36C24118R0127-0008003.docx
DOCX document 15 KB Posted
- Attached to
- MATOC CAT I-III All Locations Federal contract opportunity
- Solicitation number
- 36C24118R0127
About this file
36C24118R0127 0008 S05 523A4-12-211 RFIs 6-5 through 6-12.docx
View the file
Other files for this federal contract opportunity
Show all 50
MATOC CAT I-III All Locations has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project #523A4-12-211 SPD Exhaust PACU HVAC
1. Please clarify pipe sizes for HWG San. Drain piping: M1.03 drawing shows the pi ping as 2” going to 1-AH1. M6.01 detail 4 shows piping for HWR/S as being 1-1/4” going to 1-AH1. Please determine which pipe size you are looking for.
The HWG San. Drain piping size is to be 1 1/4" as shown on sheet M6.01.
2. Please provide the CAT No. or Tag No. on existing Motor Control Center MCC-M4E-35
MCC-M4E-35
BSC-3715-FVC-2 May 1982 1-600 AMP 2-300 AMP 600A 480V 3PH 60HZ
FED FROM P3E-03 IN RM # GC-111 1ST FL BLD #1
3. Please confirm if there are any known hazardous materials on this project?
There are no known hazardous materials in the scope of work on this project.
4. Please confirm if Federal, state, and local taxes are to be included in proposals?
Contracting will provide a tax exemption number to the successful offeror
5. Please confirm if there are any Federal, state, or local permits required on this project?
There is no Federal, State or local permits required for this project. The General contractor is to follow specifications in sections 01 47 19 construction waste management and section 01 57 19 temporary environmental controls to conform to all rules and regulations.