971-031B - Morovis NC Phase 1B - CD1 - DrawingsPart-2.pdf

PDF 19 MB Posted

Attached to
Sources Sought Notice - Morovis National Cemetery, Phase 1B
Solicitation number
36C10F26Q0062
Issued by

About this file

This document is a set of construction drawings for Morovis National Cemetery - Phase 1B located in Morovis, Puerto Rico. The drawings, prepared by AES Group, Inc. and issued in March 2026, detail site plans, traffic control plans, and phasing plans for a multi-phase cemetery improvement project under the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management.

The project encompasses three construction phases involving installation and modification of bio retention ponds (numbered 1-8), new perimeter fencing, irrigation systems, landscaping, and related site infrastructure. Phase 1 includes establishing a construction entrance and laydown yard, installing temporary fencing around ponds 2, 4, 5, 6, and a temporary pond, implementing traffic control measures to create one-way road loops, and coordinating irrigation and perimeter fencing work. Phase 2 involves traffic controls between the columbarium and Pond 4, work in the POW/MIA flag area, and modifications to ponds 1 and 7, plus installation of a French drain. Phase 3 focuses on Pond 8 and an irrigation pond with one-lane, two-way traffic controls. All phases require maintaining at least two operational committal shelters, keeping roads clear of mud and debris, providing advance notice of temporary road closures to the Contracting Officer's Representative (COR) and Resident Engineer, and completing final inspections before advancing to subsequent phases. Grading, erosion, and sediment controls must be in place prior to earth-disturbing activities, with all temporary construction areas restored to original condition and damage repaired immediately upon occurrence.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F

E

N A

ENTR

ANCE

FOYE

R

B

D

H

J

G

R

T1

L

Q

K

M

P

MECH ENCLO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CONCRETE

CO

NCRETE

CO

NCRETE

C O

N C

R

ETE

CO

NCRETE

BENCH

BENCH

BENCH

BENCH

ASPHALT DRIVEWAY

CONCRETE SIDEWALKASPHALT DRIVEWAY

ASPHALT DRIVEWAY

ASPHALT

D

RIV

EW

AY

BIO RETENTION

POND 4

BIO RETENTION

POND 5

BIO RETENTION

POND 6

EXISTING SITE PERIMETER FENCE

EXISTING SITE PERIMETER FENCE

EXISTING SITE PERIMETER FENCE

EXISTING SITE PERIMETER FENCE

EXISTING SITE PERIMETER FENCE

PH111

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

MOROVIS NATIONAL

CEMETERY - PHASE 1B

MOROVIS, PUERTO RICO

971-031B

APPROVED: PROJECT MANAGER

CHERI L. COOPER

202-841-4052

MARCH 2026REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG. OF

CONSTRUCTION

DOCUMENTS - CD1

APPROVED: CONTRACTING SPECIALIST

JOSHUA GIBSON

202-746-5192

N

CONSTRUCTION DOCUMENTS - CD1

BMWALK

PHASE 1 - OVERALL SITE PLAN

SCALE:1 PHASE 1 - OVERALL SITE PLAN

1 = 800

SHEET NOTES:

1. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR TO EARTH

DISTURBING ACTIVITIES.

2. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR CEMETERY STAFF

AND THE PUBLIC AT ALL TIMES.

3. AT LEAST TWO COMMITTAL SHELTERS MUST REMAIN OPERATIONAL AT ALL TIMES DURING

CONSTRUCTION. COORDINATE WITH THE COR OR RESIDENT ENGINEER AND SUBMIT PROJECT

SCHEDULE WITHIN TWO WEEKS OF PROJECT AWARD.

4. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR ANY TEMPORARY CLOSURE OF A ROADWAY.

5. DEMOLITION WORK NEEDED TO COMPLETE NEW WORK MUST BE REPAIRED AT THE END OF EACH

PHASE. ALL DAMAGE TO EXISTING CONDITIONS MUST BE REPAIRED IMMEDIATELY.

6. SITE PERIMETER FENCING HAS VARYING EXISTING CONDITIONS AND TOPOGRAPHY. IF ISSUES ARISE DURING CONSTRUCTION THAT REQUIRE ANY MODIFICATIONS TO THE PERIMETER FENCING, NOTIFY THE

COR AND RESIDENT ENGINEER IMMEDIATELY.

7. FINAL INSPECTION MUST BE COMPLETED AT THE END OF EACH PHASE PRIOR TO STARTING THE NEXT

PHASE OF WORK.

LEGEND:

POND FENCING

PHASE 1 SCHEDULE

PHASE 1:

CONSTRUCTION

ENTRANCE AND

LAYDOWN YARD

SHEET GI002

PRIOR TO THE COMMENCEMENT OF ALL OTHER WORK, ESTABLISH THE MAIN CONSTRUCTION ENTRANCE FOR THE

ENTIRE DURATION OF THE PROJECT AND ESTABLISH THE MAIN CONTRACTOR LAYDOWN YARD.

POND 6

SHEET GI002

INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 6 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS FLUSH AGAINST THE OUTSIDE OF THE CURRENT PERMANENT FENCING WHERE PRESENT ALONG THE DARK DASHED OUTLINE. WHERE SIDEWALK IS PRESENT, INSTALL ON THE EDGE OF THE SIDEWALK CLOSEST TO THE POND, SO THAT SIDEWALK ACCESS REMAINS OPEN. COORDINATE WORK ON THIS POND WITH THE MAIN CONTRACTOR LAYDOWN YARD.

TRAFFIC

CONTROLS

SHEET PH112

INSTALL ALL NECESSARY TRAFFIC CONTROL MEASURES TO CREATE A ONE WAY ROAD IN THE EASTBOUND DIRECTION BETWEEN THE COLUMBARIUM AND POND 4, AND A ONE WAY ROAD IN THE WESTBOUND DIRECTION NEAR POND 5. THIS ENTIRE SECTION BECOMES A ONE WAY LOOP. TEMPORARY TRAFFIC CONTROLS MUST REMAIN IN PLACE UNTIL ALL

CONSTRUCTION FENCING HAS BEEN REMOVED AT THE END OF THIS CONSTRUCTION PHASE.

POND 4

SHEET PH113

INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 4 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING BY BLOCKING ONE LANE OF THE EXISTING ROAD IN THE EASTBOUND DIRECTION ACCORDING TO THE DARK DASHED LINE.

POND 5

SHEET PH114

INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 5 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE STREET CLOSEST TO THE POND, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE

ACTIVITIES.

