21. ES101 Electrical Systems New Work Plan.pdf
PDF 478 KB Posted
- Solicitation number
- 36C24222B0037
About this file
This document outlines the electrical systems new work plan and related federal contract opportunity for the Ground Water Mitigation project at Building 30 of the Batavia VA Medical Center. The plan details the work required to install new control panels and wiring to monitor and alarm seven groundwater pumps on the building management system located in Building 11. Specifics include installing pull boxes, conduits, and control wires to connect the pumps and transmit alarm signals to the boiler plant in the event of failures. Training must also be provided per VA specifications. The related federal contract opportunity is solicitation number 36C24222B0037 for the Ground Water Mitigation project at Building 30, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2. No further opportunity details are provided.
View the file
Other files
Show 40 more
Latest 50 of 76 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
B001
DATA
B002
ELEC
B003
CRAWL SPACE
CRAWL SPACE
AREAWAY
AREAWAY
B
B
D
D
L
L
P
PE K
QC M
A
F
F
G
G
H
H
J
J N
MECHANICAL
ROOM
P3 P4 P5 P6
P2
PUMP-2
P1
PUMP-1
P7
EX. VAV
TUB-2
EX. BMS
PANEL
FA
C
P
NEW CONTROL
BOX FOR P1
AND P2
NEW WORK GENERAL NOTES
1. FOR PUMPS P1 AND P2 ON THE BUILDING 30 TAB FOR THE BMS SYSTEM THERE SHALL
BE READINGS FOR THE FOLLOWING:
a. PUMP 1 TRIP ALARM
b. PUMP 2 TRIP ALARM
c. TRANSDUCER HIGH WATER LEVEL ALARM
d. FLOAT HIGH WATER LEVEL ALARM
THESE 4 POINTS PRESENTLY EXIST ON THE BMS SYSTEM AND SHALL BE REPLICATED
FOR THE NEW PUMPS P1 AND P2. THE TRIP ALARMS INDICATE WHEN EITHER PUMP
FAILS. THE HIGH WATER TRANSDUCER ALARM IS A POINT FOR THE PIT SHOULD THE
WATER LEVEL RISE WHEN THE PUMP FAILS AND THE FLOAT HIGH WATER ALARM IS IF
THE FLOAT IS TRIPPED TO INDICATE HIGH WATER.
2. FOR PUMPS P3 AND P4, IF EITHER PUMP FAILS IT WILL ALARM ON THE BMS SYSTEM AS
ONE POINT.
3. FOR PUMPS P5 AND P6, IF EITHER PUMP FAILS IT WILL ALARM ON THE BMS SYSTEM AS
ONE POINT.
4. FOR PUMP P7, IF EITHER PUMP FAILS IT WILL ALARM ON THE BMS SYSTEM AS ONE
POINT. ONE PUMP IS SHOWN AS THAT IS THE ONLY PUMP CURRENTLY OPERATIONAL,
THERE IS TYPICALLY TWO PUMPS IN THIS LOCATION.
5. THE ONLY LOCATION THAT THE SEVEN (7) SUBJECT PUMPS SHALL ALARM IS IN
BUILDING 11 BOILER PLANT. THERE SHALL BE NO ALARMS IN BUILDING 30 ON THESE
PUMPS. REFER TO ELECTRICAL SYSTEMS NEW WORK ES102.
6. THE ALARMS ON THE BMS SYSTEM FOR THE SEVEN (7) PUMPS IN BUILDING 30 SHALL
STAY IN ALARM AT THE BMS COMPUTER STATION IN BUILDING 11 ONLY AND FOR THE
AUDIO VISUAL DEVICE IN BUILDING 11 ONLY UNTIL THEY ARE ACKNOWLEDGED BY THE
BOILER PLANT OPERATOR IN BUILDING 11.
7. THERE SHALL BE A SUPPLEMENTAL AUDIO/VISUAL ALARM LOCATED IN THE BUILDING 11
BOILER PLANT MOUNTED ON THE WALL TO NOTIFY THE BOILER PLANT OPERATOR
SHOULD THERE BE NO OPERATOR LOCATED AT THE COMPUTER IN BUILDING 11. THIS
AUDIO/VISUAL ALARM WILL INITIATE IF ANY OF THE SEVEN (7) SUBJECT PUMPS FAIL
AND WILL STAY IN ALARM UNTIL ACKNOWLEDGED BY THE BOILER PLANT OPERATOR.
