36C24118R0304 Combined Electrical Dwgs.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24118R0304-0006000.docx | DOCX document | |
| 36C24118R0304-0005000.docx | DOCX document | |
| 36C24118R0304-0004000.docx | DOCX document | |
| 36C24118R0304-00003000.docx | DOCX document | |
| 36C24118R0304-00002000.docx | DOCX document | |
| 36C24118R0304-00002001.pdf | ||
| 36C24118R0304-00001000.docx | DOCX document | |
| 36C24118R0304-00001001.pdf | ||
| 36C24118R0304-020.pdf | ||
| 36C24118R0304-017.pdf | ||
| 36C24118R0304-024.pdf | ||
| 36C24118R0304-023.pdf | ||
| 36C24118R0304-016.pdf | ||
| 36C24118R0304-018.pdf | ||
| 36C24118R0304-022.pdf | ||
| 36C24118R0304-015.docx | DOCX document | |
| 36C24118R0304-021.pdf | ||
| 36C24118R0304-000.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VOLTAGE: 120/208 PHASE: 3 WIRE: 4 AIC: TOTAL VA, L1 0 PANEL NAME: 1-CE
MAIN BUS: - AMPS TOTAL VA, L2 0 FEEDER: -
MAIN BREAKER: MLO A FRAME - A TRIP TOTAL VA, L3 0 LOCATION: ELECTRIC RM C110
MOUNTING: SURF TOTAL VA 0
L1 L2 L3
WATTS LOAD Y Y Y WATTS LOAD
DIRECTORY L1 L2 L3 C
K
T
A M
P S
A M
P S
C K
T
L1 L2 L3 DIRECTORY
EXISTING 1 20/1 20/1 2 EXISTING
EXISTING 3 20/1 20/1 4 EXISTING
EXISTING 5 20/1 20/1 6 EXISTING
EXISTING 7 20/1 20/1 8 EXISTING
EXISTING 9 20/1 20/1 10 EXISTING
EXISTING 11 20/1 20/1 12 EXISTING
EXISTING 13 20/1 20/1 14 EXISTING
EXISTING 15 20/1 20/1 16 EXISTING
EXISTING 17 20/1 20/1 18 EXISTING
EXISTING 19 20/1 20/1 20 EXISTING
UNIT HEATER & RECEPT 21 20/1 20/1 22 TERMINAL BOXES
ATC POWER 23 20/1 20/1 24 TERMINAL BOXES
ATC PANEL 25 20/1 20/1 26 TERMINAL BOXES
C111 & C113 RECEPT 27 20/1 20/1 28 TERMINAL BOXES
STAIR C102 RECEPT 29 20/1 20/1 30 TERMINAL BOXES
UNIT HEATER 31 20/1 20/1 32 SECURITY
JACUZZI TUB(GFCI REC) 33 20/1 34
35 36
37 38
39 40
41 42
NEUTRAL BUS: 100%
GROUND BUS: FULL
VOLTAGE: 120/208 PHASE: 3 WIRE: 4 AIC: TOTAL VA, L1 0 PANEL NAME: 1-BE
MAIN BUS: - AMPS TOTAL VA, L2 0 FEEDER: -
MAIN BREAKER: MLO A FRAME - A TRIP TOTAL VA, L3 0 LOCATION: ELECTRIC RM B110
MOUNTING: SURF TOTAL VA 0
L1 L2 L3
WATTS LOAD Y Y Y WATTS LOAD
DIRECTORY L1 L2 L3 C
K
T
A M
P S
A M
P S
C K
T
L1 L2 L3 DIRECTORY
EXISTING 1 20/1 20/1 2 EXISTING
EXISTING 3 20/1 20/1 4 EXISTING
