971-031B - Morovis NC Phase 1B - CD1 - DrawingsPart-6.pdf
PDF 19 MB Posted
- Solicitation number
- 36C10F26Q0062
About this file
These are construction documents for perimeter fencing at Morovis National Cemetery Phase 1B in Morovis, Puerto Rico, prepared by AES Group, Inc. for the U.S. Department of Veterans Affairs Office of Construction and Facilities Management. The project number is 971-031B with an issue date of March 2026.
The construction documents consist of detailed site plans and area-specific drawings (sheets CS111 through CS126) depicting perimeter fencing layout across 15 distinct areas (A through O) covering approximately 16 meters in width along the cemetery boundary. The fencing includes barbed wire fence, chain-link fence, and field wire fence types positioned according to survey data collected between December 9-21, 2024, using GPS, robotic total station, and LiDAR equipment. Key contractor responsibilities include obtaining all required permitting from Puerto Rico and the Municipality of Morovis prior to construction, maintaining asphalt roads clear of debris and open to cemetery staff and the public, installing grading and erosion/sediment controls before earth-disturbing activities, and immediately notifying the Contracting Officer's Representative (COR) or Resident Engineer of any significant deviations from the fence alignment caused by obstacles. The VA is providing barbed wire and poles for the new perimeter fencing, with all other fencing materials to be supplied by the contractor. The drawings reference sheet CS501 for detailed fencing specifications and CS502 for sign installation details, indicating that no trespassing signs are required at 30-meter intervals along barbed wire sections.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
ENTR
ANCE
FOYE
R
MECH ENCLO
A
B
X X
X X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X X
X
X X
X X
X
X X
X X X
X X
X X X X
X
X X X X
X
X X
X X
X
X X
X X
X
X X
X X
X
X
X
X
X
X X
X
X
X
X X
X X
X
X
X
X
X X
X X
X X
X X
X
X
X
X
X
X
X X
X X
X
X X
X
X X
X
X
XX
X
X X
X X
X
X
X X
X
X
X
XX
X
X
X X
X X
X X
X
X
X
XX
X
X
X X
X
X X
X
X
X
X
XX
X X
X X
X
X X
X
X
X
X
XX
X
X X
X X
X X
X
X
X
X
XX
X
X X
X
X X
X
X X
X
X
XX
X X
X
X
X X
X
X X
X
X
XX
X X
X X
X X
X X
X
X
X
XX
X X
X
X X
X X
X X
X
X
XX
X X
X
X X
X
X X
X
X
X
XX
X X
X X
X
X
X X
X
X
X
XX
X
X
X X
X X
X X
X
X
X
XX
X
X
X X
X
X X
X
X
X
X
XX
X X
X X
X
X X
X
X
X
X
XX
X
X X
X X
X X
X X
X
X
XX
X
X X
X
X X
XX
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X X
X X
X X
X
X X
X
X X
X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X
X X
X
X X
X X
X
X X
X X
X
X X
X X
X
X
X X
X X
X X
X X
X
X X
X
X
X X
X
X X
X
X X
X X
A
B
RO
O
F
HA
TC
H
O
PE
NI
NG
A
BO
VE
2B
7.
F.
F.
E.
CP
B1
B2
B3
B4
B5
5.5
STATE ROAD PR-137
STATE RO
AD PR-137
STATE RO
AD PR-137
X X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X
X X
X
X X
X X X X X X
X X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X
X X
X
X
X
X X
X X
X
XX
X X
X X
X X
X X
X X X X X X X
CS111
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
BMWALK
PERIMETER FENCING - OVERALL SITE
PLAN
SCALE:1 PERIMETER FENCING - OVERALL SITE PLAN
1 = 3000
KEYPLAN
30015060300
SCALE: 1:3000
SHEET NOTES:
1. THE FOLLOWING NOTES APPLY TO SHEETS
CS111-CS126.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
OBTAIN ALL PERMITTING REQUIRED BY THE US
TERRITORY OF PUERTO RICO AND THE
MUNICIPALITY OF MOROVIS PRIOR TO THE
BEGINNING OF CONSTRUCTION.
