36C24118R0304-016.pdf

PDF 2 MB Posted

Attached to
CLC Patient Privacy Improvements Project 523A5-CSI-303 Brockton VAMC
Solicitation number
36C24118R0304
Issued by

About this file

36C24118R0304 Combined Civil Dwgs REV 1-23-18.pdf

View the file

Other files

File Type Posted
36C24118R0304-0006000.docx DOCX document
36C24118R0304-0005000.docx DOCX document
36C24118R0304-0004000.docx DOCX document
36C24118R0304-00003000.docx DOCX document
36C24118R0304-00002000.docx DOCX document
36C24118R0304-00002001.pdf PDF
36C24118R0304-00001000.docx DOCX document
36C24118R0304-00001001.pdf PDF
36C24118R0304-020.pdf PDF
36C24118R0304-017.pdf PDF
36C24118R0304-024.pdf PDF
36C24118R0304-023.pdf PDF
36C24118R0304-018.pdf PDF
36C24118R0304-022.pdf PDF
36C24118R0304-015.docx DOCX document
36C24118R0304-019.pdf PDF
36C24118R0304-021.pdf PDF
36C24118R0304-000.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HDR Architecture, Inc. Michael Sanford, Project Engineer

100% BID [FINAL] DOCUMENTS

265 Winter Street, Third Flr.

Waltham, MA 02451

N

PN

WARD A

WARD B

WARD C

BUILDING 4

EXISTING CONDITIONS PLAN

SCALE: 1"=20'-0"

ESW

CS101

KWH

VHABHSSANFOM

Text Box

9. PRIOR TO EXCAVATION, THE CONTRACTOR SHALL PERFORM GROUND PENETRATING RADAR (GPR) INVESTIGATIONS WITHIN ALL AREAS TO BE EXCAVATED TO DETERMINE THE SUBSURFACE CONDITIONS. THE GRP RESULTS SHALL BE SUBMITTED TO THE VA FOR REVIEW PRIOR TO ANY EXCAVATION.

BUILDING 4

DEMOLITION PLAN

SCALE: 1"=20'-0"

ESW

CS102

HDR Architecture, Inc. Michael Sanford, Project Engineer

100% BID [FINAL] DOCUMENTS

265 Winter Street, Third Flr.

Waltham, MA 02451

N

PN

WARD A

WARD B

WARD C

KWH

LAYOUT PLAN

SCALE: 1"=20'-0"

ESW

CS103

HDR Architecture, Inc. Michael Sanford, Project Engineer

100% BID [FINAL] DOCUMENTS

265 Winter Street, Third Flr.

Waltham, MA 02451

N

PN

WARD A

WARD B

TOPOGRAPHIC AND UTILITY PLAN

SCALE: 1"=20'-0"

ESW

CS104

HDR Architecture, Inc. Michael Sanford, Project Engineer

100% BID [FINAL] DOCUMENTS

265 Winter Street, Third Flr.

Waltham, MA 02451

N

PN

WARD A

WARD B

CONSTRUCTION DETAILS

SCALE: 1"=20'-0"

ESW

CS105

CONCRETE SIDEWALK

TEMPORARY MATERIAL STOCKPILE

TOE-IN METHODS

TOP VIEW

CATCH BASIN INLET PROTECTION SACK

HDR Architecture, Inc. Michael Sanford, Project Engineer

100% BID [FINAL] DOCUMENTS

265 Winter Street, Third Flr.

Waltham, MA 02451

KWH

PRECAST CONCRETE CURB WALL DETAIL

BITUMINOUS SIDEWALK

File details come from the government source that posted it.