM: 908.50

INV. IN: 895.06 (S)

INV. OUT: 894.86

STS

STS

STS24" D.I.P.

D

STORM MH

RIM: 901.51

INV. IN: 893.54 (S)

INV. OUT: 893.34

STS

STS

STS

STS

131' of 24" D.I.P. S=0.010

24" RCP

24"

TREE

30"

TREE

24"

TREE

903904 906907908909

903904

STORMWATER COLLECTION SYSTEM

POTENTIALLY NOT ACTIVE

36"

TREE

36"

TREE

36"

TREE

STUMP

WOODED AREA TO BE CLEARED

CHAINLINK

FENCE

4" C

.I.

G

AS

L

IN

E

4" C.I. GAS LINE

4" C.I. GAS LINE

E.O.P.

CHAINLINK FENCE

30"

TREE

30"

TREE

40"

TREE

25"

TREE

40"

TREE

24"

TREE

UNKNOWN

UTILITY

TH #14

D

STORM MH

RIM: 911.69

STS24" D.I.P.

D

STORM MH

RIM: 908.50

INV. IN: 895.06 (S)

INV. OUT: 894.86

STS

STS

STS24" D.I.P.

D

STORM MH

RIM: 901.51

INV. IN: 893.54 (S)

INV. OUT: 893.34

STS

STS

STS

STS

131' of 24" D.I.P. S=0.010

24" RCP

24"

TREE

30"

TREE

24"

TREE

903904 906907908909

903904

STORMWATER COLLECTION SYSTEM

POTENTIALLY NOT ACTIVE

36"

TREE

36"

TREE

36"

TREE

STUMP

WOODED AREA TO BE CLEARED

CHAINLINK

FENCE

LdLm A

LmAOnBVA HOSPITAL DR.

BLDG. 21

CONC. ROAD BASE

APPROXIMATE

LOCATION

40" TREE

24"

TREE

18"

TREE

24"

TREE

SEE SHEET CD104

SE

E

SH

EE

T C D1

SE

E

SH

EE

T C D1

RICHMOND AVE.

VA HOSPITAL DR.

MEMORIAL DR.

RED

FIE

LD

PK

WY.

PA

RK

R D.

VETERANSA

B

C D

SITE SYMBOL - DEMOLITION

EXISTING LAWN AREA TO BE REMOVED

AND RESTORED

SITE SYMBOL

TEST HOLE #TH#

TREES TO BE REMOVED AS PART OF THIS

CONTRACT, SEE TREE REMOVAL SCHEDULE

EXISTING TREELINE TO BE REMOVED

8/1/2022

Batavia VA Medical Center Batavia, NY

528A4-18-203

CHRIS GEARY PE# 099085

Schadler/Waldron Geary

811 OR 1-800-962-7962

Project Number

Building Number

Sheet Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

KEY MAP

1"=800'

SCALE: 1"=20'

40'20'0'

TEST HOLE RESULTS BY ENGINEER

TEST HOLE

NUMBER

DEPTH TO

UTILITY

(FEET)

UTILITY

PIPE

SIZE

(INCHES)

REMARKS

14 2.7 GAS 4

GAS LINE IS MARKED AS 30 INCH ON

AS-BUILT DRAWINGS. THE EXPOSED LINE

WAS A FOUR INCH GAS LINE.

IF TREE ROOTS ARE ENCOUNTERED DURING

EXCAVATION, THE CONTRACTOR SHALL CUT

DOWN TREE AND REMOVE THE STUMP AS

PART OF THIS CONTRACT. REFER TO TREE

REMOVAL SCHEDULE AS THERE ARE SIX (6)

ADDITIONAL TREES (47 THROUGH 52) TO BE

REMOVED AS PART OF THIS CONTRACT

GENERAL NOTES:

1. THE CONTRACTOR SHALL CONDUCT SIX (6) TEST PITS WITH THE COR WITNESSING TO

VERIFY EXISTING CONDITIONS. TEST PITS SHALL BE CONDUCTED AFTER COORDINATION

WITH VA COR AND INSPECTED BY THE VA COR FOR ACCEPTANCE. THE CONTRACTOR SHALL

PROVIDE A SUBMITTAL WITH DOCUMENTATION OF THE TEST PITS CONDUCTED.