EXISTING 5 20/1 20/1 6 EXISTING
EXISTING 7 20/1 20/1 8 EXISTING
EXISTING 9 20/1 20/1 10 EXISTING
EXISTING 11 20/1 20/1 12 EXISTING
EXISTING 13 20/1 20/1 14 EXISTING
EXISTING 15 20/1 20/1 16 EXISTING
EXISTING 17 20/1 20/1 18 EXISTING
EXISTING 19 20/1 30/1 20 EXISTING
DOOR CONTROLLER 21 20/1 20/1 22 UNIT HEATER & RECEPT
DOOR CONTROLLER 23 20/1 20/1 24 TERMINAL BOXES
ATC PANEL 25 20/1 20/1 26 TERMINAL BOXES
ATC POWER 27 20/1 20/1 28 TERMINAL BOXES
PATIENT LIFT 29 20/1 20/1 30 TERMINAL BOXES
B112 RECEPT 31 20/1 20/1 32 JACUZZI TUB(GFCI REC)
33 34
35 36
37 38
39 40
41 42
NEUTRAL BUS: 100%
GROUND BUS: FULL
VOLTAGE: 120/208 PHASE: 3 WIRE: 4 AIC: TOTAL VA, L1 0 PANEL NAME: 2-BE
MAIN BUS: - AMPS TOTAL VA, L2 0 FEEDER: -
MAIN BREAKER: MLO A FRAME - A TRIP TOTAL VA, L3 0 LOCATION: ELECTRIC RM B210
MOUNTING: SURF TOTAL VA 0
L1 L2 L3
WATTS LOAD Y Y Y WATTS LOAD
DIRECTORY L1 L2 L3 C
K
T
A M
P S
A M
P S
C K
T
L1 L2 L3 DIRECTORY
EXISTING 1 20/1 20/1 2 EXISTING
EXISTING 3 20/1 20/1 4 EXISTING
EXISTING 5 20/1 20/1 6 EXISTING
EXISTING 7 20/1 20/1 8 EXISTING
EXISTING 9 20/1 20/1 10 EXISTING
EXISTING 11 20/1 20/1 12 EXISTING
TERMINAL BOXES 13 20/1 20/1 14 EXISTING
TERMINAL BOXES 15 20/1 20/1 16 EXISTING
TERMINAL BOXES 17 20/1 20/1 18 EXISTING
TERMINAL BOXES 19 20/1 30/1 20 EXISTING
B202 RECEPT 21 20/1 20/1 22 PATIENT LIFT
B211 & B212 RECEPT 23 20/1 20/1 24 ATC POWER
B202 LTG 25 20/1 20/1 26 ATC PANEL
JACUZZI TUB(GFCI REC) 27 20/1 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
NEUTRAL BUS: 100%
GROUND BUS: FULL
VOLTAGE: 120/208 PHASE: 3 WIRE: 4 AIC: TOTAL VA, L1 0 PANEL NAME: 2-CE
MAIN BUS: - AMPS TOTAL VA, L2 0 FEEDER: -
MAIN BREAKER: MLO A FRAME - A TRIP TOTAL VA, L3 0 LOCATION: ELECTRIC RM C210
MOUNTING: SURF TOTAL VA 0
L1 L2 L3
WATTS LOAD Y Y Y WATTS LOAD
DIRECTORY L1 L2 L3 C
K
T
A M
P S
A M
P S
C K
T
L1 L2 L3 DIRECTORY
EXISTING 1 20/1 20/1 2 EXISTING
EXISTING 3 20/1 20/1 4 EXISTING
EXISTING 5 20/1 20/1 6 EXISTING
EXISTING 7 20/1 20/1 8 EXISTING
EXISTING 9 20/1 20/1 10 EXISTING
EXISTING 11 20/1 20/1 12 EXISTING
EXISTING 13 20/1 20/1 14 EXISTING
TERMINAL BOXES 15 20/1 20/1 16 EXISTING
TERMINAL BOXES 17 20/1 20/1 18 EXISTING
EXISTING 19 20/1 20/1 20 ATC PANEL
TERMINAL BOXES 21 20/1 20/1 22 ATC POWER
