36C24118R0249-0003004.pdf
PDF 16 KB Posted
- Attached to
- VISN 1 SATOC West Haven Location Federal contract opportunity
- Solicitation number
- 36C24118R0249
About this file
36C24118R0249 0003 Stormwater report elements recd 07132018.pdf
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Redevelopment Site:
C/O: Priscilla Harcourt Veterans Administration 15 Veterans Way Lowell, MA 01852
Stormwater Report Elements: Stamped and compiled by a licensed professional engineer recognized by the Commonwealth of Massachusetts
• Project Narrative
a. Introduction of property and redevelopment plans
b. Method of analysis: calculations used to estimate runoff techniques
c. Soils classification
• Grading and drainage (utility) plan
• Summary table for pre- vs. post-development runoff results
• Provide Maps of the property being redeveloped – GIS MAP, Topographic map, FEMA flood plain map, web soils survey map, and all associated map legends .
• Stormwater calculations and data for 2, 10, 25, and 100 year storm
• Pre- and Post-development subcatchment plan
• Drainage diagram for pre- and post-development
• Construction- period, operation & maintenance, and long term pollution prevention plan
a. Narrative of the O&M plan.
b. Responsible parties
c. Construction period and maintenance procedures
d. Specifications of all structures being installed to capture TSS, detain stormwater flow, and improve water quality.
e. Post development maintenance procedures.
• Any additional attachments
File details come from the government source that posted it.