3. WORK SHALL NOT BE PERFORMED BEYOND THE
CONSTRUCTION LIMITS OR BEYOND THE PROPERTY
LINE WITHOUT PRIOR AUTHORIZATION FROM THE
COR OR RESIDENT ENGINEER. ANY DAMAGE OR
DISTURBANCE TO AREAS BEYOND THE
CONSTRUCTION LIMITS OR PROPERTY LINES SHALL
BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
4. ENSURE ALL GRADING, EROSION, AND SEDIMENT
CONTROLS (GESC) ARE IN PLACE PRIOR TO EARTH
DISTURBING ACTIVITIES.
5. ASPHALT ROADS TO REMAIN CLEAR OF MUD,
DEBRIS, AND ARE TO REMAIN OPEN FOR CEMETERY
STAFF AND THE PUBLIC AT ALL TIMES.
6. IF AN OBSTACLE IS PRESENT DURING
CONSTRUCTION THAT WILL CAUSE A SIGNIFICANT
DEVIATION OF THE PERIMETER FENCE, NOTIFY THE
COR OR RESIDENT ENGINEER IMMEDIATELY AND
CEASE CONSTRUCTION ACTIVITIES IN THAT AREA
UNTIL FURTHER DIRECTION IS GIVEN.
7. SEE SHEET CS501 FOR FENCING DETAILS.
8. ALL BARBED WIRE AND POLES TO BE PROVIDED BY
THE VA FOR NEW PERIMETER FENCING. ALL OTHER
FENCING MATERIALS TO BE PROVIDED BY THE
CONTRACTOR.
KEY NOTES:
1. TIE IN NEW PERIMETER FENCE TO EXISTING
CHAIN-LINK FENCE AT LOCATION INDICATED.
SURVEY NOTES:
1. THE BEARING BASIS FOR THE SURVEY IS BASED ON THE NORTH
AMERICAN DATUM OF 1983, PUERTO RICO AND VIRGIN ISLANDS,
METER. THE GEOID UTILIZED FOR THE SURVEY WAS GEOID 18.
HORIZONTAL COORDINATES WERE ESTABLISHED USING
COMPARATIVE VALUES OF BASE/ROVER GPS AND STATIC GPS,
PROCESSED THROUGH CONTINUOUSLY OPERATING REFERENCE
STATIONS (CORS) AND VERIFIED VERSUS ONLINE POSITIONING USER
SERVICE (OPUS) FOR THE BRASS DISKS SHOWN AS POINTS 1, 3, AND
4 FROM THE PREVIOUS SURVEY BY EBP LAND SURVEYING SERVICES
IN 2018.
2. ELEVATIONS WERE ESTABLISHED BY GPS ON THE BRASS DISKS
KNOWN AS POINTS 1, 3, AND 4 FROM THE PREVIOUS SURVEY BY EBP
LAND SURVEYING SERVICES IN 2018. THE PREVIOUS SURVEY
ELEVATIONS WERE REFERENCED TO MEAN SEA LEVEL (MSL)
BENCHMARK ID 87Y1934, LOCATED IN STATE ROAD PR-155, WITH
COORDINATES N=255684.4867, E=200581.9609, AND
ELEVATION=183.75 METERS. IT WAS DISCOVERED THAT GPS
ELEVATION CHECKS BETWEEN BRASS DISKS 1, 3, AND 4 DID NOT
AGREE WITH THE 2018 PUBLISHED ELEVATIONS. ELEVATION CHECKS
OF AS-BUILT STORM STRUCTURES WERE COMPARED WITH PLAN
ELEVATIONS. IT WAS DECIDED TO HOLD THE ELEVATION OF POINT 1
AND RECOMPUTE THE COORDINATES FOR POINTS 3 AND 4, SINCE
THE ELEVATION OF POINT 1 RESULTED IN AS-BUILT DATA MORE
CLOSELY AGREEING WITH PLAN ELEVATIONS. A COMPARISON OF
THE RESULTING 2024 ELEVATIONS AND THE 2018 ELEVATIONS ARE
AS FOLLOWS:
POINT 2018 ELEVATION 2024 ELEVATION
1 138.130 138.130
2 142.080 POINT NOT FOUND
3 141.710 141.535 4 149.880 149.668
3. ANY INSTANCES SPECIFIED HEREON ARE HORIZONTAL GRID
DISTANCES IN METERS.