TERMINAL BOXES 23 20/1 20/1 24 C211 & C213 RECEPT
TERMINAL BOXES 25 20/1 20/1 26 PATIENT LIFT
JACUZZI TUB(GFCI REC) 27 20/1 20/1 28 C202 RECEPT
29 30
31 32
33 34
35 36
37 38
39 40
41 42
NEUTRAL BUS: 100%
GROUND BUS: FULL
VOLTAGE: 120/208 PHASE: 3 WIRE: 4 AIC: TOTAL VA, L1 0 PANEL NAME: 2-BC
MAIN BUS: - AMPS TOTAL VA, L2 0 FEEDER: -
MAIN BREAKER: MLO A FRAME - A TRIP TOTAL VA, L3 0 LOCATION: ELECTRIC RM B210
MOUNTING: SURF TOTAL VA 0
L1 L2 L3
WATTS LOAD Y Y Y WATTS LOAD
DIRECTORY L1 L2 L3 C
K
T
A M
P S
A M
P S
C K
T
L1 L2 L3 DIRECTORY
EXISTING 1 20/1 20/1 2 EXISTING
EXISTING 3 20/1 20/1 4 EXISTING
EXISTING 5 20/1 20/1 6 EXISTING
EXISTING 7 20/1 20/1 8 EXISTING
EXISTING 9 20/1 20/1 10 EXISTING
EXISTING 11 20/1 20/1 12 EXISTING
EXISTING 13 20/1 20/1 14 EXISTING
EXISTING 15 20/1 20/1 16 EXISTING
EXISTING 17 20/1 20/1 18 EXISTING
EXISTING 19 20/1 20/1 20 EXISTING
EXISTING 21 20/1 20/1 22 EXISTING
EXISTING 23 20/1 20/1 24 EXISTING
EXISTING 25 20/1 20/1 26 EXISTING
EXISTING 27 20/1 20/1 28 EXISTING
EXISTING 29 20/1 20/1 30 EXISTING
EXISTING 31 20/1 20/1 32 EXISTING
B102 & B202 LTG 33 20/1 34
35 36
37 38
39 40
41 42
NEUTRAL BUS: 100%
GROUND BUS: FULL
VOLTAGE: 120/208 PHASE: 3 WIRE: 4 AIC: TOTAL VA, L1 0 PANEL NAME: 2-CC
MAIN BUS: - AMPS TOTAL VA, L2 0 FEEDER: -
MAIN BREAKER: 100A A FRAME - A TRIP TOTAL VA, L3 0 LOCATION: ELECTRIC RM C210
MOUNTING: SURF TOTAL VA 0
L1 L2 L3
WATTS LOAD Y Y Y WATTS LOAD
DIRECTORY L1 L2 L3 C
K
T
A M
P S
A M
P S
C K
T
L1 L2 L3 DIRECTORY
EXISTING 1 20/1 20/1 2 EXISTING
EXISTING 3 20/1 20/1 4 EXISTING
EXISTING 5 20/1 20/1 6 EXISTING
EXISTING 7 20/1 20/1 8 EXISTING
EXISTING 9 20/1 20/1 10 EXISTING
EXISTING 11 20/1 20/1 12 EXISTING
EXISTING 13 20/1 20/1 14 EXISTING
EXISTING 15 20/1 20/1 16 EXISTING
EXISTING 17 20/1 20/1 18 EXISTING
EXISTING 19 20/1 20/1 20 EXISTING
EXISTING 21 20/1 20/1 22 EXISTING
EXISTING 23 20/1 20/1 24 EXISTING
EXISTING 25 20/1 20/1 26 EXISTING
EXISTING 27 20/1 20/1 28 EXISTING
EXISTING 29 20/1 20/1 30 EXISTING
EXISTING 31 20/1 20/1 32 C102 & C202 LTG
EXISTING 33 20/1 20/1 34 SPARE
EXISTING 35 20/1 20/1 36 SPARE
EXISTING 37 20/1 20/1 38 SPARE
EXISTING 39 20/1 20/1 40 SPARE
EXISTING 41 20/1 20/1 42 EXISTING