2. REFER TO TREE REMOVAL SCHEDULE ON THIS DRAWING. AREA WHERE TREES REMOVED

SHALL BE PROMPTLY STABILIZED TO PREVENT SOIL EROSION AND METHODS OF

STABILIZATION SHALL BE SUBMITTED AS PER THE SOILD AND EROSION CONTROL PLAN

SUBMITTALS.

3. AS PER THE 010000 GENERAL REQUIREMENTS, THE CONTRACTOR SHALL REPORT ANY PRE-EXISTING

CONDITIONS TO VA COR PRIOR TO COMMENCEMENT OF WORK OR THE CONTRACTOR SHALL

RESUME RESPONSIBILITY OF ANY ISSUES DISCOVERED.

SITE SYMBOLS - GENERAL

BENCHMARK:

DRAWING BLOCK TITLE WITH GRAPHIC SCALE

(SHOWN HALF ACTUAL SIZE)

BRICK WALKWAY

PLAN

DIMENSION

A

SITE SYMBOLS - CONCRETE/MASONRY

SITE SYMBOLS - UTILITIES

NOTE:

VERTICAL TEXT INDICATES PROPOSED FEATURES (PROP.)

SLANTED TEXT INDICATES EXISTING FEATURES (EX.)

STORM SEWER LINE

UTILITY, UTILITY POLE (UP)

UTILITY, WATER MANHOLEW

UTILITY, ELECTRICAL MANHOLEE

SIGN

WATER LINE

EDGE OF PAVEMENT

CURB LINE

MINOR CONTOUR

MAJOR CONTOUR

SITE SYMBOLS - EXISTING

TREE

DRAINAGE CATCH BASIN

DETAIL NUMBER

DETAIL SHEET

SITE SYMBOLS - ABBREVIATIONS

ELECTRIC LINE

Ø DIAMETER

APPROX APPROXIMATELY

BLDG BUILDING

CIP CAST IRON PIPE

CO CLEANOUT

CONC CONCRETE

CS CURB STOP

DIP DUCTILE IRON PIPE

DS DOWN SPOUT

EB ELECTRIC BOX

ELEC ELECTRIC

EMH ELECTRIC MANHOLE

EHH ELECTRIC HANDHOLE

EOP EDGE OF PAVEMENT

FES FLARED END SECTION

GOVT GOVERNMENT

GV GAS VALVE

HDPE HIGH DENSITY POLY ETHYLENE

INSP INSPECTION

INV STORMWATER PIPE END

IP IRON PIN

LF LINEAR FEET

MH MANHOLE

N/F NOW OR FORMERLY

NRCS NATIONAL RESOURCE CONSERVATION SERVICE

PLCC PLAIN CEMENT CONCRETE

PVC POLYVINYL CHLORIDE

PVMT PAVEMENT

RCP REINFORCED-CONCRETE PIPE

S'WALK SIDEWALK

SF SQUARE FEET

SAN CO SANITARY CLEANOUT

STMH STEAM MANHOLE

TELE TELEPHONE

TEMP TEMPORARY

TMH TELEPHONE MANHOLE

TH TEST HOLE

TYP TYPICAL

WMH WATER MANHOLE

Y/4" 4" WIDE YELLOW PAINT LINE

DRAINAGE MANHOLE (DMH)D

GAS VALVE

HYDRANT, FIRE (FH)

UTILITY, SANITARY MANHOLE - (SAN MH)S

WATER VALVE (WV)

COMMUNICATION LINE

FIBER OPTIC LINE

GAS LINE

SANITARY SEWER LINE

STS

STEAM LINE

TELEPHONE LINE

UNKNOWN LINE

CENTERLINE

CHAINLINK FENCE

X X METAL FENCE

NRCS SOIL LINE

VEGETATION

LAMP POST

LIGHT POST (LP)

BOLLARD

CONCRETE

APPROXIMATE PROPERTY LINE

E UTILITY, ELECTRICAL HANDHOLE

COMM

GAS

SAN

ST

REVISED PER CONFERENCE CALL ON MARCH 9, 2021

REVISED PER 60% DESIGN REVIEW LETTERS

REVISED PER 90% DESIGN REVIEW LETTERS

REVISED PER FONT ISSUE/LINE ISSUE

5/11/2021 9/10/2021 2/4/2022 7/26/2022

CD103

7 23

Existing Features And Demolition Plan 'C' Bid Documents For Construction

Improve Ground Water, Building 30

TREE REMOVAL NOTES:

A. THE LOCATION AND DIAMETER OF THE TREES SHOWN IN THE CHART, PROVIDED ON DRAWINGS CD-101

THROUGH CD-104, ARE AN APPROXIMATE LOCATION AND BASE SIZE. ALL OF THE TREES ON CAMPUS ARE MARKED WITH YELLOW TAGS AND THE CORRESPONDING NUMBER. BIDDERS SHALL VERIFY TREES ON

CAMPUS PRIOR TO BIDDING ON PROJECT.