4. THE CONTOUR INTERVAL SHOWN HEREON IS 0.5 METERS.
5. THIS SURVEY WAS PERFORMED ON THE GROUND BETWEEN 12/9/2024
AND 12/21/2024. EQUIPMENT USED IN COLLECTING THE
TOPOGRAPHIC DATA INCLUDED: TRIMBLE R10 GPS ANTENNAS,
TRIMBLE S7 ROBOTIC TOTAL STATION, DJI M300 ZENMUSE L1 LiDAR
SENSOR.
6. THE SURVEY OF THE PROPOSED PERIMETER FENCE AREAS IS AN
APPROXIMATELY 16-METER WIDE CORRIDOR. PORTIONS OF THE
CORRIDOR WITHIN CREEK BEDS WERE UNDER WATER AND ARE NOT
INCLUDED IN THE SURFACE ELEVATIONS.
7. THE SURVEY INCLUDED LIMITED TREE LOCATION OF ONLY TREES 24
INCHES IN DIAMETER AND LARGER. TREES ALONG THE CREEKS
WERE NOT LOCATED DUE TO POOR GPS CONDITIONS.
8. THE SURVEY INCLUDED DATA COLLECTION IN POND AREAS,
INCLUDING POND BOTTOM ELEVATION CHECKS, INCOMING AND
OUTGOING STORM PIPES, INVERT ELEVATIONS, PIPE SIZES, AND PIPE
MATERIAL. THE IRRIGATION POND WAS TOO DEEP TO SAFELY
OBTAIN POND BOTTOM ELEVATION CHECKS.
F
D
COAST GUARD MARINES
AIR FORCE
NAVY
ARMY
CS112
AREA A
CS113
AREA B
CS114
AREA C
CS115
AREA D
CS116
AREA E
CS117
AREA F
CS118
AREA G
CS119
AREA H
CS120
AREA I
CS121
AREA J
CS122
AREA K
CS123
AREA L
CS124
AREA M
CS125
AREA N
CS126
AREA O
LEGEND:
X X PERIMETER FENCING
TOPOGRAPHIC LINES
XXX.XX
CS125
AREA N
CS126
AREA O
CS124
AREA M
CS122
AREA K
CS121
AREA J
CS120
AREA I
CS119
AREA H
CS117
AREA F
CS115
AREA D
CS114
AREA C
CS113
AREA B
CS112
AREA A
CS116
AREA E
CS118
AREA G
CS123
AREA L
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PARE
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WM
AutoCAD SHX Text
TEL
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
WM
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
WM
AutoCAD SHX Text
TEL
AutoCAD SHX Text
WM
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
MAXIMA
AutoCAD SHX Text
VELOCIDAD
AutoCAD SHX Text
AutoCAD SHX Text
WM
AutoCAD SHX Text
TEL
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TEL
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WM
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
WM
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TEL
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
WM
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TEL
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
TEL
AutoCAD SHX Text
MH
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
TEL
AutoCAD SHX Text
WM
AutoCAD SHX Text
KM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TEL
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text
ARMY
AutoCAD SHX Text
NAVY
AutoCAD SHX Text
AIR FORCE
AutoCAD SHX Text
MARINES
AutoCAD SHX Text
COAST GUARD
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
AutoCAD SHX Text
STATE ROAD PR-155
AutoCAD SHX Text
STATE ROAD PR-633
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
https://www.aquaengineering.com/
HAIN LINK FENCE
AS: 0+00
N: 257287.905 E: 200992.761
AS: 1+00
N: 257293.940 E: 200892.991
BP: 0+00.00
N: 257287.905 E: 200992.761
PI: 0+00.00
N: 257287.905 E: 200992.761
PI: 0+16.76
N: 257287.775 E: 200976.001
PI: 1+01.69
N: 257294.065 E: 200891.303
PI: 1+51.49
N: 257299.025
E: 200841.749 XXXXXXXXXXXXXXXXXXXXX
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
CS112
BMWALK
PERIMETER FENCING - AREA A
SCALE:1 PERIMETER FENCING - AREA A
1 = 400
402010620
SCALE: 1:400
4 8
SHEET NOTES:
1. THIS SHEET IS SHOWN FOR REFERENCE PURPOSES
ONLY TO SHOW THE SURVEY BOUNDARY. FENCING
WORK BEGINS ON THE FOLLOWING SHEET.
