Amendment 5 Seed RFIs.pdf
PDF 160 KB Posted
- Attached to
- Z2DA--VISN 1 Construction MATOC Federal contract opportunity
- Solicitation number
- 36C24123R0073
About this file
This document is an amendment to a request for information related to a federal construction contract opportunity. The amendment clarifies that while section 1.15.5 of the general contract requirements allows for Primavera or an acceptable substitute for cost-loaded scheduling, section 3.9.1.1 requires the use of Primavera. As such, respondents are instructed to submit any sample cost-loaded schedule in Primavera format. The related solicitation is number 36C24123R0073 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 for a multiple award construction task order contract for construction services within VISN 1.
View the file
Other files for this federal contract opportunity
Show all 50
Z2DA--VISN 1 Construction MATOC has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Seed Project RFI
1. Solicitation paragraph 3.9.1.1 states that the cost loaded schedule must be done in Primavera but the General Contract Requirements section 1.15.5 states Primavera or acceptable substitute. Please advise if Microsoft Project is an acceptable substitute.
Response: Submit a sample cost-loaded schedule in Primavera.