971-031B - Morovis NC Phase 1B - CD1 - DrawingsPart-1.pdf
PDF 18 MB Posted
- Solicitation number
- 36C10F26Q0062
About this file
Construction Documents Summary
These are construction documents (CD1) for the Morovis National Cemetery Phase 1B Development project in Morovis, Puerto Rico (Project Number 971-031B). The project is sponsored by the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management, with AES Group, Inc. serving as the Architect/Engineer of Record. The documents were issued in March 2026 and are approved by Project Manager Cheri L. Cooper and Contracting Specialist Joshua Gibson.
The project encompasses comprehensive site improvements including perimeter fencing installation across multiple areas (A through O), bio-retention pond development and landscaping across eight ponds, irrigation system installation, French drain construction, a POW/MIA flag area development, and temporary committal shelter relocation. Work is phased across three phases with specific traffic control measures to maintain cemetery operations, requiring at least two committal shelters to remain operational throughout construction. The documents include detailed plans for contractor laydown yard specifications, temporary Resident Engineer Office (REO) trailers with modular building requirements, construction phasing schedules, and site-specific details for decks, ramps, stairs, and drainage systems. All contractor laydown areas, temporary structures, and construction materials must be removed and the site restored to original condition upon project completion. The drawings provide comprehensive specifications for accessibility compliance, HVAC systems, plumbing, electrical connections, and structural foundations for temporary facilities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GI000
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
CONSTRUCTION DOCUMENTS - CD1
BMWALK
COVER SHEET
MOROVIS NATIONAL CEMETERY
PHASE 1B DEVELOPMENT
PROJECT NUMBER: 971-031B
SAN JUAN
BAYAMON GUAYNABO
CAGUAS
BAHÍA DE
SAN JUAN
COROZAL
VEGA ALTA
DORADO
LEVITTOWN
VEGA BAJA
MANATÍ
CIALES
TRUJILLO
ALTO
TRUJILLO
BAJO
CAROLINA
CANÓVANAS
GURABO
JUNCOS
FAJARDO
GUAYAMA
UTADO
ARECIBO
AGUADILLA
PONCE
SAN JUAN
VIEQUES
CULEBRA
PUERTO RICO
THIS PROJECT:
MOROVIS NATIONAL
CEMETERY
N
N
REGIONAL MAP
REGIONAL MAP
MOROVIS
https://www.aquaengineering.com/
GI001
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
CONSTRUCTION DOCUMENTS - CD1
BMWALK
DRAWING INDEX
F
D
N
SITE PLAN
VICINITY MAP
Sheet List Table Sheet
Number Sheet Title
GENERAL
GI000 COVER SHEET
GI001 DRAWING INDEX
GI002 CONTRACTOR LAYDOWN YARD PLAN
GI100 TEMP REO TRAILER GENERAL NOTES AND BUILDING CODE SUMMARY
GI101 TEMP RESIDENT ENGINEER OFFICE (REO) TRAILER PLAN
GI501 TEMP RESIDENT ENGINEER OFFICE (REO) DETAILS
PHASING
PH100 PHASING - OVERALL SITE PLAN
PH101 PHASING - OVERALL TRAFFIC CONTROL PLAN
PH102 CONCURRENT WORK - RETENTION POND 2 PHASING PLAN
PH103 CONCURRENT WORK - TEMPORARY RETENTION POND PHASING PLAN
PH111 PHASE 1 - OVERALL SITE PLAN
PH112 PHASE 1 - TRAFFIC CONTROL PLAN
PH113 PHASE 1 - RETENTION POND 4 PHASING PLAN
PH114 PHASE 1 - RETENTION POND 5 PHASING PLAN
PH121 PHASE 2 - OVERALL SITE PLAN
PH122 PHASE 2 - TRAFFIC CONTROL PLAN
PH123 PHASE 2 - POW-MIA FLAG AREA PHASING PLAN
PH124 PHASE 2 - RETENTION POND 7 PHASING PLAN
PH125 PHASE 2 - RETENTION POND 1 PHASING PLAN
PH126 PHASE 2 - FRENCH DRAIN PHASING PLAN
PH131 PHASE 3 - OVERALL SITE PLAN
PH132 PHASE 3 - TRAFFIC CONTROL PLAN
PH133 PHASE 3 - RETENTION POND 8 PHASING PLAN
PH134 PHASE 3 - IRRIGATION RETENTION POND PHASING PLAN
CIVIL
CI001 GENERAL CIVIL SYMBOLS AND ABBREVIATIONS
CIVIL: EXISTING CONDITIONS AND DEMOLITION
CE100 OVERALL EXISTING CONDITIONS AND DEMOLITION PLAN
CE101 RETENTION POND 1 - EXISTING CONDITIONS AND DEMOLITION PLAN
CE102 RETENTION POND 2 AND 6 - EXISTING CONDITIONS AND DEMOLITION PLAN
CE103 RETENTION POND 4 - EXISTING CONDITIONS AND DEMOLITION PLAN
CE104 RETENTION POND 5 - EXISTING CONDITIONS AND DEMOLITION PLAN
CE105 TEMPORARY POND & POND 7- EXISTING CONDITIONS AND DEMOLITION PLAN
CE106 RETENTION POND 8 - EXISTING CONDITIONS AND DEMOLITION PLAN
CE107 IRRIGATION RETENTION POND- EXISTING CONDITIONS & DEMOLITION PLAN
CE108 COMMITTAL SHELTER - EXISTING CONDITIONS PLAN
CIVIL: SITE GRADING
CG100 OVERALL SITE AND GRADING PLAN
CG101 RETENTION POND 1 - SITE AND GRADING PLAN
CG102 RETENTION POND 2 AND 6 - SITE AND GRADING PLAN
CG103 RETENTION POND 4 - SITE AND GRADING PLAN
CG104 RETENTION POND 5 - SITE AND GRADING PLAN
CG105 TEMPORARY RETENTION POND & POND 7 - SITE AND GRADING PLAN
CG106 RETENTION POND 8 - SITE AND GRADING PLAN
CG107 IRRIGATION RETENTION POND - SITE AND GRADING PLAN
CG401 POW-MIA FLAG AREA GRADING PLAN ENLARGEMENT
CIVIL: RETENTION POND FENCING
CS101 RETENTION POND FENCING - OVERALL SITE PLAN
CS102 RETENTION POND 1 - FENCING PLAN
CS103 RETENTION POND 2 - FENCING PLAN
CS104 RETENTION POND 4 - FENCING PLAN
CS105 RETENTION POND 5 - FENCING PLAN
CS106 RETENTION POND 6 - FENCING PLAN
CS107 RETENTION POND 7 - FENCING PLAN
CS108 RETENTION POND 8 - FENCING PLAN
CS109 TEMPORARY RETENTION POND - FENCING PLAN
CS110 MAINTENANCE RETENTION POND - FENCING PLAN
CIVIL: PERIMETER FENCING
CS111 PERIMETER FENCING - OVERALL SITE PLAN
CS112 PERIMETER FENCING - AREA A
CS113 PERIMETER FENCING - AREA B
CS114 PERIMETER FENCING - AREA C
CS115 PERIMETER FENCING - AREA D
CS116 PERIMETER FENCING - AREA E
CS117 PERIMETER FENCING - AREA F
CS118 PERIMETER FENCING - AREA G
CS119 PERIMETER FENCING - AREA H
CS120 PERIMETER FENCING - AREA I
CS121 PERIMETER FENCING - AREA J
CS122 PERIMETER FENCING - AREA K
CS123 PERIMETER FENCING - AREA L
CS124 PERIMETER FENCING - AREA M
CS125 PERIMETER FENCING - AREA N
CS126 PERIMETER FENCING - AREA O
CIVIL: ENLARGED PLANS AND DETAILS
CS201 TYPICAL EXISTING BIO-RETENTION POND SECTION AND DEMOLITION PLAN
CS202 TYPICAL PROPOSED BIO-RETENTION POND SECTION
CS203 TYPICAL PROPOSED BIO-RETENTION POND 8 SECTION
CS401 POW MIA FLAG AREA LAYOUT PLAN ENLARGEMENT
CS402 FRENCH DRAIN PLAN
CS403 TEMPORARY COMMITTAL SHELTER RELOCATION PLAN
CS501 CIVIL DETAILS
CS502 CIVIL DETAILS
CS503 CIVIL DETAILS
CI501 SITE DETAILS
LANDSCAPE ARCHITECTURE
LD101 RETENTION POND 1 - LANDSCAPING DEMOLITION PLAN
LD102 RETENTION POND 7 - LANDSCAPING DEMOLITION PLAN
LD103 POW MIA FLAG AREA - LANDSCAPING DEMOLITION PLAN
LP101 OVERALL LANDSCAPE PLAN
LP102 RETENTION POND 1 LANDSCAPE PLAN
LP103 RETENTION POND 2 LANDSCAPE PLAN
LP104 RETENTION POND 4 LANDSCAPE PLAN
LP105 RETENTION POND 5 LANDSCAPE PLAN
LP106 RETENTION POND 6 LANDSCAPE PLAN
LP107 RETENTION POND 7 LANDSCAPE PLAN
LP108 RETENTION POND 8 LANDSCAPE PLAN
LP109 RETENTION POND 8 LANDSCAPE PLAN - CONT.
