19. E001 Electrical Symbols, Abbreviations and Panel Schedules.pdf

PDF 2 MB Posted

Attached to
Z1DA--528A4-18-203 GROUND WATER MITIGATION BUILDING 30
Solicitation number
36C24222B0037
Issued by

About this file

This document contains electrical drawings and specifications for a construction project to improve groundwater mitigation at Building 30 of the Batavia VA Medical Center. Key details include:

  • The project involves installing new molded case circuit breakers, junction boxes, disconnect switches, and other electrical components. Detailed drawings show proposed locations and connections.
  • Specifications require the electrical contractor to update all affected panel schedules, label equipment, verify device locations, and coordinate with mechanical contractors. Temporary lighting, infection control procedures, and fire alarm bypass protocols are also specified.
  • A phasing plan is required to ensure pumps P1, P2 or P7 remain operational at all times to prevent basement flooding. The contractor must work with the VA Contracting Officer to develop this plan before starting any electrical system work.

The related federal contract opportunity is solicitation number 36C24222B0037 from the Department of Veterans Affairs for the groundwater mitigation construction project at Building 30 of the Batavia VA Medical Center.

View the file

Other files

File Type Posted
36C24222B0037 0005.docx DOCX document
014529-Testing_Laboratory.pdf PDF
333000 - Sanitary Sewer Utilities.pdf PDF
079200-Joint_Sealant.pdf PDF
12. CG101 Erosion and Sedimentation Control Plan A.pdf PDF
260519-Low-Voltage_EPower_Cond_and_Cables.pdf PDF
040100-Maintenance_of_Masonry.pdf PDF
15. CS501 Construction Details.pdf PDF
220523-General_Duty_Valves_for_Plumbing_Piping.pdf PDF
022113-Site_Survey.pdf PDF
13. CG102 Erosion and Sedimentation Control Plan B.pdf PDF
015719-Temporary_Enviromental_Controls.pdf PDF
3. GI003 Contractor Submittal List.pdf PDF
23. EP101 Power Basement New Work Plan.pdf PDF
101400-Signage.pdf PDF
312011-Earthwork_Short_Form.pdf PDF
018113-Sustanabile_Construction_Requirements.pdf PDF
36C24222B0037 0004.pdf PDF
220511-Common_Work_Results_for_Plumbing.pdf PDF
010000-General_Requirements.pdf PDF
329000-Planting.pdf PDF
4. CD100 Overall Existing Features Plan.pdf PDF
16. CS502 Construction Details.pdf PDF
260526-Grounding_and_Bonding_for_Electrical_Systems.pdf PDF
024100-Demolition.pdf PDF
055000-Metal_Fabrication.pdf PDF
6. CD102 Existing Features and Demolition Plan B.pdf PDF
000115-List_of_Drawings.pdf PDF
260541-Underground_Electrical_Construction.pdf PDF
262911-Motor_Controllers.pdf PDF
Drawings Amendment 2.pdf PDF
1. GI001 Title Sheet.pdf PDF
321723-Pavement_Markings.pdf PDF
18. PP101 Plumbing Piping Plan.pdf PDF
320523-Cement_and_Conc_for_Ext_Imp.pdf PDF
040513-Masonry_Mortaring.pdf PDF
11. CU103 Groundwater Force Main Plan & Profile C.pdf PDF
321216-Asphalt_Paving.pdf PDF
2. GI002 General Notes Sheet.pdf PDF
17. CS503 Construction Details.pdf PDF
220512-General_Motor_Requirements_for_Plumbing_Equipment.pdf PDF
334000-Storm_Sewer_Utilities.pdf PDF
20. ED101 Electrical Systems Demolition Plan.pdf PDF
312319-Dewatering.pdf PDF
14. CG103 Erosion and Sedimentation Control Plan C.pdf PDF
014219-Reference_Standards.pdf PDF
10. CU102 Groundwater Force Main Plan & Profile B.pdf PDF
_CoverBatavia.pdf PDF
033053-Concrete_Short_Form.pdf PDF
323113-Chain_Link_Fences_and_Gates.pdf PDF
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOLDED CASE CIRCUIT BREAKER

PUMP

EARTH GROUND

JUNCTION BOX

PULL BOX

DISCONNECT SWITCH, UNFUSED

ALARM STROBE WITH BOTH AUDIO AND VISUAL

ELECTRICAL GENERAL NOTES

1. ALL MOUNTING HEIGHTS ARE TO CENTER OF DEVICE UNLESS OTHERWISE NOTED.

2. ALL NEW WALL MOUNTED ELECTRICAL DEVICES ARE TO BE INSTALLED FLUSH IN WALL UNLESS OTHERWISE NOTED. ALL ELECTRICAL CONDUIT SHALL CONCEALED BEHIND FINISHED WALLS AND ABOVE FINISHED CEILING UNLESS OTHERWISE NOTED. THE COST TO CUT AND PATCH WALLS SHALL BE THE RESPONSIBILITY OF THE TRADE REQUIRING THE CUTTING.

