This is a Specifications document (95% Construction Documents) for the Morovis National Cemetery Phase 1B project under VA Contract Number 36C10F24N0041, Project Number 971-031B, dated March 2026. The project encompasses general construction work including pond liner removal and replacement, fencing installation around retention ponds and the site perimeter, landscaping, and irrigation systems across multiple phased work areas.

The specifications establish comprehensive general requirements for the contractor, including security protocols with restricted site access, OSHA compliance with mandatory 10-hour Construction Safety training for all workers, and a competent person requirement on-site at all times. The contractor must provide a temporary field office measuring 1,496 gross square feet with full utilities, furniture, and equipment including a photocopier/printer/scanner/fax machine, internet connectivity via Starlink, two-way radios, and a leased pickup truck for the Resident Engineer's use for 24 months. Additional contractor responsibilities include furnishing a temporary construction fence (minimum 7 feet height), maintaining site operations with minimal disruption to cemetery functions, providing all temporary water and electrical services (with power available through connection to PR-137 utility or portable generators), and submitting weekly construction progress photographs and final professional photography upon project completion. The contractor must also develop and submit a Project Health and Safety Plan, fire safety plan, and comply with NPDES permit requirements as an operator. Work execution must coordinate with cemetery burial activities, which take precedence over construction, and the contractor must clean all adjacent operational areas before major holidays. Specifications reference multiple divisions of work including earthwork, exterior improvements (paving, fencing, landscaping, irrigation), utilities, and site details with phasing schedules subject to approval by the Contracting Officer and Cemetery Director.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications Volume 1 of 1

Morovis National Cemetery – Phase 1B National Cemetery Administration

95% Construction Documents (CD-1)

VA Contract Number: 36C10F24N0041 VA Project Number: 971-031B AES Project Number: VANR1-2401

March, 2026

10-01-23

TABLE OF CONTENTS

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

NCA MASTER SPECIFICATIONS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 05-10

DIVISION 01 - GENERAL REQUIREMENTS

01 00 02 General Requirements (Minor NCA Projects) 10-23 01 33 23 Shop Drawings, Product Data, and Samples 10-23 01 42 19 Reference Standards 10-23 01 45 29 Testing Laboratory Services 10-23 01 57 19 Temporary Environmental Controls 10-23 01 74 19 Construction Waste Management 10-23 01 81 13 Sustainable Construction Requirements 10-23

DIVISION 02 – EXISTING CONDITIONS

02 21 00 Site Surveys 10-23 02 41 10 Demolition and Site Clearing 10-23

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 10-23

DIVISION 04 – MASONRY (NOT USED)

DIVISION 05 – METALS (NOT USED)

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES (NOT USED)

DIVISION 07 - THERMAL AND MOISTURE PROTECTION (NOT

USED)

DIVISION 08 – OPENINGS (NOT USED)

DIVISION 09 – FINISHES (NOT USED)

DIVISION 10 – SPECIALTIES

10 14 00 Exterior Signage 10-23 10 75 00 Flagpoles 10-23

DIVISION 11 – EQUIPMENT (NOT USED)

DIVISION 12 – FURNISHINGS (NOT USED)

DIVISION 13 - SPECIAL CONSTRUCTION (NOT USED)

Morovis National Cemetery - Phase 1B Project Number: 971-031B

Construction Documents (CD-1) - March 2026

00 01 10-2

DIVISION 22 – PLUMBING (NOT USED)

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC) (NOT USED)

DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)

DIVISION 26 – ELECTRICAL (NOT USED)

DIVISION 27 – COMMUNICATIONS (NOT USED)

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY (NOT

USED)

DIVISION 31 – EARTHWORK

31 20 00 Earth Moving 11-16

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 11-16 32 08 00 Commissioning of Planting Irrigation Systems 12-15 32 12 16 Asphalt Paving 11-16 32 31 13 Chain Link Fences and Gates 11-16 32 31 19 Decorative Metal Fences and Gates 11-16 32 84 00 Planting Irrigation 01-17 32 90 00 Planting 11-16