IRRIGATION

IR SERIES SHEETS

IRRIGATION WORK WHERE NEW PLANTINGS OCCUR MUST BE INSTALLED PRIOR TO THE INSTALLATION OF PLANTINGS

AND LANDSCAPING WORK.

LANDSCAPING

LP SERIES SHEETS

LANDSCAPING WORK TO BE PERFORMED AFTER THE COMPLETION OF POND SAFETY FENCING AND IRRIGATION WORK.

SEE LP SERIES SHEETS FOR FURTHER DETAILS.

CONCURRENT WORK:

PERIMETER

FENCING

INSTALL NEW PERIMETER FENCING FOR THE CEMETERY AS DETAILED FROM THE SURVEY. POINT OF CONNECTIONS ARE TO EXISTING PERIMETER FENCING AND ARE NOTED ON SHEET CS111. INSTALLATION OF PERIMETER FENCING TO BE

COMPLETED CONCURRENTLY WITH ALL OTHER PROJECT WORK.

IRRIGATION

IR SERIES SHEETS

SITE IRRIGATION WORK EXTENDS THROUGHOUT THE MAJORITY OF THE PUBLIC AREAS IN THE CEMETERY. IRRIGATION WORK TO BE PERFORMED CONCURRENTLY WITH ALL OTHER CONSTRUCTION ACTIVITIES. INCLUDE A BREAKDOWN OF IRRIGATION ACTIVITIES, DURATIONS, IMPACTS, AND A SCHEDULE AT THE BEGINNING OF THE PROJECT. NOTIFY THE COR

AND RE AT LEAST 7 DAYS IN ADVANCE OF STARTING WORK IN A NEW AREA.

POND 2

SHEET PH102

INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 2 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS FLUSH AGAINST THE OUTSIDE OF THE CURRENT PERMANENT FENCING WHERE PRESENT ALONG THE DARK DASHED OUTLINE. WORK FOR BIO RETENTION POND 2 TO BE COMPLETED CONCURRENTLY WITH ALL OTHER PROJECT WORK.

TEMPORARY POND

SHEET PH103

INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE THE TEMPORARY POND FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE ROAD CLOSEST TO THE POND, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE ACTIVITIES. WORK FOR THE TEMPORARY RETENTION POND TO BE COMPLETED CONCURRENTLY WITH ALL OTHER

PROJECT WORK.

CONSTRUCTION FENCING

ENLARGED SHEET CALLOUT

F

D

COAST GUARD MARINES

AIR FORCE

NAVY

ARMY

KEYPLAN:

PH113

PH114 GI002

GI002

PH114

PH113

0 804020

SCALE: 1:800

AutoCAD SHX Text

KM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text A https://www.aquaengineering.com/

N A

ENTR

ANCE

FOYE

R

B

D

H

J

G

R

T1

L

Q

C

K

M

P

MECH ENCLO

D

C

B

A

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CONCRETE

CO

NCRETE

CO

NCRETE

C O

N C

R

ETE

CO

NCRETE

BENCH

BENCH

BENCH

BENCH

ASPHALT DRIVEWAY

ASPHALT

D

RIV

EW

AY

AS

PH

AL

T

D R

IV

EW

AY

C O

N C

R

ET

E

SI

D

EW

AL

K

AS

PH

AL

T

D R

IV

EW

AY

C O

N C

R

ET

E

SI

D

EW

AL

K

BI

O

R

ET

EN

TI

O N

P O

N D

BIO RETENTION

POND 4

BIO RETENTION

POND 5

EXISTING SITE PERIMETER FENCE

EXISTING SITE PERIMETER FENCE

EXISTING SITE PERIMETER FENCE

EXISTING SITE PERIMETER FENCE

NEW SITE PERIM

ETER FENCE

PH112

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

MOROVIS NATIONAL

CEMETERY - PHASE 1B

MOROVIS, PUERTO RICO

971-031B

APPROVED: PROJECT MANAGER

CHERI L. COOPER

202-841-4052

MARCH 2026REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG. OF

CONSTRUCTION

DOCUMENTS - CD1

APPROVED: CONTRACTING SPECIALIST

JOSHUA GIBSON

202-746-5192

N

CONSTRUCTION DOCUMENTS - CD1

BMWALK

PHASE 1 - TRAFFIC CONTROL PLAN

SCALE:1 PHASE 1 - TRAFFIC CONTROL PLAN

1 = 500

SHEET NOTES:

1. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR TO EARTH

DISTURBING ACTIVITIES.

2. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR CEMETERY STAFF

AND THE PUBLIC AT ALL TIMES.

3. AT LEAST TWO COMMITTAL SHELTERS MUST REMAIN OPERATIONAL AT ALL TIMES DURING

CONSTRUCTION. COORDINATE WITH THE COR OR RESIDENT ENGINEER AND SUBMIT PROJECT

SCHEDULE WITHIN TWO WEEKS OF PROJECT AWARD.

4. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR ANY TEMPORARY CLOSURE OF A ROADWAY.

5. ALL SIGNAGE IS STANDARD FROM THE MANUAL ON THE 2023 UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), AND THE 2020 MANUAL DE ROTULACIÓN PARA LAS VÍAS PÚBLICAS DE PUERTO RICO.

6. WHERE ADDITIONAL SIGNAGE AND/OR TRAFFIC CONTROLS ARE REQUIRED, EITHER BY LOCAL TRAFFIC REGULATIONS OR AT THE REQUEST OF THE CEMETERY, THE CONTRACTOR IS TO FURNISH AND INSTALL THESE ADDITIONAL ITEMS AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT REGARDLESS IF IT IS

SHOWN ON THIS DRAWING.

7. TRAFFIC CONTROLS ARE TO REMAIN IN PLACE FOR THE ENTIRE DURATION OF CONSTRUCTION WHERE THE ROAD IS BLOCKED WITH CONSTRUCTION FENCING. AT NO POINT ARE TRAFFIC CONTROLS TO BE

REMOVED, BLOCKED, OR OBSCURED UNTIL THE COMPLETION OF PHASE 1 CONSTRUCTION.

KEY NOTES:

1. BEGIN ONE WAY ROAD IN THE EASTBOUND DIRECTION AT INTERSECTION INDICATED.

2. BEGIN ONE WAY ROAD IN THE WESTBOUND DIRECTION AT INTERSECTION INDICATED.

3. PROVIDE NECESSARY ROAD MARKINGS OR TRAFFIC CONTROL DEVICES, SUCH AS CONES, TO INDICATE

ONE WAY LANE SHIFT TO THE LEFT BEFORE THE TEMPORARY CONSTRUCTION FENCING.

