19. E001 Electrical Symbols, Abbreviations and Panel Schedules.pdf
PDF 2 MB Posted
- Solicitation number
- 36C24222B0037
About this file
This document contains electrical drawings and specifications for a construction project to improve groundwater mitigation at Building 30 of the Batavia VA Medical Center. Key details include:
- The project involves installing new molded case circuit breakers, junction boxes, disconnect switches, and other electrical components. Detailed drawings show proposed locations and connections.
- Specifications require the electrical contractor to update all affected panel schedules, label equipment, verify device locations, and coordinate with mechanical contractors. Temporary lighting, infection control procedures, and fire alarm bypass protocols are also specified.
- A phasing plan is required to ensure pumps P1, P2 or P7 remain operational at all times to prevent basement flooding. The contractor must work with the VA Contracting Officer to develop this plan before starting any electrical system work.
The related federal contract opportunity is solicitation number 36C24222B0037 from the Department of Veterans Affairs for the groundwater mitigation construction project at Building 30 of the Batavia VA Medical Center.
View the file
Other files
Show 40 more
Latest 50 of 76 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOLDED CASE CIRCUIT BREAKER
PUMP
EARTH GROUND
JUNCTION BOX
PULL BOX
DISCONNECT SWITCH, UNFUSED
ALARM STROBE WITH BOTH AUDIO AND VISUAL
ELECTRICAL GENERAL NOTES
1. ALL MOUNTING HEIGHTS ARE TO CENTER OF DEVICE UNLESS OTHERWISE NOTED.
2. ALL NEW WALL MOUNTED ELECTRICAL DEVICES ARE TO BE INSTALLED FLUSH IN WALL UNLESS OTHERWISE NOTED. ALL ELECTRICAL CONDUIT SHALL CONCEALED BEHIND FINISHED WALLS AND ABOVE FINISHED CEILING UNLESS OTHERWISE NOTED. THE COST TO CUT AND PATCH WALLS SHALL BE THE RESPONSIBILITY OF THE TRADE REQUIRING THE CUTTING.
3. CONTRACTOR SHALL UPDATE ALL PANEL SCHEDULES AFFECTED IN THE SCOPE OF WORK AREA AND SHALL LABEL ALL EQUIPMENT WITH THE CIRCUIT AND PANELS THAT THEY ARE FED FROM. EXTERIOR DEVICES SUCH AS THE DISCONNECT
SWITCHES CAN BE LABELED WITH A PERMANENT MARKER ON THE INSIDE OF THE ENCLOSURE.
4. PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW OR RELOCATED WALL OR CEILING MOUNTED DEVICES
WITH ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLANS.
5. COORDINATE ALL SHUT-DOWNS OF EXISTING ELECTRICAL SYSTEMS WITH OWNER A MINIMUM OF FOURTEEN (14) WORKING DAYS IN ADVANCE. ALL WORK INSIDE OF BUILDING 30 SHALL NOT BEGIN UNTIL 8AM DAILY AND BE COMPLETED
BY 3:30PM DAILY, MONDAY THROUGH FRIDAY EXCLUDING FEDERAL HOLIDAYS.
6. ALL NOISE GENERATING OPERATIONS, INCLUDING CUTTING OF CEILINGS, WALLS AND FLOORS, CORING, DRILLING, ETC.
SHALL BE SCHEDULED DURING WEEKENDS OR BETWEEN 8:00PM AND 7:00AM ON WEEKDAYS("OFF HOURS"), INCLUDING ALL PREMIUM TIME CHARGES IN BID. CONTRACTOR SHALL PROVIDE A WORK PLAN TO FOLLOW INFECTION CONTROL AND SAFETY GUIDELINES FOR THIS PROJECT. NEGATIVE AIR SHALL EXIT THE WINDOW IN THE STAIRWELL THROUGH HEPA FILTRATION, PARTICULARLY IN THE CASE OF CORE DRILLING THROUGH CONCRETE TO RUN NEW CONDUITS OR ANY
DUST GENERATING ACTIVITIES.
7. CONTRACTOR SHALL CONNECT ALL MECHANICAL EQUIPMENT COMPLETE PER MANUFACTURER'S WIRING DIAGRAMS AND INSTRUCTIONS. COORDINATE WITH MECHANICAL CONTRACTOR AND VERIFY LOCATION, VOLTAGE, AMPS, NO. OF WIRES, AND PROTECTION REQUIREMENTS PRIOR TO ROUGH-IN. CONTRACTOR SHALL SEND VA REQUESTS FOR INFORMATION
WITH ANY DISCREPANCIES OR QUESTIONS FROM DESIGN DRAWINGS.
8. ALL WORK SHALL BE PERFORMED IN STRICT CONFORMANCE WITH THE PHASING REQUIREMENTS OF THE PROJECT. ALL
COSTS ASSOCIATED WITH THESE REQUIREMENTS SHALL BE INCLUDED IN THE BID SUBMITTAL.
9. CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY LIGHTING TO ADEQUATELY LIGHT ALL CONSTRUCTION AREAS, TEMPORARILY PARTITIONED AREAS, AND EXIT CORRIDORS MAINTAINED DURING CONSTRUCTION.
10. DEFINITION: PROVIDE* - FURNISH, INSTALL AND CONNECT COMPLETE.
11. PROJECT AND PHASING SCOPE LINES INDICATE WHERE GENERAL CONSTRUCTION BOUNDARIES OCCUR. ELECTRICAL
WORK AND UTILITY TIE-INS MAY OCCUR OUTSIDE OF SCOPE LINES.
12. CONTRACTOR SHALL CALL THE VA TO PUT THE FIRE ALARM SYSTEM FOR BUILDING 30 IN BYPASS DAILY AND AT THE END OF THE DAY CALL TO TAKE IT OFF OF BYPASS. THE CONTRACTOR SHALL ALSO COVER ALL FIRE ALARM DETECTION DEVICES WITH COVERS TO PREVENT DUST FROM INFILTRATING THE SMOKE HEADS, THESE COVERS SHALL BE REMOVED DAILY. WHEN THE CONTRACTOR LEAVES AT THE END OF THE DAY THE FIRE ALARM SHALL BE 100% OPERATIONAL.
13. IF EXISTING CONDUITS THROUGH THE EXTERIOR WALL TO THE PUMP CONTROL PANEL CANNOT BE USED, THE CONTRACTOR SHALL CORE DRILL THROUGH THE CONCRETE WALL AND PROVIDE EXTERIOR RATED CONDUITS AS PER THE VA SPECIFICATIONS. THE CONTRACTOR SHALL ALLOW IN THEIR BID AND ADDITIONAL 70 FEET OF 2” DIAMETER [OR AS REQUIRED BY NFPA 70] CONDUIT FROM THE INTERIOR PANELS TO THE EXTERIOR PUMP CONTROL PANEL. THIS IS
FOR BOTH POWER AND CONTROLS FOR THE PUMPS P1 AND P2.
14. ALL CONDUITS ON THE INTERIOR OF BUILDING 30 SHALL BE NEW, REFER TO NOTE 13 FOR CONDUITS THAT PENETRATE THE BASEMENT WALL. ALL CONDUCTORS ON THIS PROJECT SHALL BE NEW FROM ORIGIN TO TERMINATION, NO CONDUCTORS SHALL BE RE-USED INCLUDING THE EXISTING CONDUCTORS TO PUMPS P1 AND P2.
PUMP CONTROL PANEL
N L3 L2 L1
N L3 L2 L1
PANEL SCHEDULE GENERAL NOTES
1. NEW CIRCUIT BREAKER SHALL MATCH WITH EXISTING IN SO FAR AS MANUFACTURER,
TYPE AND AIC RATINGS.
2. CONTRACTOR SHALL PROVIDE TWO (2) NEW 3-POLE CIRCUIT BREAKERS FOR P5 & P6
AND OUTSIDE PUMP STANDBY ON PANEL 'BLSL1'.
8/1/2022
Batavia VA Medical Center Batavia, NY
528A4-18-203
CHRIS GEARY PE# 099085
Schadler/Waldron Geary
Project Number
Building Number
Sheet Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
FROM PANEL BLSL1 #26,28,30
(EMERGENCY POWER)
FROM PANEL BPCL1-B #70,72,74
(NORMAL POWER)
NTS
ELECTRICAL SYMBOLS DIAGRAM
PUMP CONTROL PANEL POWER SUPPLY WIRING DIAGRAM DETAIL
REVISED PER CONFERENCE CALL ON MARCH 9, 2021
REVISED PER 60% DESIGN REVIEW LETTERS
REVISED PER 90% DESIGN REVIEW LETTERS
REVISED PER FONT ISSUE/LINE ISSUE
5/11/2021 9/10/2021 2/4/2022 7/26/2022
E001 19 23
Improve Ground Water, Building 30
Electrical Symbols, Abbreviations And Panel Schedules
Bid Documents For Construction
NEMA 3R
240V/60A/3PH
DISCONNECT
(TYP. FOR 2)
EXISTING 3-PHASE RECEPTACLE IN CONDUIT
FOR ANCILLARY PUMP TO REMAIN
EXISTING CONDUITS TO PUMPS
TO REMAIN
(TYP. FOR 5)
EXISTING UNISTRUT TO REMAIN
VISUAL ALARM ONLY (SOUND DISABLED)
NTS
DUAL POWER PUMP CONTROL PANEL DETAIL
EXISTING CONDUITS
TO POWER TO REMAIN
PUMP CONTROL PANEL
(4)#8 & (1)#10GR IN 3 4"C EMT,
THHN COPPER
(4)#8 & (1)#10GR IN 3 4"C EMT,
THHN COPPER
NOTES
1. CONTRACTOR SHALL INSTALL NEW CONDUIT & CONDUCTORS FROM EACH ELECTRICAL PANEL TO THE NEW PUMP
CONTROL PANEL.
2. CONTRACTOR SHALL PROVIDE NEW CONDUIT TO EXTEND FROM EXISTING CONDUIT TO NEW NEMA 3R DISCONNECT
SWITCHES ON DUAL POWER PUMP CONTROL DETAIL.
2" O.D.
2" O.D.
1.5" O.D.
NOTES
1. PUMP CONTROL PANEL IS NEMA 4X RATED, AND SHALL BE LOCKABLE WITH A PADLOCK.
2. THE PUMP CONTROL VENDOR SHALL PROVIDE (2) 2-HOUR SESSIONS (MORNING/AFTERNOON) ON PANEL TRAINING WITH
(3) COPIES OF HARD COPY MANUALS AND (1) COPY OF ELECTRONIC VERSION.
AFF ABOVE FINISH FLOOR
ATS AUTOMATIC TRANSFER SWITCH
AWG AMERICAN WIRE GAUGE
BMS BUILDING MANAGEMENT SYSTEM (BY U&S SERVICES)
C CONDUIT
EC ELECTRICAL CONTRACTOR
EX EXISTING
EMT ELECTRICAL METALLIC TUBING
FACP FIRE ALARM CONTROL PANEL
GFI GROUND FAULT INTERRUPTER
GR GROUND
IG ISOLATED GROUND
JB JUNCTION BOX
MC METAL CLAD CABLE
MCB MAIN CIRCUIT BREAKER
MCM THOUSAND CIRCULAR MILL
MDP MAIN DISTRIBUTION PANEL
MDS MAIN DISTRIBUTION SWITCHBOARD
MLO MAIN LUGS ONLY
N NEUTRAL (GROUNDED CIRCUIT CONDUCTOR)
OD OUTSIDE DIAMETER
OS OCCUPANCY SENSOR
PVC POLYVINYL CHLORIDE
RGS RIGID GALVANIZED STEEL
SWBD SWITCHBOARD
TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR
U.O.N. UNLESS OTHERWISE NOTED
V.I.F. VERIFY IN FIELD
VA COR VETERANS ADMINISTRATION CONTRACTING OFFICERS
WP WEATHER PROOF
ELECTRICAL ABBREVIATIONS
ELECTRICAL PHASING NOTES
1. AT NO TIME SHALL THE PUMPS BE DISENGAGED AND LEFT UNATTENDED BY CONTRACTOR. PUMP P7 IS THE PRIMARY
PUMP FOR THIS BUILDING. PUMPS P1 AND P2 BOTH ARE OPERATIONAL.
2. THE PUMPS AND THE ALARMS SHALL BE OPERATIONAL AT THE END OF EACH SHIFT AND CONTRACTOR SHALL ASSURE
THAT THE PUMPS ARE WORKING AND THE ALARM WILL WORK SHOULD A PUMP FAIL.
3. THE CONTRACTOR SHALL PROVIDE A PHASING PLAN FOR THIS ELECTRICAL WORK FOR THE VA TO REVIEW AND
APPROVE TO ASSURE THAT THE PUMPS AND THEIR MONITORING STAYS OPERATIONAL.
§ P1 AND P2 CURRENTLY ARE MONITORED BY THE EXISTING BMS SYSTEM.
§ PUMPS 3 THROUGH 6 ARE MONITORED BY THE FIRE ALARM CONTROL PANEL.
§ AS THE CONTRACTOR COMES UP WITH A PLAN TAKE PUMPS OFFLINE, INSTALL NEW PUMPS AND
PROVIDE THE CONTROLS TO MONITOR THE PUMPS TO ASSURE THAT THEY ARE OPERATIONAL THE
CONTRACTOR SHALL WORK WITH THE VA COR TO COME UP WITH A PROCEDURE AND PLAN TO
SCHEDULE THIS WORK.
§ THE CONTRACTOR SHALL NOT LEAVE THE BASEMENT OF BUILDING 30 UNLESS PUMPS 1 AND 2 ARE OPERATIONAL AND MONITORED FOR SYSTEM FAILURE OR PUMP P7 IS OPERATIONAL AND MONITORED
FOR SYSTEM FAILURE. PUMPS P3 TROUGH P6 ARE BACK UP PUMPS THAT CANNOT HANDLE THE
PUMPING CAPACITY OF THE GROUND WATER ON THEIR OWN. IT IS CRUCIAL THAT THE CONTRACTOR HAVE THE PUMPS AS INDICATED ABOVE OPERATIONAL AND MONITORED EACH DAY AS THE GROUND WATER INFILTRATES INTO THE BUILDING AND WILL FLOOD THE BASEMENT IN A FEW HOURS SHOULD THE
PUMPS FAIL.
§ NO WORK SHALL ON THE ELECTRICAL SYSTEM SHALL PROCEED UNTIL A PHASING PLAN IS SUBMITTED
BY THE CONTRACTOR AND APPROVED BY THE VA COR.