DIVISION 33 – UTILITIES

33 40 00 Storm Sewer Utilities 11-16 33 47 13 Pond Lining 11-17

Morovis National Cemetery - Phase 1B

05-10

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

SHEET LIST TABLE

SHEET NUMBER SHEET TITLE

GENERAL

GI000 COVER SHEET

GI001 DRAWING INDEX

GI002 CONTRACTOR LAYDOWN YARD PLAN

GI100 TEMP REO TRAILER GENERAL NOTES AND BUILDING CODE SUMMARY

GI101 TEMP RESIDENT ENGINEER OFFICE (REO) TRAILER PLAN

GI501 TEMP RESIDENT ENGINEER OFFICE (REO) DETAILS

PHASING

PH100 PHASING – OVERALL SITE PLAN

PH101 PHASING - OVERALL TRAFFIC CONTROL PLAN

PH102 CONCURRENT WORK - RETENTION POND 2 PHASING PLAN

PH103 CONCURRENT WORK - TEMPORARY RETENTION POND PHASING PLAN

PH111 PHASE 1 - OVERALL SITE PLAN

PH112 PHASE 1 - TRAFFIC CONTROL PLAN

PH113 PHASE 1 - RETENTION POND 4 PHASING PLAN

PH114 PHASE 1 - RETENTION POND 5 PHASING PLAN

PH121 PHASE 2 - OVERALL SITE PLAN

PH122 PHASE 2 - TRAFFIC CONTROL PLAN

PH123 PHASE 2 - POW-MIA FLAG AREA PHASING PLAN

PH124 PHASE 2 - RETENTION POND 7 PHASING PLAN

PH125 PHASE 2 - RETENTION POND 1 PHASING PLAN

PH126 PHASE 2 - FRENCH DRAIN PHASING PLAN

PH131 PHASE 3 - OVERALL SITE PLAN

PH132 PHASE 3 - TRAFFIC CONTROL PLAN

PH133 PHASE 3 - RETENTION POND 8 PHASING PLAN

PH134 PHASE 3 - IRRIGATION RETENTION POND PHASING PLAN

00 01 15 - 2

CIVIL

CI001 GENERAL CIVIL SYMBOLS AND ABBREVIATIONS

CIVIL: EXISTING CONDITIONS AND DEMOLITION

CE100 OVERALL EXISTING CONDITIONS AND DEMOLITION PLAN

CE101 RETENTION POND 1 - EXISTING CONDITIONS AND DEMOLITION PLAN

CE102 RETENTION POND 2 AND 6 - EXISTING CONDITIONS AND DEMOLITION

PLAN

CE103 RETENTION POND 4 - EXISTING CONDITIONS AND DEMOLITION PLAN

CE104 RETENTION POND 5 - EXISTING CONDITIONS AND DEMOLITION PLAN

CE105 TEMPORARY RETENTION POND & POND 7 - EXISTING CONDITIONS AND

DEMOLITION PLAN

CE106 RETENTION POND 8 - EXISTING CONDITIONS AND DEMOLITION PLAN

CE107 IRRIGATION RETENTION POND - EXISTING CONDITIONS AND DEMOLITION

PLAN

CE108 COMMITTAL SHELTER – EXISTING CONDITIONS PLAN

CIVIL: SITE GRADING

CG100 OVERALL SITE AND GRADING PLAN

CG101 RETENTION POND 1 - SITE AND GRADING PLAN

CG102 RETENTION POND 2 AND 6 - SITE AND GRADING PLAN

CG103 RETENTION POND 4 - SITE AND GRADING PLAN

CG104 RETENTION POND 5 - SITE AND GRADING PLAN

CG105 TEMPORARY RETENTION POND & POND 7 - SITE AND GRADING PLAN

CG106 RETENTION POND 8 - SITE AND GRADING PLAN

CG107 IRRIGATION RETENTION POND - SITE AND GRADING PLAN

CG401 POW/MIA FLAG AREA GRADING PLAN ENLARGEMENT

CIVIL: RETENTION POND FENCING

CS101 RETENTION POND FENCING – OVERALL SITE PLAN

CS102 RETENTION POND 1 – FENCING PLAN