NEUTRAL BUS: 100%
GROUND BUS: FULL
VOLTAGE: 277/480 PHASE: 3 WIRE: 4 AIC: TOTAL VA, L1 26,382 PANEL NAME: R-BH
MAIN BUS: 225 AMPS TOTAL VA, L2 26,382 FEEDER: -
MAIN BREAKER: MLO A FRAME - A TRIP TOTAL VA, L3 26,382 LOCATION: -
MOUNTING: SURF TOTAL VA 79,146
L1 L2 L3
WATTS LOAD Y Y Y WATTS LOAD
DIRECTORY L1 L2 L3 C
K
T
A M
P S
A M
P S
C K
T
L1 L2 L3 DIRECTORY
6,216 1 2 6,216
6,216 3 4 6,216
6,216 5 6 6,216
6,216 7 8 1,243
6,216 9 10 1,243
6,216 11 12 1,243
248 13 14 1,243
248 15 16 1,243
248 17 18 1,243
SPACE 19 20 5,000
SPACE 21 22 5,000
SPACE 23 24 5,000
SPACE 25 20/1 26 SPARE
SPACE 27 20/1 28 SPARE
SPACE 29 20/1 30 SPARE
SPACE 31 20/1 32 SPARE
SPACE 33 20/1 34 SPARE
SPACE 35 20/1 36 SPARE
SPACE 37 20/1 38 SPARE
SPACE 39 20/1 40 SPARE
SPACE 41 20/1 42 SPARE
65,000
NEUTRAL BUS: 100%
GROUND BUS: FULL
AHU-4B1 SF-1
HWP-4B3
AHU-4B1 SF-280/3
AHU-4B1 RF-1 80/3
HWP-4B220/3
TRANSFORMER30/3
20/3
80/3
HWP-4B120/3
VOLTAGE: 120/208 PHASE: 3 WIRE: 4 AIC: TOTAL VA, L1 144 PANEL NAME: R-BL
MAIN BUS: 100 AMPS TOTAL VA, L2 320 FEEDER: -
MAIN BREAKER: 100 A FRAME 60 A TRIP TOTAL VA, L3 360 LOCATION: DP-HVAC
MOUNTING: SURF TOTAL VA 824
L1 L2 L3
WATTS LOAD Y Y Y WATTS LOAD
DIRECTORY L1 L2 L3 C
K
T
A M
P S
A M
P S
C K
T
L1 L2 L3 DIRECTORY
HEAT TRACE 1 20/1 20/1 2 144 SG-B1
UNIT HEATER 3 20/1 20/1 4 HEAT TRACE
ATC PANEL 5 20/1 20/1 6 360 RECEPTACLES
HEAT TRACE 7 20/1 20/1 8 HEAT TRACE
AHU LIGHTING 320 9 20/1 20/1 10 ATC POWER
AHU LIGHTING 11 20/1 20/1 12 SPARE
SPACE 13 20/1 14 SPARE
SPACE 15 20/1 16 SPARE
SPACE 17 20/1 18 SPARE
SPACE 19 20/1 20 SPARE
10,000
NEUTRAL BUS: 100%
GROUND BUS: FULL
VOLTAGE: 277/480 PHASE: 3 WIRE: 4 AIC: TOTAL VA, L1 26,382 PANEL NAME: R-CH
MAIN BUS: 225 AMPS TOTAL VA, L2 26,382 FEEDER: -
MAIN BREAKER: MLO A FRAME - A TRIP TOTAL VA, L3 26,382 LOCATION: -
MOUNTING: SURF TOTAL VA 79,146
L1 L2 L3
WATTS LOAD Y Y Y WATTS LOAD
DIRECTORY L1 L2 L3 C
K
T
A M
P S
A M
P S
C K
T
L1 L2 L3 DIRECTORY
6,216 1 2 6,216
6,216 3 4 6,216
6,216 5 6 6,216
6,216 7 8 1,243
6,216 9 10 1,243
6,216 11 12 1,243
248 13 14 1,243
248 15 16 1,243
248 17 18 1,243
SPACE 19 20 5,000
SPACE 21 22 5,000
SPACE 23 24 5,000
SPACE 25 20/1 26 SPARE
SPACE 27 20/1 28 SPARE
SPACE 29 20/1 30 SPARE
SPACE 31 20/1 32 SPARE
SPACE 33 20/1 34 SPARE
SPACE 35 20/1 36 SPARE
SPACE 37 20/1 38 SPARE
SPACE 39 20/1 40 SPARE
SPACE 41 20/1 42 SPARE
20/3
80/3
HWP-4C120/3
TRANSFORMER30/3
HWP-4C3
AHU-4C1 SF-280/3
AHU-4C1 RF-1 80/3
HWP-4C220/3
65,000
NEUTRAL BUS: 100%
GROUND BUS: FULL
AHU-4C1 SF-1
VOLTAGE: 120/208 PHASE: 3 WIRE: 4 AIC: TOTAL VA, L1 144 PANEL NAME: R-CL
MAIN BUS: 100 AMPS TOTAL VA, L2 320 FEEDER: -
MAIN BREAKER: 100 A FRAME 60 A TRIP TOTAL VA, L3 360 LOCATION: DP-HVAC
MOUNTING: SURF TOTAL VA 824
L1 L2 L3
WATTS LOAD Y Y Y WATTS LOAD
DIRECTORY L1 L2 L3 C
K
T
A M
P S
A M
P S
C K
T
L1 L2 L3 DIRECTORY
HEAT TRACE 1 20/1 20/1 2 144 SG-C1
UNIT HEATER 3 20/1 20/1 4 HEAT TRACE
ATC PANEL 5 20/1 20/1 6 360 RECEPTACLES
HEAT TRACE 7 20/1 20/1 8 HEAT TRACE
AHU LIGHTING 320 9 20/1 20/1 10 ATC POWER
AHU LIGHTING 11 20/1 20/1 12 SPARE
SPACE 13 20/1 14 SPARE
SPACE 15 20/1 16 SPARE
SPACE 17 20/1 18 SPARE
SPACE 19 20/1 20 SPARE
10,000
NEUTRAL BUS: 100%
GROUND BUS: FULL
| 4.E001 ELECTRICAL LEGEND & NOTES |
| 4.ED101 ELECTRICAL BASEMENT DEMOLITION PLAN |
| 4.ED102 ELECTRICAL FIRST FLOOR DEMOLITION PLAN |
| 4.ED103 ELECTRICAL FIRST FLOOR DEMOLITION PLAN |
| 4.ED104 ELECTRICAL SECOND FLOOR DEMOLITION PLAN |
| 4.ED105 ELECTRICAL SECOND FLOOR DEMOLITION PLAN |
| 4.ED106 ELECTRICAL ROOF DEMOLITION PLAN |
| 4.ED107 ELECTRICAL ROOF DEMOLITION PLAN |
| 4.EP101 ELECTRICAL BASEMENT POWER PLAN |
| 4.EP102 ELECTRICAL FIRST FLOOR POWER PLAN |
| 4.EP103 ELECTRICAL FIRST FLOOR POWER PLAN |
| 4.EP104 ELECTRICAL SECOND FLOOR POWER PLAN |
| 4.EP105 ELECTRICAL SECOND FLOOR POWER PLAN |
| 4.EP106 ELECTRICAL ROOF POWER & LIGHTING PLAN |
| 4.EP107 ELECTRICAL ROOF POWER & LIGHTING PLAN |
| 4.EL101 ELECTRICAL BASEMENT LIGHTING PLAN |
| 4.EL102 ELECTRICAL FIRST FLOOR LIGHTING PLAN |
| 4.EL103 ELECTRICAL FIRST FLOOR LIGHTING PLAN |
| 4.EL104 ELECTRICAL SECOND FLOOR LIGHTING PLAN |
| 4.EL105 ELECTRICAL SECOND FLOOR LIGHTING PLAN |
| 4.ET101 ELECTRICAL FIRST FLOOR SIGNAL PLAN |
| 4.ET102 ELECTRICAL FIRST FLOOR & BASEMENT SIGNAL PLAN |
| 4.ET103 ELECTRICAL SECOND FLOOR SIGNAL PLAN |
| 4.ET104 ELECTRICAL SECOND FLOOR SIGNAL PLAN |
| 4.E501 ELECTRICAL AHU DETAILS |
| 4.E502 ELECTRICAL DETAILS |
| 4.E601 ELECTRICAL SCHEDULES |