Exhibit E Base Offer Cost Breakdown.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Z2DA--VISN 1 Construction MATOC Federal contract opportunity
Solicitation number
36C24123R0073
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document is a base offer cost breakdown template for a construction project. It outlines the divisional labor and material costs for various project components that an offeror would complete for a construction project. The template includes sections for offeror information, estimated labor costs by trade broken down by division with labor rates and hours, estimated material costs by division with item descriptions and pricing, overhead and profit percentages to apply to costs, and total base offer cost. It appears to correspond to the Veterans Affairs solicitation for an indefinite delivery indefinite quantity multiple award construction contract vehicle for construction projects in Veterans Integrated Service Network 1. The solicitation and template provide relevant details for prospective offerors to estimate their pricing for future task orders that may be issued under the multiple award contract.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--VISN 1 Construction MATOC, newest first.
File Type Posted
WD MA20230001 Effective 12082023.pdf PDF
523-19-602 Rev 1 AD100 AS101 AS102.pdf PDF
SSJ Electronic Safety and Security_.pdf PDF
523-19-602 Seed Project Site Visit 2 Attendees.pdf PDF
WD MA20220001 Effective 10132023.pdf PDF
523 19 602 Project Manual Part 1 A0016.pdf PDF
523 19 602 Drawings Pages 19 to 23 A0016.pdf PDF
Seed Project Original Site Visit Sign In Sheet August 9 2023 A0016.pdf PDF
523-19-602 Seed ICRA JP Police Office A0016.pdf PDF
SPECIAL MATOC REQUIREMENTS A0016.pdf PDF
Exhibit F Price Schedule Sheet A0016.pdf PDF
Exhibit E Base Offer Cost Breakdown A0016.xlsx XLSX spreadsheet
523 19 602 Drawings Pages 24 to 30 A0016.pdf PDF
523-19-602 523-19-602 Install Site Security Revised Specs A0016.pdf PDF
SSJ DDC BMS A0016.pdf PDF
523-19-602 Seed Project PCRA A0016.pdf PDF
Updated MATOC Solicitation Instructions.pdf PDF
Exhibit D Proposal Inquiry Form A0016.pdf PDF
Exhibit A Project Information Sheet for Contractors A0016.pdf PDF
36C24123R0073 0015.pdf PDF
36C24123R0073 0013.pdf PDF
36C24123R0073 0012.pdf PDF
36C24123R0073 0011.pdf PDF
MATOC RFIs Amendment 10.pdf PDF
WD MA20230001 Effective 09152023.pdf PDF
SSJ Electronic Safety and Security.pdf PDF
36C24123R0073 0010.pdf PDF
36C24123R0073 0009.pdf PDF
36C24123R0073 0008.pdf PDF
36C24123R0073 0005.docx DOCX document
Amendment 5 Seed RFIs.pdf PDF
Amendment 5 MATOC RFIs.pdf PDF
GENERAL CONTRACT REQUIREMENT SECTIONS 01000 01001 01300 01451 01700.pdf PDF
Seed Project RFIs.pdf PDF
36C24123R0073 0004.pdf PDF
Seed Project 523-19-602 Install Site Security Site Visit Sign In Sheet.pdf PDF
36C24123R0073 0003.pdf PDF
36C24123R0073 0002.pdf PDF
523 19 602 Drawings Pages 31 to 68.pdf PDF
523 19 602 Specifications.pdf PDF
Exhibit D Proposal Inquiry Form.pdf PDF
523 19 602 Drawings Pages 10 to 18.pdf PDF
523 19 602 Drawings Pages 1 to 9.pdf PDF
523 19 602 Task Order RFP.pdf PDF
Exhibit F Price Schedule Sheet.pdf PDF
SPECIAL MATOC REQUIREMENTS.pdf PDF
GENERAL CONTRACT REQUIREMENTS SECTIONS 01000 01001 01300 01451 01700.pdf PDF
WD MA20230001 Effective 07212023.pdf PDF
523 19 602 Project Manual Part 1.pdf PDF
523 19 602 Drawings Pages 24 to 30.pdf PDF
Show all 50

Z2DA--VISN 1 Construction MATOC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Labor Detail

Sample Example
DivisionLabor CategoryLabor RateHoursTotal
1Plumber$35.00123$4,305.00
1Laborer14.7570$1,032.50
$5,337.50

Materials and Equipment Details

Sample Example
DivisionItemRateUnitsTotal
1Pipe - 150'$1.50150$225.00
190 Degree Coupling$1.105$5.50
1Pump Rental - Hour$200.006$1,200.00
$1,430.50