971-031B - Morovis NC Phase 1B - CD1 - DrawingsPart-2.pdf
PDF 19 MB Posted
- Solicitation number
- 36C10F26Q0062
About this file
This document is a set of construction drawings for Morovis National Cemetery - Phase 1B located in Morovis, Puerto Rico. The drawings, prepared by AES Group, Inc. and issued in March 2026, detail site plans, traffic control plans, and phasing plans for a multi-phase cemetery improvement project under the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management.
The project encompasses three construction phases involving installation and modification of bio retention ponds (numbered 1-8), new perimeter fencing, irrigation systems, landscaping, and related site infrastructure. Phase 1 includes establishing a construction entrance and laydown yard, installing temporary fencing around ponds 2, 4, 5, 6, and a temporary pond, implementing traffic control measures to create one-way road loops, and coordinating irrigation and perimeter fencing work. Phase 2 involves traffic controls between the columbarium and Pond 4, work in the POW/MIA flag area, and modifications to ponds 1 and 7, plus installation of a French drain. Phase 3 focuses on Pond 8 and an irrigation pond with one-lane, two-way traffic controls. All phases require maintaining at least two operational committal shelters, keeping roads clear of mud and debris, providing advance notice of temporary road closures to the Contracting Officer's Representative (COR) and Resident Engineer, and completing final inspections before advancing to subsequent phases. Grading, erosion, and sediment controls must be in place prior to earth-disturbing activities, with all temporary construction areas restored to original condition and damage repaired immediately upon occurrence.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F
E
N A
ENTR
ANCE
FOYE
R
B
D
H
J
G
R
T1
L
Q
K
M
P
MECH ENCLO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CONCRETE
CO
NCRETE
CO
NCRETE
C O
N C
R
ETE
CO
NCRETE
BENCH
BENCH
BENCH
BENCH
ASPHALT DRIVEWAY
CONCRETE SIDEWALKASPHALT DRIVEWAY
ASPHALT DRIVEWAY
ASPHALT
D
RIV
EW
AY
BIO RETENTION
POND 4
BIO RETENTION
POND 5
BIO RETENTION
POND 6
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
PH111
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
BMWALK
PHASE 1 - OVERALL SITE PLAN
SCALE:1 PHASE 1 - OVERALL SITE PLAN
1 = 800
SHEET NOTES:
1. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR TO EARTH
DISTURBING ACTIVITIES.
2. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR CEMETERY STAFF
AND THE PUBLIC AT ALL TIMES.
3. AT LEAST TWO COMMITTAL SHELTERS MUST REMAIN OPERATIONAL AT ALL TIMES DURING
CONSTRUCTION. COORDINATE WITH THE COR OR RESIDENT ENGINEER AND SUBMIT PROJECT
SCHEDULE WITHIN TWO WEEKS OF PROJECT AWARD.
4. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR ANY TEMPORARY CLOSURE OF A ROADWAY.
5. DEMOLITION WORK NEEDED TO COMPLETE NEW WORK MUST BE REPAIRED AT THE END OF EACH
PHASE. ALL DAMAGE TO EXISTING CONDITIONS MUST BE REPAIRED IMMEDIATELY.
6. SITE PERIMETER FENCING HAS VARYING EXISTING CONDITIONS AND TOPOGRAPHY. IF ISSUES ARISE DURING CONSTRUCTION THAT REQUIRE ANY MODIFICATIONS TO THE PERIMETER FENCING, NOTIFY THE
COR AND RESIDENT ENGINEER IMMEDIATELY.
7. FINAL INSPECTION MUST BE COMPLETED AT THE END OF EACH PHASE PRIOR TO STARTING THE NEXT
PHASE OF WORK.
LEGEND:
POND FENCING
PHASE 1 SCHEDULE
PHASE 1:
CONSTRUCTION
ENTRANCE AND
LAYDOWN YARD
SHEET GI002
PRIOR TO THE COMMENCEMENT OF ALL OTHER WORK, ESTABLISH THE MAIN CONSTRUCTION ENTRANCE FOR THE
ENTIRE DURATION OF THE PROJECT AND ESTABLISH THE MAIN CONTRACTOR LAYDOWN YARD.
POND 6
SHEET GI002
INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 6 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS FLUSH AGAINST THE OUTSIDE OF THE CURRENT PERMANENT FENCING WHERE PRESENT ALONG THE DARK DASHED OUTLINE. WHERE SIDEWALK IS PRESENT, INSTALL ON THE EDGE OF THE SIDEWALK CLOSEST TO THE POND, SO THAT SIDEWALK ACCESS REMAINS OPEN. COORDINATE WORK ON THIS POND WITH THE MAIN CONTRACTOR LAYDOWN YARD.
TRAFFIC
CONTROLS
SHEET PH112
INSTALL ALL NECESSARY TRAFFIC CONTROL MEASURES TO CREATE A ONE WAY ROAD IN THE EASTBOUND DIRECTION BETWEEN THE COLUMBARIUM AND POND 4, AND A ONE WAY ROAD IN THE WESTBOUND DIRECTION NEAR POND 5. THIS ENTIRE SECTION BECOMES A ONE WAY LOOP. TEMPORARY TRAFFIC CONTROLS MUST REMAIN IN PLACE UNTIL ALL
CONSTRUCTION FENCING HAS BEEN REMOVED AT THE END OF THIS CONSTRUCTION PHASE.
POND 4
SHEET PH113
INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 4 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING BY BLOCKING ONE LANE OF THE EXISTING ROAD IN THE EASTBOUND DIRECTION ACCORDING TO THE DARK DASHED LINE.