REFER TO ELECTRICAL SYSTEMS NEW WORK - ES102.
8. U&S SERVICES SHALL PROVIDE TRAINING AS OUTLINED IN THE VA SPECIFICATIONS
010000 GENERAL REQUIREMENTS FOR THIS WORK ADDED.
NEW WORK KEY NOTES
PROVIDE A 12X12 PULL BOX ABOVE THE EXISTING PUMP CONTROL BOXES WITH 1/2"
FLEXIBLE METAL CONDUIT TO EACH PUMP CONTROL BOX. PROVIDE A 3/4" ELECTRICAL
METALLIC TUBE (EMT) CONDUIT AND (2) #18 AWG PAIRS FOR CONTROL WIRES FROM
EXISTING VAV TUB-2 TO NEW PULL BOX.
THERE ARE TWO (2) EXISTING SPARES INPUTS THAT U&S SERVICES SHALL USE TO
CONNECT PUMPS P3, P4, P5 AND P6. NOTE: P3 AND P4 WILL SHOW AS ONE SYSTEM AND P5
AND P6 WILL SHOW AS ANOTHER SYSTEM ON THE BUILDING MANAGEMENT SYSTEM (BMS).
IF EITHER P3 OR P4 FAIL, THE BMS WILL SHOW THAT POINT HAS FAILED AND IF P5 OR P6
FAIL, THE BMS WILL SHOW TAHT POINT HAS FAILED.
THERE ARE 4 INPUTS IN VAV TUB-2 EXISTING FOR U&S SERVICES TO CONNECT PUMPS P1
AND P2. PROVIDE A 3/4" GALVANIZED RIGID STEEL CONDUIT WITH (4) #18 AWG PAIRS TO
THE NEW CONTROL BOX FOR THE PUMPS P1 AND P2.
AS PER VA SPECIFICATIONS, ALL PENETRATIONS SHALL BE SEALED WITH LIKE MATERIAL.
THESE PENETRATIONS SHALL BE WATERTIGHT TO KEEP WATER OUT OF THE BASEMENT OF
BUILDING 30. PROVIDE SUBMITTAL TO VA COR AND ENGINEER OF RECORD FOR APPROVAL
PRIOR TO INSTALLATION.
U&S SERVICES TO PROVIDE NEW CONTROL RELAYS FOR PUMPS P1 AND P2 IN NEW
CONTROL BOX. REFER TO ELECTRICAL POWER DRAWINGS AND DETAILS.
PROVIDE A JUNCTION BOX ON EXISTING CONDUIT THAT SERVES P7 AND ADD
APPROXIMATELY 150 FEET OF 1/2" EMT CONDUIT FOR PUMP P7 AND RE-ROUTE TO EITHER
THE EXISTING BMS PANEL OR EXISTING VAV TUB-2. COORDINATE WITH U&S SERVICES TO
DETERMINE WHAT LOCATION THE PUMP P-7 WILL TERMINATE AT FOR THE BMS SYSTEM.
PROVIDE A PAIR OF #18 AWG CONDUCTORS IN ELECTRICAL METALLIC TUBING CONDUIT
FROM PUMP P7 TO THE TERMINATING LOCATION AT EITHER THE BMS PANEL OR VAV TUB-2,
SELECTED BY U&S SERVICES.
REFER TO KEY NOTE 1 ON ED101, U&S SERVICES SHALL USE INPUTS IN BOTH CR7 THAT
WERE PREVIOUSLY USED BY JOHNSON CONTORLS (SIMPLEX) CONNECTED TO THE FIRE
ALARM SYSTEM.
8/1/2022
Batavia VA Medical Center Batavia, NY
528A4-18-203
CHRIS GEARY PE# 099085
Schadler/Waldron Geary
Project Number
Building Number
Sheet Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
REVISED PER CONFERENCE CALL ON MARCH 9, 2021
REVISED PER 60% DESIGN REVIEW LETTERS
REVISED PER 90% DESIGN REVIEW LETTERS
REVISED PER FONT ISSUE/LINE ISSUE
5/11/2021 9/10/2021 2/4/2022 7/26/2022
ES101
21 23
Electrical Systems New Work Plan Bid Documents For Construction
Improve Ground Water, Building 30
N
7 7