3. CONTRACTOR SHALL UPDATE ALL PANEL SCHEDULES AFFECTED IN THE SCOPE OF WORK AREA AND SHALL LABEL ALL EQUIPMENT WITH THE CIRCUIT AND PANELS THAT THEY ARE FED FROM. EXTERIOR DEVICES SUCH AS THE DISCONNECT

SWITCHES CAN BE LABELED WITH A PERMANENT MARKER ON THE INSIDE OF THE ENCLOSURE.

4. PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW OR RELOCATED WALL OR CEILING MOUNTED DEVICES

WITH ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS.

5. COORDINATE ALL SHUT-DOWNS OF EXISTING ELECTRICAL SYSTEMS WITH OWNER A MINIMUM OF FOURTEEN (14) WORKING DAYS IN ADVANCE. ALL WORK INSIDE OF BUILDING 30 SHALL NOT BEGIN UNTIL 8AM DAILY AND BE COMPLETED

BY 3:30PM DAILY, MONDAY THROUGH FRIDAY EXCLUDING FEDERAL HOLIDAYS.

6. ALL NOISE GENERATING OPERATIONS, INCLUDING CUTTING OF CEILINGS, WALLS AND FLOORS, CORING, DRILLING, ETC.

SHALL BE SCHEDULED DURING WEEKENDS OR BETWEEN 8:00PM AND 7:00AM ON WEEKDAYS("OFF HOURS"), INCLUDING ALL PREMIUM TIME CHARGES IN BID. CONTRACTOR SHALL PROVIDE A WORK PLAN TO FOLLOW INFECTION CONTROL AND SAFETY GUIDELINES FOR THIS PROJECT. NEGATIVE AIR SHALL EXIT THE WINDOW IN THE STAIRWELL THROUGH HEPA FILTRATION, PARTICULARLY IN THE CASE OF CORE DRILLING THROUGH CONCRETE TO RUN NEW CONDUITS OR ANY

DUST GENERATING ACTIVITIES.

7. CONTRACTOR SHALL CONNECT ALL MECHANICAL EQUIPMENT COMPLETE PER MANUFACTURER'S WIRING DIAGRAMS AND INSTRUCTIONS. COORDINATE WITH MECHANICAL CONTRACTOR AND VERIFY LOCATION, VOLTAGE, AMPS, NO. OF WIRES, AND PROTECTION REQUIREMENTS PRIOR TO ROUGH-IN. CONTRACTOR SHALL SEND VA REQUESTS FOR INFORMATION

WITH ANY DISCREPANCIES OR QUESTIONS FROM DESIGN DRAWINGS.

8. ALL WORK SHALL BE PERFORMED IN STRICT CONFORMANCE WITH THE PHASING REQUIREMENTS OF THE PROJECT. ALL

COSTS ASSOCIATED WITH THESE REQUIREMENTS SHALL BE INCLUDED IN THE BID SUBMITTAL.

9. CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY LIGHTING TO ADEQUATELY LIGHT ALL CONSTRUCTION AREAS, TEMPORARILY PARTITIONED AREAS, AND EXIT CORRIDORS MAINTAINED DURING CONSTRUCTION.

10. DEFINITION: PROVIDE* - FURNISH, INSTALL AND CONNECT COMPLETE.

11. PROJECT AND PHASING SCOPE LINES INDICATE WHERE GENERAL CONSTRUCTION BOUNDARIES OCCUR. ELECTRICAL

WORK AND UTILITY TIE-INS MAY OCCUR OUTSIDE OF SCOPE LINES.

12. CONTRACTOR SHALL CALL THE VA TO PUT THE FIRE ALARM SYSTEM FOR BUILDING 30 IN BYPASS DAILY AND AT THE END OF THE DAY CALL TO TAKE IT OFF OF BYPASS. THE CONTRACTOR SHALL ALSO COVER ALL FIRE ALARM DETECTION DEVICES WITH COVERS TO PREVENT DUST FROM INFILTRATING THE SMOKE HEADS, THESE COVERS SHALL BE REMOVED DAILY. WHEN THE CONTRACTOR LEAVES AT THE END OF THE DAY THE FIRE ALARM SHALL BE 100% OPERATIONAL.

13. IF EXISTING CONDUITS THROUGH THE EXTERIOR WALL TO THE PUMP CONTROL PANEL CANNOT BE USED, THE CONTRACTOR SHALL CORE DRILL THROUGH THE CONCRETE WALL AND PROVIDE EXTERIOR RATED CONDUITS AS PER THE VA SPECIFICATIONS. THE CONTRACTOR SHALL ALLOW IN THEIR BID AND ADDITIONAL 70 FEET OF 2” DIAMETER [OR AS REQUIRED BY NFPA 70] CONDUIT FROM THE INTERIOR PANELS TO THE EXTERIOR PUMP CONTROL PANEL. THIS IS

FOR BOTH POWER AND CONTROLS FOR THE PUMPS P1 AND P2.

14. ALL CONDUITS ON THE INTERIOR OF BUILDING 30 SHALL BE NEW, REFER TO NOTE 13 FOR CONDUITS THAT PENETRATE THE BASEMENT WALL. ALL CONDUCTORS ON THIS PROJECT SHALL BE NEW FROM ORIGIN TO TERMINATION, NO CONDUCTORS SHALL BE RE-USED INCLUDING THE EXISTING CONDUCTORS TO PUMPS P1 AND P2.

PUMP CONTROL PANEL

N L3 L2 L1

N L3 L2 L1

PANEL SCHEDULE GENERAL NOTES

1. NEW CIRCUIT BREAKER SHALL MATCH WITH EXISTING IN SO FAR AS MANUFACTURER,

TYPE AND AIC RATINGS.

2. CONTRACTOR SHALL PROVIDE TWO (2) NEW 3-POLE CIRCUIT BREAKERS FOR P5 & P6

AND OUTSIDE PUMP STANDBY ON PANEL 'BLSL1'.

8/1/2022

Batavia VA Medical Center Batavia, NY

528A4-18-203

CHRIS GEARY PE# 099085

Schadler/Waldron Geary

Project Number

Building Number

Sheet Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

FROM PANEL BLSL1 #26,28,30

(EMERGENCY POWER)

FROM PANEL BPCL1-B #70,72,74

(NORMAL POWER)

NTS

ELECTRICAL SYMBOLS DIAGRAM

PUMP CONTROL PANEL POWER SUPPLY WIRING DIAGRAM DETAIL

REVISED PER CONFERENCE CALL ON MARCH 9, 2021

REVISED PER 60% DESIGN REVIEW LETTERS

REVISED PER 90% DESIGN REVIEW LETTERS

REVISED PER FONT ISSUE/LINE ISSUE

5/11/2021 9/10/2021 2/4/2022 7/26/2022

E001 19 23

Improve Ground Water, Building 30

Electrical Symbols, Abbreviations And Panel Schedules

Bid Documents For Construction

NEMA 3R

240V/60A/3PH

DISCONNECT

(TYP. FOR 2)

EXISTING 3-PHASE RECEPTACLE IN CONDUIT

FOR ANCILLARY PUMP TO REMAIN

EXISTING CONDUITS TO PUMPS

TO REMAIN

(TYP. FOR 5)

EXISTING UNISTRUT TO REMAIN

VISUAL ALARM ONLY (SOUND DISABLED)

NTS

DUAL POWER PUMP CONTROL PANEL DETAIL

EXISTING CONDUITS

TO POWER TO REMAIN

PUMP CONTROL PANEL

(4)#8 & (1)#10GR IN 3 4"C EMT,

THHN COPPER

(4)#8 & (1)#10GR IN 3 4"C EMT,

THHN COPPER

NOTES

1. CONTRACTOR SHALL INSTALL NEW CONDUIT & CONDUCTORS FROM EACH ELECTRICAL PANEL TO THE NEW PUMP

CONTROL PANEL.

2. CONTRACTOR SHALL PROVIDE NEW CONDUIT TO EXTEND FROM EXISTING CONDUIT TO NEW NEMA 3R DISCONNECT

SWITCHES ON DUAL POWER PUMP CONTROL DETAIL.

2" O.D.

2" O.D.

1.5" O.D.