POND 5
SHEET PH114
INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 5 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE STREET CLOSEST TO THE POND, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE
ACTIVITIES.
IRRIGATION
IR SERIES SHEETS
IRRIGATION WORK WHERE NEW PLANTINGS OCCUR MUST BE INSTALLED PRIOR TO THE INSTALLATION OF PLANTINGS
AND LANDSCAPING WORK.
LANDSCAPING
LP SERIES SHEETS
LANDSCAPING WORK TO BE PERFORMED AFTER THE COMPLETION OF POND SAFETY FENCING AND IRRIGATION WORK.
SEE LP SERIES SHEETS FOR FURTHER DETAILS.
CONCURRENT WORK:
PERIMETER
FENCING
INSTALL NEW PERIMETER FENCING FOR THE CEMETERY AS DETAILED FROM THE SURVEY. POINT OF CONNECTIONS ARE TO EXISTING PERIMETER FENCING AND ARE NOTED ON SHEET CS111. INSTALLATION OF PERIMETER FENCING TO BE
COMPLETED CONCURRENTLY WITH ALL OTHER PROJECT WORK.
IRRIGATION
IR SERIES SHEETS
SITE IRRIGATION WORK EXTENDS THROUGHOUT THE MAJORITY OF THE PUBLIC AREAS IN THE CEMETERY. IRRIGATION WORK TO BE PERFORMED CONCURRENTLY WITH ALL OTHER CONSTRUCTION ACTIVITIES. INCLUDE A BREAKDOWN OF IRRIGATION ACTIVITIES, DURATIONS, IMPACTS, AND A SCHEDULE AT THE BEGINNING OF THE PROJECT. NOTIFY THE COR
AND RE AT LEAST 7 DAYS IN ADVANCE OF STARTING WORK IN A NEW AREA.
POND 2
SHEET PH102
INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 2 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS FLUSH AGAINST THE OUTSIDE OF THE CURRENT PERMANENT FENCING WHERE PRESENT ALONG THE DARK DASHED OUTLINE. WORK FOR BIO RETENTION POND 2 TO BE COMPLETED CONCURRENTLY WITH ALL OTHER PROJECT WORK.
TEMPORARY POND
SHEET PH103
INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE THE TEMPORARY POND FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE ROAD CLOSEST TO THE POND, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE ACTIVITIES. WORK FOR THE TEMPORARY RETENTION POND TO BE COMPLETED CONCURRENTLY WITH ALL OTHER
PROJECT WORK.
CONSTRUCTION FENCING
ENLARGED SHEET CALLOUT
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
KEYPLAN:
PH113
PH114 GI002
GI002
PH114
PH113
0 804020
SCALE: 1:800
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text A https://www.aquaengineering.com/
N A
ENTR
ANCE
FOYE
R
B
D
H
J
G
R
T1
L
Q
C
K
M
P
MECH ENCLO
D
C
B
A
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CONCRETE
CO
NCRETE
CO
NCRETE
C O
N C
R
ETE
CO
NCRETE
BENCH
BENCH
BENCH
BENCH
ASPHALT DRIVEWAY
ASPHALT
D
RIV
EW
AY
AS
PH
AL
T
D R
IV
EW
AY
C O
N C
R
ET
E
SI
D
EW
AL
K
AS
PH
AL
T
D R
IV
EW
AY
C O
N C
R
ET
E
SI
D
EW
AL
K
BI
O
R
ET
EN
TI
O N
P O
N D
BIO RETENTION
POND 4
BIO RETENTION
POND 5
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
NEW SITE PERIM
ETER FENCE
PH112
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
BMWALK
PHASE 1 - TRAFFIC CONTROL PLAN
SCALE:1 PHASE 1 - TRAFFIC CONTROL PLAN
1 = 500
SHEET NOTES:
1. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR TO EARTH
DISTURBING ACTIVITIES.
2. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR CEMETERY STAFF
AND THE PUBLIC AT ALL TIMES.
3. AT LEAST TWO COMMITTAL SHELTERS MUST REMAIN OPERATIONAL AT ALL TIMES DURING
CONSTRUCTION. COORDINATE WITH THE COR OR RESIDENT ENGINEER AND SUBMIT PROJECT
SCHEDULE WITHIN TWO WEEKS OF PROJECT AWARD.
4. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR ANY TEMPORARY CLOSURE OF A ROADWAY.
5. ALL SIGNAGE IS STANDARD FROM THE MANUAL ON THE 2023 UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), AND THE 2020 MANUAL DE ROTULACIÓN PARA LAS VÍAS PÚBLICAS DE PUERTO RICO.
6. WHERE ADDITIONAL SIGNAGE AND/OR TRAFFIC CONTROLS ARE REQUIRED, EITHER BY LOCAL TRAFFIC REGULATIONS OR AT THE REQUEST OF THE CEMETERY, THE CONTRACTOR IS TO FURNISH AND INSTALL THESE ADDITIONAL ITEMS AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT REGARDLESS IF IT IS
SHOWN ON THIS DRAWING.
7. TRAFFIC CONTROLS ARE TO REMAIN IN PLACE FOR THE ENTIRE DURATION OF CONSTRUCTION WHERE THE ROAD IS BLOCKED WITH CONSTRUCTION FENCING. AT NO POINT ARE TRAFFIC CONTROLS TO BE
REMOVED, BLOCKED, OR OBSCURED UNTIL THE COMPLETION OF PHASE 1 CONSTRUCTION.