CS112CS113
CS114
KEYPLAN
F D
CS112
AREA A
CS113
AREA B
CS114
AREA C
CS115
AREA D
CS116
AREA E
CS117
AREA F
CS118
AREA G
CS119
AREA H
CS120
AREA I
CS121
AREA J
CS122
AREA K
CS123
AREA L
CS124
AREA M
CS125
AREA N
CS126
AREA O
M
AT
C H
LI
N
E C
S1
C S1
C
S1
C S1
C
S1
LEGEND:
X X PERIMETER FENCING
EXISTING TREE
POINT #
ELEVATION
SURVEY #
SURVEY POINT
TOPOGRAPHIC LINESXXX.XX
XX" DIAMETER
MATCH LINE
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X
X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
BARBED WIRE FENCE
BARBED WIRE FENCE
BAR
BED
W
IR
E FEN
C
E
BARBED W
IRE FENCE
CHAIN-LINK FENCE
AS: 2+00
N: 257298.207 E: 200793.250
AS: 3+00
N: 257286.621 E: 200694.313
AS: 3+48
N: 257277.155 E: 200647.467
AS: 0+00.00
N: 257277.1554 E: 200647.4672
AS: 1+00.00
N: 257272.6374 E: 200689.2232
24"
24"DEAD
24"
24"
155.496
BS
155.466
BS
PI: 2+43.85
N: 257297.467 E: 200749.411
PI: 2+92.63
N: 257288.080 E: 200701.534
EP: 3+47.79
N: 257277.155 E: 200647.467
BP: 0+00.00
N: 257277.155 E: 200647.467
PI: 0+15.07
N: 257262.800 E: 200642.893
PI: 0+29.01
N: 257248.864 E: 200643.464
PI: 0+43.23
N: 257235.095 E: 200647.012
PI: 0+50.45
N: 257238.473 E: 200653.385
PI: 0+96.95
N: 257270.905 E: 200686.716
PI: 1+17.21
N: 257282.420 E: 200703.383
D
C
B
A
XXXXXXXXXXX
XXXXXX
X X
X X
X
X
X
X
X
X
X X
X X
X X
X
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
CS113
BMWALK
PERIMETER FENCING - AREA B
SCALE:1 PERIMETER FENCING - AREA B
1 = 400
402010620
SCALE: 1:400
4 8
MATCHLINE
CS112CS113
CS114
KEYPLAN
F D
CS112
AREA A
CS113
AREA B
CS114
AREA C
CS115
AREA D
CS116
AREA E
CS117
AREA F
CS118
AREA G
CS119
AREA H
CS120
AREA I
CS121
AREA J
CS122
AREA K
CS123
AREA L
CS124
AREA M
CS125
AREA N
CS126
AREA O
M
AT
C H
LI
N
E
C S1
C
S1
C S1
CS113
CS114
C S1
C
S1
KEY NOTES:
1. EXISTING TIE IN POINT FOR NEW PERIMETER
FENCING.