CS103 RETENTION POND 2 – FENCING PLAN

CS104 RETENTION POND 4 – FENCING PLAN

CS105 RETENTION POND 5 – FENCING PLAN

CS106 RETENTION POND 6 – FENCING PLAN

CS107 RETENTION POND 7 – FENCING PLAN

CS108 RETENTION POND 8 – FENCING PLAN

CS109 TEMPORARY RETENTION POND – FENCING PLAN

CS110 IRRIGATION RETENTION POND – FENCING PLAN

00 01 15 - 3

CIVIL: PERIMETER FENCING

CS111 PERIMETER FENCING – OVERALL SITE PLAN

CS112 PERIMETER FENCING – AREA A

CS113 PERIMETER FENCING – AREA B

CS114 PERIMETER FENCING – AREA C

CS115 PERIMETER FENCING – AREA D

CS116 PERIMETER FENCING – AREA E

CS117 PERIMETER FENCING – AREA F

CS118 PERIMETER FENCING – AREA G

CS119 PERIMETER FENCING – AREA H

CS120 PERIMETER FENCING – AREA I

CS121 PERIMETER FENCING – AREA J

CS122 PERIMETER FENCING – AREA K

CS123 PERIMETER FENCING – AREA L

CS124 PERIMETER FENCING – AREA M

CS125 PERIMETER FENCING – AREA N

CS126 PERIMETER FENCING – AREA O

CIVIL: ENLARGED PLANS AND DETAILS

CS201 TYPICAL EXISTING BIO-RETENTION POND SECTION AND DEMOLITION PLAN

CS202 TYPICAL PROPOSED BIO-RETENTION POND SECTION

CS203 TYPICAL PROPOSED BIO-RETENTION POND 8 SECTION

CS401 POW/MIA FLAG AREA LAYOUT PLAN ENLARGEMENT

CS402 FRENCH DRAIN PLAN

CS403 TEMPORARY COMMITTAL SHELTER RELOCATION PLAN

CS501 CIVIL DETAILS

CS502 CIVIL DETAILS

CS503 CIVIL DETAILS

CI501 SITE DETAILS

LANDSCAPE ARCHITECTURE

LD101 RETENTION POND 1 - LANDSCAPING DEMOLITION PLAN

LD102 RETENTION POND 7 - LANDSCAPING DEMOLITION PLAN

LD103 POW/MIA FLAG AREA - LANDSCAPING DEMOLITION PLAN

LP101 OVERALL LANDSCAPE PLAN

LP102 RETENTION POND 1 LANDSCAPE PLAN

LP103 RETENTION POND 2 LANDSCAPE PLAN

LP104 RETENTION POND 4 LANDSCAPE PLAN

LP105 RETENTION POND 5 LANDSCAPE PLAN

Morovis National Cemetery - Phase 1B

00 01 15 - 4

LP106 RETENTION POND 6 LANDSCAPE PLAN

LP107 RETENTION POND 7 LANDSCAPE PLAN

LP108 RETENTION POND 8 LANDSCAPE PLAN

PL109 RETENTION POND 8 LANDSCAPE PLAN - CONT.

LP110 POW/MIA FLAG AREA LANDSCAPE PLAN ENLARGEMENT

LP501 LANDSCAPE DETAILS & PLANT SCHEDULE

IRRIGATION

IR100 IRRIGATION COVER SHEET

IR101 IRRIGATION PLAN

IR102 IRRIGATION PLAN

IR103 IRRIGATION PLAN

IR104 IRRIGATION PLAN

IR105 IRRIGATION PLAN

IR106 IRRIGATION PLAN

IR107 IRRIGATION PLAN

IR108 IRRIGATION PLAN

IR109 IRRIGATION PLAN

IR110 IRRIGATION PLAN

IR501 IRRIGATION DETAILS

IR502 IRRIGATION DETAILS

IR503 IRRIGATION DETAILS

IR504 IRRIGATION DETAILS

- - - END - - -

i

SECTION 01 00 02

GENERAL REQUIREMENTS (MINOR NCA PROJECTS)

1.1 GENERAL INTENTION

1.2 STATEMENT OF BID ITEM(S)

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.4 construction security requirements