KEY NOTES:
1. BEGIN ONE WAY ROAD IN THE EASTBOUND DIRECTION AT INTERSECTION INDICATED.
2. BEGIN ONE WAY ROAD IN THE WESTBOUND DIRECTION AT INTERSECTION INDICATED.
3. PROVIDE NECESSARY ROAD MARKINGS OR TRAFFIC CONTROL DEVICES, SUCH AS CONES, TO INDICATE
ONE WAY LANE SHIFT TO THE LEFT BEFORE THE TEMPORARY CONSTRUCTION FENCING.
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
KEYPLAN:
PH112
SIGN LEGEND:
NO RIGHT TURN
MUTCD R3-1
NO THRU MOVEMENT
MUTCD R3-27
SINGLE LANE SHIFT, LEFT
MUTCD CW1-4 (I)
ONE WAY, RIGHT
MUTCD R6-1 (D)
ONE WAY, LEFT
MUTCD R6-1 (I)
DIRECTION OF TRAVEL
LEGEND:
POND FENCING
ROAD SIGN POST
CONSTRUCTION FENCING
SCALE: 1:500
5025105 15 20
SINGLE LANE SHIFT, RIGHT
MUTCD CW1-4 (D)
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text A
CO
NCRETE
BENCH
BENCH
BENCH
BENCH
BIO RETENTION
POND 4
PH113
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
BMWALK
PHASE 1 - RETENTION POND 4
PHASING PLAN
SCALE:1 PHASE 1 - RETENTION POND 4 PHASING PLAN
1 = 150
SHEET NOTES:
1. TEMPORARY CONSTRUCTION FENCING LOCATIONS SHOWN TO BE VERIFIED BY
CONTRACTOR AND THE RESIDENT ENGINEER PRIOR TO STARTING WORK.
2. ANY POND FENCING OR LANDSCAPING SHOWN IS FOR REFERENCE ONLY TO ILLUSTRATE
CONSTRUCTION FENCING AND STAGING/PARKING AREAS.
3. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR
TO EARTH DISTURBING ACTIVITIES.
4. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR
CEMETERY STAFF AND THE PUBLIC AT ALL TIMES.
5. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE
CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS
PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR
ANY TEMPORARY CLOSURE OF A ROADWAY.
6. AFTER COMPLETION OF CONSTRUCTION, ENSURE TEMPORARY CONSTRUCTION AREAS
ARE REPAIRED TO THEIR ORIGINAL STATE. RESEED AREA AND REMOVE ALL TEMPORARY
FENCING. REPAIR ANY DAMAGE TO ROADWAYS, CURBS, GUTTERS, AND EXISTING
INFRASTRUCTURE IF DAMAGE OCCURRED DURING CONSTRUCTION.
POND FENCING
CONSTRUCTION FENCING
150 105321
SCALE: 1:150
KEY NOTES:
1. CONTRACTOR STAGING AREA AND TEMPORARY PARKING.
2. EXISTING VEGETATION TO BE DEMOLISHED TO ENSURE ADEQUATE SPACE FOR
CONSTRUCTION EQUIPMENT TO ACCESS POND 4 AS NEEDED. RE-SEED AREA AFTER
COMPLETION OF WORK.
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
KEYPLAN:
PH113
GUARD RAIL
STAGING AREA/PARKING
VEGETATION
CS502
LEGEND:
TOPOGRAPHIC LINESXXX.XX
DIRECTION OF TRAVEL
ASPHALT DRIVEWAY
ASPHALT
D
RIV
EW
AY
BIO RETENTION
POND 5
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
PH114
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
BMWALK
PHASE 1 - RETENTION POND 5
PHASING PLAN
SCALE:1 PHASE 1 - RETENTION POND 5 PHASING PLAN
1 = 150
150 105321
SCALE: 1:150
SHEET NOTES:
1. TEMPORARY CONSTRUCTION FENCING LOCATIONS SHOWN TO BE VERIFIED BY
CONTRACTOR AND THE RESIDENT ENGINEER PRIOR TO STARTING WORK.
2. ANY POND FENCING OR LANDSCAPING SHOWN IS FOR REFERENCE ONLY TO ILLUSTRATE
CONSTRUCTION FENCING AND STAGING/PARKING AREAS.
3. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR
TO EARTH DISTURBING ACTIVITIES.
4. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR
CEMETERY STAFF AND THE PUBLIC AT ALL TIMES.
5. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE
CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS
PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR
ANY TEMPORARY CLOSURE OF A ROADWAY.
6. AFTER COMPLETION OF CONSTRUCTION, ENSURE TEMPORARY CONSTRUCTION AREAS
ARE REPAIRED TO THEIR ORIGINAL STATE. RESEED AREA AND REMOVE ALL TEMPORARY
FENCING. REPAIR ANY DAMAGE TO ROADWAYS, CURBS, GUTTERS, AND EXISTING
INFRASTRUCTURE IF DAMAGE OCCURRED DURING CONSTRUCTION.