B. TREES SHALL BE CUT DOWN, STUMPS AND ROOTS GROUND DOWN MINIMUM OF 6 INCHES BELOW SURFACE, ALL DEBRIS REMOVED FROM SITE (WOOD AND SAW DUST), PROVIDE 6 INCHES OF CLEAN AND SCREENED TOPSOIL, HYDROSEEDED AND WATER DAILY AS PER THIS CONTRACT (USING A WATER TRUCK).

SAWDUST SHALL NOT BE BURIED, ALL SAW DUST SHALL BE REMOVED FROM SITE AND INSPECTED BY VA COR PRIOR TO TOPSOIL. THESE REQUIREMENTS ARE FURTHER OUTLINED IN THE NOTES ON DRAWING

GI002.

C. GRIND STUMP, NO TREE TO CUT AT THIS LOCATION.

D. MISCELLANEOUS TREE(S) TO BE REMOVED DURING THE PROJECT IDENTIFIED BY THE VA COR. THE TREES

THAT SHALL BE REMOVED IN ADDITION TO WHAT IS IDENTIFIED ON THE DRAWINGS ARE UP TO 36 INCHES

IN DIAMETER AT THE BASE OF THE TREE.

TREE REMOVAL SCHEDULE

DRAWING ITEM #

BASE

DIAMETER

(INCHES)

NOTES

CD-103 20 40 A,B

CD-103 21 25 A,B

CD-103 22 30 A,B

CD-103 23 36 A,B

NA 47 36 A,B,D

NA 48 36 A,B,D

NA 49 36 A,B,D

NA 50 36 A,B,D

NA 51 36 A,B,D

NA 52 36 A,B,D

DURING EXCAVATION THE CONTRACTOR WILL

ENCOUNTER RELATIVELY ROCKY SOIL. THE

CONTRACTOR SHALL REMOVE ALL OF THE ROCKS

FROM THE CAMPUS THAT ARE EXCAVATED LARGER

THAN A SOFTBALL IN SIZE. THE ROCKS SHALL NOT BE

RE-BURIED WHERE THEY CAN DAMAGE THE FORCE

MAIN PIPE OR TWO (2) PVC CONDUITS.

THE WOODED AREA WHERE THE FORCE MAIN WATER PIPE IS RUNNING PAST THE MAINTAINED

TREE LINE SHALL BE CLEARED AS PART OF THIS CONTRACT APPROXIMATELY 5 FEET MINIMUM

TO THE LEFT AND TO THE RIGHT OF THE PATH FOR THE FORCE MAIN WATER PIPE. THE

CONTRACTOR MAY ELECT TO CLEAR ADDITIONAL AREA FOR THEIR EQUIPMENT AND WORKING

AREA AT THEIR EXPENSE. TREES THAT ARE CUT DOWN BEYOND THE 5 FEET MINIMUM AREA

TO THE LEFT AND RIGHT OF THE FORCE MAIN WATER PIPE DO NOT NEED TO HAVE THE STUMP

GROUND. NEW TOPSOIL IS NOT NEEDED IN THIS AREA ONLY HOWEVER THE GROUND SHALL

BE COMPLETELY BACKFILLED TO THE SAME LEVEL AS ITS ORIGINAL CONDITION TO PROTECT

THE PIPE FROM FREEZING AND TO RE-ESTABLISH VEGETATION GROWTH. THE EXISTING LAYER

OF TOPSOIL SHALL BE REPLACED IN THIS AREA TO RE-ESTABLISH VEGETATION GROWTH TO

PREVENT EROSION. ALL DEBRIS THAT IS CLEARED SUCH AS TREES, ROOTS, WEEDS, ROCKS

FROM EXCAVATION, ETC. SHALL BE REMOVED FROM THE CAMPUS AT CONTRACTOR EXPENSE

AutoCAD SHX Text 200'

AutoCAD SHX Text 100'

AutoCAD SHX Text 50'

AutoCAD SHX Text

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

TU

File details come from the government source that posted it. Updated .