NOTES

1. PUMP CONTROL PANEL IS NEMA 4X RATED, AND SHALL BE LOCKABLE WITH A PADLOCK.

2. THE PUMP CONTROL VENDOR SHALL PROVIDE (2) 2-HOUR SESSIONS (MORNING/AFTERNOON) ON PANEL TRAINING WITH

(3) COPIES OF HARD COPY MANUALS AND (1) COPY OF ELECTRONIC VERSION.

AFF ABOVE FINISH FLOOR

ATS AUTOMATIC TRANSFER SWITCH

AWG AMERICAN WIRE GAUGE

BMS BUILDING MANAGEMENT SYSTEM (BY U&S SERVICES)

C CONDUIT

EC ELECTRICAL CONTRACTOR

EX EXISTING

EMT ELECTRICAL METALLIC TUBING

FACP FIRE ALARM CONTROL PANEL

GFI GROUND FAULT INTERRUPTER

GR GROUND

IG ISOLATED GROUND

JB JUNCTION BOX

MC METAL CLAD CABLE

MCB MAIN CIRCUIT BREAKER

MCM THOUSAND CIRCULAR MILL

MDP MAIN DISTRIBUTION PANEL

MDS MAIN DISTRIBUTION SWITCHBOARD

MLO MAIN LUGS ONLY

N NEUTRAL (GROUNDED CIRCUIT CONDUCTOR)

OD OUTSIDE DIAMETER

OS OCCUPANCY SENSOR

PVC POLYVINYL CHLORIDE

RGS RIGID GALVANIZED STEEL

SWBD SWITCHBOARD

TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR

U.O.N. UNLESS OTHERWISE NOTED

V.I.F. VERIFY IN FIELD

VA COR VETERANS ADMINISTRATION CONTRACTING OFFICERS

WP WEATHER PROOF

ELECTRICAL ABBREVIATIONS

ELECTRICAL PHASING NOTES

1. AT NO TIME SHALL THE PUMPS BE DISENGAGED AND LEFT UNATTENDED BY CONTRACTOR. PUMP P7 IS THE PRIMARY

PUMP FOR THIS BUILDING. PUMPS P1 AND P2 BOTH ARE OPERATIONAL.

2. THE PUMPS AND THE ALARMS SHALL BE OPERATIONAL AT THE END OF EACH SHIFT AND CONTRACTOR SHALL ASSURE

THAT THE PUMPS ARE WORKING AND THE ALARM WILL WORK SHOULD A PUMP FAIL.

3. THE CONTRACTOR SHALL PROVIDE A PHASING PLAN FOR THIS ELECTRICAL WORK FOR THE VA TO REVIEW AND

APPROVE TO ASSURE THAT THE PUMPS AND THEIR MONITORING STAYS OPERATIONAL.

§ P1 AND P2 CURRENTLY ARE MONITORED BY THE EXISTING BMS SYSTEM.

§ PUMPS 3 THROUGH 6 ARE MONITORED BY THE FIRE ALARM CONTROL PANEL.

§ AS THE CONTRACTOR COMES UP WITH A PLAN TAKE PUMPS OFFLINE, INSTALL NEW PUMPS AND

PROVIDE THE CONTROLS TO MONITOR THE PUMPS TO ASSURE THAT THEY ARE OPERATIONAL THE

CONTRACTOR SHALL WORK WITH THE VA COR TO COME UP WITH A PROCEDURE AND PLAN TO

SCHEDULE THIS WORK.

§ THE CONTRACTOR SHALL NOT LEAVE THE BASEMENT OF BUILDING 30 UNLESS PUMPS 1 AND 2 ARE OPERATIONAL AND MONITORED FOR SYSTEM FAILURE OR PUMP P7 IS OPERATIONAL AND MONITORED

FOR SYSTEM FAILURE. PUMPS P3 TROUGH P6 ARE BACK UP PUMPS THAT CANNOT HANDLE THE

PUMPING CAPACITY OF THE GROUND WATER ON THEIR OWN. IT IS CRUCIAL THAT THE CONTRACTOR HAVE THE PUMPS AS INDICATED ABOVE OPERATIONAL AND MONITORED EACH DAY AS THE GROUND WATER INFILTRATES INTO THE BUILDING AND WILL FLOOD THE BASEMENT IN A FEW HOURS SHOULD THE

PUMPS FAIL.

§ NO WORK SHALL ON THE ELECTRICAL SYSTEM SHALL PROCEED UNTIL A PHASING PLAN IS SUBMITTED

BY THE CONTRACTOR AND APPROVED BY THE VA COR.

AutoCAD SHX Text J

AutoCAD SHX Text

PB