CS501
LEGEND:
X X PERIMETER FENCING
EXISTING TREE
TOPOGRAPHIC LINESXXX.XX
XX" DIAMETER
MATCH LINE
PI: STATION #
NORTHING
EASTING
INTERSECTION ALIGNMENT
SURVEY POINT
AS: STATION #
NORTHING
EASTING
ALIGNMENT STATION
SURVEY POINT
TITLE
NORTHING
EASTING
COORDINATE GEOMETRY
SURVEY POINT
BP OR EP: STATION #
NORTHING
EASTING
START AND END
ALIGNMENT
SURVEY POINT
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X
BARBED W
IRE FENCE
BAR
BED
W
IR
E FEN
C
E
BAR
BED
W
IR
E FEN
C
E
BARBED W
IRE FENCE
BA
R
BE
D
W
IR
E
FE
N C
E
BARBED W
IRE FENCE
AS: 2+00.00
N: 257200.4798 E: 200709.1818
AS: 3+00.00
N: 257103.7853 E: 200714.0498
AS: 4+00.00
N: 257029.0190 E: 200672.8160
24"DEAD
24"
24"
PI: 1+78.21
N: 257222.063 E: 200712.196
PI: 2+20.95
N: 257179.736 E: 200706.285
PI: 2+40.65
N: 257161.215 E: 200699.554
PI: 2+82.52
N: 257121.073 E: 200711.441
PI: 3+42.05
N: 257062.208 E: 200720.323
PI: 4+01.32
N: 257028.265 E: 200671.737
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X X
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
CS114
BMWALK
PERIMETER FENCING - AREA C
SCALE:1 PERIMETER FENCING - AREA C
1 = 400
402010620
SCALE: 1:400
4 8
MATCHLINE
MATCHLINE
CS114
CS115
CS114
CS115
KEYPLAN
CS112CS113
CS114
F D
CS112
AREA A
CS113
AREA B
CS114
AREA C
CS115
AREA D
CS116
AREA E
CS117
AREA F
CS118
AREA G
CS119
AREA H
CS120
AREA I
CS121
AREA J
CS122
AREA K
CS123
AREA L
CS124
AREA M
CS125
AREA N
CS126
AREA O
C S1
C
S1
C S1
CS113
CS114
CS501
LEGEND:
X X PERIMETER FENCING
EXISTING TREE
TOPOGRAPHIC LINESXXX.XX
XX" DIAMETER
MATCH LINE
PI: STATION #
NORTHING
EASTING
INTERSECTION ALIGNMENT
SURVEY POINT
AS: STATION #
NORTHING
EASTING
ALIGNMENT STATION
SURVEY POINT
TITLE
NORTHING
EASTING
COORDINATE GEOMETRY
SURVEY POINT
BP OR EP: STATION #
NORTHING
EASTING
START AND END
ALIGNMENT
SURVEY POINT
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
BA
R
BE
D
W
IR
E
FE
N C
E
BA
R
BE
D W
IR
E
FE
N
C E
BA
R
BE
D
W
IR
E
FE
N C
E
BARBED WIRE FENCE
C H
AI
N
-L
IN
K
FE
N C
E
C H
AI
N
-L
IN
K
FE
N C
E
AS: 5+00.00
N: 256966.8487 E: 200628.8735
AS: 6+00.00
N: 256884.4704 E: 200586.7920
N: 257028.265 E: 200671.737
PI: 4+28.27
N: 257001.355 E: 200670.130
PI: 4+52.92
N: 256977.150 E: 200674.761
PI: 4+93.95
N: 256968.886 E: 200634.567
PI: 5+22.11
N: 256959.398 E: 200608.052
PI: 5+40.55
N: 256941.673 E: 200602.975
X X
X X
X
XXXX
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
CS115
BMWALK
PERIMETER FENCING - AREA D
SCALE:1 PERIMETER FENCING - AREA D
1 = 400
402010620
SCALE: 1:400
4 8
MATCHLINE
MATCHLINE
KEYPLAN
CS115
CS116
CS114
CS115
CS114
CS115
CS117
CS115
CS116
C S1
C
S1
C S1
F D
CS112
AREA A
CS113
AREA B
CS114
AREA C
CS115
AREA D
CS116
AREA E
CS117
AREA F
CS118
AREA G
CS119
AREA H
CS120
AREA I
CS121