KEY NOTES:
1. CONTRACTOR STAGING AREA AND TEMPORARY PARKING.
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
KEYPLAN:
PH114
POND FENCING
CONSTRUCTION FENCING
STAGING AREA/PARKING
LEGEND:
EXISTING PERIMETER FENCE
TOPOGRAPHIC LINESXXX.XX
CS502
DIRECTION OF TRAVEL
E
N A
ENTR
ANCE
FOYE
R
B
D
H
J
G
R
T1
L
Q
C
K
M
P
MECH ENCLO
D
C
B
A
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CONCRETE
CO
NCRETE
CO
NCRETE
C O
N C
R
ETE
CO
NCRETE
BENCH
BENCH
BENCH
BENCH
CONCRETE SIDEWALK
ASPHALT DRIVEWAY
ASPHALT DRIVEWAY
CONCRETE SIDEWALK
ASPHALT DRIVEWAY
ASPHALT
D
RIV
EW
AY
AS
PH
AL
T
D R
IV
EW
AY
C O
N C
R
ET
E
SI
D
EW
AL
K
AS
PH
AL
T
D R
IV
EW
AY
C O
N C
R
ET
E
SI
D
EW
AL
K
BIO RETENTION
POND 1
BI
O
R
ET
EN
TI
O N
P O
N
BIO RETENTION
POND 4
BIO RETENTION
POND 5
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
NEW SITE PERIM
ETER FENCE
PH121
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
BMWALK
PHASE 2 - OVERALL SITE PLAN
SCALE:1 PHASE 2 - OVERALL SITE PLAN
1 = 800
SHEET NOTES:
1. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR TO EARTH
DISTURBING ACTIVITIES.
2. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR CEMETERY STAFF
AND THE PUBLIC AT ALL TIMES.
3. AT LEAST TWO COMMITTAL SHELTERS MUST REMAIN OPERATIONAL AT ALL TIMES DURING
CONSTRUCTION. COORDINATE WITH THE COR OR RESIDENT ENGINEER AND SUBMIT PROJECT
SCHEDULE WITHIN TWO WEEKS OF PROJECT AWARD.
4. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR ANY TEMPORARY CLOSURE OF A ROADWAY.
5. DEMOLITION WORK NEEDED TO COMPLETE NEW WORK MUST BE REPAIRED AT THE END OF EACH
PHASE. ALL DAMAGE TO EXISTING CONDITIONS MUST BE REPAIRED IMMEDIATELY.
6. SITE PERIMETER FENCING HAS VARYING EXISTING CONDITIONS AND TOPOGRAPHY. IF ISSUES ARISE DURING CONSTRUCTION THAT REQUIRE ANY MODIFICATIONS TO THE PERIMETER FENCING, NOTIFY THE
COR AND RESIDENT ENGINEER IMMEDIATELY.
7. FINAL INSPECTION MUST BE COMPLETED AT THE END OF EACH PHASE PRIOR TO STARTING THE NEXT
PHASE OF WORK.
LEGEND:
POND FENCING
PHASE 2 SCHEDULE
PHASE 2:
TRAFFIC
CONTROLS
SHEET PH122
INSTALL ALL NECESSARY TRAFFIC CONTROL MEASURES TO CREATE A ONE WAY ROAD IN THE EASTBOUND DIRECTION BETWEEN THE COLUMBARIUM AND POND 4. TEMPORARY TRAFFIC CONTROLS MUST REMAIN IN PLACE UNTIL ALL
CONSTRUCTION FENCING HAS BEEN REMOVED AT THE END OF THIS CONSTRUCTION PHASE.
P.O.W./M.I.A AREA
SHEET PH123
P.O.W. / M.I.A. WORK TO BE PERFORMED CONCURRENTLY WITH OTHER WORK WITHIN PHASE 2.
POND 7
SHEET PH124
INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 7 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS FLUSH AGAINST THE ROAD, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE ACTIVITIES.
POND 1
SHEET PH125
INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 1 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE SIDEWALK CLOSEST TO THE ROAD, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE
ACTIVITIES. PROVIDE APPROPRIATE SIDEWALK CLOSURE SIGNS.
FRENCH DRAIN
SHEET PH126
INSTALLATION OF FRENCH DRAIN TO BE COMPLETED CONCURRENTLY WITH THE INSTALLATION AND PHASING OF THE FENCING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE STREET CLOSEST TO THE FRENCH
DRAIN, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE ACTIVITIES.
IRRIGATION
IR SERIES SHEETS
IRRIGATION WORK WHERE NEW PLANTINGS OCCUR MUST BE INSTALLED PRIOR TO THE INSTALLATION OF PLANTINGS
AND LANDSCAPING WORK.
LANDSCAPING
LP SERIES SHEETS
LANDSCAPING WORK TO BE PERFORMED AFTER THE COMPLETION OF POND SAFETY FENCING AND IRRIGATION WORK.
SEE LP SERIES SHEETS FOR FURTHER DETAILS.
CONCURRENT WORK:
PERIMETER
FENCING
INSTALL NEW PERIMETER FENCING FOR THE CEMETERY AS DETAILED FROM THE SURVEY. POINT OF CONNECTIONS ARE TO EXISTING PERIMETER FENCING AND ARE NOTED ON SHEET CS111. INSTALLATION OF PERIMETER FENCING TO BE
COMPLETED CONCURRENTLY WITH ALL OTHER PROJECT WORK.
IRRIGATION
IR SERIES SHEETS
SITE IRRIGATION WORK EXTENDS THROUGHOUT THE MAJORITY OF THE PUBLIC AREAS IN THE CEMETERY. IRRIGATION WORK TO BE PERFORMED CONCURRENTLY WITH ALL OTHER CONSTRUCTION ACTIVITIES. INCLUDE A BREAKDOWN OF IRRIGATION ACTIVITIES, DURATIONS, IMPACTS, AND A SCHEDULE AT THE BEGINNING OF THE PROJECT. NOTIFY THE COR
AND RE AT LEAST 7 DAYS IN ADVANCE OF STARTING WORK IN A NEW AREA.
POND 2
SHEET PH102
INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 2 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS FLUSH AGAINST THE OUTSIDE OF THE CURRENT PERMANENT FENCING WHERE PRESENT ALONG THE DARK DASHED OUTLINE. WORK FOR BIO RETENTION POND 2 TO BE COMPLETED CONCURRENTLY WITH ALL OTHER PROJECT WORK.