F

D

COAST GUARD MARINES

AIR FORCE

NAVY

ARMY

KEYPLAN:

PH112

SIGN LEGEND:

NO RIGHT TURN

MUTCD R3-1

NO THRU MOVEMENT

MUTCD R3-27

SINGLE LANE SHIFT, LEFT

MUTCD CW1-4 (I)

ONE WAY, RIGHT

MUTCD R6-1 (D)

ONE WAY, LEFT

MUTCD R6-1 (I)

DIRECTION OF TRAVEL

LEGEND:

POND FENCING

ROAD SIGN POST

CONSTRUCTION FENCING

SCALE: 1:500

5025105 15 20

SINGLE LANE SHIFT, RIGHT

MUTCD CW1-4 (D)

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text A

CO

NCRETE

BENCH

BENCH

BENCH

BENCH

BIO RETENTION

POND 4

PH113

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

MOROVIS NATIONAL

CEMETERY - PHASE 1B

MOROVIS, PUERTO RICO

971-031B

APPROVED: PROJECT MANAGER

CHERI L. COOPER

202-841-4052

MARCH 2026REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG. OF

CONSTRUCTION

DOCUMENTS - CD1

APPROVED: CONTRACTING SPECIALIST

JOSHUA GIBSON

202-746-5192

N

CONSTRUCTION DOCUMENTS - CD1

BMWALK

PHASE 1 - RETENTION POND 4

PHASING PLAN

SCALE:1 PHASE 1 - RETENTION POND 4 PHASING PLAN

1 = 150

SHEET NOTES:

1. TEMPORARY CONSTRUCTION FENCING LOCATIONS SHOWN TO BE VERIFIED BY

CONTRACTOR AND THE RESIDENT ENGINEER PRIOR TO STARTING WORK.

2. ANY POND FENCING OR LANDSCAPING SHOWN IS FOR REFERENCE ONLY TO ILLUSTRATE

CONSTRUCTION FENCING AND STAGING/PARKING AREAS.

3. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR

TO EARTH DISTURBING ACTIVITIES.

4. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR

CEMETERY STAFF AND THE PUBLIC AT ALL TIMES.

5. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE

CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS

PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR

ANY TEMPORARY CLOSURE OF A ROADWAY.

6. AFTER COMPLETION OF CONSTRUCTION, ENSURE TEMPORARY CONSTRUCTION AREAS

ARE REPAIRED TO THEIR ORIGINAL STATE. RESEED AREA AND REMOVE ALL TEMPORARY

FENCING. REPAIR ANY DAMAGE TO ROADWAYS, CURBS, GUTTERS, AND EXISTING

INFRASTRUCTURE IF DAMAGE OCCURRED DURING CONSTRUCTION.

POND FENCING

CONSTRUCTION FENCING

150 105321

SCALE: 1:150

KEY NOTES:

1. CONTRACTOR STAGING AREA AND TEMPORARY PARKING.

2. EXISTING VEGETATION TO BE DEMOLISHED TO ENSURE ADEQUATE SPACE FOR

CONSTRUCTION EQUIPMENT TO ACCESS POND 4 AS NEEDED. RE-SEED AREA AFTER

COMPLETION OF WORK.

F

D

COAST GUARD MARINES

AIR FORCE

NAVY

ARMY

KEYPLAN:

PH113

GUARD RAIL

STAGING AREA/PARKING

VEGETATION

CS502

LEGEND:

TOPOGRAPHIC LINESXXX.XX

DIRECTION OF TRAVEL

ASPHALT DRIVEWAY

ASPHALT

D

RIV

EW

AY

BIO RETENTION

POND 5

EXISTING SITE PERIMETER FENCE

EXISTING SITE PERIMETER FENCE

PH114

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

MOROVIS NATIONAL

CEMETERY - PHASE 1B

MOROVIS, PUERTO RICO

971-031B

APPROVED: PROJECT MANAGER

CHERI L. COOPER

202-841-4052

MARCH 2026REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG. OF

CONSTRUCTION

DOCUMENTS - CD1

APPROVED: CONTRACTING SPECIALIST

JOSHUA GIBSON

202-746-5192

N

CONSTRUCTION DOCUMENTS - CD1

BMWALK

PHASE 1 - RETENTION POND 5

PHASING PLAN

SCALE:1 PHASE 1 - RETENTION POND 5 PHASING PLAN

1 = 150

150 105321

SCALE: 1:150

SHEET NOTES:

1. TEMPORARY CONSTRUCTION FENCING LOCATIONS SHOWN TO BE VERIFIED BY

CONTRACTOR AND THE RESIDENT ENGINEER PRIOR TO STARTING WORK.

2. ANY POND FENCING OR LANDSCAPING SHOWN IS FOR REFERENCE ONLY TO ILLUSTRATE

CONSTRUCTION FENCING AND STAGING/PARKING AREAS.

3. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR

TO EARTH DISTURBING ACTIVITIES.

4. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR

CEMETERY STAFF AND THE PUBLIC AT ALL TIMES.

5. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE

CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS

PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR

ANY TEMPORARY CLOSURE OF A ROADWAY.

6. AFTER COMPLETION OF CONSTRUCTION, ENSURE TEMPORARY CONSTRUCTION AREAS

ARE REPAIRED TO THEIR ORIGINAL STATE. RESEED AREA AND REMOVE ALL TEMPORARY

FENCING. REPAIR ANY DAMAGE TO ROADWAYS, CURBS, GUTTERS, AND EXISTING

INFRASTRUCTURE IF DAMAGE OCCURRED DURING CONSTRUCTION.

KEY NOTES:

1. CONTRACTOR STAGING AREA AND TEMPORARY PARKING.

F

D

COAST GUARD MARINES

AIR FORCE

NAVY

ARMY

KEYPLAN:

PH114

POND FENCING

CONSTRUCTION FENCING

STAGING AREA/PARKING

LEGEND:

EXISTING PERIMETER FENCE

TOPOGRAPHIC LINESXXX.XX

CS502

DIRECTION OF TRAVEL

E

N A

ENTR

ANCE

FOYE

R

B

D

H

J

G

R

T1

L

Q

C

K

M

P

MECH ENCLO

D

C

B

A

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CONCRETE

CO

NCRETE

CO

NCRETE

C O

N C

R

ETE

CO

NCRETE

BENCH

BENCH

BENCH

BENCH

CONCRETE SIDEWALK

ASPHALT DRIVEWAY

ASPHALT DRIVEWAY

CONCRETE SIDEWALK

ASPHALT DRIVEWAY

ASPHALT

D

RIV

EW

AY

AS

PH

AL

T

D R

IV

EW

AY

C O

N C

R

ET

E

SI

D

EW

AL

K

AS

PH

AL

T

D R

IV

EW

AY

C O

N C

R

ET

E

SI

D

EW

AL

K

BIO RETENTION

POND 1

BI

O

R

ET

EN

TI

O N

P O

N

BIO RETENTION

POND 4

BIO RETENTION

POND 5

EXISTING SITE PERIMETER FENCE

EXISTING SITE PERIMETER FENCE

EXISTING SITE PERIMETER FENCE

EXISTING SITE PERIMETER FENCE

NEW SITE PERIM

ETER FENCE

PH121

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

MOROVIS NATIONAL

CEMETERY - PHASE 1B

MOROVIS, PUERTO RICO

971-031B

APPROVED: PROJECT MANAGER

CHERI L. COOPER

202-841-4052

MARCH 2026REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG. OF

CONSTRUCTION

DOCUMENTS - CD1

APPROVED: CONTRACTING SPECIALIST

JOSHUA GIBSON

202-746-5192

N

CONSTRUCTION DOCUMENTS - CD1

BMWALK

PHASE 2 - OVERALL SITE PLAN

SCALE:1 PHASE 2 - OVERALL SITE PLAN

1 = 800

SHEET NOTES:

1. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR TO EARTH

DISTURBING ACTIVITIES.

2. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR CEMETERY STAFF

AND THE PUBLIC AT ALL TIMES.

3. AT LEAST TWO COMMITTAL SHELTERS MUST REMAIN OPERATIONAL AT ALL TIMES DURING

CONSTRUCTION. COORDINATE WITH THE COR OR RESIDENT ENGINEER AND SUBMIT PROJECT

SCHEDULE WITHIN TWO WEEKS OF PROJECT AWARD.

4. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR ANY TEMPORARY CLOSURE OF A ROADWAY.

5. DEMOLITION WORK NEEDED TO COMPLETE NEW WORK MUST BE REPAIRED AT THE END OF EACH

PHASE. ALL DAMAGE TO EXISTING CONDITIONS MUST BE REPAIRED IMMEDIATELY.

6. SITE PERIMETER FENCING HAS VARYING EXISTING CONDITIONS AND TOPOGRAPHY. IF ISSUES ARISE DURING CONSTRUCTION THAT REQUIRE ANY MODIFICATIONS TO THE PERIMETER FENCING, NOTIFY THE

COR AND RESIDENT ENGINEER IMMEDIATELY.

7. FINAL INSPECTION MUST BE COMPLETED AT THE END OF EACH PHASE PRIOR TO STARTING THE NEXT

PHASE OF WORK.

LEGEND:

POND FENCING

PHASE 2 SCHEDULE

PHASE 2:

TRAFFIC

CONTROLS

SHEET PH122

INSTALL ALL NECESSARY TRAFFIC CONTROL MEASURES TO CREATE A ONE WAY ROAD IN THE EASTBOUND DIRECTION BETWEEN THE COLUMBARIUM AND POND 4. TEMPORARY TRAFFIC CONTROLS MUST REMAIN IN PLACE UNTIL ALL

CONSTRUCTION FENCING HAS BEEN REMOVED AT THE END OF THIS CONSTRUCTION PHASE.

P.O.W./M.I.A AREA

SHEET PH123

P.O.W. / M.I.A. WORK TO BE PERFORMED CONCURRENTLY WITH OTHER WORK WITHIN PHASE 2.

POND 7

SHEET PH124

INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 7 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS FLUSH AGAINST THE ROAD, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE ACTIVITIES.

POND 1

SHEET PH125

INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 1 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE SIDEWALK CLOSEST TO THE ROAD, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE

ACTIVITIES. PROVIDE APPROPRIATE SIDEWALK CLOSURE SIGNS.

FRENCH DRAIN

SHEET PH126

INSTALLATION OF FRENCH DRAIN TO BE COMPLETED CONCURRENTLY WITH THE INSTALLATION AND PHASING OF THE FENCING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE STREET CLOSEST TO THE FRENCH

DRAIN, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE ACTIVITIES.

IRRIGATION

IR SERIES SHEETS

IRRIGATION WORK WHERE NEW PLANTINGS OCCUR MUST BE INSTALLED PRIOR TO THE INSTALLATION OF PLANTINGS

AND LANDSCAPING WORK.

LANDSCAPING

LP SERIES SHEETS

LANDSCAPING WORK TO BE PERFORMED AFTER THE COMPLETION OF POND SAFETY FENCING AND IRRIGATION WORK.

SEE LP SERIES SHEETS FOR FURTHER DETAILS.

CONCURRENT WORK:

PERIMETER

FENCING

INSTALL NEW PERIMETER FENCING FOR THE CEMETERY AS DETAILED FROM THE SURVEY. POINT OF CONNECTIONS ARE TO EXISTING PERIMETER FENCING AND ARE NOTED ON SHEET CS111. INSTALLATION OF PERIMETER FENCING TO BE

COMPLETED CONCURRENTLY WITH ALL OTHER PROJECT WORK.

IRRIGATION

IR SERIES SHEETS

SITE IRRIGATION WORK EXTENDS THROUGHOUT THE MAJORITY OF THE PUBLIC AREAS IN THE CEMETERY. IRRIGATION WORK TO BE PERFORMED CONCURRENTLY WITH ALL OTHER CONSTRUCTION ACTIVITIES. INCLUDE A BREAKDOWN OF IRRIGATION ACTIVITIES, DURATIONS, IMPACTS, AND A SCHEDULE AT THE BEGINNING OF THE PROJECT. NOTIFY THE COR

AND RE AT LEAST 7 DAYS IN ADVANCE OF STARTING WORK IN A NEW AREA.

POND 2

SHEET PH102

INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 2 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS FLUSH AGAINST THE OUTSIDE OF THE CURRENT PERMANENT FENCING WHERE PRESENT ALONG THE DARK DASHED OUTLINE. WORK FOR BIO RETENTION POND 2 TO BE COMPLETED CONCURRENTLY WITH ALL OTHER PROJECT WORK.

TEMPORARY POND

SHEET PH103

INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE THE TEMPORARY POND FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE ROAD CLOSEST TO THE POND, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE ACTIVITIES. WORK FOR THE TEMPORARY RETENTION POND TO BE COMPLETED CONCURRENTLY WITH ALL OTHER

PROJECT WORK.

CONSTRUCTION FENCING

ENLARGED SHEET CALLOUT

F

D

COAST GUARD MARINES

AIR FORCE

NAVY

ARMY

KEYPLAN:

PH124

PH123

PH125

PH126

PH124

PH123

PH125

PH127

0 804020

SCALE: 1:800

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text A

E

N A

ENTR

ANCE

FOYE

R

B

D

H

J

G

R

T1

L

Q

C

K

M

P

MECH ENCLO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CONCRETE

CO

NCRETE

CO

NCRETE

C O

N C

R

ETE

CO

NCRETE

BENCH

BENCH

BENCH

BENCH

CONCRETE SIDEWALK

ASPHALT DRIVEWAY

ASPHALT DRIVEWAY

CONCRETE SIDEWALK

ASPHALT DRIVEWAY

ASPHALT

D

RIV

EW

AY

BIO RETENTION

POND 1

BIO RETENTION

POND 4

BIO RETENTION

POND 5

EXISTING SITE PERIMETER FENCE

EXISTING SITE PERIMETER FENCE

EXISTING SITE PERIMETER FENCE

F

D

COAST GUARD MARINES

AIR FORCE

NAVY

ARMY

PH122

SIGN LEGEND:

NO RIGHT TURN

MUTCD R3-1

NO LEFT TURN

MUTCD R3-2

NO THRU MOVEMENT

MUTCD R3-27

SINGLE LANE SHIFT, LEFT

MUTCD CW1-4 (I)

ONE WAY, RIGHT

MUTCD R6-1 (D)

ONE WAY, LEFT

MUTCD R6-1 (I)

DIRECTION OF TRAVEL

PH122

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

MOROVIS NATIONAL

CEMETERY - PHASE 1B

MOROVIS, PUERTO RICO

971-031B

APPROVED: PROJECT MANAGER

CHERI L. COOPER

202-841-4052

MARCH 2026REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG. OF

CONSTRUCTION

DOCUMENTS - CD1

APPROVED: CONTRACTING SPECIALIST

JOSHUA GIBSON

202-746-5192

N

CONSTRUCTION DOCUMENTS - CD1

BMWALK

PHASE 2 - TRAFFIC CONTROL PLAN

SCALE:1 PHASE 2 - TRAFFIC CONTROL PLAN

1 = 500

SHEET NOTES:

1. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR TO EARTH

DISTURBING ACTIVITIES.

2. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR CEMETERY STAFF

AND THE PUBLIC AT ALL TIMES.

3. AT LEAST TWO COMMITTAL SHELTERS MUST REMAIN OPERATIONAL AT ALL TIMES DURING

CONSTRUCTION. COORDINATE WITH THE COR OR RESIDENT ENGINEER AND SUBMIT PROJECT

SCHEDULE WITHIN TWO WEEKS OF PROJECT AWARD.

4. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR ANY TEMPORARY CLOSURE OF A ROADWAY.

5. ALL SIGNAGE IS STANDARD FROM THE MANUAL ON THE 2023 UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), AND THE 2020 MANUAL DE ROTULACIÓN PARA LAS VÍAS PÚBLICAS DE PUERTO RICO.

6. WHERE ADDITIONAL SIGNAGE AND/OR TRAFFIC CONTROLS ARE REQUIRED, EITHER BY LOCAL TRAFFIC REGULATIONS OR AT THE REQUEST OF THE CEMETERY, THE CONTRACTOR IS TO FURNISH AND INSTALL THESE ADDITIONAL ITEMS AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT REGARDLESS IF IT IS

SHOWN ON THIS DRAWING.

7. TRAFFIC CONTROLS ARE TO REMAIN IN PLACE FOR THE ENTIRE DURATION OF CONSTRUCTION WHERE THE ROAD IS BLOCKED WITH CONSTRUCTION FENCING. AT NO POINT ARE TRAFFIC CONTROLS TO BE

REMOVED, BLOCKED, OR OBSCURED UNTIL THE COMPLETION OF PHASE 2 CONSTRUCTION.

LEGEND:

POND FENCING

ROAD SIGN POST

CONSTRUCTION FENCING

KEY NOTES:

1. BEGIN ONE WAY ROAD IN THE EASTBOUND DIRECTION AT INTERSECTION INDICATED.

2. ONE WAY ROAD TERMINATES AT INTERSECTION INDICATED.

3. PROVIDE NECESSARY ROAD MARKINGS OR TRAFFIC CONTROL DEVICES, SUCH AS CONES, TO

INDICATE ONE WAY LANE SHIFT TO THE RIGHT BEFORE THE TEMPORARY CONSTRUCTION FENCING.

4. PROVIDE NECESSARY MARKINGS AND ADDITIONAL SIGNAGE AS REQUIRED TO PROHIBIT PUBLIC

PARKING FOR CONTRACTOR ACCESS TO LAYDOWN YARD AND CONSTRUCTION AREA.

KEYPLAN:

SINGLE LANE SHIFT, RIGHT

MUTCD CW1-4 (D)

NO PARKING

MUTCD R8-3a

NO PARKING AREA

SCALE: 1:500

5025105 15 20

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text A

CO

CO

CO

CO

CO

CONCRETE

CO

NCRETE

CO

NCRETE

C O

N C

R

ETE

CO

NCRETE

BENCH

BENCH

BENCH

BENCH

BIO RETENTION

PH123

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

MOROVIS NATIONAL

CEMETERY - PHASE 1B

MOROVIS, PUERTO RICO

971-031B

APPROVED: PROJECT MANAGER

CHERI L. COOPER

202-841-4052

MARCH 2026REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG. OF

CONSTRUCTION

DOCUMENTS - CD1

APPROVED: CONTRACTING SPECIALIST

JOSHUA GIBSON

202-746-5192

N

CONSTRUCTION DOCUMENTS - CD1

BMWALK

PHASE 2 - POW-MIA FLAG AREA

PHASING PLAN

SCALE:1 PHASE 2 - POW-MIA FLAG AREA PHASING PLAN

1 = 150

150 105321

SCALE: 1:150

F

D

COAST GUARD MARINES

AIR FORCE

NAVY

ARMY

KEYPLAN:

PH123

SHEET NOTES:

1. TEMPORARY CONSTRUCTION FENCING LOCATIONS SHOWN TO BE VERIFIED BY

CONTRACTOR AND THE RESIDENT ENGINEER PRIOR TO STARTING WORK.

2. ANY POND FENCING OR LANDSCAPING SHOWN IS FOR REFERENCE ONLY TO ILLUSTRATE

CONSTRUCTION FENCING AND STAGING/PARKING AREAS.

3. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR

TO EARTH DISTURBING ACTIVITIES.

4. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR

CEMETERY STAFF AND THE PUBLIC AT ALL TIMES.

5. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE

CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS

PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR

ANY TEMPORARY CLOSURE OF A ROADWAY.

6. WORK IS WITHIN AN ACTIVE BURIAL SECTIONS, COORDINATE WITH THE COR TO ENSURE

THAT ACTIVE SECTIONS REMAIN OPEN TO THE PUBLIC AT ALL TIMES.

6. AFTER COMPLETION OF CONSTRUCTION, ENSURE TEMPORARY CONSTRUCTION AREAS

ARE REPAIRED TO THEIR ORIGINAL STATE. RESEED AREA AND REMOVE ALL TEMPORARY

FENCING. REPAIR ANY DAMAGE TO ROADWAYS, CURBS, GUTTERS, AND EXISTING

INFRASTRUCTURE IF DAMAGE OCCURRED DURING CONSTRUCTION.

7. PROTECT COLUMBARIUM WALLS WITHIN THE CONSTRUCTION AREA. CONTRACTOR TO

INSPECT COLUMBARIUM WALLS BEFORE THE START OF CONSTRUCTION AND PROVIDE

PHOTOGRAPHIC DOCUMENTATION TO THE GOVERNMENT. AT THE COMPLETION OF

CONSTRUCTION, THE CONTRACTOR TO INSPECT COLUMBARIUM WALLS AND PROVIDE

PHOTOGRAPHIC DOCUMENTATION TO THE GOVERNMENT. IF DAMAGE TO THE

COLUMBARIUM WALLS OCCURRED DURING CONSTRUCTION, IT IS THE RESPONSIBILITY OF

THE CONTRACTOR TO RESTORE THE WALLS TO THEIR ORIGINAL STATE AT NO

ADDITIONAL COST TO THE GOVERNMENT.

KEY NOTES:

1. CONTRACTOR STAGING AREA AND TEMPORARY PARKING.

2. PROVIDE SIGNAGE WITHIN THE COLUMBARIUM AREA THAT NO DRINKING WATER IS

AVAILABLE DURING CONSTRUCTION, SIGN SHOULD ALSO PROVIDE INSTRUCTIONS

FOR THE NEAREST LOCATION AVAILABLE FOR DRINKING WATER. COORDINATE WITH

THE CEMETERY TO FURNISH APPROPRIATE SIGNAGE.

POND FENCING

CONSTRUCTION FENCING

STAGING AREA/PARKING

LEGEND:

GUARD RAIL

CS502

TOPOGRAPHIC LINESXXX.XX

DIRECTION OF TRAVEL

C

B

A

CO

CO

AS

PH

AL

T

D R

IV

EW

AY

C O

N C

R

ET

E

SI

D

EW

AL

K

AS

PH

AL

T

D R

IV

EW

AY

C O

N C

R

ET

E

SI

D

EW

AL

K

BI

O

R

ET

EN

TI

O N

P O

N

EXISTING SITE PERIMETER FENCE

NEW SITE PERIM

ETER FENCE

PH124

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

MOROVIS NATIONAL

CEMETERY - PHASE 1B

MOROVIS, PUERTO RICO

971-031B

APPROVED: PROJECT MANAGER

CHERI L. COOPER

202-841-4052

MARCH 2026REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG. OF

CONSTRUCTION

DOCUMENTS - CD1

APPROVED: CONTRACTING SPECIALIST

JOSHUA GIBSON

202-746-5192

N

CONSTRUCTION DOCUMENTS - CD1

BMWALK

PHASE 2 - RETENTION POND 7

PHASING PLAN

SCALE:1 PHASE 2 - RETENTION POND 7 PHASING PLAN

1 = 150

150 105321

SCALE: 1:150

F

D

COAST GUARD MARINES

AIR FORCE

NAVY

ARMY

KEYPLAN:

PH124

SHEET NOTES:

1. TEMPORARY CONSTRUCTION FENCING LOCATIONS SHOWN TO BE VERIFIED BY

CONTRACTOR AND THE RESIDENT ENGINEER PRIOR TO STARTING WORK.

2. ANY POND FENCING OR LANDSCAPING SHOWN IS FOR REFERENCE ONLY TO ILLUSTRATE

CONSTRUCTION FENCING AND STAGING/PARKING AREAS.

3. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR

TO EARTH DISTURBING ACTIVITIES.

4. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR

CEMETERY STAFF AND THE PUBLIC AT ALL TIMES.

5. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE

CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS

PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR

ANY TEMPORARY CLOSURE OF A ROADWAY.

6. AFTER COMPLETION OF CONSTRUCTION, ENSURE TEMPORARY CONSTRUCTION AREAS

ARE REPAIRED TO THEIR ORIGINAL STATE. RESEED AREA AND REMOVE ALL TEMPORARY

FENCING. REPAIR ANY DAMAGE TO ROADWAYS, CURBS, GUTTERS, AND EXISTING

INFRASTRUCTURE IF DAMAGE OCCURRED DURING CONSTRUCTION.

KEY NOTES:

1. CONTRACTOR STAGING AREA AND TEMPORARY PARKING.

POND FENCING

CONSTRUCTION FENCING

STAGING AREA/PARKING

LEGEND:

GUARD RAIL

CS502

EXISTING PERIMETER FENCE

TOPOGRAPHIC LINESXXX.XX

DIRECTION OF TRAVEL

C

CONCRETE SIDEWALK

ASPHALT DRIVEWAY

ASPHALT DRIVEWAY

CONCRETE SIDEWALK

BIO RETENTION

POND 1

PH125

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

MOROVIS NATIONAL

CEMETERY - PHASE 1B

MOROVIS, PUERTO RICO

971-031B

APPROVED: PROJECT MANAGER

CHERI L. COOPER

202-841-4052

MARCH 2026REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG. OF

CONSTRUCTION

DOCUMENTS - CD1

APPROVED: CONTRACTING SPECIALIST

JOSHUA GIBSON

202-746-5192

N

CONSTRUCTION DOCUMENTS - CD1

BMWALK

PHASE 2 - RETENTION POND 1

PHASING PLAN

SCALE:1 PHASE 2 - RETENTION POND 1 PHASING PLAN

1 = 150

150 105321

SCALE: 1:150

F

D

COAST GUARD MARINES

AIR FORCE

NAVY

ARMY

KEYPLAN:

PH125

SHEET NOTES:

1. TEMPORARY CONSTRUCTION FENCING LOCATIONS SHOWN TO BE VERIFIED BY

CONTRACTOR AND THE RESIDENT ENGINEER PRIOR TO STARTING WORK.

2. ANY POND FENCING OR LANDSCAPING SHOWN IS FOR REFERENCE ONLY TO ILLUSTRATE

CONSTRUCTION FENCING AND STAGING/PARKING AREAS.

3. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR

TO EARTH DISTURBING ACTIVITIES.

4. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR

CEMETERY STAFF AND THE PUBLIC AT ALL TIMES.

5. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE

CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS

PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR

ANY TEMPORARY CLOSURE OF A ROADWAY.

6. PROVIDE TEMPORARY ONE-WAY AND DO NOT ENTER SIGNAGE WHERE NECESSARY.

TRAFFIC CONTROLS ARE TO REMAIN IN PLACE FOR THE ENTIRE DURATION OF

CONSTRUCTION.

6. AFTER COMPLETION OF CONSTRUCTION, ENSURE TEMPORARY CONSTRUCTION AREAS

ARE REPAIRED TO THEIR ORIGINAL STATE. RESEED AREA AND REMOVE ALL TEMPORARY

FENCING. REPAIR ANY DAMAGE TO ROADWAYS, CURBS, GUTTERS, AND EXISTING

INFRASTRUCTURE IF DAMAGE OCCURRED DURING CONSTRUCTION.

KEY NOTES:

1. PRIMARY CONTRACTOR STAGING AREA AND TEMPORARY PARKING.

POND FENCING

CONSTRUCTION FENCING

STAGING AREA/PARKING

LEGEND:

CS502

TOPOGRAPHIC LINESXXX.XX

DIRECTION OF TRAVEL

PH126

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

MOROVIS NATIONAL

CEMETERY - PHASE 1B

MOROVIS, PUERTO RICO

971-031B

APPROVED: PROJECT MANAGER

CHERI L. COOPER

202-841-4052

MARCH 2026REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG. OF

CONSTRUCTION

DOCUMENTS - CD1

APPROVED: CONTRACTING SPECIALIST

JOSHUA GIBSON

202-746-5192

N

CONSTRUCTION DOCUMENTS - CD1

BMWALK

PHASE 2 - FRENCH DRAIN PHASING

PLAN

SCALE:1 PHASE 2 - FRENCH DRAIN PHASING PLAN

1 = 150

150 105321

SCALE: 1:150

F

D

COAST GUARD MARINES

AIR FORCE

NAVY

ARMY

KEYPLAN:

PH126

SHEET NOTES:

1. TEMPORARY CONSTRUCTION FENCING LOCATIONS SHOWN TO BE VERIFIED BY

CONTRACTOR AND THE RESIDENT ENGINEER PRIOR TO STARTING WORK.

2. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR

TO EARTH DISTURBING ACTIVITIES.

3. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR

CEMETERY STAFF AND THE PUBLIC AT ALL TIMES.

4. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE

CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS

PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR

ANY TEMPORARY CLOSURE OF A ROADWAY.

6. AFTER COMPLETION OF CONSTRUCTION, ENSURE TEMPORARY CONSTRUCTION AREAS

ARE REPAIRED TO THEIR ORIGINAL STATE. RESEED AREA AND REMOVE ALL TEMPORARY

FENCING. REPAIR ANY DAMAGE TO ROADWAYS, CURBS, GUTTERS, AND EXISTING

INFRASTRUCTURE IF DAMAGE OCCURRED DURING CONSTRUCTION.

KEY NOTES:

1. ENSURE THAT NO EXCAVATION OCCURS IN BURIAL AREAS. COORDINATE WITH THE

RESIDENT ENGINEER PRIOR TO EXCAVATION FOR FRENCH DRAIN.

ACTIVE BURIAL AREA

CONSTRUCTION FENCING

LEGEND:

CS502

TOPOGRAPHIC LINESXXX.XX

C

B

A

1 2

UP

J

H

F

B

D

G

E

C

L

A

A

B

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

AE

4B

AE

4B

AE

4B

D4

B6

D1

A

B

0'

- 0

2'

0"

2'

0"

PE

RI

M

ET

ER

O

F

RO

O F

AB

O

VE

5' - 1 3/4"

30' - 0"

4' - 1 1/4"

39' - 3"

RA

IN

L

EA

DE

R

5'

9"

10' - 1"

CH

AI

N

LI

NK

FE

NC

E- R

EF

ER

T O

CI

VI

L

DW

G S

B4

AE

4B

B4

AE

4B

SL

C

O L, W

IT

H

CO

NC

RE

TE

E

NC

AS

EM

EN

T-

TY

P

M

ET

AL

B

RA

CI

NG

RE

FE

R

TO

S

TR

UC

T

DW

G

S

M

ET

AL

B

RA

CI

NG

RE

FE

R

TO

S

TR

UC

T

DW

G

S

M

ET

AL

B

RA

CI

NG

RE

FE

R

TO

ST

RU

CT

D

W G

S

A

B

RO

O

F

HA

TC

H

O

PE

NI

NG

A

BO

VE

2B

7.

F.

F.

E.

CP

B1

B2

B3

B4

B5

5.5

CO

CO

CO

CO

ESW40

158.29

ESW40

158.30

BL*EB60

158.45

EB60

158.45

EB60

158.44

EB60

158.43

EB60

158.43

EB60

158.43

EC60

158.43EB60

158.44

EB60

158.45

EB60

158.44

EB60

158.44

EB60

158.45

EB60

158.44

EC60

158.47

EB60

158.46

CO

COL

158.46

COL

158.48

COL

158.46

COL

158.48

COL

158.48

COL

158.50

COL

158.48

COL

158.46

COL

158.48

COL

158.48

COL

158.47

COL

158.50

COL

158.46

COL

158.46 FFE

158.45

COL

158.47

COL

158.47

EB62

158.45

EB62

158.44

EB62

158.43

EB62

158.45

158.45

158.45

158.44

EB62

158.45

EB62

158.45

GS

158.15

GS

158.49

BENCH

158.46

BENCH

158.48

BENCH

158.47

BENCH

158.46

BENCH

158.48

BENCH

158.48

BENCH

158.47

BENCH

158.47

BENCH

158.48

BENCH

158.48

BENCH

158.47

BENCH

158.47

BENCH

158.48

BENCH

158.48

BENCH

158.47

BENCH

158.46

COL

158.46

COL

158.47

COL

158.47

COL

158.47

COL

158.48

COL

158.46

COL

158.48

GS

158.47

COMMITTAL

SHELTER SIGN

GRAVEL DRIVE W

ITH CONCRETE CURB BORDER

TEMPORARY POND

IRRIGATION POND

BIO RETENTION

POND 8

EXISTING SITE PERIMETER FENCE

EXISTING SITE PERIMETER FENCE

EXISTING SITE PERIMETER FENCE

PH131

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

MOROVIS NATIONAL

CEMETERY - PHASE 1B

MOROVIS, PUERTO RICO

971-031B

APPROVED: PROJECT MANAGER

CHERI L. COOPER

202-841-4052

MARCH 2026REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG. OF

CONSTRUCTION

DOCUMENTS - CD1

APPROVED: CONTRACTING SPECIALIST

JOSHUA GIBSON

202-746-5192

N

CONSTRUCTION DOCUMENTS - CD1

BMWALK

PHASE 3 - OVERALL SITE PLAN

SCALE:1 PHASE 3 - OVERALL SITE PLAN

1 = 800

SHEET NOTES:

1. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR TO EARTH

DISTURBING ACTIVITIES.

2. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR CEMETERY STAFF

AND THE PUBLIC AT ALL TIMES.

3. AT LEAST TWO COMMITTAL SHELTERS MUST REMAIN OPERATIONAL AT ALL TIMES DURING

CONSTRUCTION. COORDINATE WITH THE COR OR RESIDENT ENGINEER AND SUBMIT PROJECT

SCHEDULE WITHIN TWO WEEKS OF PROJECT AWARD.

4. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR ANY TEMPORARY CLOSURE OF A ROADWAY.

5. DEMOLITION WORK NEEDED TO COMPLETE NEW WORK MUST BE REPAIRED AT THE END OF EACH

PHASE. ALL DAMAGE TO EXISTING CONDITIONS MUST BE REPAIRED IMMEDIATELY.

6. SITE PERIMETER FENCING HAS VARYING EXISTING CONDITIONS AND TOPOGRAPHY. IF ISSUES ARISE DURING CONSTRUCTION THAT REQUIRE ANY MODIFICATIONS TO THE PERIMETER FENCING, NOTIFY THE

COR AND RESIDENT ENGINEER IMMEDIATELY.

7. FINAL INSPECTION MUST BE COMPLETED AT THE END OF EACH PHASE PRIOR TO STARTING THE NEXT

PHASE OF WORK.

LEGEND:

POND FENCING

PHASE 3 SCHEDULE

PHASE 3:

TRAFFIC

CONTROLS

SHEET PH132

INSTALL ALL NECESSARY TRAFFIC CONTROL MEASURES TO CREATE A ONE LANE, TWO-WAY ROAD NEAR POND 8.

TEMPORARY TRAFFIC CONTROLS MUST REMAIN IN PLACE UNTIL ALL CONSTRUCTION FENCING HAS BEEN REMOVED AT

THE END OF THIS CONSTRUCTION PHASE.

POND 8

SHEET PH133

INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 8 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE SIDEWALK CLOSEST TO THE ROAD, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE

ACTIVITIES. PROVIDE APPROPRIATE SIDEWALK CLOSURE SIGNS.

IRRIGATION POND

SHEET PH134

INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE THE IRRIGATION POND FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE ROAD CLOSEST TO THE POND, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE

ACTIVITIES.

IRRIGATION

IR SERIES SHEETS

IRRIGATION WORK WHERE NEW PLANTINGS OCCUR MUST BE INSTALLED PRIOR TO THE INSTALLATION OF PLANTINGS

AND LANDSCAPING WORK.

LANDSCAPING

LP SERIES SHEETS

LANDSCAPING WORK TO BE PERFORMED AFTER THE COMPLETION OF POND SAFETY FENCING AND IRRIGATION WORK.

SEE LP SERIES SHEETS FOR FURTHER DETAILS.

CONCURRENT WORK:

PERIMETER

FENCING

INSTALL NEW PERIMETER FENCING FOR THE CEMETERY AS DETAILED FROM THE SURVEY. POINT OF CONNECTIONS ARE TO EXISTING PERIMETER FENCING AND ARE NOTED ON SHEET CS111. INSTALLATION OF PERIMETER FENCING TO BE

COMPLETED CONCURRENTLY WITH ALL OTHER PROJECT WORK.

IRRIGATION

IR SERIES SHEETS

SITE IRRIGATION WORK EXTENDS THROUGHOUT THE MAJORITY OF THE PUBLIC AREAS IN THE CEMETERY. IRRIGATION WORK TO BE PERFORMED CONCURRENTLY WITH ALL OTHER CONSTRUCTION ACTIVITIES. INCLUDE A BREAKDOWN OF IRRIGATION ACTIVITIES, DURATIONS, IMPACTS, AND A SCHEDULE AT THE BEGINNING OF THE PROJECT. NOTIFY THE COR

AND RE AT LEAST 7 DAYS IN ADVANCE OF STARTING WORK IN A NEW AREA.

POND 2

SHEET PH126

INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 2 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS FLUSH AGAINST THE OUTSIDE OF THE CURRENT PERMANENT FENCING WHERE PRESENT ALONG THE DARK DASHED OUTLINE. WORK FOR BIO RETENTION POND 2 TO BE COMPLETED CONCURRENTLY WITH ALL OTHER PROJECT WORK.

TEMPORARY POND

SHEET PH134

INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE THE TEMPORARY POND FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE ROAD CLOSEST TO THE POND, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE ACTIVITIES. WORK FOR THE TEMPORARY RETENTION POND TO BE COMPLETED CONCURRENTLY WITH ALL OTHER

PROJECT WORK.

CONSTRUCTION FENCING

ENLARGED SHEET CALLOUT

F

D

COAST GUARD MARINES

AIR FORCE

NAVY

ARMY

KEYPLAN:

PH133

PH134

PH133

PH134

0 804020

SCALE: 1:800

AutoCAD SHX Text

TEL

AutoCAD SHX Text

WM

AutoCAD SHX Text W.M.

AutoCAD SHX Text W.M.

File details come from the government source that posted it. Updated .