This file is an amendment to a combined solicitation for the Manchester VA Medical Center's UPS replacement and maintenance contract. The Department of Veterans Affairs is seeking a Service-Disabled Veteran-Owned Small Business (SDVOSB) contractor to replace an existing end-of-life Eaton Powerware 9390 UPS system (80 kVA, 208VAC 3-phase input/output) and provide ongoing preventative maintenance, inspection, standby labor, emergency repair, parts, and training over a base year plus four option years. The existing system operates at 208VAC 3-phase 60Hz with 384-480Vdc DC bus and includes 40 Hitachi Chemical Energy Technology 12V 540W batteries providing 60 minutes of runtime; the replacement must maintain similar in-kind specifications or accept Eaton alternatives meeting performance requirements. The acquisition is set aside 100% for SDVOSBs under NAICS code 811310 (Commercial and Industrial Machinery and Equipment Repair and Maintenance) with a small business size standard of $12.5 million, issued as a Request for Quotation (RFQ) under FAC 2026-01.

Quotations must be submitted via email to Shawn.Lawrence@va.gov by November 30, 2026, at 5:00 PM EST, with written questions due by November 19, 2026, at 5:00 PM EST. A site visit is scheduled for November 16, 2026, at 9:00 AM EST at the Manchester VA Medical Center (718 Smyth Road, Manchester, NH 03104) to allow quoters to inspect the existing UPS, installation location, and site conditions; attendance is recommended but not required. The amendment addresses 15 requests for information clarifying that technicians performing quarterly and annual preventive maintenance must be individually factory-certified or authorized by Eaton, the prime contractor may subcontract manufacturer-restricted procedures to Eaton-authorized technicians, minor preventive maintenance such as filter changes may be performed by qualified technicians, the replacement UPS must include a maintenance bypass capability to maintain power during maintenance, and the VA will process invoices within 15 days with funds transferred within 30 days of receipt. The contracting office is located at VA Connecticut, 950 Campbell Avenue, West Haven, CT 06516, with Shawn Lawrence as the contract specialist (Shawn.Lawrence@va.gov, 914-737-4400 ext. 202121).

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment to a Previous Combined Solicitation

Amendment to a Previous Combined Solicitation

SUBJECT*
Eaton Powerware System Replacement

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
06516
SOLICITATION NUMBER*
36C24127Q0030
RESPONSE DATE/TIME/ZONE
11-30-2026 17:00 EASTERN TIME, NEW YORK, USA
ARCHIVE
60 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
J061
NAICS CODE*
811310
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

VA Connecticut

950 Campbell Avenue West Haven CT 06516

POINT OF CONTACT*

Contract Specialist Shawn Lawrence Shawn.Lawrence@va.gov 914-737-4400 ext. 202121

PLACE OF PERFORMANCE

ADDRESS
Manchester VA Medical Center

718 Smyth Road

Manchester NH

POSTAL CODE
03104
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS
Shawn.Lawrence@va.gov

EMAIL DESCRIPTION

DESCRIPTION

36C24127Q0030 UPS Eaton Powerware System Replacement - RFIs

1. Does the VA require technicians performing quarterly and annual preventive maintenance to be individually factory-certified or authorized by Eaton?

a. Due to the complex nature of the product and criticality - Yes

2. Will documented experience and technical qualifications satisfy the qualification requirement for routine preventive maintenance?

a. See answer to RFI 1

3. Is direct access to Eaton's proprietary field-service software mandatory for the prime contractor, or may that requirement be fulfilled through an Eaton-authorized service provider supporting specific procedures?

a. Prime Contractor does not require that; That portion can be filled through an Eaton Authorized Technician.

4. Would a contractor be considered technically acceptable if it performs routine maintenance using qualified technicians and subcontracts manufacturer-restricted procedures and startup to Eaton?

a. Yes, minor PM work such as filter changes etc. would be outside the requirement of needing an Eaton Technician.

5. Since Eaton has discontinued the 93E product line, will the VA accept the current Eaton 93PM or another equivalent replacement system meeting the required performance specifications?

a. The VA would accept an Eaton alternative. The goal of the project is to replace existing equipment in-kind with newer model.

6. Does the existing Eaton Powerware 9390 system have an external maintenance bypass (for example, a maintenance bypass panel or a bypass sidecar with maintenance bypass and isolation breakers)?

a. Yes, See photos.

7. Is the replacement expected to include a maintenance bypass sidecar, such as the Eaton 93E 60 kVA bypass sidecar shown in Attachment A, or is it limited to the UPS and Extended Battery Cabinet listed in SOW Section 3.5?

a. The UPS is required to be able to go into maintenance Bypass and maintain power to the computer room during maintenance.

8. What is the kVA rating of the existing unit? The SOW says "Model 80," but the replacement is specified at 60 kVA.

a. Existing UPS is 80KVA. The goal is to replace-in- kind. The 60kVA was utilized as a basis of design.

9. What are the existing input voltage and output voltage?

a. Current system: Eaton Powerware 9390-80 Model 80 AC IN: 208VAC 3W 60Hz 3Phase 240A AC OUT: 208VAC 4W 60Hz 3Phase 222A 78KW 80KVA BYPASS: 208VAC 4W 60Hz 3Phase 222A 80KVA DC: 384-480Vdc – 204A

10. Please provide a photo of the existing unit's data plate.

a. See attached photos

11. Please provide photos of the full system (standing back) and of the battery cabinet and batteries.

a. See attached photos

12. Please confirm the battery quantity and model: 40 x Hitachi Chemical Energy Technology 12V 540W, HRC12540WP.

a. Confirmed

13. What is the current battery run time, and what run time is required for the replacement?

a. 60 minutes

14. would it be possible to forward the latest performance specifications/Source Control Drawings for the Powerware System

a. attached

15. Will the VA be paying invoices on a Net-30/45/60 schedule?

a. The VA approves all invoices within 15 days and funds are transferred within 30 days of receipt.

See attached document: UPS Eaton PowerWare Replacement Photos.

See attached document: UPS Guide Specification.

See attached document: UPS Installation Instructions.

See attached document: UPS Manual, Section II, Operation.

See attached document: UPS Drawings and Other Info.

See attached document: UPS, Eaton 9390 product info.