1.5 APPLICABLE PUBLICATIONS

1.6 FIRE SAFETY:

1.7 OPERATIONS AND STORAGE AREAS

1.8 ALTERATIONS

1.9 DISPOSAL AND RETENTION

1.10 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

1.11 RESTORATION

1.12 PHYSICAL DATA

1.13 PROFESSIONAL SURVEYING SERVICES

1.14 LAYOUT OF WORK

1.15 As-Built Drawings

1.16 USE OF ROADWAYS

1.17 RE/COTR'S FIELD OFFICE

1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.19 TEMPORARY TOILETS

1.20 AVAILABILITY AND USE OF UTILITY SERVICES

ii

1.21 INSTRUCTIONS

1.22 GOVERNMENT-FURNISHED PROPERTY

1.23 RELOCATED ITEMS

1.24 CONSTRUCTION SIGN

1.25 SAFETY SIGN

1.26 CONSTRUCTION DIGITAL IMAGES

1.27 FINAL ELEVATION PHOTOGRAPHS

1.28 HISTORIC PRESERVATION

1.29 PROJECT HEALTH AND SAFETY PLAN

1.30 CONTRACTOR FURNISHED TRANSPORTATION

This page intentionally blank

GENERAL REQUIREMENTS

01 00 02 - 1

SECTION 01 00 02

GENERAL REQUIREMENTS (MINOR NCA PROJECTS)

1.1 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor, materials, equipment and services and perform and complete all work for Morovis National Cemetery – Phase 1B as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

Cemetery Director.

C. Offices of AES Group, Inc., as Architect-Engineers (A/E), may render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Resident Engineer/Contracting Officers Representative

(RE/COR) or his duly authorized representative.

D. All Testing Laboratory services will be retained and paid for by the

Contractor (see Spec Section 01 45 29, Testing Laboratory Services).

However, the Department of Veterans Affairs may elect to retain its own

Testing Laboratory for any purpose. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the RE/COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the RE/COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program security requirements as established by the RE/COR, be identified by name and employer. They shall be restricted from unauthorized access.

F. Prior to commencing work, general contractor shall provide proof that an OSHA certified “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.

G. Training:

1. All employees of general contractor or subcontractors shall, at the minimum, have successfully completed the 10-hour OSHA certified

Morovis National Cemetery - Phase 1B

01 00 02 - 2

Construction Safety course and/or other relevant competency training, as determined by VA CP.

2. Submit OSHA training records of all employees for approval before the start of work.

1.2 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: Installation of all work shown on the plans and described in the specifications including but not limited to:

pond liner removal and replacement, fencing around the perimeter of each pond, fencing around the perimeter of the site, landscaping, and irrigation.

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. AFTER AWARD OF CONTRACT, 2 bond paper set(s) of specifications and drawings will be furnished. These drawings and specifications will consist of those returned by prospective bidders.

B. Additional sets of drawings may be made by the Contractor, at

Contractor's expense, from Bond or digital files furnished by the

Issuing Office.

1.4 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the site without following the procedures approved by the RE/COR. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. For working outside the “regular hours” as defined in the contract, The General Contractor shall give 3 days’ notice to the RE/COTR so that appropriate arrangements can be provided for the Cemetery employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the RE/COTR.

Morovis National Cemetery - Phase 1B

01 00 02 - 3

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the RE/COR.

C. Guards:

1. The General Contractor shall provide unarmed guards at the project site when theft or vandalism warrants.

D. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the RE/COR for the purpose of security inspections of every area of project including toolboxes and parked machines, and to take any necessary emergency action.

E. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the RE/COTR upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of RE/COR.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify RE/COR immediately when there is a loss or compromise of

“sensitive information”.

7. All electronic information shall be stored in a specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

Morovis National Cemetery - Phase 1B

01 00 02 - 4

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

1.5 APPLICABLE PUBLICATIONS

A. Applicable Publications: Publications listed below form part of this

Article to the extent referenced. Publications are referenced in text by basic designations only.

1. American Society for Testing and Materials (ASTM):

E84-22 Surface Burning Characteristics of Building

Materials

2. National Fire Protection Association (NFPA):

10-2010 Standard for Portable Fire Extinguishers

30-2008 Flammable and Combustible Liquids Code

51B-2009 Standard for Fire Prevention During Welding, Cutting and Other Hot Work

70-2008 National Electrical Code

241-2009 Standard for Safeguarding Construction, Alteration, and Demolition Operations

3. Occupational Safety and Health Administration (OSHA):

29 CFR 1926 Safety and Health Regulations for Construction

1.6 FIRE SAFETY:

A. Establish and maintain a fire protection program in accordance with 29 CFR

1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to

RE/COR/Cemetery Director for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES.

Prior to any worker for the contractor or subcontractor’s beginning work, they shall undergo a safety briefing provided by the General Contractor’s competent person per OSHA requirements. This briefing shall include information on the construction limits, safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of NCA equipment, etc.

Morovis National Cemetery - Phase 1B

01 00 02 - 5

Documentation shall be provided to the RE/COR that individuals have undergone the Contractor’s safety briefing.

B. Site and Building Access: Maintain free and unobstructed access to emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.

C. Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet).

E. Temporary Heating and Electrical: Install, use and maintain installations in accordance with 29 CFR 1926, NFPA 241 and NFPA 70.

F. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with

RE/COR/Cemetery Director.

G. Egress Routes for Construction Workers: Maintain free and unobstructed egress. Inspect daily. Report findings and corrective actions weekly to

RE/COR.

H. Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with 29 CFR 1926, NFPA

241 and NFPA 10.

I. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR 1926, NFPA 241 and NFPA 30.

J. Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections. Request interruptions in accordance with Article, OPERATIONS AND STORAGE AREAS, and coordinate with RE/COTR. All existing or temporary fire protection systems (fire alarms) located in construction areas shall be tested as coordinated with the Cemetery. Parameters for the testing and results of any tests performed shall be recorded by the Cemetery and copies provided to the RE/COTR.

K. Smoke Detectors: Prevent accidental operation. Remove temporary covers at end of work operations each day. Coordinate with RE/COTR.

L. Hot Work: Perform and safeguard hot work operations in accordance with

NFPA 241 and NFPA 51B. Coordinate with RE/COR.

Morovis National Cemetery - Phase 1B

01 00 02 - 6

M. Fire Hazard Prevention and Safety Inspections: Inspect entire construction areas weekly. Coordinate with, and report findings and corrective actions weekly to RE/COR.

N. Smoking: Smoking is prohibited in and adjacent to construction areas inside existing buildings and additions under construction. In separate and detached buildings under construction, smoking is prohibited except in designated smoking rest areas.

O. Dispose of waste and debris in accordance with NFPA 241. Remove from site weekly.

P. Perform other construction, alteration and demolition operations in accordance with 29 CFR 1926.

1.7 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the RE/COR. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage trailers, office trailers) and utilities may be erected by the Contractor only with the approval of the RE/COR and shall be built with labor and materials furnished by the

Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work.

C. The Contractor shall, under regulations prescribed by the RE/COR, use only established roadways, or use temporary roadways constructed by the

Contractor when and as authorized by the RE/COR. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.(FAR 52.236-10)

D. Working space and space available for storing materials shall be as shown on the drawings, and as approved by the RE/COR with agreement of the Cemetery. Contractor parking will be only in areas and on roadways designated and agreed to by the RE/COR in agreement of the Cemetery.

E. Workmen are subject to rules of the Cemetery applicable to their conduct.

Morovis National Cemetery - Phase 1B

01 00 02 - 7

F. Execute work so as to interfere as little as possible with normal functioning of Cemetery as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by the Cemetery in quantities sufficient for not more than two workdays. Provide unobstructed access to the Cemetery areas required to remain in operation.

3. Where access by Cemetery personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

G. Phasing: To ensure such executions, the Contractor shall furnish the

RE/COR with a schedule of approximate phasing dates on which the

Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, the Contractor shall notify the RE/COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to the Cemetery Director, RE/COR and

Contractor, as follows (refer to drawings for details of phasing):

Discuss phasing plan provided in the drawings, and submit durations for each phase and concurrent work to the COR and RE for approval.

H. All buildings will be occupied during performance of work; but immediate areas of alterations will be vacated.

1.

The Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Cemetery’s operations will not be hindered. The Contractor shall permit access to Cemetery personnel through other construction areas which serve as routes of access to

Morovis National Cemetery - Phase 1B

01 00 02 - 8 such affected areas and equipment. Coordinate alteration work in areas occupied by Cemetery Staff so that Cemetery operations will continue during the construction period.

2. Immediate areas of alterations not mentioned in preceding

Subparagraph 1 will be temporarily vacated while alterations are performed.

I. Construction Fence: Before construction operations begin, the

Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. The temporary fencing shall encompass the construction work area(s) to serve as a pedestrian barrier to alert cemetery patrons of the construction site. Remove the fence when directed by RE/COR.