TEMPORARY POND
SHEET PH103
INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE THE TEMPORARY POND FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE ROAD CLOSEST TO THE POND, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE ACTIVITIES. WORK FOR THE TEMPORARY RETENTION POND TO BE COMPLETED CONCURRENTLY WITH ALL OTHER
PROJECT WORK.
CONSTRUCTION FENCING
ENLARGED SHEET CALLOUT
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
KEYPLAN:
PH124
PH123
PH125
PH126
PH124
PH123
PH125
PH127
0 804020
SCALE: 1:800
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text A
E
N A
ENTR
ANCE
FOYE
R
B
D
H
J
G
R
T1
L
Q
C
K
M
P
MECH ENCLO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CONCRETE
CO
NCRETE
CO
NCRETE
C O
N C
R
ETE
CO
NCRETE
BENCH
BENCH
BENCH
BENCH
CONCRETE SIDEWALK
ASPHALT DRIVEWAY
ASPHALT DRIVEWAY
CONCRETE SIDEWALK
ASPHALT DRIVEWAY
ASPHALT
D
RIV
EW
AY
BIO RETENTION
POND 1
BIO RETENTION
POND 4
BIO RETENTION
POND 5
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
PH122
SIGN LEGEND:
NO RIGHT TURN
MUTCD R3-1
NO LEFT TURN
MUTCD R3-2
NO THRU MOVEMENT
MUTCD R3-27
SINGLE LANE SHIFT, LEFT
MUTCD CW1-4 (I)
ONE WAY, RIGHT
MUTCD R6-1 (D)
ONE WAY, LEFT
MUTCD R6-1 (I)
DIRECTION OF TRAVEL
PH122
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
BMWALK
PHASE 2 - TRAFFIC CONTROL PLAN
SCALE:1 PHASE 2 - TRAFFIC CONTROL PLAN
1 = 500
SHEET NOTES:
1. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR TO EARTH
DISTURBING ACTIVITIES.
2. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR CEMETERY STAFF
AND THE PUBLIC AT ALL TIMES.
3. AT LEAST TWO COMMITTAL SHELTERS MUST REMAIN OPERATIONAL AT ALL TIMES DURING
CONSTRUCTION. COORDINATE WITH THE COR OR RESIDENT ENGINEER AND SUBMIT PROJECT
SCHEDULE WITHIN TWO WEEKS OF PROJECT AWARD.
4. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR ANY TEMPORARY CLOSURE OF A ROADWAY.
5. ALL SIGNAGE IS STANDARD FROM THE MANUAL ON THE 2023 UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), AND THE 2020 MANUAL DE ROTULACIÓN PARA LAS VÍAS PÚBLICAS DE PUERTO RICO.
6. WHERE ADDITIONAL SIGNAGE AND/OR TRAFFIC CONTROLS ARE REQUIRED, EITHER BY LOCAL TRAFFIC REGULATIONS OR AT THE REQUEST OF THE CEMETERY, THE CONTRACTOR IS TO FURNISH AND INSTALL THESE ADDITIONAL ITEMS AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT REGARDLESS IF IT IS
SHOWN ON THIS DRAWING.
7. TRAFFIC CONTROLS ARE TO REMAIN IN PLACE FOR THE ENTIRE DURATION OF CONSTRUCTION WHERE THE ROAD IS BLOCKED WITH CONSTRUCTION FENCING. AT NO POINT ARE TRAFFIC CONTROLS TO BE
REMOVED, BLOCKED, OR OBSCURED UNTIL THE COMPLETION OF PHASE 2 CONSTRUCTION.
LEGEND:
POND FENCING
ROAD SIGN POST
CONSTRUCTION FENCING
KEY NOTES:
1. BEGIN ONE WAY ROAD IN THE EASTBOUND DIRECTION AT INTERSECTION INDICATED.
2. ONE WAY ROAD TERMINATES AT INTERSECTION INDICATED.
3. PROVIDE NECESSARY ROAD MARKINGS OR TRAFFIC CONTROL DEVICES, SUCH AS CONES, TO
INDICATE ONE WAY LANE SHIFT TO THE RIGHT BEFORE THE TEMPORARY CONSTRUCTION FENCING.
4. PROVIDE NECESSARY MARKINGS AND ADDITIONAL SIGNAGE AS REQUIRED TO PROHIBIT PUBLIC
PARKING FOR CONTRACTOR ACCESS TO LAYDOWN YARD AND CONSTRUCTION AREA.
KEYPLAN:
SINGLE LANE SHIFT, RIGHT
MUTCD CW1-4 (D)
NO PARKING
MUTCD R8-3a
NO PARKING AREA
SCALE: 1:500
5025105 15 20
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text A
CO
CO
CO
CO
CO
CONCRETE
CO
NCRETE
CO
NCRETE
C O
N C
R
ETE
CO
NCRETE
BENCH
BENCH
BENCH
BENCH
BIO RETENTION
PH123
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
BMWALK
PHASE 2 - POW-MIA FLAG AREA
PHASING PLAN
SCALE:1 PHASE 2 - POW-MIA FLAG AREA PHASING PLAN
1 = 150
150 105321
SCALE: 1:150
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
KEYPLAN:
PH123
SHEET NOTES:
1. TEMPORARY CONSTRUCTION FENCING LOCATIONS SHOWN TO BE VERIFIED BY
CONTRACTOR AND THE RESIDENT ENGINEER PRIOR TO STARTING WORK.
2. ANY POND FENCING OR LANDSCAPING SHOWN IS FOR REFERENCE ONLY TO ILLUSTRATE
CONSTRUCTION FENCING AND STAGING/PARKING AREAS.
3. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR
TO EARTH DISTURBING ACTIVITIES.
4. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR
CEMETERY STAFF AND THE PUBLIC AT ALL TIMES.
5. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE
CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS
PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR
ANY TEMPORARY CLOSURE OF A ROADWAY.
6. WORK IS WITHIN AN ACTIVE BURIAL SECTIONS, COORDINATE WITH THE COR TO ENSURE
THAT ACTIVE SECTIONS REMAIN OPEN TO THE PUBLIC AT ALL TIMES.
6. AFTER COMPLETION OF CONSTRUCTION, ENSURE TEMPORARY CONSTRUCTION AREAS
ARE REPAIRED TO THEIR ORIGINAL STATE. RESEED AREA AND REMOVE ALL TEMPORARY
FENCING. REPAIR ANY DAMAGE TO ROADWAYS, CURBS, GUTTERS, AND EXISTING
INFRASTRUCTURE IF DAMAGE OCCURRED DURING CONSTRUCTION.
7. PROTECT COLUMBARIUM WALLS WITHIN THE CONSTRUCTION AREA. CONTRACTOR TO
INSPECT COLUMBARIUM WALLS BEFORE THE START OF CONSTRUCTION AND PROVIDE
PHOTOGRAPHIC DOCUMENTATION TO THE GOVERNMENT. AT THE COMPLETION OF
CONSTRUCTION, THE CONTRACTOR TO INSPECT COLUMBARIUM WALLS AND PROVIDE
PHOTOGRAPHIC DOCUMENTATION TO THE GOVERNMENT. IF DAMAGE TO THE
COLUMBARIUM WALLS OCCURRED DURING CONSTRUCTION, IT IS THE RESPONSIBILITY OF
THE CONTRACTOR TO RESTORE THE WALLS TO THEIR ORIGINAL STATE AT NO
ADDITIONAL COST TO THE GOVERNMENT.
KEY NOTES:
1. CONTRACTOR STAGING AREA AND TEMPORARY PARKING.
2. PROVIDE SIGNAGE WITHIN THE COLUMBARIUM AREA THAT NO DRINKING WATER IS
AVAILABLE DURING CONSTRUCTION, SIGN SHOULD ALSO PROVIDE INSTRUCTIONS
FOR THE NEAREST LOCATION AVAILABLE FOR DRINKING WATER. COORDINATE WITH
THE CEMETERY TO FURNISH APPROPRIATE SIGNAGE.
POND FENCING
CONSTRUCTION FENCING
STAGING AREA/PARKING
LEGEND:
GUARD RAIL
CS502
TOPOGRAPHIC LINESXXX.XX
DIRECTION OF TRAVEL
C
B
A
CO
CO
AS
PH
AL
T
D R
IV
EW
AY
C O
N C
R
ET
E
SI
D
EW
AL
K
AS
PH
AL
T
D R
IV
EW
AY
C O
N C
R
ET
E
SI
D
EW
AL
K
BI
O
R
ET
EN
TI
O N
P O
N
EXISTING SITE PERIMETER FENCE
NEW SITE PERIM
ETER FENCE
PH124
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
BMWALK
PHASE 2 - RETENTION POND 7
PHASING PLAN
SCALE:1 PHASE 2 - RETENTION POND 7 PHASING PLAN
1 = 150
150 105321
SCALE: 1:150
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
KEYPLAN:
PH124
SHEET NOTES:
1. TEMPORARY CONSTRUCTION FENCING LOCATIONS SHOWN TO BE VERIFIED BY
CONTRACTOR AND THE RESIDENT ENGINEER PRIOR TO STARTING WORK.
2. ANY POND FENCING OR LANDSCAPING SHOWN IS FOR REFERENCE ONLY TO ILLUSTRATE
CONSTRUCTION FENCING AND STAGING/PARKING AREAS.
3. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR
TO EARTH DISTURBING ACTIVITIES.
4. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR
CEMETERY STAFF AND THE PUBLIC AT ALL TIMES.
5. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE
CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS
PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR
ANY TEMPORARY CLOSURE OF A ROADWAY.
6. AFTER COMPLETION OF CONSTRUCTION, ENSURE TEMPORARY CONSTRUCTION AREAS
ARE REPAIRED TO THEIR ORIGINAL STATE. RESEED AREA AND REMOVE ALL TEMPORARY
FENCING. REPAIR ANY DAMAGE TO ROADWAYS, CURBS, GUTTERS, AND EXISTING
INFRASTRUCTURE IF DAMAGE OCCURRED DURING CONSTRUCTION.
KEY NOTES:
1. CONTRACTOR STAGING AREA AND TEMPORARY PARKING.
POND FENCING
CONSTRUCTION FENCING
STAGING AREA/PARKING
LEGEND:
GUARD RAIL
CS502
EXISTING PERIMETER FENCE
TOPOGRAPHIC LINESXXX.XX
DIRECTION OF TRAVEL
C
CONCRETE SIDEWALK
ASPHALT DRIVEWAY
ASPHALT DRIVEWAY
CONCRETE SIDEWALK
BIO RETENTION
POND 1
PH125
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
BMWALK
PHASE 2 - RETENTION POND 1
PHASING PLAN
SCALE:1 PHASE 2 - RETENTION POND 1 PHASING PLAN
1 = 150
150 105321
SCALE: 1:150
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
KEYPLAN:
PH125
SHEET NOTES:
1. TEMPORARY CONSTRUCTION FENCING LOCATIONS SHOWN TO BE VERIFIED BY
CONTRACTOR AND THE RESIDENT ENGINEER PRIOR TO STARTING WORK.
2. ANY POND FENCING OR LANDSCAPING SHOWN IS FOR REFERENCE ONLY TO ILLUSTRATE
CONSTRUCTION FENCING AND STAGING/PARKING AREAS.
3. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR
TO EARTH DISTURBING ACTIVITIES.
4. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR
CEMETERY STAFF AND THE PUBLIC AT ALL TIMES.
5. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE
CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS
PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR
ANY TEMPORARY CLOSURE OF A ROADWAY.
6. PROVIDE TEMPORARY ONE-WAY AND DO NOT ENTER SIGNAGE WHERE NECESSARY.
TRAFFIC CONTROLS ARE TO REMAIN IN PLACE FOR THE ENTIRE DURATION OF
CONSTRUCTION.
6. AFTER COMPLETION OF CONSTRUCTION, ENSURE TEMPORARY CONSTRUCTION AREAS
ARE REPAIRED TO THEIR ORIGINAL STATE. RESEED AREA AND REMOVE ALL TEMPORARY
FENCING. REPAIR ANY DAMAGE TO ROADWAYS, CURBS, GUTTERS, AND EXISTING
INFRASTRUCTURE IF DAMAGE OCCURRED DURING CONSTRUCTION.
KEY NOTES:
1. PRIMARY CONTRACTOR STAGING AREA AND TEMPORARY PARKING.
POND FENCING
CONSTRUCTION FENCING
STAGING AREA/PARKING
LEGEND:
CS502
TOPOGRAPHIC LINESXXX.XX
DIRECTION OF TRAVEL
PH126
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
BMWALK
PHASE 2 - FRENCH DRAIN PHASING
PLAN
SCALE:1 PHASE 2 - FRENCH DRAIN PHASING PLAN
1 = 150
150 105321
SCALE: 1:150
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
KEYPLAN:
PH126
SHEET NOTES:
1. TEMPORARY CONSTRUCTION FENCING LOCATIONS SHOWN TO BE VERIFIED BY
CONTRACTOR AND THE RESIDENT ENGINEER PRIOR TO STARTING WORK.
2. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR
TO EARTH DISTURBING ACTIVITIES.
3. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR
CEMETERY STAFF AND THE PUBLIC AT ALL TIMES.
4. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE
CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS
PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR
ANY TEMPORARY CLOSURE OF A ROADWAY.
6. AFTER COMPLETION OF CONSTRUCTION, ENSURE TEMPORARY CONSTRUCTION AREAS
ARE REPAIRED TO THEIR ORIGINAL STATE. RESEED AREA AND REMOVE ALL TEMPORARY
FENCING. REPAIR ANY DAMAGE TO ROADWAYS, CURBS, GUTTERS, AND EXISTING
INFRASTRUCTURE IF DAMAGE OCCURRED DURING CONSTRUCTION.
KEY NOTES:
1. ENSURE THAT NO EXCAVATION OCCURS IN BURIAL AREAS. COORDINATE WITH THE
RESIDENT ENGINEER PRIOR TO EXCAVATION FOR FRENCH DRAIN.
ACTIVE BURIAL AREA
CONSTRUCTION FENCING
LEGEND:
CS502
TOPOGRAPHIC LINESXXX.XX
C
B
A
1 2
UP
J
H
F
B
D
G
E
C
L
A
A
B
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
AE
4B
AE
4B
AE
4B
D4
B6
D1
A
B
0'
- 0
2'
0"
2'
0"
PE
RI
M
ET
ER
O
F
RO
O F
AB
O
VE
5' - 1 3/4"
30' - 0"
4' - 1 1/4"
39' - 3"
RA
IN
L
EA
DE
R
5'
9"
10' - 1"
CH
AI
N
LI
NK
FE
NC
E- R
EF
ER
T O
CI
VI
L
DW
G S
B4
AE
4B
B4
AE
4B
SL
C
O L, W
IT
H
CO
NC
RE
TE
E
NC
AS
EM
EN
T-
TY
P
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
S
TR
UC
T
DW
G
S
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
S
TR
UC
T
DW
G
S
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
ST
RU
CT
D
W G
S
A
B
RO
O
F
HA
TC
H
O
PE
NI
NG
A
BO
VE
2B
7.
F.
F.
E.
CP
B1
B2
B3
B4
B5
5.5
CO
CO
CO
CO
ESW40
158.29
ESW40
158.30
BL*EB60
158.45
EB60
158.45
EB60
158.44
EB60
158.43
EB60
158.43
EB60
158.43
EC60
158.43EB60
158.44
EB60
158.45
EB60
158.44
EB60
158.44
EB60
158.45
EB60
158.44
EC60
158.47
EB60
158.46
CO
COL
158.46
COL
158.48
COL
158.46
COL
158.48
COL
158.48
COL
158.50
COL
158.48
COL
158.46
COL
158.48
COL
158.48
COL
158.47
COL
158.50
COL
158.46
COL
158.46 FFE
158.45
COL
158.47
COL
158.47
EB62
158.45
EB62
158.44
EB62
158.43
EB62
158.45
158.45
158.45
158.44
EB62
158.45
EB62
158.45
GS
158.15
GS
158.49
BENCH
158.46
BENCH
158.48
BENCH
158.47
BENCH
158.46
BENCH
158.48
BENCH
158.48
BENCH
158.47
BENCH
158.47
BENCH
158.48
BENCH
158.48
BENCH
158.47
BENCH
158.47
BENCH
158.48
BENCH
158.48
BENCH
158.47
BENCH
158.46
COL
158.46
COL
158.47
COL
158.47
COL
158.47
COL
158.48
COL
158.46
COL
158.48
GS
158.47
COMMITTAL
SHELTER SIGN
GRAVEL DRIVE W
ITH CONCRETE CURB BORDER
TEMPORARY POND
IRRIGATION POND
BIO RETENTION
POND 8
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
PH131
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
BMWALK
PHASE 3 - OVERALL SITE PLAN
SCALE:1 PHASE 3 - OVERALL SITE PLAN
1 = 800
SHEET NOTES:
1. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR TO EARTH
DISTURBING ACTIVITIES.
2. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR CEMETERY STAFF
AND THE PUBLIC AT ALL TIMES.
3. AT LEAST TWO COMMITTAL SHELTERS MUST REMAIN OPERATIONAL AT ALL TIMES DURING
CONSTRUCTION. COORDINATE WITH THE COR OR RESIDENT ENGINEER AND SUBMIT PROJECT
SCHEDULE WITHIN TWO WEEKS OF PROJECT AWARD.
4. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR ANY TEMPORARY CLOSURE OF A ROADWAY.
5. DEMOLITION WORK NEEDED TO COMPLETE NEW WORK MUST BE REPAIRED AT THE END OF EACH
PHASE. ALL DAMAGE TO EXISTING CONDITIONS MUST BE REPAIRED IMMEDIATELY.
6. SITE PERIMETER FENCING HAS VARYING EXISTING CONDITIONS AND TOPOGRAPHY. IF ISSUES ARISE DURING CONSTRUCTION THAT REQUIRE ANY MODIFICATIONS TO THE PERIMETER FENCING, NOTIFY THE
COR AND RESIDENT ENGINEER IMMEDIATELY.
7. FINAL INSPECTION MUST BE COMPLETED AT THE END OF EACH PHASE PRIOR TO STARTING THE NEXT
PHASE OF WORK.
LEGEND:
POND FENCING
PHASE 3 SCHEDULE
PHASE 3:
TRAFFIC
CONTROLS
SHEET PH132
INSTALL ALL NECESSARY TRAFFIC CONTROL MEASURES TO CREATE A ONE LANE, TWO-WAY ROAD NEAR POND 8.
TEMPORARY TRAFFIC CONTROLS MUST REMAIN IN PLACE UNTIL ALL CONSTRUCTION FENCING HAS BEEN REMOVED AT
THE END OF THIS CONSTRUCTION PHASE.
POND 8
SHEET PH133
INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 8 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE SIDEWALK CLOSEST TO THE ROAD, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE
ACTIVITIES. PROVIDE APPROPRIATE SIDEWALK CLOSURE SIGNS.
IRRIGATION POND
SHEET PH134
INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE THE IRRIGATION POND FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE ROAD CLOSEST TO THE POND, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE
ACTIVITIES.
IRRIGATION
IR SERIES SHEETS
IRRIGATION WORK WHERE NEW PLANTINGS OCCUR MUST BE INSTALLED PRIOR TO THE INSTALLATION OF PLANTINGS
AND LANDSCAPING WORK.
LANDSCAPING
LP SERIES SHEETS
LANDSCAPING WORK TO BE PERFORMED AFTER THE COMPLETION OF POND SAFETY FENCING AND IRRIGATION WORK.
SEE LP SERIES SHEETS FOR FURTHER DETAILS.
CONCURRENT WORK:
PERIMETER
FENCING
INSTALL NEW PERIMETER FENCING FOR THE CEMETERY AS DETAILED FROM THE SURVEY. POINT OF CONNECTIONS ARE TO EXISTING PERIMETER FENCING AND ARE NOTED ON SHEET CS111. INSTALLATION OF PERIMETER FENCING TO BE
COMPLETED CONCURRENTLY WITH ALL OTHER PROJECT WORK.
IRRIGATION
IR SERIES SHEETS
SITE IRRIGATION WORK EXTENDS THROUGHOUT THE MAJORITY OF THE PUBLIC AREAS IN THE CEMETERY. IRRIGATION WORK TO BE PERFORMED CONCURRENTLY WITH ALL OTHER CONSTRUCTION ACTIVITIES. INCLUDE A BREAKDOWN OF IRRIGATION ACTIVITIES, DURATIONS, IMPACTS, AND A SCHEDULE AT THE BEGINNING OF THE PROJECT. NOTIFY THE COR
AND RE AT LEAST 7 DAYS IN ADVANCE OF STARTING WORK IN A NEW AREA.
POND 2
SHEET PH126
INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 2 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS FLUSH AGAINST THE OUTSIDE OF THE CURRENT PERMANENT FENCING WHERE PRESENT ALONG THE DARK DASHED OUTLINE. WORK FOR BIO RETENTION POND 2 TO BE COMPLETED CONCURRENTLY WITH ALL OTHER PROJECT WORK.
TEMPORARY POND
SHEET PH134
INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE THE TEMPORARY POND FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE ROAD CLOSEST TO THE POND, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE ACTIVITIES. WORK FOR THE TEMPORARY RETENTION POND TO BE COMPLETED CONCURRENTLY WITH ALL OTHER
PROJECT WORK.
CONSTRUCTION FENCING
ENLARGED SHEET CALLOUT
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
KEYPLAN:
PH133
PH134
PH133
PH134
0 804020
SCALE: 1:800
AutoCAD SHX Text
TEL
AutoCAD SHX Text
WM
AutoCAD SHX Text W.M.
AutoCAD SHX Text W.M.
File details come from the government source that posted it. Updated .