LP110 POW-MIA FLAG AREA LANDSCAPE PLAN ENLARGEMENT
LP501 LANDSCAPE DETAILS & PLANT SCHEDULE
IRRIGATION
IR100 IRRIGATION COVER SHEET
IR101 IRRIGATION PLAN
IR102 IRRIGATION PLAN
IR103 IRRIGATION PLAN
IR104 IRRIGATION PLAN
IR105 IRRIGATION PLAN
IR106 IRRIGATION PLAN
IR107 IRRIGATION PLAN
IR108 IRRIGATION PLAN
IR109 IRRIGATION PLAN
IR110 IRRIGATION PLAN
IR501 IRRIGATION DETAILS
IR502 IRRIGATION DETAILS
IR503 IRRIGATION DETAILS
IR504 IRRIGATION DETAILS
l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l llllllllllllllllll l l l l lllll l l l l l l l l l l l l l l l
BIO RETENTION
POND VI
BIO RETENTION
POND V
l l l l l
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
STM
STM
STM
GI002
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
BMWALK
CONTRACTOR LAYDOWN YARD PLAN
SHEET NOTES:
1. TOPOGRAPHY SHOWN IS FOR REFERENCE ONLY AND IS NOT SURVEY ACCURATE. VERIFY
ALL FIELD CONDITIONS AND DISCUSS CONTRACTOR LAYDOWN LARD LOCATION AND
PERIMETER PRIOR TO COMMENCEMENT OF WORK.
2. AT THE COMPLETION OF CONSTRUCTION ACTIVITIES IN THIS CONTRACT, REMOVE
CONSTRUCTION TRAILERS, FENCING, ELECTRICAL CONNECTIONS, GRAVEL, AND RE SEED
AREA DISTURBED BY THE CONTRACTOR LAYDOWN YARD.
3. PROVIDE POWER TO CONTRACTOR TRAILERS AND TEMPORARY RESIDENT ENGINEER
TRAILER DURING THE ENTIRE DURATION OF THIS CONTRACT. COORDINATE WITH LUMA
ENERGY FOR TEMPORARY POWER EXTENSION FROM PR-137 TO THE CONTRACTOR
LAYDOWN YARD. PROVIDE ALL NECESSARY PROVISIONS FOR TEMPORARY POWER
INCLUDING BUT NOT LIMITED TO NEW POWER POLES, FEEDERS, DISCONNECT SWITCH,
PANELS, METER SOCKET, AND CONNECTIONS TO TRAILERS. A GENERATOR MAY BE USED
IN LIEU OF THE CONNECTION TO THE EXISTING POWER INFRASTRUCTURE ON PR-137.
CONTRACTOR WILL BE RESPONSIBLE FOR ALL PERMITS, FEES, FUEL COSTS, AND
OVERALL COST TO PROVIDE AND MAINTAIN POWER FOR THE TRAILERS THROUGHOUT
CONSTRUCTION.
4. AT THE END OF CONSTRUCTION, REMOVE ALL CONSTRUCTION MATERIALS INCLUDING
BUT NOT LIMITED TO: CONTRACTOR TRAILERS, UTILITIES, GRAVEL, CONSTRUCTION
FENCING AND CONCRETE PADS. REGRADE LAYDOWN AREA BACK TO THE ORIGINAL
CONDITION PRIOR TO CONSTRUCTION AND RESEED LAYDOWN AREA.
KEY NOTES:
1. EXISTING YARD TO REMAIN. MAINTAIN ACCESS TO AREA AT ALL TIMES DURING
CONSTRUCTION. THIS AREA IS NOT TO BE USED BY THE CONTRACTOR DURING
CONSTRUCTION AT ANY TIME,
2. COMPACT AND RE-GRADE AREA AS NECESSARY TO SAFELY MANEUVER EQUIPMENT,
STORE MATERIALS, AND PLACE TRAILERS SO THAT THEY ARE LEVEL. ADD GRAVEL IN
ALL AREAS INDICATED BY A HATCH PATTERN.
3. INSTALL TEMPORARY CHAIN LINK FENCING.
4. INSTALL NEW 24'-0" WIDE ACCESS GATE AND VEHICLE TRACKING CONTROL. GATE
MUST BE LOCKABLE.
5. EXISTING CONCRETE PAD TO BE UTILIZED FOR VA REO TRAILER. COORDINATE WITH
TRAILER MANUFACTURER FOR DELEGATED FOUNDATION DESIGN. IF THE EXISTING
PAD IS NOT LARGE OR THICK ENOUGH FOR THE REO TRAILER, IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO EXTEND OR RE-POUR AN ADEQUATE SLAB
AS REQUIRED BY THE SELECTED TRAILER MANUFACTURER.
6. EXISTING LAYDOWN YARD TO REMAIN. RECOMPACT AND ADD ADDITIONAL GRAVEL IN
THIS AREA AS NECESSARY TO ENSURE AREA HAS FULL GRAVEL COVERAGE.
7. EXISTING CONSTRUCTION FENCING IN THE EXISTING LAYDOWN YARD CAN BE
RELOCATED AND USED FOR THIS PROJECT.
8. POND 5 WORK WILL NEED TO OCCUR DURING PHASE 1 PER THE PHASING DRAWINGS.
ENSURE ADEQUATE ROOM IS AVAILABLE TO MANEUVER EQUIPMENT AND PERFORM
THE WORK REQUIRED FOR POND 5 WHEN PLACING FENCING IN THIS AREA. FENCING
MAY BE PLACED FURTHER WEST IF ADDITIONAL SPACE IS NEEDED, WITH APPROVAL
FROM THE RESIDENT ENGINEER / COR. DURING PHASE 2, THE TEMPORARY
COMMITTAL SHELTER NEARBY WILL BE UTILIZED. NOISE MUST BE REDUCED ON DAYS
THAT THE TEMPORARY COMMITTAL SHELTER IS USED.
9. PROVIDE 1000 GALLON WATER HOLDING TANK FOR VA REO TRAILER. TANK CAN BE
PAD MOUNTED OR RACK MOUNTED, FOLLOW SPECIFIC MANUFACTURERS
REQUIREMENTS. PROVIDE WATER PUMP CAPABLE OF 5 GPM, 200 FT OF HEAD,
OUTDOOR RATED. CONNECT WATER HOLDING TANK AND PUMP TO A MIN. 20 GALLON
PRESSURE TANK. PROVIDE 1" COPPER LINE CONNECTION TO REO TRAILER. ENSURE
WATER IS CHECKED AND REFILLED ON A REGULAR BASIS.
10. EXISTING CONCRETE PAD AVAILABLE FOR CONTRACTOR TRAILER.
X X X X
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
KEYPLAN:
GI002
25155210
SCALE: 1:250
103 4
SCALE:1 CONTRACTOR LAYDOWN YARD PLAN
1 = 250
LEGEND:
X X X EXISTING PERIMETER FENCING TO REMAIN
TEMPORARY 8' NON VINYL COATED
CHAIN-LINK FENCING
TEMPORARY CHAIN LINK FENCING TO REMAIN
LOCKABLE 24'-0" WIDE ACCESS GATE
2 - LEAVES
EXISTING AREA TO REMAIN
NEW COMPACTED GRAVEL
VEHICLE TRACKING CONTROL
HAUL ROUTE
TYP.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
STA-8103
AutoCAD SHX Text
STA-T13
GI100
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
CONSTRUCTION DOCUMENTS - CD1
BMWALK
TEMP REO TRAILER GENERAL NOTES
AND BUILDING CODE SUMMARY
GENERAL:
DESIGN OF TEMPORARY TRAILERS, STRUCTURAL TIE-DOWNS, AND
INFRASTRUCTURE SHALL BE A DELEGATED DESIGN AND SHALL BE
SIGNED AND SEALED BY AN A/E PROFESSIONAL WITH LICENSE IN
PUERTO RICO. PERFORMANCE SPECIFICATIONS AND DRAWINGS
PROVIDED IN THIS SET ARE FOR REFERENCE AND DESCRIPTION OF
FUNCTIONAL REQUIREMENTS ONLY. PROVIDE COMPLETE SIGNED AND
SEALED PLANS AND SPECIFICATIONS BY THE DELEGATED LICENSED
PROFESSIONAL PRIOR TO CONSTRUCTION, FOR APPROVAL BY
RESIDENT ENGINEER AND A/E
STRUCTURAL DESIG CRITERIA:
CODES:
IBC 2024
ASCE 7-22
AISC 360-22
ACI 318-25
WIND:
156 MPH DESIGN WIND SPEED (ASCE 7-22)
RISK CATEGORY II
EXPOSURE CATEGORY C
INTERNAL PRESSURE COEFFICIENT +- 0.18
LIVE LOAD:
OFFICE 50 PSF
FRAME:
OUTRIGGER TYPE (I-BEAM SPACING AT 95 ½”
I-BEAM SIZE AS REQUIRED AXLE QUANTITY AS REQUIRED NEW TIRES
AND DETACHABLE E HITCHES
FLOOR:
NYLON IMPREGNATEDD BOTTOM BOARD
2X6 JOISTS AT 16: OC
3/4" T & G PLYWOOD DECKING
1/8” VINYL COMPOSITE BLOCK TILY OR 26 OZ. CARPET
WALL PARTITIONS:
WALL HEIGHT 8'-0”
2 X 4 WOOD STUDS AT 16” OC
DOUBLE TAP PLATE
½” VINYL COVERED GYPSUM INTERIOR WALLBOARD
4” HIGH VINYL COVE BASE
INTERIOR DOORS:
SIZES PER DOOR SCHEDULE
SOLID CORE IMPERIAL OAK STRAIGHT FRAME
ROOF:
TRUSS TYPE BOX
TRUSS SPACING 24” OC
FR-DECK
45 MIL BLACK EPDM (REQUIRED FR BOARD)
CEILING 5/8” SHEET ROCK WITH KNOCK DOWN FINISH
CEILING HEIGT: 8'-0”
MATELINE RIDGEBEAM
RIDGBEAM: 3 LAYERS 30”, ¾” PLYWOOD
EXTERIOR FINISHES:
HI-RIB 29 GAUGE STELL SIDING W/STEEL TRIM
SHEATHING AS REQUIRED
100% HOUSE WARP
HI-RIB 29 GAUGE STEEL MANSARO ROOF
COLORS TO BE SELECTED FROM MANF. STANDARDS
ADMINISTRATION TRAILER BUILDING CODE SUMMARY
OCCUPANCY CLASS BUSINESS - GROUP B
CONSTRUCTION TYPE TYPE V - UNSPRINKLED
SQUARE FOOTAGE GROSS AREA 1,496 SQFT
OCCUPANT LOAD OCCUPANT LOAD -
CALCULATED PER FBC TABLE 1004.1.1
OFFICE AREA 1,496 SF/100 = 14
TOTAL = 14
NUMBER OF EXITS: 2
MAX ALLOWED DISTANCE TO EXIT: 29'-10”
ACTUAL MINIMUM TRAVEL DISTANCE: 120'-11”
MAXIMUM ALLOWED DEAD END CORRIDOR PER FBC-B TABLE
1004: 20'-0”
ACTUAL DEAD END CORRIDOR:
0'-0”
NOTES:
1) SUBMIT SHOP DRAWINGS, OF TRAILERS (WITH ALL
TRADES INFORMATION, INCLUDING BUT NOT LIMITED TO
DECKS, RAMPS, AND STAIRS, WHERE OCCUR,
FURNITURE, FURNISHINGS, AND EQUIPMENT LAYOUTS)
FOR APPROVAL PRIOR TO COMMENCING FABRICATION
AND INSTALLATION.
2) PROVIDE DOMESTIC WATER HOLDING TANK, AND PIPE
TO VA TRAILER AS WELL AS CONTRACTOR PROVIDED
TRAILERS FOR DOMESTIC WATER USAGE IN THE
CONTRACTOR LAYDOWN YARD. CONTRACTOR WILL BE
REQUIRED TO MAINTAIN AND REFILL DOMESTIC WATER
HOLDING TANK THROUGHOUT CONSTRUCTION
DURATION. THERE IS NO DOMESTIC WATER
CONNECTION AVAILABLE IN THIS AREA.
3) SANITARY SEWER HOLDING TANKS FOR VA AND
CONTRACTOR TRAILERS WILL NEED TO BE PUMPED OUT
ON A REGULAR BASIS. CONTRACTOR WILL BE REQUIRED
TO PUMP OUT AND DISPOSE OF SANITARY SEWAGE
THROUGHOUT THE DURATION OF CONSTRUCTION.
THERE IS NO SANITARY SEWER CONNECTION AVAILABLE
IN THIS AREA.
4) POWER WILL NEED TO BE PROVIDED TO ALL TRAILERS
THROUGHOUT THE DURATION OF CONSTRUCTION. SEE
SHEET GI002.
EXTERIOR WINDOWS:
SIZES PER SCHEDULE - V/S DP-55
BRONZE ALUMINUM FRAMES
BRONZE TINTED LOW-E INSULATED GLAZING
ALUMINUM MINI-BLINDS
EXTERIOR DOORS:
SIZES PER SCHEDULE
18” GAUGE DOOR + 16 GAUGE FRAME
LOCKING LEVER HARDWARE
STANDARD CLOSER
EXTERIOR DECKS / STAIRS / RAMPS:
1. DECKS, RAMPS, AND STAIRS CONSTRUCTED TO CONNECT AND
PROVIDE ACCESS TO THE TEMPORARY FACILITIES TRAILERS
SHALL COMPLY WITH APPLICABLE CODES, INCLUDING, BUT NOT
LIMITED TO, THE 2024 INTERNATIONAL BUILDING CODE (IBC) AND
AMERICAN BARRIERS ACT (ABA) AND AMERICAN W / DISABILITY
ACT (ADA) FOR ACCESSIBILITY ASPECTS.
2. AT LEAST ONE ACCESSIBLE ROUTE WITHIN THE BOUNDARY OF
THE SITE SHALL CONNECT ACCESSIBLE AMENITIES TO AN
ACCESSIBLE MEANS TO TEMPORARY BUILDINGS' ENTRANCES
AND TO INTERIOR ROOMS OR SPACES IN THE TEMPORARY
FACILITIES.
3. USE TREATED WOOD FOR DECKS, STAIRS, AND RAMP
CONSTRUCTION. FINISHED WOOD ON EXPOSED SIDES WITH ONE
PRIME COAT-ALKYD PRIMER FOR EXTERIOR WOOD; ONE
INTERMEDIATE COAT-EXTERIOR ALKYD ENAMEL COMPATIBLE
WITH TOPCOAT; ONE TOPCOAT-ALKYD, EXTERIOR, FLAT, LEVEL 3.
4. WALKING SURFACES (DECKS, RAMPS, STAIRS, AND LANDINGS)
THAT ARE LOCATED 30 INCHES, MEASURED VERTICALLY TO THE
FLOOR OR GRADE BELOW, AT ANY POINT WITHIN 36 INCHES
HORIZONTALLY TO THE EDGE OF THE OPEN SIDE, REQUIRE A
42-INCH HIGH GUARDRAIL AT THE EDGES, AS PER THE 2024 IBC,
ANY OPENING IN THE GUARDRAIL SHALL BE OF SUCH DIMENSIONS
THAT A 4-INCH BALL CANNOT PASS THROUGH THE OPENING.
5. GUARDRAILS AND HANDRAILS SHALL BE ABLE TO WITHSTAND A
FORCE OF 250 POUNDS APPLIED TO IT IN ANY DIRECTION.
6. MAXIMUM RAMP SLOPE, IN THE DIRECTION OF TRAVEL, SHALL
BE 1:12. MAXIMUM HEIGHT FOR ONE RAMP RUN SHALL BE 30
INCHES HIGH, AT WHICH POINT, THERE SHALL BE A HORIZONTAL
(LEVEL) PLATFORM THAT IS 5 FEET BY 5 FEET MINIMUM
DIMENSIONS.
7. CROSS SLOPE IN RAMPS, STAIRS, AND DECKS SHALL BE EQUAL
OR LESS THAN 1:50.
8. RAMP, DECK, AND STAIR SURFACE SHALL BE STABLE, FIRM,
AND SLIP RESISTANT.
9. PROVIDE GRIPPING SURFACE AT RAMP, DECK, AND STAIR
FLOOR BY INSTALLING "GRIT" TAPE OR STRIPS OF ROLLED
ROOFING THROUGHOUT. ON STAIRS, RAMPS, AND PLATFORMS,
INSTALL PERPENDICULAR TO THE DIRECTION OF TRAVEL AND
COVERING THE ENTIRE WIDTH OF FLOOR SURFACE. ON DECKS,
DISTRIBUTE THROUGHOUT, AS DEEMED APPROPRIATE TO AVOID
SLIPPING.
10. RAMP'S LANDING SHALL CONNECT TO EXISTING MEANS OF
ACCESS IN A CONTINUOUS FLUSH FINISHED SURFACE. MAXIMUM
VERTICAL DIFFERENCE BETWEEN BOTH SURFACES SHALL BE ¼
INCH AT ANY ONE POINT ALONG THE ACCESSIBLE ROUTE.
11. RAMPS SHALL HAVE A HANDRAIL AT BOTH SIDES. HEIGHT
DIMENSION FROM FINISHED FLOOR TO TOP OF HANDRAIL SHALL
BE BETWEEN 30 AND 34 INCHES. HANDRAIL SHALL HAVE A
CONTINUOUS GRIPPING SURFACE OF 1 ½ INCHES OUTSIDE
DIAMETER, AND SHALL BE SEPARATED FROM WALL OR
GUARDRAIL A MINIMUM CLEARANCE OF 1 ½ INCHES.
12. RAMP HANDRAIL ENDS SHALL EXTEND 12 INCHES MINIMUM
BEYOND RAMP AT LEVEL PLANE AND BE ROUNDED OR RETURNED
TO FLOOR.
13. STAIR MINIMUM CLEAR WIDTH SHALL BE 44 INCHES, BETWEEN
HANDRAILS.
14. STAIRS SHALL HAVE A HANDRAIL AT BOTH SIDES. HEIGHT
DIMENSION FROM FINISHED FLOOR TO TOP OF HANDRAIL SHALL
BE BETWEEN 34 AND 38 INCHES. HANDRAIL SHALL HAVE A
CONTINUOUS GRIPPING SURFACE OF 1 ½ INCHES OUTSIDE
DIAMETER, AND SHALL BE SEPARATED FROM WALL OR
GUARDRAIL A MINIMUM CLEARANCE OF 1 ½ INCHES.
15. STAIRS SHALL HAVE TREADS THAT ARE 11 INCHES MINIMUM
DEPTH AND RISERS THAT ARE A MAXIMUM OF 7 INCHES / MINIMUM
OF 4 INCHES HIGH.
16. HEIGHT OF STAIR HANDRAIL SHALL BE BETWEEN 34 AND 38
INCHES ABOVE THE LEADING EDGE OF STAIRWAY TREAD OR
LANDING.
17. STAIR HANDRAIL SHALL EXTEND HORIZONTALLY (LEVEL) 12
INCHES BEYOND, AT THE TOP OF STAIR; AT THE BOTTOM OF
STAIR, THE HANDRAIL SHALL EXTEND ONE TREAD DEPTH,
CONTINUING HANDRAIL SLANTED DIRECTION.
18. DOORS AT TEMPORARY FACILITIES TRAILERS SHALL BE 3'-0"
WIDE PLUS FRAME.
INSULATION:
FLOOR: R-19 (3.5”)
EXTERIOR WALLS: R-13 (3.5”)
ROOF: R-38 (6.25”)
INTERIOR WALLS: R-11 (3.5”)
PLUMBING:
WALL MOUNTED LAVATORIES WITH MIRROR & SINGLE LEVER FAUCET
WALL MOUNTED URINALS
HC WATER CLOSET WITH 36” AND 42” GRAB BARS
WALL MOUNTED TOILET PAPER HOLDER
6.5 KW INSTANT WATER HEATER
CPVC SUPPLY LINES
PVC DRAIN LINES
SANITARY SEWER HOLDING TANKS WITH PUMP OUT CONNECTION
HVAC:
4 -TON UNIT
PROGRAMMABLE THERMOSTAT.
FIBERGLASS SUPPLY DUCTS WITH GRILLES
FIBERGLASS RETURN DUCTS WITH GRILLES
EXHAUST FAN SYSTEM FOR RESTROOMS
ELECTRICAL:
100 AMP POWER PANEL
LED LIGHTS RECESSED WITH ACRYLIC LENSES
PORCH LIGHT WITH FACTORY PHOTO CELL
COMBO LIGHTED EXIT SIGNS / EMERGENCY LIGHT W / BATTERY
POWER AND DATA OUTLETS AS SHOWN ON PLAN
COMBO 60W LIGHT WITH 100 CFM TOILET EXHAUST FAN
GFI PROTECTED 20 AMP RECEPTACLE IN TOILET ROOM
GFI PROTECTED 20 AMP OUTSIDE RECEPTACLE
ALL WIRING TO BE 12-2 ROMEX
2' -6
'-8
7' -5
2'
-6
7' -5
4'
-1 0"
3' 9'
-4
9' -4
3'
DRY-STACKED PIER
AND FOOTING, TYP INTERIOR
DRY STACKING PIERS MAY ONLY BE
CONSTRUCTED UNDER MANUFACTURER'S
SPECIFICATIONS & SET UP MANUALS
ALL DIMENSIONS TO BE VERIFIED
WITH MODULAR BUILDING
MANUFACTURER'S SPECS.
F1
GI101
EARTH ANCHORS (INSTALLED PER MFGR
SPECS). INSTALL ANCHORS BEFORE
CONSTRUCTING FOUNDATION.
DRY-STACKED PIER
AND FOOTING @ENDS OF BEAMS
6'-4" 8' 8' 8' 6'-4"8' 8' 8'
60'-8"
2' 3'-6" 3'-4" 3'-4" 3'-4" 5'-8" 3'-4" 3'-4" 3'-8" 5'-8" 3'-4" 3'-4" 3'-8" 5'-8" 2' 3'-6" 2'
2'-6" 7'-5" 4'-10" 7'-5" 2'-6"
EM
BE
D
1' -6
" M
IN
4' -0
" M
AX
FLOOR SYSTEM PER MFR.
WOOD SHIMS PER
CONTRACTOR AS REQUIRED
STRAPS CONNECT TO STEEL
BEAM EA. SIDE STRAP AT EA.
ANCHOR ROW
DRYSTACK MASONRY PIER
PREFAB ABS PAD
EARTH ANCHORS (INSTALLED PER
MFGR SPECS) INSTALL ANCHORS
BEFORE CONSTRUCTING FOUNDATION
K-1729CHESAPEAKEC_LAVATORYVITREOUS CHINA
'-2
'-6
'-8
6'-4"6'-1"
12'-5"27'-11"12'-4"
60'-8"
12'-5"35'-11"12'-4"
'-2
'-6
'-8
A01 W1
A03
A104
A105A106
W1W1W1
W1 W1 W1A107
A08
A09
6'-4"6'-1"9'-11"8'8'10'6'6'-4"
60'-8"
A02A
A7
GI101
B4
GI101
B7
GI101
A4
GI101
DRYWALL CEILING
AT 8'-0"
GFCI
2'-6"
8' -6
2'-3"
6'
ARCHED VINYL CANOPY ABOVE
ARCHED VINYL CANOPY ABOVE
ARCHED VINYL
CANOPY ABOVE
8'
6'
24'
ARCHED VINYL CANOPY ABOVE
A04
OFFICE
A03
OFFICE
A08
OFFICE
A09
OFFICE
A01
CONFERENCE ROOM
A07
KITCHENETTE 142/100
=2 occ
142/100 =2 occ
141/100 =2 occ
141/100 =2 occ
HW
K-1729CHESAPEAKEC_LAVATORYVITREOUS CHINA
A02
BATHROOM
HW
FOR DECK, RAMP, STAIR, LAYOUT OF THE RESIDENT ENGINEER OFFICE (REO)
TRAILER REFER TO GI501.
K-1729CHESAPEAKEC_LAVATORYVITREOUS CHINA
HW
A02
SERVICE SINK
GFCI
GFCI
SHOWER
A106A
A06
BATHROOM
A05
IT/PHONE
K-1729CHESAPEAKEC_LAVATORYVITREOUS CHINA
A04
OFFICE
A03
OFFICE
A08
OFFICE
A09
OFFICE
A01
CONFERENCE ROOM
A07
KITCHENETTE
A02
BATHROOM
A10
STORAGE
A05
IT/PHONE
A06
BATHROOM
A10
FRIDGE
D4
GI501
D4
GI5017'-4"
A10
STORAGE
8x8 WOOD POST
EXTERIOR VINYL
CANOPY ON
ALUMINUM FRAME
MODULAR BUILDING
2'-4" F.F.E.
-2'-4"
GRADE LEVEL
ADMINISTRATION OFFICE
EXTERIOR VINYL
CANOPY ON
ALUMINUM FRAME
42" WOOD GUARDRAIL
2x2 WOOD PICKETS 4x4 WOOD POST 2x4 WOOD DECKING
MODULAR
BUILDING
National Cemetery
VENTED VINYL SKIRTING
VENTED VINYL
SKIRTING
2'-4" F.F.E.
-2'-4"
GRADE LEVEL
EXTERIOR VINYL CANOPY
ON ALUMINUM FRAME
VINYL AWNING CANOPY
SIGNAGE LETTER
HEIGHT MIN. 6",
FONT ARIAL
SIGNAGE LETTER
HEIGHT MIN. 5",
FONT ARIAL
SLOPE RAMP MAXIMUM
1:12 TO REACH FINISHED
GRADE. SEE GI501
K-1729CHESAPEAKEC_LAVATORYVITREOUS CHINA
8'
4"4"
8' -1
0"
18" MIN
5' -5
2'
-9
A06
BATHROOM
3'
3' -6
1'
HW
K-1729CHESAPEAKEC_LAVATORYVITREOUS CHINA
A02
BATHROOM
HW
7'-10"
4"
8' -2
18" MIN
5' -3
2'
-3
3'
3' -6
1'
4'
3'
ADMINISTRATION TRAILER
A01 FRONT ENTRY PAIR
OFFICE
OFFICE
IT CLOSET
RESTROOM
OFFICE
ROOM
NO.
ROOM NAME REMARKS
DOOR
WIDTH HEIGHT THICKNESS MATERIAL FI
R E
R
AT
ED
H
D W
R S
ET
C
LO
SE
R
EL
EV
AT
IO
N
MATERIAL FINISH
FRAME
6'-0" 1 3 4"
3'-0" 1 3 4" 3'-0" 1 3 4" 2'-0" 1 3 4"
3'-0" 1 3 4"
3'-0" 1 3 4"
HOLLOW METAL
SOLID CORE
SOLID CORE
HOLLOW CORE
SOLID CORE
SOLID CORE
LEVER LATCH W/ LOCK- KICK PLTMETAL PAINTED
WOOD CLEAR
CLEAR
REAR ENTRY 3'-0" 1 3 4" METAL PAINTED-
LEVER LATCH W/ LOCK
LEVER LATCH W/ LOCK
LEVER LATCH W/ LOCK
LEVER LATCH W/ LOCK- KICK PLT
LEVER LATCH W/ LOCK- KICK PLT
LEVER LATCH W/ LOCK6'-8"
6'-8"
6'-8"
6'-8" 6'-8"
6'-8"
6'-8"A03 A04 A05
A02
A07 A08
OFFICE 3'-0" 1 3 4" SOLID CORE - LEVER LATCH W/ LOCK6'-8"A09
WATER HEATER CLOSET 2'-0" 1 3 4" HOLLOW CORE - LEVER LATCH6'-8"A02A
W-1
WINDOW SCHEDULE
WIDTH HEIGHT MATERIAL GLAZING
2'-0" ALUM 1" LOW-E TINTED4'-6"
TYPE
WOOD
CLEARWOOD
CLEARWOOD
HOLLOW METAL
CLEARWOOD
CLEARWOOD
CLEARWOOD
DOOR SCHEDULE
NOTE:
DELEGATED DESIGN OF FOUNDATIONS SHALL
BE BY TRAILER MANUFACTURER. FOR DESIGN
AND SUBMISSION REQUIREMENTS SEE
GENERAL NOTES AND STRUCTURAL DESIGN
CRITERIA ON DRAWING GI100.
GB
LAV
TTDI
GB
WC
D1
GI101
SHEET NOTES:
1) TRAILER FOR ADMINISTRATION AND FOR RESIDENT ENGINEER
OFFICE (REO) ARE THE SAME IN SIZE, LAYOUT, ELEMENTS,
FINISHES, FURNITURE, AND FURNISHINGS AND EQUIPMENT,
REFER TO SPECIFICATION SECTION 01 00 04-GENERAL
REQUIREMENTS, SECTION 1.17 AND 1.18.
2) FOR DECKS, STAIRS, AND RAMP DETAILS, REFER TO GI501.
3) SUBMIT SHOP DRAWINGS OF TRAILERS (WITH ALL TRADES
INFORMATION, INCLUDING BUT NOT LIMITED TO DECKS, RAMPS,
AND STAIRS WHERE OCCUR, FURNITURE, FURNISHINGS AND
EQUIPMENT LAYOUTS) FOR APPROVAL PRIOR TO COMMENCING
FABRICATION AND INSTALLATION.
4) TRAILER FOR ADMINISTRATION AND FOR RESIDENT ENGINEER
OFFICE (REO) ARE THE SAME IN SIZE, LAYOUT, ELEMENTS,
FINISHES, FURNITURE, AND FURNISHINGS.
5) PROVIDE A COMPLETE AND FUNCTIONAL ELECTRICAL SYSTEM
FOR THE TRAILER. WIRE ALL RECEPTACLES, LIGHTS, AND
TERMINATE WIRING INTO THE ELECTRICAL PANEL. PROVIDE
CONNECTIONS TO GENERATOR AND / OR TEMPORARY POWER
CONNECTION.
6) INSTALL ALL DATA JACKS, INCLUDING CAT6 CABLING TO TELECOM
ROOM. TERMINATE ALL WIRING INTO DATA RACK. ENSURE RACK
HAS ADEQUATE CAPACITY FOR REQUIRED CONNECTIONS, AND
GROUND RACK. COORDINATE WITH THE VA FOR CONNECTION
INTO NETWORK INFRASTRUCTURE.
7) MOUNT HVAC UNIT ON 4" CONCRETE PAD OUTSIDE OF THE
TRAILER. PROVIDE ALL DUCTWORK, GRILLS, FOR A FULL
COMPLETE FUNCTIONING SYSTEM. WIRE UNIT TO ELECTRICAL
PANEL.
8) PROVIDE ONE 40 GALLON WATER HEATER TO SERVE BOTH
LAVATORIES, THE SHOWER, AND THE SERVICE SINK. INCLUDE ALL
DOMESTIC WATER PIPING AND SANITARY SEWER PIPING TO AND
FROM PLUMBING FIXTURES, AND SANITARY SEWER HOLDING
TANK. INCLUDE CONNECTIONS TO DOMESTIC WATER HOLDING
TANK.
9) REFER TO SHEET GI100 FOR WRITTEN DESCRIPTION OF MINIMUM
REQUIREMENTS FOR MODULAR BUILDING CONSTRUCTION
RESTROOM 2 3'-0" 1 3 4" SOLID CORE - LEVER LATCH W/ LOCK- KICK PLT6'-8"A06 -- CLEARWOOD-
TTDI
WC
LAV
GB
D2
GI101
GB
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
CONSTRUCTION DOCUMENTS - CD1
0'
SCALE: 1/8" = 1'-0"SCALE: 1/8" = 1'-0"
16'8'4'
SCALE:A1 DOOR SCHEDULE
NTS
SCALE:B1 WINDOW SCHEDULE
NTS
SCALE:D1 ENLARGED RESTROOM PLAN
3/8" = 1' - 0" SCALE:D2 ENLARGED RESTROOM 2 PLAN
3/8" = 1' - 0"
SCALE:A4 ELEVATION SIDE VIEW
1/8" = 1' - 0" SCALE:A7 ELEVATION SIDE VIEW
1/8" = 1' - 0"
SCALE:B4 ELEVATION REAR VIEW
1/8" = 1' - 0" SCALE:B7 ELEVATION FRONT VIEW
1/8" = 1' - 0"
SCALE:D4
RESIDENT ENGINEER OFFICE
(REO) PLAN & FURNITURE LAYOUT
1/8" = 1' - 0" SCALE:D7
RESIDENT ENGINEER OFFICE
(REO) REFLECTED CEILING PLAN
1/8" = 1' - 0"
SCALE:F4
RESIDENT ENGINEER
OFFICE (REO) FLOOR PLAN
1/8" = 1' - 0"
SCALE:F1 PIER & TIE DOWN DESIGN
3/8" = 1' - 0"
SCALE:E1 TYP. FOUNDATION LAYOUT
1/8" = 1' - 0"
DATA JACK
DUPLEX OUTLET
1x4 LED LIGHT FIXTURE
WALL MOUNTED PORCH LIGHT
EXHAUST FAN WITH LIGHT
SUPPLY AIR GRILLE
RETURN AIR GRILLE
EMERGENCY LIGHT WITH BATTERY BACKUP
EXIT SIGN WITH EMERGENCY LIGHTS AND
BATTERY BACKUP
FIRE EXTINGUISHER
WINDOW TAG
DOOR TAG
ELEVATION CALLOUT
DETAIL CALLOUT
DATA RACK
W1
A4
GI101
AXXX
D1
GI101
LEGEND:
SCALE: 3/8" = 1'-0"
0' 6'3'1'
GI101
WBRALK
TEMP RESIDENT ENGINEER OFFICE
(REO) TRAILER PLAN
-WATER HEATER CLOSET 2'-0" 1 3 4" HOLLOW CORE - LEVER LATCH6'-8"A06A ---- CLEARWOOD-
STORAGE 3'-0" 1 3 4" SOLID CORE - LEVER LATCH W/ LOCK6'-8"A10 -- CLEARWOOD-
GB
SH
AutoCAD SHX Text
ESTCODE
P.T. 2x8 TOP RAIL
P.T. 11 2"x11
2"
PICKETS @ 5" O.C.
P.T. 2x4 BOTTOM RAIL
2" DIA. PIPE
HANDRAIL, PAINT.
P.T. 2x4
3' -6
3' -0
1'-6"
2" M
AX
72" MIN.
LEVEL LANDING
EXISTING GRADE
3' -9
6"
1' -6
1'
-6
3' -6
3"
B6
GI501
RAMP MAX SLOPE.
2"x11
2"
PICKETS @ 5" O.C. MAX.
2" DIA. HANDRAIL
2x8 RISER
1'-4"
8"
4x4 P.T. POST AT ENDS AND
MID-SPAN OF EACH STAIR
3' -2
4-12" DIA. ANCHOR BOLTS
2x8 GUARDRAIL
2x12 TREAD
1' 11"
2x12 STRINGER
2-SIMPSON A23
AT EACH STRINGER
2x12 SILL PLATE
2-#4 CONT.
3" 3"
11"
3' -6
3' -2
2x12 STRINGER 5" M
IN.
2x10 RIM JOISTS
3' -6
3' -2
2"x11
2"
PICKETS @ 5" O.C. MAX.
2" DIA. HANDRAIL
1'
5" MAX.
2x8 GUARDRAIL
5" MAX.
2x2 P.T. PICKETS AT 5" O.C.
4"x6" P.T. DECKING
4x4 P.T. POST
P.T. 2x10 BEAM PER PLAN
P.T. 2x10 BEAM PER PLAN
(2) 12"~ THRU BOLT FROM
POST TO BEAM
2" M
AX
P.T. 2x8 TOP RAIL
P.T. 2x4 NAILER
D6
GI501
3-2x12 STAIR STRINGERS
3'-8"
2" DIA. HANDRAIL
(2) 12"~ THRU BOLTS
FROM P.T. 2x12 STRINGER TO P.T. 4x4 POST
2"x11
2"
PICKETS @ 5" O.C. MAX.
P.T. 2x8 TOP RAIL
4x4 P.T. POST
P.T. 2x4 NAILER
3' -6
" M
IN
" M
AX
4x4 P.T. POST
P.T. 5 4"x6" DECK BOARDS
2"x11
2"
PICKETS @ 5" O.C. MAX.
SLOPE 1:12
SEE FRAMING PLAN
2" DIA. HANDRAIL
P.T. 2x4 NAILER
P.T. 2x8 TOP RAIL
P.T. 2x8 STRINGERS @ 16" O.C.
P.T. 2x10 RIM JOIST
P.T. 2x10 BEAM
(2) 12"~ THRU BOLTS FROM
POST TO BEAM
P.T. 2x4 LEDGER
3' -6
" M
IN
" M
AX
3'-8" MIN.
(2) 12"~ THRU BOLTS FROM
POST TO POST
P.T. 4x4 POST
P.T. 5 4"x6" DECKING BOARDS
P.T. 2x8 DECK JOIST
P.T. 2x4 LEDGER
P.T. 2x10 BEAM P.T. 2x8 JOIST
(2) 12"~ THRU BOLTS POST TO BEAM
(2) 12"~ THRU BOLTS POST TO POST
STAGGER BOLTS EQUALLY
RAMP INTERSECTING
DECK BEYOND
3' -9
6"
6" 1'
-6
1' -6
3' -6
1'-4" DIA.
#5x10" LONG
THROUGH POST
6" GRAVEL BASE
P.T. 2x10 RIM JOIST
P.T. 2x4 LEDGER
P.T. 5 4"x6" DECKING BOARDS
P.T. 2x8 JOIST
(2) 12"~ THRU BOLTS
P.T. 2x4 NAILER
P.T. 11 2"x11
2"
PICKETS @ 5" O.C.
P.T. 2x10 BEAM3"
P.T. 4x4 POST
P.T. 4x4 POST
P.T. 4x4 POST
P.T. 5 4"x6" DECKING BOARDS
P.T. 2x8 DECK JOIST
P.T. 2x4 LEDGER
P.T. 2x10 BEAMP.T. 2x8 JOIST
RAMP INTERSECTING
DECK BEYOND
P.T. 2x4 LEDGER
3' -6
3'
1'-6"
2" M
AX
P.T.
4"x6" DECK
BOARDS
P.T. 2x10 @ 16" O.C.
4x4 P.T. POST
SEE DETAIL 1/A-050 FOR
TYPICAL FOOTING DETAIL
P.T. 2x4 NAILER
EXISTING GRADE
3' -9
6"
1' -6
1'
-6
3' -6
3"
NOTES:
1. REFER TO GENERAL NOTES UNDER
''EXTERIOR DECKS, STAIRS, RAMPS'' ON
SHEET GI100.
SCALE:C1 TYP. RAMP DETAIL
3/4" = 1'-0"
SCALE:C4 TYP. RAMP DETAIL
3/4" = 1'-0"
SCALE:B6 RAMP SECTION
3/4" = 1'-0"
SCALE:D1 DECK SECTION
3/4" = 1'-0"
SCALE:D4 TYP. STAIR DETAIL
3/4" = 1'-0"
SCALE:D6 STAIR SECTION
3/4" = 1'-0"
SCALE:F1 TYP. STAIR DETAIL
3/4" = 1'-0" SCALE:F4 RAMP CONNECTION
3/4" = 1'-0" SCALE:F6 TYP. EXT. DECK & FOOTING DETAIL
3/4" = 1'-0"
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
CONSTRUCTION DOCUMENTS - CD1
GI501
WBRALK
TEMP RESIDENT ENGINEER OFFICE
(REO) DETAILS
SCALE: 3/4" = 1'-0"
1'
AutoCAD SHX Text 7"
AutoCAD SHX Text P.T. 2x10 BEAM
D
C
B
A
1 2
X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
UP
J
H
F
B
D
G
E
C
L
A
F
E
N A
ENTR
ANCE
FOYE
R
B
D
H
J
G
R
T1
L
Q
C
K
M
P
MECH ENCLO
A
B
X X
X X
X X
X
X
X
X
X X
X X
X X
X X
X
X
X
X X
X X
X X
X X
X
X X
X X
X X
X
X X
X
X X
X X
X X
X
X
X X
X X
X X
X X
X
X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X
X X
X
X X
X X
X X
X
X
X X
X
X X
X
X X
X X
X
X X
X
X
X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X X
X
X
X X
X X
X
X X
X
X X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X X
X
X
X X
X X
X
X X
X
X X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X X
X
X
X X
X X
X
X X
X
X X
X X
X
X
X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X
X
X
X X
X X
X
X
X X
X X
X
X X
X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X
X
X
X X
X X
X
X
X X
AE
4B
AE
4B
AE
4B
D4
B6
D1
A
B
0'
- 0
2'
- 0
2'
0"
PE
RI
M
ET
ER
O
F
RO
O F
AB
O
VE
5' - 1 3/4"
30' - 0
4' - 1 1/4"
39' - 3
RA
IN
L
EA
DE
R
5'
9"
10' - 1"
CH
AI
N
LI
NK
FE
NC
E- R
EF
ER
T O
CI
VI
L
DW
G S
B4
AE
4B
B4
AE
4B
SL
C
O L, W
IT
H
CO
NC
RE
TE
E
NC
AS
EM
EN
T-
TY
P
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
S
TR
UC
T
DW
G
S
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
S
TR
UC
T
DW
G
S
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
ST
RU
CT
D
W G
S
A
B
RO
O
F
HA
TC
H
O
PE
NI
NG
A
BO
VE
2B
7.
F.
F.
E.
C P2
B1
B2
B3
B4
B5
5.5
D
C
B
A
CO
CO
CO
CO
CO
CO
CO
137.289
TCB
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CONCRETE
CO
NCRETE
CO
NCRETE
C O
N C
R
ETE
CO
NCRETE
BENCH
BENCH
BENCH
BENCH
ESW40
158.29
ESW40
158.30
BL*EB60
158.45
EB60
158.45
EB60
158.44
EB60
158.43
EB60
158.43
EB60
158.43
EC60
158.43
EB60
158.44
EB60
158.45
EB60
158.44
EB60
158.44
EB60
158.45
EB60
158.44
EC60
158.47
EB60
158.46
CO
COL
158.46
COL
158.48
COL
158.46
COL
158.48
COL
158.48
COL
158.50
COL
158.48
COL
158.46
COL
158.48
COL
158.48
COL
158.47
COL
158.50
COL
158.46
COL
158.46
FFE
158.45
COL
158.47
COL
158.47
EB62
158.45
EB62
158.44
EB62
158.43
EB62
158.45
158.45
158.45
158.44
EB62
158.45
EB62
158.45
GS
158.15
GS
158.49
BENCH
158.46
BENCH
158.48
BENCH
158.47
BENCH
158.46
BENCH
158.48
BENCH
158.48
BENCH
158.47BENCH
158.47
BENCH
158.48
BENCH
158.48
BENCH
158.47
BENCH
158.47 BENCH
158.48
BENCH
158.48
BENCH
158.47BENCH
158.46
COL
158.46
COL
158.47
COL
158.47
COL
158.47
COL
158.48
COL
158.46
COL
158.48
GS
158.47
COMMITTAL
SHELTER SIGN
GRAVEL DRIVE W
ITH CONCRETE CURB BORDER
CONCRETE SIDEWALK
ASPHALT DRIVEWAY
ASPHALT DRIVEWAY
CONCRETE SIDEWALK
ASPHALT DRIVEWAY
CONCRETE SIDEWALKASPHALT DRIVEWAY
ASPHALT DRIVEWAY
ASPHALT
D
RIV
EW
AY
AS
PH
AL
T
D R
IV
EW
AY
C O
N C
R
ET
E
SI
D
EW
AL
K
AS
PH
AL
T
D R
IV
EW
AY
C O
N C
R
ET
E
SI
D
EW
AL
K
152.061
EG1
152.006
EG1
152.134
EG1
151.932
EG2
152.002
EG2
152.124
EG2
BIO RETENTION
POND 1
BIO RETENTION
POND 2
TEMPORARY POND
BI
O
R
ET
EN
TI
O N
P O
N
BIO RETENTION
POND 4
BIO RETENTION
POND 5
BIO RETENTION
POND 6
IRRIGATION POND
BIO RETENTION
POND 8
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
NEW SITE PERIM
ETER FENCE
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
PH100
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
BMWALK
PHASING - OVERALL SITE PLAN
SCALE:1 PHASING - OVERALL SITE PLAN
1 = 1500
15075150
SCALE: 1:1500
30 45 60
SHEET NOTES:
1. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR TO EARTH
DISTURBING ACTIVITIES.
2. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR CEMETERY STAFF
AND THE PUBLIC AT ALL TIMES.
3. AT LEAST TWO COMMITTAL SHELTERS MUST REMAIN OPERATIONAL AT ALL TIMES DURING
CONSTRUCTION. COORDINATE WITH THE COR OR RESIDENT ENGINEER AND SUBMIT PROJECT
SCHEDULE WITHIN TWO WEEKS OF PROJECT AWARD.
4. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR ANY TEMPORARY CLOSURE OF A ROADWAY.
5. DEMOLITION WORK NEEDED TO COMPLETE NEW WORK MUST BE REPAIRED AT THE END OF EACH
PHASE. ALL DAMAGE TO EXISTING CONDITIONS MUST BE REPAIRED IMMEDIATELY.
6. SITE PERIMETER FENCING HAS VARYING EXISTING CONDITIONS AND TOPOGRAPHY. IF ISSUES ARISE DURING CONSTRUCTION THAT REQUIRE ANY MODIFICATIONS TO THE PERIMETER FENCING, NOTIFY THE
COR AND RESIDENT ENGINEER IMMEDIATELY.
7. FINAL INSPECTION MUST BE COMPLETED AT THE END OF EACH PHASE PRIOR TO STARTING THE NEXT
PHASE OF WORK.
LEGEND:
POND FENCING
OVERALL PHASING SCHEDULE
PHASE 1 (SEE SHEET PH111 FOR ADDITIONAL DETAILS):
CONSTRUCTION
ENTRANCE AND
LAYDOWN YARD
SHEET GI002
PRIOR TO THE COMMENCEMENT OF ALL OTHER WORK, ESTABLISH THE MAIN CONSTRUCTION ENTRANCE FOR THE
ENTIRE DURATION OF THE PROJECT AND ESTABLISH THE MAIN CONTRACTOR LAYDOWN YARD.
TRAFFIC
CONTROLS
INSTALL ALL NECESSARY TRAFFIC CONTROL MEASURES TO CREATE A ONE WAY ROAD IN THE EASTBOUND DIRECTION.
TEMPORARY TRAFFIC CONTROLS MUST REMAIN IN PLACE UNTIL ALL CONSTRUCTION FENCING HAS BEEN REMOVED AT
THE END OF THIS CONSTRUCTION PHASE.
POND WORK
INSTALL CONSTRUCTION FENCING AS SHOWN FOR INSTALLATION OF POND LINERS, NEW SAFETY FENCES, AND
LANDSCAPING.
IRRIGATION
IR SERIES SHEETS
IRRIGATION WORK WHERE NEW PLANTINGS OCCUR MUST BE INSTALLED PRIOR TO THE INSTALLATION OF PLANTINGS
AND LANDSCAPING WORK.
LANDSCAPING
LP SERIES SHEETS
LANDSCAPING WORK TO BE PERFORMED AFTER THE COMPLETION OF POND SAFETY FENCING AND IRRIGATION WORK.
SEE LP SERIES SHEETS FOR FURTHER DETAILS.
PHASE 2 (SEE SHEET PH121 FOR ADDITIONAL DETAILS):
TRAFFIC
CONTROLS
INSTALL ALL NECESSARY TRAFFIC CONTROL MEASURES TO CREATE A ONE WAY ROAD IN THE EASTBOUND DIRECTION.
TEMPORARY TRAFFIC CONTROLS MUST REMAIN IN PLACE UNTIL ALL CONSTRUCTION FENCING HAS BEEN REMOVED AT
THE END OF THIS CONSTRUCTION PHASE.
P.O.W./M.I.A AREA P.O.W. / M.I.A. WORK TO BE PERFORMED CONCURRENTLY WITH OTHER WORK WITHIN PHASE 2.
POND WORK
INSTALL CONSTRUCTION FENCING AS SHOWN FOR INSTALLATION OF POND LINERS, NEW SAFETY FENCES, AND
LANDSCAPING.
FRENCH DRAIN
INSTALLATION OF FRENCH DRAIN TO BE COMPLETED CONCURRENTLY WITH THE INSTALLATION AND PHASING OF THE FENCING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE STREET CLOSEST TO THE FRENCH
DRAIN, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE ACTIVITIES.
IRRIGATION
IR SERIES SHEETS
IRRIGATION WORK WHERE NEW PLANTINGS OCCUR MUST BE INSTALLED PRIOR TO THE INSTALLATION OF PLANTINGS
AND LANDSCAPING WORK.
LANDSCAPING
LP SERIES SHEETS
LANDSCAPING WORK TO BE PERFORMED AFTER THE COMPLETION OF POND SAFETY FENCING AND IRRIGATION WORK.
SEE LP SERIES SHEETS FOR FURTHER DETAILS.
PHASE 3 (SEE SHEET PH131 FOR ADDITIONAL DETAILS):
TRAFFIC
CONTROLS
INSTALL ALL NECESSARY TRAFFIC CONTROL MEASURES TO CREATE A ONE LANE, TWO-WAY ROAD. TEMPORARY TRAFFIC CONTROLS MUST REMAIN IN PLACE UNTIL ALL CONSTRUCTION FENCING HAS BEEN REMOVED AT THE END OF
THIS CONSTRUCTION PHASE.
POND WORK
INSTALL CONSTRUCTION FENCING AS SHOWN FOR INSTALLATION OF POND LINERS, NEW SAFETY FENCES, AND
LANDSCAPING.
IRRIGATION
IR SERIES SHEETS
IRRIGATION WORK WHERE NEW PLANTINGS OCCUR MUST BE INSTALLED PRIOR TO THE INSTALLATION OF PLANTINGS
AND LANDSCAPING WORK.
LANDSCAPING
LP SERIES SHEETS
LANDSCAPING WORK TO BE PERFORMED AFTER THE COMPLETION OF POND SAFETY FENCING AND IRRIGATION WORK.
SEE LP SERIES SHEETS FOR FURTHER DETAILS.
CONCURRENT WORK:
PERIMETER
FENCING
INSTALL NEW PERIMETER FENCING FOR THE CEMETERY AS DETAILED FROM THE SURVEY. POINT OF CONNECTIONS ARE TO EXISTING PERIMETER FENCING AND ARE NOTED ON SHEET CS111. INSTALLATION OF PERIMETER FENCING TO BE
COMPLETED CONCURRENTLY WITH ALL OTHER PROJECT WORK.
IRRIGATION
IR SERIES SHEETS
SITE IRRIGATION WORK EXTENDS THROUGHOUT THE MAJORITY OF THE PUBLIC AREAS IN THE CEMETERY. IRRIGATION WORK TO BE PERFORMED CONCURRENTLY WITH ALL OTHER CONSTRUCTION ACTIVITIES. INCLUDE A BREAKDOWN OF IRRIGATION ACTIVITIES, DURATIONS, IMPACTS, AND A SCHEDULE AT THE BEGINNING OF THE PROJECT. NOTIFY THE COR
AND RE AT LEAST 7 DAYS IN ADVANCE OF STARTING WORK IN A NEW AREA.
POND 2
SHEET PH102
INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE BIO RETENTION POND 2 FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS FLUSH AGAINST THE OUTSIDE OF THE CURRENT PERMANENT FENCING WHERE PRESENT ALONG THE DARK DASHED OUTLINE. WORK FOR BIO RETENTION POND 2 TO BE COMPLETED CONCURRENTLY WITH ALL OTHER PROJECT WORK.
TEMPORARY POND
SHEET PH103
INSTALL CONSTRUCTION FENCING ACCORDING TO DARK DASHED LINE TO ISOLATE THE TEMPORARY POND FOR INSTALLATION OF POND LINER, NEW SAFETY FENCE, AND LANDSCAPING. INSTALL CONSTRUCTION FENCING SO THAT IT IS ON THE EDGE OF THE ROAD CLOSEST TO THE POND, BUT DOES NOT RESTRICT NORMAL ROAD AND SERVICE ACTIVITIES. WORK FOR THE TEMPORARY RETENTION POND TO BE COMPLETED CONCURRENTLY WITH ALL OTHER
PROJECT WORK.
PHASE 1
PHASE 2
PHASE 3
CONSTRUCTION FENCING
ENLARGED SHEET CALLOUT
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
KEYPLAN:
PH102
PH103
PH111
PH121
PH131
PH103
PH102
PHASE 1
PHASE 2
PHASE 3
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PARE
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
WM
AutoCAD SHX Text W.M.
AutoCAD SHX Text W.M.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text E
A…
This is the start of the file's text. The full file is on GovTribe.