971-031B - Morovis NC Phase 1B - CD1 - DrawingsPart-3.pdf
PDF 19 MB Posted
- Solicitation number
- 36C10F26Q0062
About this file
These are construction documents for Phase 1B of the Morovis National Cemetery project in Morovis, Puerto Rico, prepared by AES Group, Inc. as the Architect/Engineer of Record. The documents include traffic control plans, retention pond phasing plans, irrigation retention pond phasing plans, general civil symbols and abbreviations, overall existing conditions and demolition plans, and detailed existing conditions and demolition plans for eight retention ponds plus temporary and irrigation retention ponds. The project is being managed by the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management, with Project Manager Cheri L. Cooper and Contracting Specialist Joshua Gibson identified as key contacts.
The construction documents establish specific operational requirements including maintaining at least two committal shelters in operation at all times during construction, keeping asphalt roads clear of mud and debris for cemetery staff and public access, coordinating all construction activities with the cemetery director through the Resident Engineer/Contracting Officer's Representative (RE/COR), and providing a project schedule within two weeks of award. Construction sequencing includes three distinct phases that cannot occur simultaneously, though perimeter fencing work may proceed concurrently. Traffic control plans specify lane shifts, stop signs, and street closures using 2023 MUTCD standards and 2020 Puerto Rico traffic manual requirements. Contractors must install temporary signage, establish designated staging areas, use primary construction access unless otherwise authorized, and submit detailed construction sequencing plans for approval. All site cleanup occurs daily, grading and erosion/sediment controls must be implemented before earth-disturbing activities commence, and existing pond liners must be excavated and removed entirely with disposal off-site, with all site features damaged during removal repaired at contractor expense.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
C
B
A
1 2
H
ESW40
158.29
ESW40
158.30
BL*EB60
158.45
EB60
158.45
EB60
158.44
EB60
158.43
EB60
158.43
EB60
158.43
EC60
158.43EB60
158.44
EB60
158.45
EB60
158.44
EB60
158.44
EB60
158.45
EB60
158.44
EC60
158.47
EB60
158.46
CO
COL
158.46
COL
158.48
COL
158.46
COL
158.48
COL
158.48
COL
158.50
COL
158.48
COL
158.46
COL
158.48
COL
158.48
COL
158.47
COL
158.50
COL
158.46
COL
158.46 FFE
158.45
COL
158.47
COL
158.47
EB62
158.45
EB62
158.44
EB62
158.43
EB62
158.45
158.45
158.45
158.44
EB62
158.45
EB62
158.45
GS
158.15
GS
158.49
BENCH
158.46
BENCH
158.48
BENCH
158.47
BENCH
158.46
BENCH
158.48
BENCH
158.48
BENCH
158.47
BENCH
158.47
BENCH
158.48
BENCH
158.48
BENCH
158.47
BENCH
158.47
BENCH
158.48
BENCH
158.48
BENCH
158.47
BENCH
158.46
COL
158.46
COL
158.47
COL
158.47
COL
158.47
COL
158.48
COL
158.46
COL
158.48
GS
158.47
COMMITTAL
SHELTER SIGN
BIO RETENTION
POND 8
PH132
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
BMWALK
PHASE 3 - TRAFFIC CONTROL PLAN
SCALE:1 PHASE 3 - TRAFFIC CONTROL PLAN
1 = 500
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
KEYPLAN:
SIGN LEGEND:
SINGLE LANE SHIFT, LEFT
MUTCD CW1-4 (I)
SHEET NOTES:
1. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR TO EARTH
DISTURBING ACTIVITIES.
2. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR CEMETERY STAFF
AND THE PUBLIC AT ALL TIMES.
3. AT LEAST TWO COMMITTAL SHELTERS MUST REMAIN OPERATIONAL AT ALL TIMES DURING
CONSTRUCTION. COORDINATE WITH THE COR OR RESIDENT ENGINEER AND SUBMIT PROJECT
SCHEDULE WITHIN TWO WEEKS OF PROJECT AWARD.
4. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR ANY TEMPORARY CLOSURE OF A ROADWAY.
5. ALL SIGNAGE IS STANDARD FROM THE MANUAL ON THE 2023 UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), AND THE 2020 MANUAL DE ROTULACIÓN PARA LAS VÍAS PÚBLICAS DE PUERTO RICO.
6. WHERE ADDITIONAL SIGNAGE AND/OR TRAFFIC CONTROLS ARE REQUIRED, EITHER BY LOCAL TRAFFIC REGULATIONS OR AT THE REQUEST OF THE CEMETERY, THE CONTRACTOR IS TO FURNISH AND INSTALL THESE ADDITIONAL ITEMS AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT REGARDLESS IF IT IS
SHOWN ON THIS DRAWING.
7. TRAFFIC CONTROLS ARE TO REMAIN IN PLACE FOR THE ENTIRE DURATION OF CONSTRUCTION WHERE THE ROAD IS BLOCKED WITH CONSTRUCTION FENCING. AT NO POINT ARE TRAFFIC CONTROLS TO BE
REMOVED, BLOCKED, OR OBSCURED UNTIL THE COMPLETION OF PHASE 3 CONSTRUCTION.
8. PROVIDE ADDITIONAL SIGNAGE IN ACCORDANCE WITH LOCAL TRAFFIC REGULATIONS TO IDENTIFY THE
ROAD AS A ONE LANE, TWO-WAY STREET FOR CONSTRUCTION TRAFFIC AND AUTHORIZED
GOVERNMENT VEHICLES ONLY.
KEY NOTES:
1. PROVIDE STOP LINE ROAD MARKINGS AT LOCATION INDICATED.
2. PROVIDE NECESSARY ROAD MARKINGS FOR LANE GUIDANCE AT LOCATION INDICATED.
3. PROVIDE ADDITIONAL SIGNAGE IN ACCORDANCE WITH LOCAL TRAFFIC REGULATIONS THAT
CONSTRUCTION AND AUTHORIZED GOVERNMENT VEHICLES ONLY ARE ALLOWED BEYOND LOCATION
INDICATED. ROAD CLOSED SIGNAGE IS INTENDED FOR THE PUBLIC ONLY, NOT FOR GOVERNMENT OR
CONSTRUCTION PERSONNEL.
SINGLE LANE SHIFT, RIGHT
MUTCD CW1-4 (D)
STOP SIGN
MUTCD R1-1
STREET CLOSED
MUTCD R11-3
DIRECTION OF TRAVEL
LEGEND:
POND FENCING
ROAD SIGN POST
CONSTRUCTION FENCING
LANE SHIFT MARKINGS
PH132
SCALE: 1:500
5025105 15 20 https://www.aquaengineering.com/
B
ESW40
158.29
ESW40
158.30
EB60
EB60
158.43
EB60
158.43
EB60
158.43
EC60
158.43
EB60
158.44
EB60
158.45
EB60
158.44
EB60
158.44
EB60
158.45
EB60
158.44
EC60
158.47
EB60
158.46
CO
COL
158.46
COL
158.48
COL
158.46
COL
158.48
COL
158.48
COL
158.46
COL
158.48
COL
158.48
COL
EB62
158.45
EB62
158.45
GS
158.49
BENCH
158.46
BENCH
158.48
BENCH
158.47
BENCH
158.46
BENCH
158.48
BENCH
158.48
BENCH
158.47
BENCH
158.47
BENCH
158.48
BENCH
158.48
BENCH
158.47
BENCH
158.47
BENCH
158.48
BENCH
158.48
BENCH
158.47
BENCH
158.46
COL
158.47
COL
158.47
COL
158.47
COL
158.48
COL
158.46
COMMITTAL
SHELTER SIGN
BIO RETENTION
POND 8
PH133
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
BMWALK
PHASE 3 - RETENTION POND 8
PHASING PLAN
SCALE:1 PHASE 3 - RETENTION POND 8 PHASING PLAN
1 = 250
25155210
SCALE: 1:250
103 4
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
KEYPLAN:
PH133
SHEET NOTES:
1. TEMPORARY CONSTRUCTION FENCING LOCATIONS SHOWN TO BE VERIFIED BY
CONTRACTOR AND THE RESIDENT ENGINEER PRIOR TO STARTING WORK.
2. ANY POND FENCING OR LANDSCAPING SHOWN IS FOR REFERENCE ONLY TO ILLUSTRATE
CONSTRUCTION FENCING AND STAGING/PARKING AREAS.
3. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR
TO EARTH DISTURBING ACTIVITIES.
4. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR
CEMETERY STAFF AND THE PUBLIC AT ALL TIMES.
5. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE
CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS
PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR
ANY TEMPORARY CLOSURE OF A ROADWAY.
6. AFTER COMPLETION OF CONSTRUCTION, ENSURE TEMPORARY CONSTRUCTION AREAS
ARE REPAIRED TO THEIR ORIGINAL STATE. RESEED AREA AND REMOVE ALL TEMPORARY
FENCING. REPAIR ANY DAMAGE TO ROADWAYS, CURBS, GUTTERS, AND EXISTING
INFRASTRUCTURE IF DAMAGE OCCURRED DURING CONSTRUCTION.
KEY NOTES:
1. CONTRACTOR STAGING AREA AND TEMPORARY PARKING.
2. VEGETATION TO BE PROTECTED DURING CONSTRUCTION. TAKE ALL NECESSARY
PRECAUTIONS TO ENSURE VEGETATION IS UNHARMED DURING ALL PHASES OF
CONSTRUCTION.
CS502
2 2
POND FENCING
CONSTRUCTION FENCING
STAGING AREA/PARKING
LEGEND:
GUARD RAIL
TOPOGRAPHIC LINESXXX.XX
DIRECTION OF TRAVEL
UP
J
F
B
D
G
E
C
L
A
A
B
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
AE
4B
AE
4B
AE
4B
D4
B6
D1
A
B
0'
0"
2'
- 0
2'
0"
PE
RI
M
ET
ER
O
F
RO
O F
AB
O
VE
5' - 1 3/4"
30' - 0"
4' - 1 1/4"
39' - 3"
RA
IN
L
EA
DE
R
5'
9"
10' - 1"
CH
AI
N
LI
NK
FE
NC
E- R
EF
ER
T O
CI
VI
L
DW
G S
B4
AE
4B
B4
AE
4B
SL
C
O L, W
IT
H
CO
NC
RE
TE
E
NC
AS
EM
EN
T-
TY
P
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
S
TR
UC
T
DW
G
S
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
S
TR
UC
T
DW
G
S
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
ST
RU
CT
D
W G
S
A
B
RO
O
F
HA
TC
H
O
PE
NI
NG
A
BO
VE
2B
7.
F.
F.
E.
CP
B1
B2
B3
B4
B5
5.5
CO
CO
CO
CO
IRRIGATION POND
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
EXISTING SITE PERIMETER FENCE
PH134
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
BMWALK
PHASE 3 - IRRIGATION RETENTION
POND PHASING PLAN
SCALE:1 PHASE 3 - IRRIGATION RETENTION POND PHASING PLAN
1 = 400
402010620
SCALE: 1:400
4 8
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
KEYPLAN:
PH134
SHEET NOTES:
1. TEMPORARY CONSTRUCTION FENCING LOCATIONS SHOWN TO BE VERIFIED BY
CONTRACTOR AND THE RESIDENT ENGINEER PRIOR TO STARTING WORK.
2. ANY POND FENCING OR LANDSCAPING SHOWN IS FOR REFERENCE ONLY TO ILLUSTRATE
CONSTRUCTION FENCING AND STAGING/PARKING AREAS.
3. ENSURE ALL GRADING, EROSION, AND SEDIMENT CONTROLS (GESC) ARE IN PLACE PRIOR
TO EARTH DISTURBING ACTIVITIES.
4. ASPHALT ROADS TO REMAIN CLEAR OF MUD, DEBRIS, AND ARE TO REMAIN OPEN FOR
CEMETERY STAFF AND THE PUBLIC AT ALL TIMES.
5. CONSTRUCTION FENCING MUST BE PLACED IN THE LEAST DISRUPTIVE MANNER TO THE
CEMETERY AND ITS VISITORS IN ORDER TO ACCOMPLISH WORK DESCRIBED IN THIS
PROJECT. NOTIFY THE COR AND RESIDENT ENGINEER AT LEAST 7 DAYS IN ADVANCE FOR
ANY TEMPORARY CLOSURE OF A ROADWAY.
6. AFTER COMPLETION OF CONSTRUCTION, ENSURE TEMPORARY CONSTRUCTION AREAS
ARE REPAIRED TO THEIR ORIGINAL STATE. RESEED AREA AND REMOVE ALL TEMPORARY
FENCING. REPAIR ANY DAMAGE TO ROADWAYS, CURBS, GUTTERS, AND EXISTING
INFRASTRUCTURE IF DAMAGE OCCURRED DURING CONSTRUCTION.
KEY NOTES:
1. CONTRACTOR STAGING AREA AND TEMPORARY PARKING.
2. KEEP TRASH AREA AND ACCESS TO THE WELL PUMP FREE AND CLEAR AT ALL TIMES,
DO NOT IMPEDE ACCESS TO THE DUMPSTERS OR THE WELL PUMP.
POND FENCING
CONSTRUCTION FENCING
STAGING AREA/PARKING
LEGEND:
GUARD RAIL
CS502
CS502
EXISTING PERIMETER FENCE
TOPOGRAPHIC LINESXXX.XX
CI001
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
CONSTRUCTION DOCUMENTS - CD1
BMWALK
GENERAL CIVIL SYMBOLS AND
ABBREVIATIONS
ABBREVIATIONS
ADJ ADJACENT
AWWA AMERICAN WATER WORKS ASSOCIATION
BLDG BUILDING
BP BASE POINT
CB CATCH BASIN OR CEMENT BASE
CO CLEANOUT/CONTRACTING OFFICER
CONC CONCENTRIC OR CONCRETE
COR CONTRACTING OFFICER'S REPRESENTATIVE
DIA DIAMETER
DWG DRAWING
EJ EXPANSION JOINT
EP EDGE OF PAVEMENT (PAVING)
ETO EARLY TURNOVER
FG FINISHED GRADE
GA GAGE
GALV GALVANIZED
GESC GRADING, EROSION, AND SEDIMENT CONTROLS
GPM GALLONS PER MINUTE
HDPE HIGH DENSITY POLYETHYLENE
HT HEIGHT
IE INVERT ELEVATION
ID INSIDE DIAMETER
IRR IRRIGATION
MAX MAXIMUM
MEG MEET EXISTING GRADE
MIN MINIMUM
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
PI POINT OF INTERSECTION
POC POINT OF CONNECTION
PR PUERTO RICO
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE (PLASTIC)
PVMT PAVEMENT
R RADIUS OR RANGE
RE RESIDENT ENGINEER
REQ REQUIRE
S= SLOPE EQUALS
SCH SCHEDULE
SQ SQUARE
SQ IN SQUARE INCH
ST/STM STORM
STA STATION
SURF SURFACE
SURV SURVEY
SW SIDEWALK
SWR SEWER
SYM SYMBOL
TE TOP ELEVATION
TEMP TEMPORARY
TOPO TOPOGRAPHY
TYP TYPICAL
VIF VERIFY IN FIELD
VTC VEHICLE TRACKING CONTROL
W WATER
SYMBOL LEGEND
ELEVATION/SURVEY POINT
CLEAN OUT
HANDICAP PARKING
MANHOLE, STORM SEWER
TREE, CONIFEROUS
TREE, DECIDUOUS
CATCH BASIN
D
GENERAL NOTES
1. THE MEANS OF THE WORK AND THE SAFETY OF THE
CONTRACTOR'S EMPLOYEES ARE SOLELY THE
RESPONSIBILITY OF THE CONTRACTOR.
2. NO WORK SHALL BE PERFORMED BEYOND THE
CONSTRUCTION LIMITS OR BEYOND THE PROPERTY LINE
WITHOUT PRIOR AUTHORIZATION FROM THE RE/COR. ANY
DAMAGE OR DISTURBANCE TO AREAS BEYOND THE
CONSTRUCTION LIMITS OR PROPERTY LINES SHALL BE
REPAIRED AT THE CONTRACTOR'S EXPENSE.
3. CONTRACTOR SHALL INSPECT AND VERIFY ALL FIELD
DIMENSIONS AND SITE CONDITIONS SHOWN HEREIN BEFORE
PROCEEDING WITH SITE WORK. DISCREPANCIES BETWEEN
FIELD CONDITIONS AND THESE PLANS SHALL BE BROUGHT
TO THE DEPARTMENT OF VETERANS AFFAIRS RESIDENT
ENGINEER'S ATTENTION PRIOR TO ANY COMMENCEMENT OF
THE WORK. ONCE CONSTRUCTION HAS BEGUN
CONTRACTOR SHALL NOT USE FIELD INFORMATION
DISCREPANCIES AS THE BASIS FOR CHANGE ORDER CLAIMS.
4. MAINTAIN POSITIVE DRAINAGE ON THE SITE THROUGHOUT
THE PROJECT DURATION.
5. SITE CLEAN-UP SHALL BE PERFORMED ON A DAILY BASIS.
SIDEWALKS, PARKING LOTS, ROADWAYS, ETC. SHALL BE
KEPT CLEAN AT ALL TIMES.
6. CONTROL DUST SPREADING FROM ALL WORK AND STAGING
AREAS.
7. ANY WORK REQUIRED TO COMPLETE THE SCOPE OF THIS
PROJECT BUT NOT SPECIFICALLY CALLED OUT, SHALL BE
CONSIDERED INCIDENTAL TO THE PROJECT. NO ADDITIONAL
COMPENSATION SHALL BE ALLOWED FOR THE COMPLETION
OF THIS WORK.
8. WORK WHICH DOES NOT CONFORM TO THE REQUIREMENTS
OF THE CONTRACT WILL BE CONSIDERED UNACCEPTABLE.
UNACCEPTABLE WORK, WHETHER THE RESULT OF POOR
WORKMANSHIP, USE OF DEFECTIVE MATERIALS, DAMAGE
THROUGH CARELESSNESS OR ANY OTHER CAUSE, FOUND
TO EXIST PRIOR TO THE FINAL ACCEPTANCE OF THE WORK,
SHALL BE REMOVED AND REPLACED IN AN ACCEPTABLE
MANNER, AS REQUIRED BY THE RE/COR AT THE
CONTRACTOR'S EXPENSE. WORK DONE CONTRARY TO THE
INSTRUCTIONS OF THE RE/COR, WORK DONE BEYOND THE
LINES SHOWN ON THE PLANS OR ANY EXTRA WORK DONE
WITHOUT AUTHORITY WILL NOT BE PAID FOR.
CONSTRUCTION SEQUENCING ACTIVITIES
THESE NOTES PROVIDE SOME GENERAL, AND SPECIFIC
INFORMATION RELATED TO THE CONSTRUCTION SEQUENCING
ACTIVITIES AND SHALL NOT SUPERCEDE ANY REQUIREMENTS
IDENTIFIED ELSEWHERE IN THE PLANS AND SPECIFICATIONS.
CONSTRUCTION PHASES:
1. THIS PROJECT CONTAINS THREE PHASES OF
CONSTRUCTION. THE PHASES ARE REFERRED TO AS PHASE
1, PHASE 2, AND PHASE 3. NONE OF THE WORK FOR THESE
THREE PHASES MAY OCCUR SIMULTANEOUSLY; HOWEVER,
PERIMETER FENCING WORK MAY OCCUR SIMULTANEOUSLY
WITH ALL THREE PHASES.
CONSTRUCTION SEQUENCING ACTIVITIES:
1. ALL CONSTRUCTION ACTIVITIES SHALL BE CAREFULLY
COORDINATED WITH THE CEMETERY DIRECTOR AND HIS
DESIGNATED STAFF, THROUGH THE RESIDENT
ENGINEER/CONTRACTING OFFICER'S REPRESENTATIVE
(RE/COR), TO MINIMIZE OR ELIMINATE THE IMPACTS TO THE
OPERATION OF THE CEMETERY. THE OFFICIAL CONTRACTOR
WORK SEQUENCE PLAN SHALL BE PREPARED BY THE
CONTRACTOR TAKING INTO CONSIDERATION THE
OPERATIONAL CONSTRUCTION SEQUENCING ACTIVITIES,
PHASING AND ANY SPECIFIC IDENTIFIED WORK SEQUENCING
TASKS THAT ARE INCLUDED IN THE CONSTRUCTION
DOCUMENTS. THE CONTRACTOR'S WORK SEQUENCE PLAN
SHALL BE SUBMITTED, REVIEWED, MODIFIED AS REQUIRED
UNTIL APPROVED BY THE RE/COR AND CEMETERY
DIRECTOR. THE APPROVED PLAN SHALL, AS MUCH AS
POSSIBLE, ALLOW THE CONTRACTOR FLEXIBILITY IN HIS/HER
MEANS AND METHODS, AS LONG AS THE CEMETERY
OPERATIONS AND INCONVENIENCE TO THE PUBLIC HAVE
BEEN ADDRESSED TO THE SATISFACTION OF THE RE/COR
AND CEMETERY DIRECTOR. THESE PLANS, NOTES, AND
SPECIFICATIONS IDENTIFY OPERATIONAL CONSTRUCTION
SEQUENCING ACTIVITIES AND OTHER CRITICAL TIMING
ISSUES FOR THE PROJECT WORK FLOW. THE CONTRACTOR
SHALL INCORPORATE THE PLANS AND NOTES INTO HIS/HER
OVERALL PROJECT WORK SEQUENCING PLAN.
GENERAL CONSTRUCTION REQUIREMENTS:
1. JUST PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION,TEMPORARY SIGNAGE IS REQUIRED
THROUGHOUT THE PROJECT. THE SIGNAGE IS TO CLEARLY
FACILITATE THE PUBLIC MOVING THROUGH THE SITE WHILE
AVOIDING CONSTRUCTION ACTIVITIES. SIGNAGE SHALL ALSO
PROVIDE ADVANCE NOTIFICATION WHERE DEEMED
NECESSARY BY CEMETERY OPERATIONS. THE CONTRACTOR
SHALL PREPARE A TEMPORARY SIGNAGE PLAN TO BE
REVIEWED AND MODIFIED AS REQUIRED UNTIL APPROVED
BY THE RE/COR. ONCE APPROVED THE CONTRACTOR SHALL
FURNISH AND INSTALL ALL TEMPORARY SIGNAGE
ACCORDING TO THE APPROVED PLAN.
2. CONTRACTOR SHALL CONSTRUCT AND USE THE IDENTIFIED
PRIMARY CONSTRUCTION ACCESS FOR INGRESS AND
EGRESS ACTIVITIES, UNLESS THERE IS SPECIFIC
AUTHORIZATION TO VARY FROM THAT ROADWAY GRANTED
IN ADVANCE BY THE RE/COR.
3. CONTRACTOR STAGING AND STORAGE SHALL BE WITHIN
THE AREA(S) DESIGNATED ON THE PLANS.
4. THE CONTRACTOR SHALL BE ALLOWED TO CONTROL THE
OVERALL PROJECT WORK SEQUENCE AS LONG AS THE
WORK ACTIVITIES, STAGING ACCESS AND EGRESS, AND
TEMPORARY SIGNAGE HAVE BEEN APPROVED IN ADVANCE.
ALL OF THE PROJECT WORK SHALL BE INDICATED IN THE
APPROVED CONTRACTOR CONSTRUCTION SEQUENCING
PLAN.
https://www.aquaengineering.com/ https://www.aquaengineering.com/ AutoCAD SHX Text
CB
B
A
1 2
X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEVDEVDEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DE
V
DE
V
DE
V
DE
V
DE
V
D
EV
D
EV
D
EV
D
EV
D
EV
D
EV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEVDEVDEVDEVDEVDEVDEVDEVDEV
DEV
DEVDEVDEVDEVDEV
DEV
DEV
DEV
DEV
DEV
DEV
UP
J
H
F
B
D
G
E
C
L
A
F
E
N A
ENTR
ANCE
FOYE
R
B
D
H
J
G
R
T1
L
Q
C
K
M
P
MECH ENCLO
A
B
X X
X X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X
X
X X
X X
X X
X X
X
X
X X
X X
X X
X X
X
X
X
X X
X X
X X
X
X
X
X X
X X
X X
X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X
X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X X
X
X
X X
X X
X
X X
X
X X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X
X
X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X
X
X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X X
X X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X
AE
4B
AE
4B
AE
4B
D4
B6
D1
A
B
0'
- 0
2'
0"
2'
- 0
PE
RI
M
ET
ER
O
F
RO
O F
AB
O
VE
5' - 1 3/4"
30' - 0"
4' - 1 1/4"
39' - 3"
RA
IN
L
EA
DE
R
5'
- 9
10' - 1
CH
AI
N
LI
NK
FE
NC
E- R
EF
ER
T O
CI
VI
L
DW
G S
B4
AE
4B
B4
AE
4B
SL
C
O L, W
IT
H
CO
NC
RE
TE
E
NC
AS
EM
EN
T-
TY
P
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
S
TR
UC
T
DW
G
S
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
S
TR
UC
T
DW
G
S
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
ST
RU
CT
D
W G
S
A
B
RO
O
F
HA
TC
H
O
PE
N
IN
G A
BO
VE
2B
7.
F.
F.
E.
C P2
B1
B2
B3
B4
B5
5.5
DEV
DEV
DEV
DEV
DEV
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DEV
DEV
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEVDEVDEVDEVDEVDEVDEVDEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
D
EV
D
EV
D
EV
D
EV
D
EV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
D
EV
D
C
B
A
CBCB
D
C
B
A
1 2
X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEVDEVDEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DE
V
DE
V
DE
V
DE
V
DE
V
D
EV
D
EV
D
EV
D
EV
D
EV
D
EV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEVDEVDEVDEVDEVDEVDEVDEVDEV
DEV
DEVDEVDEVDEVDEV
DEV
DEV
DEV
DEV
DEV
DEV
UP
J
H
F
B
D
G
E
C
L
A
F
E
N A
ENTR
ANCE
FOYE
R
B
D
H
J
G
R
T1
L
Q
C
K
M
P
MECH ENCLO
A
B
X X
X X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X
X
X X
X X
X X
X X
X
X
X X
X X
X X
X X
X
X
X
X X
X X
X X
X
X
X
X X
X X
X X
X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X
X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X X
X
X
X X
X X
X
X X
X
X X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X
X
X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X
X
X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X X
X X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X
AE
4B
AE
4B
AE
4B
D4
B6
D1
A
B
0'
- 0
2'
0"
2'
- 0
PE
RI
M
ET
ER
O
F
RO
O F
AB
O
VE
5' - 1 3/4"
30' - 0"
4' - 1 1/4"
39' - 3"
RA
IN
L
EA
DE
R
5'
- 9
10' - 1
CH
AI
N
LI
NK
FE
NC
E- R
EF
ER
T O
CI
VI
L
DW
G S
B4
AE
4B
B4
AE
4B
SL
C
O L, W
IT
H
CO
NC
RE
TE
E
NC
AS
EM
EN
T-
TY
P
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
S
TR
UC
T
DW
G
S
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
S
TR
UC
T
DW
G
S
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
ST
RU
CT
D
W G
S
A
B
RO
O
F
HA
TC
H
O
PE
N
IN
G A
BO
VE
2B
7.
F.
F.
E.
C P2
B1
B2
B3
B4
B5
5.5
DEV
DEV
DEV
DEV
DEV
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DEV
DEV
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEVDEVDEVDEVDEVDEVDEVDEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
D
EV
D
EV
D
EV
D
EV
D
EV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
D
EV
D
C
B
A
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
3.00 MTS. BERM
CB
3.00 M
TS. BERM
CB
3.00 MTS. BERM
3.00 MTS. BERM
5.00 MTS.
3.00 MTS. BERM
3.00 MTS. BERM
ST
M
STM
T.E.=156.83
I.E.=155.63(12"Ø IN-NORTH)
DROP IN.NO.45
2'-6"X8' DOUBLE
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
CB
STM
ST
M
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM STM STM STM STM
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
D
ST
M
CB
STATE ROAD PR-137
STM STM STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
STM
STM
STM
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
D
STM
STM
STM
STM
STM
STM STM
STM
STM STM STM
D
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
CB
STM
STM
STM
STM STM STM STM STM STM STM
STM STM STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM STM STM STM STM STM STM STM STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM STM STM STM
STM
STM
STM
STM
I.E.=154.92(24"Ø IN-WEST)
I.E.=154.92(24"Ø OUT-SOUTH)
D
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
D
D
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
SD
SD
SD
SD
SD
SD
SD
SD
SD
T.E.=149.10
STM
STM
STM
STM
CB
CB
STM
STM
STM
STM
STM
D
142.00
STM
D
STM
STM
STM
STM
STM STM
SD
SD
STM
STM
STM
STM
STM
SD
SD
ST
M
ST
M
ST
M
ST
M
ST
M
STM STM STM STM STM STM STM STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
C5
CJ-506
D6
CI-303
E6
CI-302
F6
CI-301
C6
CI-302
D6
CI-301
B6
CI-301
D
ST
M
STM
151.15
151.83 151.49
151.49
151.49
1.
0.
0.
0.
0.
160.33
159.83
159.79
160.01
159.51
159.47
159.66
159.62
160.16
159.57
159.07
159.03
9.
9.
9.
9.
9.
9.
9.
9.
159.03
159.47
159.62
159.79
3.00 MTS. BERM
D
154.90
154.00
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
SD
SD
SD
SD
SD
SD
STM
STM
STM
STM
STM
STM
STM
STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
D
D
S=1 .4%
STM
D
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
C B
CB
CB
CB
CB
CB
CB
151.860
153.270
152.500
153.650
154.080
154.510
154.870
152.300
152.300
151.730
151.730
151.440
151.440
150.600
150.600
147.830
7.
146.580
146.580
145.330
5.
9.
9.1
149.090
149.090
7.
147.830
6.
146.580
145.330
145.330
156.420
153.070
153.000
152.770
152.480
152.190
152.140
152.430
152.720
150.860
150.800
150.705
150.646
150.550
150.490
151.440
151.560
152.140
152.430
153.000
152.720
152.250
149.390
151.420
151.560
156.86
149.83
147.53
147.34
154.65
154.95
148.75
153.14 156.37
157.09
154.37
STM
STM
STM
STM
STM STM
STM
STM
STM
STM
STM STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
CB
CB
STM
STM
STM
STM
STM
STM
STM
STM
P.V.C. S=1%Min.
PROPOSED 6"Ø
(FOR CONTINUATION
SEE PLUMBING PLAN
PP105A)
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
P.V.C. S=1%Min.
PROPOSED 4"Ø
(FOR CONTINUATION
SEE PLUMBING PLAN
PP106B)
SD
SD
SD
SD
SD
SD
SD
SD
P.V.C. S=1%Min.
PROPOSED 4"Ø
(FOR CONTINUATION
SEE PLUMBING PLAN
PP106B)
4"Ø C-OUT.
4"Ø C-OUT.
4"Ø C-OUT.
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD SD SD
4"Ø C-OUT. P.V.C. S=1%Min.
PROPOSED 4"Ø
(FOR CONTINUATION
SEE PLUMBING PLAN
PP106B)
SD
SD
SD
SD
SD
SD
SD
SD
P.V.C. S=1%Min.
PROPOSED 3"Ø
(FOR CONTINUATION
SEE PLUMBING PLAN
PP106B)
P.V.C. S=1%Min.
PROPOSED 3"Ø
4"Ø C-OUT.
P.V.C. S=1%Min.
PROPOSED 4"Ø
PROPOSED 4"Ø
P.V.C. S=1%Min.
PROPOSED 4"Ø
P.V.C. S=1%Min.
SD
SD
SD
PROPOSED 3"Ø
P.V.C. S=1%Min.
(FOR CONTINUATION
SEE PLUMBING PLAN
PP101C)
PROPOSED 3"Ø
P.V.C. S=1%Min.
(FOR CONTINUATION
SEE PLUMBING PLAN
PP402B)
PROPOSED 3"Ø
P.V.C. S=1%Min.
(FOR CONTINUATION
SEE PLUMBING PLAN
PP402B)
4"Ø C-O
3"Ø P.V.C.
3"Ø P.V.C.
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD SD SD SD SD SD SD
PROPOSED 3"Ø
P.V.C. S=1%Min.
(FOR CONTINUATION
SEE PLUMBING PLAN
PP101C)
P.V.C. S=1%Min.
PROPOSED 4"Ø
4"x4"x4"Ø TEE
PROPOSED
3"@4"Ø
INCREASER
PROPOSED
CBCB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB CB
CB CB
CB
CB
CB
CB
CB
CB
CB
CB
C B
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
C B
C B
C B
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
C B
C B
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
C B
C B
C1CI-304
CB
STATE RO
AD PR-137
STATE R
O
AD
PR
-137
D
D
STM
D
C
B
A
1 2
X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEVDEVDEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DE
V
DE
V
DE
V
DE
V
DE
V
D
EV
D
EV
D
EV
D
EV
D
EV
D
EV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEVDEVDEVDEVDEVDEVDEVDEVDEV
DEV
DEVDEVDEVDEVDEV
DEV
DEV
DEV
DEV
DEV
DEV
UP
J
H
F
B
D
G
E
C
L
A
F
E
N A
ENTR
ANCE
FOYE
R
B
D
H
J
G
R
T1
L
Q
C
K
M
P
MECH ENCLO
A
B
X X
X X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X
X
X X
X X
X X
X X
X
X
X X
X X
X X
X X
X
X
X
X X
X X
X X
X
X
X
X X
X X
X X
X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X
X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X X
X
X
X X
X X
X
X X
X
X X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X
X
X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X
X
X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X X
X X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X
AE
4B
AE
4B
AE
4B
D4
B6
D1
A
B
0'
- 0
2'
0"
2'
- 0
PE
RI
M
ET
ER
O
F
RO
O F
AB
O
VE
5' - 1 3/4"
30' - 0"
4' - 1 1/4"
39' - 3"
RA
IN
L
EA
DE
R
5'
- 9
10' - 1
CH
AI
N
LI
NK
FE
NC
E- R
EF
ER
T O
CI
VI
L
DW
G S
B4
AE
4B
B4
AE
4B
SL
C
O L, W
IT
H
CO
NC
RE
TE
E
NC
AS
EM
EN
T-
TY
P
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
S
TR
UC
T
DW
G
S
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
S
TR
UC
T
DW
G
S
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
ST
RU
CT
D
W G
S
A
B
RO
O
F
HA
TC
H
O
PE
N
IN
G A
BO
VE
2B
7.
F.
F.
E.
C P2
B1
B2
B3
B4
B5
5.5
DEV
DEV
DEV
DEV
DEV
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DEV
DEV
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEVDEVDEVDEVDEVDEVDEVDEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
D
EV
D
EV
D
EV
D
EV
D
EV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
D
EV
D
C
B
A
CBCB
D
C
B
A
1 2
X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEVDEVDEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DE
V
DE
V
DE
V
DE
V
DE
V
D
EV
D
EV
D
EV
D
EV
D
EV
D
EV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEVDEVDEVDEVDEVDEVDEVDEVDEV
DEV
DEVDEVDEVDEVDEV
DEV
DEV
DEV
DEV
DEV
DEV
UP
J
H
F
B
D
G
E
C
L
A
F
E
N A
ENTR
ANCE
FOYE
R
B
D
H
J
G
R
T1
L
Q
C
K
M
P
MECH ENCLO
A
B
X X
X X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X
X
X X
X X
X X
X X
X
X
X X
X X
X X
X X
X
X
X
X X
X X
X X
X
X
X
X X
X X
X X
X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X
X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X X
X
X
X X
X X
X
X X
X
X X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X
X
X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X
X
X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X
X X
X X
X
X X
X X
X X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X X
X
X X
X
X
X
X X
X X
X
X
X
X
X X
X
X
AE
4B
AE
4B
AE
4B
D4
B6
D1
A
B
0'
- 0
2'
0"
2'
- 0
PE
RI
M
ET
ER
O
F
RO
O F
AB
O
VE
5' - 1 3/4"
30' - 0"
4' - 1 1/4"
39' - 3"
RA
IN
L
EA
DE
R
5'
- 9
10' - 1
CH
AI
N
LI
NK
FE
NC
E- R
EF
ER
T O
CI
VI
L
DW
G S
B4
AE
4B
B4
AE
4B
SL
C
O L, W
IT
H
CO
NC
RE
TE
E
NC
AS
EM
EN
T-
TY
P
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
S
TR
UC
T
DW
G
S
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
S
TR
UC
T
DW
G
S
M
ET
AL
B
RA
CI
NG
RE
FE
R
TO
ST
RU
CT
D
W G
S
A
B
RO
O
F
HA
TC
H
O
PE
N
IN
G A
BO
VE
2B
7.
F.
F.
E.
C P2
B1
B2
B3
B4
B5
5.5
DEV
DEV
DEV
DEV
DEV
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DEV
DEV
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DE
V
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEVDEVDEVDEVDEVDEVDEVDEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
D
EV
D
EV
D
EV
D
EV
D
EV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
DEV
D
EV
D
C
B
A
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
3.00 MTS. BERM
CB
3.00 M
TS. BERM
CB
3.00 MTS. BERM
3.00 MTS. BERM
5.00 MTS.
3.00 MTS. BERM
3.00 MTS. BERM
ST
M
STM
T.E.=156.83
I.E.=155.63(12"Ø IN-NORTH)
DROP IN.NO.45
2'-6"X8' DOUBLE
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
CB
STM
ST
M
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM STM STM STM STM
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
D
ST
M
CB
STATE ROAD PR-137
STM STM STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
STM
STM
STM
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
D
STM
STM
STM
STM
STM
STM STM
STM
STM STM STM
D
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
CB
STM
STM
STM
STM STM STM STM STM STM STM
STM STM STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM STM STM STM STM STM STM STM STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM STM STM STM
STM
STM
STM
STM
I.E.=154.92(24"Ø IN-WEST)
I.E.=154.92(24"Ø OUT-SOUTH)
D
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
D
D
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
SD
SD
SD
SD
SD
SD
SD
SD
SD
T.E.=149.10
STM
STM
STM
STM
CB
CB
STM
STM
STM
STM
STM
D
142.00
STM
D
STM
STM
STM
STM
STM STM
SD
SD
STM
STM
STM
STM
STM
SD
SD
ST
M
ST
M
ST
M
ST
M
ST
M
STM STM STM STM STM STM STM STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
C5
CJ-506
D6
CI-303
E6
CI-302
F6
CI-301
C6
CI-302
D6
CI-301
B6
CI-301
D
ST
M
STM
151.15
151.83 151.49
151.49
151.49
1.
0.
0.
0.
0.
160.33
159.83
159.79
160.01
159.51
159.47
159.66
159.62
160.16
159.57
159.07
159.03
9.
9.
9.
9.
9.
9.
9.
9.
159.03
159.47
159.62
159.79
3.00 MTS. BERM
D
154.90
154.00
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
SD
SD
SD
SD
SD
SD
STM
STM
STM
STM
STM
STM
STM
STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
D
D
S=1 .4%
STM
D
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
C B
CB
CB
CB
CB
CB
CB
151.860
153.270
152.500
153.650
154.080
154.510
154.870
152.300
152.300
151.730
151.730
151.440
151.440
150.600
150.600
147.830
7.
146.580
146.580
145.330
5.
9.
9.1
149.090
149.090
7.
147.830
6.
146.580
145.330
145.330
156.420
153.070
153.000
152.770
152.480
152.190
152.140
152.430
152.720
150.860
150.800
150.705
150.646
150.550
150.490
151.440
151.560
152.140
152.430
153.000
152.720
152.250
149.390
151.420
151.560
156.86
149.83
147.53
147.34
154.65
154.95
148.75
153.14 156.37
157.09
154.37
STM
STM
STM
STM
STM STM
STM
STM
STM
STM
STM STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
CB
CB
STM
STM
STM
STM
STM
STM
STM
STM
P.V.C. S=1%Min.
PROPOSED 6"Ø
(FOR CONTINUATION
SEE PLUMBING PLAN
PP105A)
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
P.V.C. S=1%Min.
PROPOSED 4"Ø
(FOR CONTINUATION
SEE PLUMBING PLAN
PP106B)
SD
SD
SD
SD
SD
SD
SD
SD
P.V.C. S=1%Min.
PROPOSED 4"Ø
(FOR CONTINUATION
SEE PLUMBING PLAN
PP106B)
4"Ø C-OUT.
4"Ø C-OUT.
4"Ø C-OUT.
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD SD SD
4"Ø C-OUT. P.V.C. S=1%Min.
PROPOSED 4"Ø
(FOR CONTINUATION
SEE PLUMBING PLAN
PP106B)
SD
SD
SD
SD
SD
SD
SD
SD
P.V.C. S=1%Min.
PROPOSED 3"Ø
(FOR CONTINUATION
SEE PLUMBING PLAN
PP106B)
P.V.C. S=1%Min.
PROPOSED 3"Ø
4"Ø C-OUT.
P.V.C. S=1%Min.
PROPOSED 4"Ø
PROPOSED 4"Ø
P.V.C. S=1%Min.
PROPOSED 4"Ø
P.V.C. S=1%Min.
SD
SD
SD
PROPOSED 3"Ø
P.V.C. S=1%Min.
(FOR CONTINUATION
SEE PLUMBING PLAN
PP101C)
PROPOSED 3"Ø
P.V.C. S=1%Min.
(FOR CONTINUATION
SEE PLUMBING PLAN
PP402B)
PROPOSED 3"Ø
P.V.C. S=1%Min.
(FOR CONTINUATION
SEE PLUMBING PLAN
PP402B)
4"Ø C-O
3"Ø P.V.C.
3"Ø P.V.C.
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD SD SD SD SD SD SD
PROPOSED 3"Ø
P.V.C. S=1%Min.
(FOR CONTINUATION
SEE PLUMBING PLAN
PP101C)
P.V.C. S=1%Min.
PROPOSED 4"Ø
4"x4"x4"Ø TEE
PROPOSED
3"@4"Ø
INCREASER
PROPOSED
CBCB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB CB
CB CB
CB
CB
CB
CB
CB
CB
CB
CB
C B
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
C B
C B
C B
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
C B
C B
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
C B
C B
C1CI-304
CB
STATE RO
AD PR-137
STATE R
O
AD
PR
-137
D
D
STM
CE100
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
DESIGN DEVELOPMENT - DD2
MJAEB
OVERALL EXISTING CONDTIONS AND
DEMOLITION PLAN
SCALE:1
OVERALL EXISTING CONDTIONS AND
DEMOLITION PLAN
1 = 1500
15075150
SCALE: 1:1500
30 45 60
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
KEYPLAN:
IRRIGATION
RETENTION POND
TEMPORARY
RETENTION POND
RETENTION POND 8
RETENTION POND 7
RETENTION POND 5
RETENTION POND 6
RETENTION POND 4
RETENTION POND 1
RETENTION POND 2
SURVEYOR'S NOTES:
1. THE BEARING BASIS FOR THIS SURVEY ARE BASED ON THE NORTH AMERICAN DATUM OF 1983, PUERTO RICO AND VIRGIN ISLANDS, METER. THE GEOID UTILIZED FOR THE SURVEY WAS GEOID 18. HORIZONTAL COORDINATES WERE ESTABLISHED USING COMPARATIVE VALUES OF BASE/ROVER GPS AND STATIC GPS, PROCESSED THROUGH CONTINUOUSLY OPERATING REFERENCE STATIONS (CORS) AND VERIFIED VERSUS ONLINE POSITIONING USER SERVICE (OPUS) FOR THE BRASS DISKS KNOWN AS POINTS 1, 3, AND 4 FROM THE
PREVIOUS SURVEY BY EBP LAND SURVEYING SERVICES IN 2018.
2. ELEVATIONS WERE ESTABLISHED BY GPS ON THE BRASS DISKS KNOWN AS POINTS 1, 3, AND 4 FROM THE PREVIOUS SURVEY BY EBP LAND SURVEYING SERVICES IN 2018. THE 2018 SURVEY ELEVATIONS WERE REFERENCED TO MEAN SEA LEVEL (M.S.L.) BENCHMARK ID 87Y1934, LOCATED IN STATE ROAD PR-155, WITH COORDINATES N=255684.4867, E=200581.9609, AND ELEVATION=183.75 METERS. IT WAS DISCOVERED THAT GPS ELEVATION CHECKS BETWEEN BRASS DISKS 1, 3, AND 4 DID NOT AGREE WITH THE 2018 PUBLISHED ELEVATIONS. ELEVATION CHECKS OF AS-BUILT STORM STRUCTURES WERE COMPARED WITH PLAN ELEVATIONS. IT WAS DECIDED TO HOLD THE ELEVATION OF POINT 1 AND RECOMPUTE THE COORDINATES FOR POINTS 3 AND 4 SINCE THE ELEVATION OF POINT 1 RESULTED IN AS-BUILT DATA MORE CLOSELY AGREEING WITH PLAN ELEVATIONS. A COMPARISON OF THE RESULTING 2024 ELEVATIONS
AND THE 2018 ELEVATIONS ARE AS FOLLOWS:
POINT 2018 ELEVATION 2024 ELEVATION
1 138.130 138.130
2 142.080 POINT NOT FOUND
3 141.710 141.535 4 149.880 149.668
3. ANY DISTANCES SPECIFIED HEREON ARE HORIZONTAL GRID DISTANCES IN METERS.
4. THE CONTOUR INTERVAL SHOWN HEREON IS 0.5 METERS.
5. THIS SURVEY WAS PERFORMED ON THE GROUND BETWEEN 12/9/2024 AND 12/21/2024. EQUIPMENT USED IN COLLECTING THE
TOPOGRAPHIC DATA INCLUDED:
· TRIMBLE R10 GPS ANTENNAS
· TRIMBLE S7 ROBOTIC TOTAL STATION
· DJI M300 AND ZENMUSE L1 LIDAR SENSOR
6. THE SURVEY OF THE PROPOSED PERIMETER FENCE AREAS IS AN APPROXIMATELY 16-METER WIDE CORRIDOR. PORTIONS OF THE CORRIDOR WITHIN CREEK BEDS WERE UNDER WATER AND ARE NOT INCLUDED IN THE SURFACE ELEVATIONS.
7. THE SURVEY INCLUDED LIMITED TREE LOCATION OF ONLY TREES 24 INCHES IN DIAMETER AND LARGER. TREES ALONG THE CREEKS
WERE NOT LOCATED DUE TO POOR GPS CONDITIONS.
8. THE SURVEY INCLUDED DATA COLLECTION IN POND AREAS INCLUDING POND BOTTOM ELEVATION CHECKS, INCOMING AND OUTGOING STORM PIPES, AND INVERT ELEVATIONS, PIPE SIZES AND PIPE MATERIAL. THE IRRIGATION POND WAS TOO DEEP TO SAFELY OBTAIN
POND BOTTOM ELEVATION CHECKS.
9. NO BOUNDARY SURVEYS WERE PERFORMED ON THIS SITE NOR THE ADJOINING PROPERTIES
LEGEND:
PROPERTY CORNER
BENCH MARK
LIGHT POLE
ELECTRIC BOX
ELECTRIC MANHOLE
TRANSFORMER PAD
WATER VAULT
WATER VALVE
FIRE HYDRANT
IRRIGATION CONTROL VALVE
SPRINKLER HEAD
GAS VALVE
TELEPHONE BOX
COMMUNICATION HANDHOLE
TRAFFIC SIGNAL HANDHOLE
CATCH BASIN DOUBLE WING
CATCH BASIN SINGLE WING
STORM DRAIN MANHOLE
DROP INLET
SEWER MANHOLE
BOLLARD
MAILBOX
SIGN
BUSH
TREE (P=PINE)
BUILDING SETBACK LINE
COMMON AREA
END OF INFORMATION
FINISHED FLOOR ELEVATION
FIBER OPTIC CABLE
TRAFFIC SIGNAL POLE
POINT OF COMMENCEMENT
POINT OF BEGINNING
POINT NOT SET (UNDER
CONSTRUCTION)
CRIMPED TOP PIPE
IRON PIN FOUND
MAG NAIL FOUND
MAG NAIL SET
REBAR FOUND
REBAR SET
RIGHT-OF-WAY
TEMPORARY BENCH MARK
CAST IRON PIPE
CORRUGATED METAL PIPE
DUCTILE IRON PIPE
HIGH DENSITY
POLYETHYLENE PIPE
REINFORCED CONCRETE PIPE
VITRIFIED CLAY PIPE
PROPERTY LINE
FENCE
SANITARY SEWER LINE
STORM SEWER LINE
WATER LINE
UNDERGROUND POWER LINE
UNDERGROUND GAS LINE
UNDERGROUND
COMMUNICATION LINE
S
B.S.L.
C.A.
EOI
FFE
D
DI
E
T
TS
FOC
TSP
P.O.C.
P.O.B.
PNS
CTP
IPF
HDPE
RCP
VCP
MNS
RBF
MNF
RBS
R/W
TBM
CI
CMP
DIP
CONSTRUCTION DOCUMENTS - CD1
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
0.
6m
[2 '-0
0.6m[2'-0"]
.2
26.0%
.7
% 34 .2
.2
.7
.8
45.0%
.5
.3
30.1%
.1%
41.4%
.2
BOTTOM OF POND
DESIGN FG= 150.55 m EXIST FG = 150.50 m
BOTTOM OF POND
DESIGN FG= 150.55 m EXIST FG = 150.38 m
BOTTOM OF POND
DESIGN FG= 150.55 m EXIST FG = 150.40 m
TOP OF POND
DESIGN FG = 153.00 m
EXIST FG = 152.96 m
TOP OF POND
DESIGN FG = 153.00 m
EXIST FG = 153.56 m
TOP OF POND
DESIGN FG = 153.00 m
EXIST FG = 153.20 m
TOP OF POND
DESIGN FG = 153.00 m EXIST FG = 153.29 m
TOP OF POND
DESIGN FG = 153.00 m EXIST FG = 153.42 m
TOP OF POND
DESIGN FG = 153.00 m EXIST FG = 153.27 m
CE101
MJAEB
RETENTION POND 1 - EXISTING
CONDITIONS AND DEMOLITION PLAN
SCALE:1
RETENTION POND 1 - EXISTING CONDITIONS
AND DEMOLITION PLAN
1 = 100
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
CE101
KEYPLAN:
10510
SCALE: 1:100
2 3 4
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
DESIGN DEVELOPMENT - DD2
SHEET NOTES:
1. TOPOGRAPHIC SURVEY WAS PREPARED BY
ATKINSREALIS BASED ON FIELD SURVEYS
PERFORMED IN DECEMBER 2024 AND DECEMBER
2025.
2. THE EXISTING POND LINER TRENCH SHALL BE
EXCAVATED TO ALLOW FOR REMOVAL OF THE
ENTIRE POND LINER WITH THE EXCEPTION OF
EXISTING POND LINERS LOCATED UNDER WALLS
AND RIPRAP PADS THAT ARE IDENTIFIED TO
REMAIN. THE EXISTING POND LINER ANCHOR
TRENCH IS ASSUMED TO BE 600MM WIDE BY
600MM DEEP. THE EXACT DIMENSIONS OF THE
ANCHOR TRENCH SHALL BE VERIFIED IN THE
FIELD. THE EXISTING POND LINER SHALL BE
DISPOSED OF OFF GOVERNMENT PROPERTY.
3. ALL SITE FEATURES REMOVED OR DAMAGED
DURING EXCAVATION AND REMOVAL OF THE
POND LINER SHALL BE REPAIRED OR REPLACED
IN KIND AT THE CONTRACTOR'S EXPENSE.
KEY NOTES:
1. EXISTING POND LINER ANCHOR TRENCH TO BE
EXCAVATED AND EXISTING POND LINER, SAND
LAYER, GEOTEXTILE, AND WARNING BARRIER TO
BE REMOVED IN ITS ENTIRETY
LEGEND:
LIMITS OF TOPOGRAPHIC
SURVEY
TOPOGRAPHIC LINESXXX.XX
EXISTING ANCHOR TRENCH
EXISTING CONCRETE
SURFACE
REMOVAL LIMIT
CONSTRUCTION DOCUMENTS - CD1
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
D
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
CB
CB
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
147.830
7.
146.580
146.580
145.330
5.
149.090
149.090
7.
147.830
6.
146.580
145.330
145.330
CB
CB
CB
CB
CB
CB
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
D
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
CB
CB
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
147.830
7.
146.580
146.580
145.330
5.
149.090
149.090
7.
147.830
6.
146.580
145.330
145.330
CB
CB
CB
CB
CB
CB
0.6m[2'-0"]
0.6m[2'-0"]
0.
9%
49.7%
51.6%
51.1%
48.5%
52.1%
1.3%
37.9%
6.3%
4.9%
3.8%
31.5%
22.9%
BOTTOM OF POND
DESIGN FG = 141.55 m
EXIST FG = 142.11 m
BOTTOM OF POND
DESIGN FG = 141.55 m EXIST FG = 142.09 m
BOTTOM OF POND
DESIGN FG = 141.55 m EXIST FG = 142.09 m
BOTTOM OF POND
DESIGN FG = 141.55 m
EXIST FG = 142.17 m
BOTTOM OF POND
DESIGN FG = 141.55 m
EXIST FG = 141.38 m
BOTTOM OF POND
DESIGN FG = 141.55 m EXIST FG = 141.38 m
BOTTOM OF POND
DESIGN FG = 141.55 m
EXIST FG = 142.12 m
BOTTOM OF POND
DESIGN FG = 141.55 m
EXIST FG = 141.58 m
BOTTOM OF POND
DESIGN FG = 141.55 m EXIST FG = 141.81 m
TOP OF POND
DESIGN FG = 145.20 m
EXIST FG = 145.17 m
TOP OF POND
DESIGN FG = 145.20 m
EXIST FG = 145.13 m
TOP OF POND
DESIGN FG = 145.20 m EXIST FG = 145.16 m
TOP OF POND
DESIGN FG = 145.20 m EXIST FG = 145.24 m
TOP OF POND
DESIGN FG = 145.20 m EXIST FG = 144.95 m
TOP OF POND
DESIGN FG = 145.20 m EXIST FG = 145.12 m
TOP OF POND
DESIGN FG = 145.20 m EXIST FG = 145.28 m
TOP OF POND
DESIGN FG = 145.20 m
EXIST FG = 145.29 m
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
CB
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
154.90
154.00
STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
D
CB
CB
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
CB
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
154.90
154.00
STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
D
CB
CB
0.6m[2'-0"]
0.6m[2'-0"]
.6%
49.2%
50.5%
46.6%
45.9% 52.3%
5.4%
4.0%
4.
0%
14.7%
26.8%
0.1%
0.9%
2.5%
BOTTOM OF POND
DESIGN FG = 151.55 m EXIST FG = 152.01 m
BOTTOM OF POND
DESIGN FG = 151.55 m
EXIST FG = 152.12 m
BOTTOM OF POND
DESIGN FG = 151.55 m
EXIST FG = 151.50 m
BOTTOM OF POND
DESIGN FG = 151.55 m EXIST FG = 151.47 m
BOTTOM OF POND
DESIGN FG = 151.55 m
EXIST FG = 152.23 m
BOTTOM OF POND
DESIGN FG = 151.55 m EXIST FG = 151.32 m
TOP OF POND
DESIGN FG = 155.00 m
EXIST FG = 155.05 m
TOP OF POND
DESIGN FG = 155.00 m EXIST FG = 154.90 m
TOP OF POND
DESIGN FG = 155.00 m EXIST FG = 154.83 m
TOP OF POND
DESIGN FG = 155.00 m EXIST FG = 154.93 m
TOP OF POND
DESIGN FG = 155.00 m EXIST FG = 155.04 m
TOP OF POND
DESIGN FG = 155.00 m
EXIST FG = 155.07 m
TOP OF POND
DESIGN FG = 155.00 m
EXIST FG = 155.08 m
TOP OF POND
DESIGN FG = 155.00 m EXIST FG = 155.00 m
SCALE:1
RETENTION POND 2 - EXISTING CONDITIONS AND
DEMOLITION PLAN
1 = 250
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
1/CE102
KEYPLAN:
25155210
SCALE: 1:250
103 4
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
DESIGN DEVELOPMENT - DD2
CE102
MJAEB
RETENTION POND 2 & 6 - EXISTING
CONDITIONS AND DEMOLITION PLAN
SCALE:2
RETENTION POND 6 - EXISTING CONDITIONS
AND DEMOLITION PLAN
1 = 250
2/CE102
SHEET NOTES:
1. TOPOGRAPHIC SURVEY WAS PREPARED BY
ATKINSREALIS BASED ON FIELD SURVEYS
PERFORMED IN DECEMBER 2024 AND DECEMBER
2025.
2. THE EXISTING POND LINER TRENCH SHALL BE
EXCAVATED TO ALLOW FOR REMOVAL OF THE
ENTIRE POND LINER WITH THE EXCEPTION OF
EXISTING POND LINERS LOCATED UNDER WALLS
AND RIPRAP PADS THAT ARE IDENTIFIED TO
REMAIN. THE EXISTING POND LINER ANCHOR
TRENCH IS ASSUMED TO BE 600MM WIDE BY
600MM DEEP. THE EXACT DIMENSIONS OF THE
ANCHOR TRENCH SHALL BE VERIFIED IN THE
FIELD. THE EXISTING POND LINER SHALL BE
DISPOSED OF OFF GOVERNMENT PROPERTY.
3. ALL SITE FEATURES REMOVED OR DAMAGED
DURING EXCAVATION AND REMOVAL OF THE
POND LINER SHALL BE REPAIRED OR REPLACED
IN KIND AT THE CONTRACTOR'S EXPENSE.
KEY NOTES:
1. EXISTING POND LINER ANCHOR TRENCH TO BE
EXCAVATED AND EXISTING POND LINER, SAND
LAYER, GEOTEXTILE, AND WARNING BARRIER TO
BE REMOVED IN ITS ENTIRETY
2. EXISTING SIDEWALK/CURB/GUTTER TO BE
REMOVED AS NECESSARY FOR CONSTRUCTION.
SIDEWALK/CURB/GUTTER TO BE REPLACED IN
KIND.
3. EXISTING FENCE TO BE REMOVED AS
NECESSARY FOR CONSTRUCTION. FENCE TO BE
REINSTALLED/REPLACED IN KIND.
LEGEND:
LIMITS OF TOPOGRAPHIC
SURVEY
TOPOGRAPHIC LINESXXX.XX
EXISTING ANCHOR TRENCH
EXISTING RIPRAP
EXISTING CONCRETE
SURFACE
EXISTING FENCE
REMOVA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .