36C24118R0249-0003004.pdf
PDF 16 KB Posted
- Attached to
- VISN 1 SATOC West Haven Location
- Solicitation number
- 36C24118R0249
About this file
36C24118R0249 0003 Stormwater report elements recd 07132018.pdf
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Redevelopment Site:
C/O: Priscilla Harcourt Veterans Administration 15 Veterans Way Lowell, MA 01852
Stormwater Report Elements: Stamped and compiled by a licensed professional engineer recognized by the Commonwealth of Massachusetts
• Project Narrative
a. Introduction of property and redevelopment plans
b. Method of analysis: calculations used to estimate runoff techniques
c. Soils classification
• Grading and drainage (utility) plan
• Summary table for pre- vs. post-development runoff results
• Provide Maps of the property being redeveloped – GIS MAP, Topographic map, FEMA flood plain map, web soils survey map, and all associated map legends .
• Stormwater calculations and data for 2, 10, 25, and 100 year storm
• Pre- and Post-development subcatchment plan
• Drainage diagram for pre- and post-development
• Construction- period, operation & maintenance, and long term pollution prevention plan
a. Narrative of the O&M plan.
b. Responsible parties
c. Construction period and maintenance procedures
d. Specifications of all structures being installed to capture TSS, detain stormwater flow, and improve water quality.
e. Post development maintenance procedures.
• Any additional attachments
File details come from the government source that posted it.