AREA J
CS122
AREA K
CS123
AREA L
CS124
AREA M
CS125
AREA N
CS126
AREA O
CS501
LEGEND:
X X PERIMETER FENCING
EXISTING TREE
TOPOGRAPHIC LINESXXX.XX
XX" DIAMETER
MATCH LINE
PI: STATION #
NORTHING
EASTING
INTERSECTION ALIGNMENT
SURVEY POINT
AS: STATION #
NORTHING
EASTING
ALIGNMENT STATION
SURVEY POINT
TITLE
NORTHING
EASTING
COORDINATE GEOMETRY
SURVEY POINT
BP OR EP: STATION #
NORTHING
EASTING
START AND END
ALIGNMENT
SURVEY POINT
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
C H
AI
N
-L
IN
K
FE
N C
E
BARBED WIRE FENCE
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
AS: 7+00.00
N: 256788.2469 E: 200559.5698
AS: 8+00.00
N: 256737.3231 E: 200482.2238
PI: 7+23.78
N: 256765.361 E: 200553.095
X X
X X
X X
X X
X X
X X
X X
X X
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
CS116
BMWALK
PERIMETER FENCING - AREA E
SCALE:1 PERIMETER FENCING - AREA E
1 = 400
402010620
SCALE: 1:400
4 8
M
AT
C H
LI
N
E
MATCHLINE
KEYPLAN
C S1
C
S1
CS115
CS116
C S1
C
S1
C S1
CS115
CS116CS117
F D
CS112
AREA A
CS113
AREA B
CS114
AREA C
CS115
AREA D
CS116
AREA E
CS117
AREA F
CS118
AREA G
CS119
AREA H
CS120
AREA I
CS121
AREA J
CS122
AREA K
CS123
AREA L
CS124
AREA M
CS125
AREA N
CS126
AREA O
CS501
LEGEND:
X X PERIMETER FENCING
EXISTING TREE
TOPOGRAPHIC LINESXXX.XX
XX" DIAMETER
MATCH LINE
PI: STATION #
NORTHING
EASTING
INTERSECTION ALIGNMENT
SURVEY POINT
AS: STATION #
NORTHING
EASTING
ALIGNMENT STATION
SURVEY POINT
TITLE
NORTHING
EASTING
COORDINATE GEOMETRY
SURVEY POINT
BP OR EP: STATION #
NORTHING
EASTING
START AND END
ALIGNMENT
SURVEY POINT
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
BARBED WIRE FENCE
BARBED WIRE FENCE
BARBED WIRE FENCE
BARBED WIRE FENCE
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
AS: 9+00.00
N: 256700.5353 E: 200389.2364
AS: 10+00.00
N: 256674.8366 E: 200292.6625
AS: 11+00.00
N: 256650.2033 E: 200195.7439
PI: 9+08.77
N: 256697.311 E: 200381.086
PI: 11+26.44
N: 256643.691 E: 200170.122
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
CS117
BMWALK
PERIMETER FENCING - AREA F
SCALE:1 PERIMETER FENCING - AREA F
1 = 400
402010620
SCALE: 1:400
4 8
M
AT
C H
LI
N
E
KEYPLAN
CS119
CS118
CS115
CS116
C S1
C S1
C S1
C
S1
C S1
C
S1
C S1
C
S1
C S1
C
S1
CS117CS117
M
AT
C H
LI
N
E
F D
CS112
AREA A
CS113
AREA B
CS114
AREA C
CS115
AREA D
CS116
AREA E
CS117
AREA F
CS118
AREA G
CS119
AREA H
CS120
AREA I
CS121
AREA J
CS122
AREA K
CS123
AREA L
CS124
AREA M
CS125
AREA N
CS126
AREA O
CS501
LEGEND:
X X PERIMETER FENCING
EXISTING TREE
TOPOGRAPHIC LINESXXX.XX
XX" DIAMETER
MATCH LINE
PI: STATION #
NORTHING
EASTING
INTERSECTION ALIGNMENT
SURVEY POINT
AS: STATION #
NORTHING
EASTING
ALIGNMENT STATION
SURVEY POINT
TITLE
NORTHING
EASTING
COORDINATE GEOMETRY
SURVEY POINT
BP OR EP: STATION #
NORTHING
EASTING
START AND END
ALIGNMENT
SURVEY POINT
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
BARBED W
IRE FENCE
BARBED WIRE FENCE
BARBED WIRE FENCE
FI
EL
D W
IR
E
FE
NC
E
CHAIN-LINK FENCE
CELL BASE
TOWER
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
AS: 12+00.00
N: 256636.1249 E: 200102.1423
AS: 13+00.00
N: 256710.0176 E: 200034.8409
AS: 14+00.00
N: 256791.3354 E: 200016.4984
E: 199917.8102
26"
30"
24"
25"
PI: 11+89.49
N: 256628.169 E: 200109.008
PI: 12+58.95
N: 256680.756 E: 200063.627
PI: 12+92.39
N: 256704.641 E: 200040.233
PI: 13+51.55
N: 256746.416 E: 199998.339
X X
X X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
CS118
BMWALK
PERIMETER FENCING - AREA G
SCALE:1 PERIMETER FENCING - AREA G
1 = 400
402010620
SCALE: 1:400
4 8
MATCHLINE
KEYPLAN
CS117
C S1
C
S1
C S1
C
S1
C S1
CS119
CS118
CS119
CS118
M
AT
C H
LI
N
E
F D
CS112
AREA A
CS113
AREA B
CS114
AREA C
CS115
AREA D
CS116
AREA E
CS117
AREA F
CS118
AREA G
CS119
AREA H
CS120
AREA I
CS121
AREA J
CS122
AREA K
CS123
AREA L
CS124
AREA M
CS125
AREA N
CS126
AREA O
CS501
SHEET NOTES:
1. INSTALL NO TRESPASSING SIGNS IN 30m INTERVALS
ALONG THE BARBED WIRE FENCE. SEE DETAILS 5
AND 6 ON SHEET CS502.
LEGEND:
X X PERIMETER FENCING
EXISTING TREE
TOPOGRAPHIC LINESXXX.XX
XX" DIAMETER
MATCH LINE
PI: STATION #
NORTHING
EASTING
INTERSECTION ALIGNMENT
SURVEY POINT
AS: STATION #
NORTHING
EASTING
ALIGNMENT STATION
SURVEY POINT
TITLE
NORTHING
EASTING
COORDINATE GEOMETRY
SURVEY POINT
BP OR EP: STATION #
NORTHING
EASTING
START AND END
ALIGNMENT
SURVEY POINT
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
FIELD WIRE & CHAIN-LINK FENCE
FI
EL
D W
IR
E
FE
N
C E
FIELD WIRE FENCE
CHAIN-LINK FENCE
BAR
BED
W
IR
E FEN
C
E
BA
R
BE
D
W
IR
E
FE
N C
E
STATE RO
AD PR-155
ASPH
ALT R
O
AD
ASPHALT ROAD
G U
AR
D
R
AI
L
BAR
BED
W
IR
E FEN
C
E
BAR
BED
W
IR
E FEN
C
E
BAR
BED
W
IR
E FEN
C
E
AS: 15+00.00
N: 256849.9609 E: 200005.9188
AS: 15+88.29
N: 256844.5289 E: 199917.8102
AS: 0+00.00
N: 256844.5289 E: 199917.8102
AS: 1+00.00
N: 256940.7975 E: 199891.8240
AS: 0+00.00
N: 256954.2820 E: 199891.2754
30"
35"
40"
26"
28"
PI: 14+65.01
N: 256851.610 E: 200040.866
PI: 15+51.43
N: 256847.536 E: 199954.547
EP: 15+88.29
N: 256844.529 E: 199917.810
BP: 0+00.00
N: 256844.529 E: 199917.810
PI: 0+15.62
N: 256859.419 E: 199913.092
PI: 0+31.64
N: 256874.686 E: 199908.247
PI: 0+44.21
N: 256886.676 E: 199904.477
PI: 0+52.36
N: 256894.490 E: 199902.148
PI: 0+66.92
N: 256908.238 E: 199897.358
PI: 0+90.93
N: 256931.757 E: 199892.494
PI: 1+09.90
N: 256950.667 E: 199891.092
PI: 1+21.07
N: 256961.828 E: 199891.658
PI: 1+43.60
N: 256984.091 E: 199895.137
PI: 1+60.48
N: 257000.831 E: 199897.265
PI: 1+71.27
N: 257010.950 E: 199901.018