J. When a building is turned over to Contractor, Contractor shall accept entire responsibility, therefore.

1. The Contractor shall maintain a minimum temperature of 4 degrees C

(40 degrees F) at all times, except as otherwise specified.

2. The Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, the Contractor shall make arrangements for pre-inspection of the site with Fire Department or Company (Department of Veterans

Affairs or municipal) whichever will be required to respond to an alarm from the Contractor's employee.

K. Utilities Services: Maintain existing utility services for the Cemetery at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by RE/COR. All such actions shall be coordinated with the Utility Company involved.

Morovis National Cemetery - Phase 1B

01 00 02 - 9

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of RE/COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the

RE/COR, and Cemetery Director’s prior knowledge and written approval.

2. The Contractor shall submit a request to interrupt any such services to both RE/COR and the Cemetery Director in writing, 48 hours in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. The Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of the Cemetery. Interruption time approved by the Cemetery and RE/COR may occur at other than

Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the RE/COR.

5. In case of a contract construction emergency, service will be interrupted on approval of RE/COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

7. Provide an underground utility locating service to locate any existing underground lines or other underground facilities within all work areas that are to remain in service. This includes but is not limited to all areas where digging and excavating will be required to accomplish this scope of work.Any new information, not clearly indicated on the bid documents shall be passed on to the

Contractor's underground locating service staff. Any new information discovered by the underground locating service staff shall be turned over to the RE/COR for dissemination to the Cemetery

Staff.

Morovis National Cemetery - Phase 1B

01 00 02 - 10

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged-in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

M. To minimize interference of construction activities with flow of

Cemetery traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the RE/COR.

N. Coordinate the work for this contract with other construction operations as directed by RE/COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF

ROADWAYS.

O. Coordination of Construction with Cemetery Director: The burial activities at a National Cemetery shall take precedence over construction activities. The Contractor must cooperate and coordinate with the Cemetery Director, through the RE/COR, in arranging construction schedule to cause the least possible interference with

Cemetery activities in actual burial areas. Construction noise during the committal services shall not disturb the service. Trucks and workmen shall not pass through the service area during this period.

1. The Contractor is required to discontinue his work sufficiently in advance of Easter Sunday, Mother's Day, Father's Day, Memorial Day, Veteran's Day and/or Federal holidays, to permit him to clean up all areas of operation adjacent to existing burial plots before these dates.

2. Cleaning up shall include the removal of all equipment, tools, materials and debris and leaving the areas in a clean, neat condition.

Morovis National Cemetery - Phase 1B

01 00 02 - 11

1.8 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the RE/COR of areas in which alterations occur and areas which are anticipated routes of access, and furnish a signed report, to the Contracting Officer. This report shall list:

1. Shall note any discrepancies between drawings and existing conditions at site.

2. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur, and which have been agreed upon by Contractor and RE/COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of

RE/COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by the Contractor with new items in accordance with specifications which will be furnished by the Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR

52.236-2) and "CHANGES" (FAR 52.243-4 and VAAR 852.236-88).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and RE/COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing surfaces as compared with conditions of same as noted in first condition survey report.

1. Re-survey report shall also list any damage caused by the Contractor to such flooring and other surfaces, despite protection measures;

and will form the basis for determining extent of repair work required of the Contractor to restore damage caused by the

Contractor's workmen in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled, and equipment moved and/or relocated.

Morovis National Cemetery - Phase 1B

01 00 02 - 12

1.9 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items were directed by RE/COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from the Cemetery.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.10 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the RE/COR.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract

Morovis National Cemetery - Phase 1B

01 00 02 - 13 or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the RE/COR may have the necessary work performed and charge the cost to the

Contractor.

(FAR 52.236-9)

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge

Elimination System (NPDES) permit is required for this project. The

Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate NCA

Central/Cemetery) office. The contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements. Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the Contractor's method of operations and operations planning and the Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:

1. Designating areas for equipment maintenance and repair;

2. Providing waste receptacles at convenient locations and provide regular collection of wastes;

3. Locating equipment wash down areas on site, and provide appropriate control of wash-waters;

4. Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and

5. Providing adequately maintained sanitary facilities.

1.11 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any water/irrigation or electric work without approval of the RE/COR.

Morovis National Cemetery - Phase 1B

01 00 02 - 14

Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the RE/COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, landscape stone, lawns, paving, roads, walks, etc.)

disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At the Contractor's own expense, the Contractor shall immediately restore to service and repair any damage caused by the Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services, fire protection systems, communications systems

(including telephone), irrigation system control, and power, which are indicated on drawings and which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR

52.236-2).

1.12 PHYSICAL DATA

A. Data and information furnished or referred to below is for the

Contractor's information. The Government shall not be responsible for any interpretation of, or conclusion drawn from the data or information by the Contractor.

1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by the A/E.

(FAR 52.236-4)

B. The Government does not guarantee that other materials will not be encountered, nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine the site of work and logs of borings and, after investigation, decide for themselves the character of materials and

Morovis National Cemetery - Phase 1B

01 00 02 - 15 make their bids accordingly. Upon proper application to the Department of Veterans Affairs, including approved scheduling bidders will be permitted to make subsurface explorations of their own at site.

1.13 PROFESSIONAL SURVEYING SERVICES

A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections.

The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.

1.14 LAYOUT OF WORK

A. The Contractor shall lay out the work from Government established base lines and benchmarks indicated on the drawings and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at the Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the RE/COR. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the RE/COR until authorized to remove them. If such marks are destroyed by the

Contractor or through Contractor's negligence before their removal is authorized, the RE/COR may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

(FAR 52.236-17)

B. Establish and plainly mark center lines for each building and/or addition to each existing building, lines for each gravesite control monument, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure and/or addition, roads, parking lots, gravesite control monuments, are in accordance with lines and elevations shown on contract drawings.

C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. The

Morovis National Cemetery - Phase 1B

01 00 02 - 16

Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:

1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the RE/COR before any work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.

D. During progress of work, the Contractor shall have lines, grades, locations and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings. Furnish such certification to the

RE/COR before any major items of concrete work are placed. In addition, furnish to the RE/COR certificates from a registered land surveyor or registered civil engineer that the following work is complete in every respect as required by contract drawings.

1. Lines of each building and/or addition.

2. Elevations of bottoms of footings and tops of floors of each building and/or addition.

3. Lines and elevations of sewers and of all outside distribution systems.

4. Lines of grave plot documentation.

5. Lines of elevations of all swales and interment areas.

6. Lines and elevations of roads, streets and parking lots.

7. Lines and elevations and location of top of pre-placed crypts within their respective plots.

8. Lines and elevations of grade over pre-placed crypts.

9. Northing/Easting coordinate locations and elevation depth below finished grade, of all water, sanitary, storm, gas and irrigation structures, directional fittings, control wire and lines.

10. Northing/Easting coordinate locations and elevation for each gravesite grid monument.

E. Upon completion of the work, the Contractor shall furnish the RE/COR with reproducible drawings, in AutoCAD form, at the scale of the contract drawings, showing the finished grade on the grid developed for constructing the work. These drawings shall bear the seal of the registered land surveyor or registered civil engineer.

Morovis National Cemetery - Phase 1B

01 00 02 - 17

F. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of

Article "Professional Surveying Services".

1.15 AS-BUILT DRAWINGS

A. The Contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, which will include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the RE/COR's review, as often as requested.

C. The Contractor shall deliver two approved completed sets of as-built drawings to the RE/COR within 15 calendar days after acceptance of the project by the RE/COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.16 USE OF ROADWAYS

A. For hauling, use only established public roads and designated permanent roads on Cemetery property and, when authorized by the RE/COR, such existing or Contractor constructed and/or modified temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed or modified by the Contractor at the

Contractor's expense following approved plans that include construction, operation, maintenance and restoration. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

1.17 RE/COTR'S FIELD OFFICE

A. The Contractor shall, within fifteen (15) days after receipt of Notice to Proceed, provide where shown on the drawings a temporary field office, furniture, and two-inch-deep gravel surfaced area for use of the RE/COR. Office and furniture shall be like new.

B. The field office shall provide not less than 139 square meters (1496 gross square feet) of floor area in one unit. Installation of the office shall meet all local codes.

C. Provide office with two, 900 mm (three foot) wide exterior doors, including hardware and OSHA approved ramp and stairs leading to grade.

D. Enclose the entire perimeter of the office from the floor to the ground and finish to match exterior. Provide insulation levels listed on the drawings, and seal tight to the ground with a painted 19 mm (3/4 inch) exterior grade plywood skirt.

Morovis National Cemetery - Phase 1B

01 00 02 - 18

E. Exterior finishes shall be per shown on the drawings.

G. Interior finishes shall consist of resilient flooring, painted wallboard on walls, and acoustical tile ceilings. Interior doors may be either painted or stained.

H. Interior shall be subdivided with full height partitions to provide four offices, one conference room, two toilets, one shower, one storage closet, and one kitchenette. Provide each space with 900 mm (three foot) wide door with master keyed locks.

I. Provide 609 mm (2feet) wide by 1372 mm (4.5 feet) high operable windows; where shown on the drawings. Window openings shall be fitted with security bars to prevent any forced entry. The doors of field office shall have a hasp and padlock and also deadbolts keyed from both sides.

J. Provide sufficient led lighting in each room to deliver 750 lux (70 foot-candles) of light at desk top height without the aid of daylight.

Provide one light switch in each room.

K. Provide two duplex receptacles in each wall of each office, one GFCI in each restroom and kitchenette area, and multiple outlets throughout the conference room as shown on the drawings. If a wall is 3.0 m (10 feet) long or more, provide two receptacles for each 3.0 m (10 feet), or portion thereof, of wall.

L. The Contractor shall provide the following:

1. Electricity, hot and cold water, and necessary utility services.

2. All necessary piping, power circuits, network cabling, patch panels, equipment racks, cat 5e or better cabling for phones and computers, electrical fixtures, lighting, and other items necessary to provide a habitable structure for the purpose intended. Provide minimum of 7 network receptacles located as approved by Resident Engineer upon review of the Contractor’s submitted plan.

3. Thermostatically controlled, centralized heating and air conditioning system designed to maintain the temperature between 21 and 27 degrees C (70- and 80-degrees F) with 50 percent relative humidity maintained during the air conditioning season. Thermostats shall be energy saving programmable type with a minimum of three temperature settings for each day of the week.

4. Two water closets, lavatories, mirrors, toilet paper dispensers, paper towel dispensers, soap dispensers, towel bars, and two-prong

Morovis National Cemetery - Phase 1B

01 00 02 - 19 coat hooks for toilet rooms. Provide holding tank for sanitary sewer, including periodic pumping as required. Provide one shower.

5. One (1) wall mounted first aid kit that meets or exceeds current

OSHA and AMSI Z.803-1 requirements.

6. One (1) wall mounted key safe with push-button combination lock sized for 12 keys.

7. Two (2) wall mounted 10-pound Tri-Class (ABC) dry chemical fire extinguishers.

8. Four (4) hard hats, white, full brim with ratchet headband system.

9. Four (4) ANSI 207 Class 2 safety vest in lime color with two pockets, size extra-large.

M. The Contractor shall, for the duration of the RE/COR's occupancy, provide the following:

1. Satisfactory conditions in and around the field office and parking area.

2. Maintenance of gravel surfaced area, including the area for parking, in an acceptable condition for vehicle and foot traffic at all times.

3. Maintenance of utility services.

5. Potable water, fuel and electric power for normal office uses, including lights, heating and air conditioning.

6. Photocopier/Printer/Scanner/Fax Machine (complete with installation, service, maintenance, supplies and payment of all monthly usages charges):

a. Minimum Photocopier/Printer requirements:

1) Collating/sorting/stapling.

2) Enlarging/reducing

3) Multi-size sheet feeder.

4) Four paper tray sizes and bypass tray.

5) Two-sided and single-sided copying.

6) Network capability/connectivity

b. Minimum Scanner requirements:

1) Scan to email and scan to folder capability.

2) PDF, TIFF, JPEG output format capability

3) Network capability/connectivity.

c. Minimum Fax Machine requirements:

1) Plain paper copies.

2) Memory feature with fifty documents.

Morovis National Cemetery - Phase 1B

01 00 02 - 20

3) Automatic document feeder with 50-page capacity.

4) Memory storage for twenty or more numbers.

5) Network capacity/connectivity.

d. All services, maintenance and supplies shall be same day service

7. Contractor shall provide two-way radios (2 each) Motorola DTR650…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .