36C24118R0304-00003000.docx
DOCX document 27 KB Posted
- Solicitation number
- 36C24118R0304
About this file
36C24118R0304 00003 36C24118R0304 00003.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24118R0304-0006000.docx | DOCX document | |
| 36C24118R0304-0005000.docx | DOCX document | |
| 36C24118R0304-0004000.docx | DOCX document | |
| 36C24118R0304-00002000.docx | DOCX document | |
| 36C24118R0304-00002001.pdf | ||
| 36C24118R0304-00001000.docx | DOCX document | |
| 36C24118R0304-00001001.pdf | ||
| 36C24118R0304-020.pdf | ||
| 36C24118R0304-017.pdf | ||
| 36C24118R0304-024.pdf | ||
| 36C24118R0304-023.pdf | ||
| 36C24118R0304-016.pdf | ||
| 36C24118R0304-018.pdf | ||
| 36C24118R0304-022.pdf | ||
| 36C24118R0304-015.docx | DOCX document | |
| 36C24118R0304-019.pdf | ||
| 36C24118R0304-021.pdf | ||
| 36C24118R0304-000.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITE
M 10A.
15C. DATE
SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE
SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00003 523A5-18-303 Department of Veterans Affairs Network Contracting Office 1 VAMC Manchester 718 Smyth Road, BST Suite 105 Manchester NH 03104 Department of Veterans Affairs Network Contracting Office 1 VAMC Manchester 718 Smyth Road, BST Suite 105 Manchester NH 03104 To all Offerors/Bidders
36C24118R0304 05-24-2018
X X X X Amendment to solicitation to answer vendor questions Please see Continuation Page
CONTINUATION PAGE
Vendor Questions with Answers
1. Are stamped engineered drawings with details and calculations required?
See requirements noted in project specifications Section 10 28 00, Patient Lift System.
2. Are the electrical outlet installations the responsibility of the ceiling lift company or others?
See Electrical drawings and specifications for electrical power provided for ceiling mounted patient lifts. This work is to be coordinated with the requirements of the patient lift system and associated work.
3. Will all rooms that are to receive lifts be available at the same time or will there be phases to this project?
See project Phasing drawings
4. Will the ceilings be replaced during this renovation and if so will we be able to install our fixed rails while the ceilings are removed?
Project architectural ceiling scope of work is indicated in the project drawings and specifications. Removal/replacement and new ceiling installation for any and all project work required (this includes work necessary to accommodate installation of any construction related item)is indicated within the these documents and is the full responsibility of the contractor and/or specific section of work as indicated.
5. Are all lifts 550 lb. capable? Are there any bariatric lifts being installed and if so what is their weight capacity?
6. If fireproofing has to be removed above ceiling, is it the responsibility of the ceiling lift company or others to repatch?
See requirements noted in project specifications section 01 73 29, Cutting and Patching, in addition to the project construction drawings including drawing notes. Designation of the work, unless specifically indicated within a section of the work specified is required by and to be determined by the contractor.
7. Can our material be stored on site or will we have to arrange for local storage?
See requirements noted in specification section 01 00 00, General Conditions, Section 1.6, Operations and Storage Areas.
8. Is VA supplying lifts or GC?