E: 199897.516
BP: 0+00.00
N: 256954.282 E: 199891.275
PI: 0+16.37
N: 256967.601 E: 199900.793
PI: 0+29.48
N: 256974.770 E: 199911.764
PI: 0+41.83
N: 256983.743 E: 199920.252
PI: 0+61.26
N: 257001.477 E: 199928.208
PI: 0+73.47
N: 257011.927 E: 199934.525
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXXXXXXXXXXXX
X
X X
X X
X X
X X
X
X
X X
X
X X
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
CS119
BMWALK
PERIMETER FENCING - AREA H
SCALE:1 PERIMETER FENCING - AREA H
1 = 400
402010620
SCALE: 1:400
4 8
MATCHLINE
MATCHLINE
CS120
CS119
CS120
CS119
CS119
CS118 CS117
CS119
CS118
KEYPLAN
C S1
C
S1
C S1
F D
CS112
AREA A
CS113
AREA B
CS114
AREA C
CS115
AREA D
CS116
AREA E
CS117
AREA F
CS118
AREA G
CS119
AREA H
CS120
AREA I
CS121
AREA J
CS122
AREA K
CS123
AREA L
CS124
AREA M
CS125
AREA N
CS126
AREA OCS501
SHEET NOTES:
1. INSTALL NO TRESPASSING SIGNS IN 30m INTERVALS
ALONG THE BARBED WIRE FENCE. SEE DETAILS 4
AND 5 ON SHEET CS502.
CS501
LEGEND:
X X PERIMETER FENCING
EXISTING TREE
TOPOGRAPHIC LINESXXX.XX
XX" DIAMETER
MATCH LINE
PI: STATION #
NORTHING
EASTING
INTERSECTION ALIGNMENT
SURVEY POINT
AS: STATION #
NORTHING
EASTING
ALIGNMENT STATION
SURVEY POINT
TITLE
NORTHING
EASTING
COORDINATE GEOMETRY
SURVEY POINT
BP OR EP: STATION #
NORTHING
EASTING
START AND END
ALIGNMENT
SURVEY POINT
AutoCAD SHX Text
(2)GUY WIRE
BA
RB
ED
W
IR
E
FE
NC
E
STATE ROAD PR-155
ASPHALT ROAD
GUARD RAIL
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
AS
PH
AL
T
G
RA
VE
L
DR
IV
E
AS: 2+00.00
N: 257034.0473 E: 199885.9152
AS: 2+22.89
N: 257044.8929 E: 199866.2502
AS: 1+00.00
N: 257034.5026 E: 199948.4506
AS: 2+00.00
N: 257130.8166 E: 199963.7451
AS: 3+00.00
N: 257225.0067 E: 199995.7466
22"
36"
24"
PI: 1+84.08
N: 257023.273 E: 199897.516
PI: 1+90.45
N: 257028.157 E: 199893.436
PI: 2+13.59
N: 257042.425 E: 199875.218
EP: 2+22.89
N: 257044.893 E: 199866.250
PI: 1+07.44
N: 257040.834 E: 199952.356
PI: 1+29.72
N: 257063.033 E: 199950.496
PI: 1+43.95
N: 257077.233 E: 199949.517
PI: 1+52.92
N: 257084.705 E: 199954.486
PI: 1+79.30
N: 257110.394 E: 199960.467
PI: 1+89.47
N: 257120.495 E: 199961.662
PI: 2+10.08
N: 257140.694 E: 199965.739
PI: 2+13.75
N: 257144.327 E: 199966.265
PI: 2+52.04
N: 257178.797 E: 199982.933
PI: 2+94.53
N: 257219.833 E: 199993.975
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
CS120
BMWALK
PERIMETER FENCING - AREA I
SCALE:1 PERIMETER FENCING - AREA I
1 = 400
402010620
SCALE: 1:400
4 8
MATCHLINE
MATCHLINE
CS121
CS120
CS121
CS120
KEYPLAN
CS120
CS119
CS120
CS119
F D
CS112
AREA A
CS113
AREA B
CS114
AREA C
CS115
AREA D
CS116
AREA E
CS117
AREA F
CS118
AREA G
CS119
AREA H
CS120
AREA I
CS121
AREA J
CS122
AREA K
CS123
AREA L
CS124
AREA M
CS125
AREA N
CS126
AREA O
CS501
SHEET NOTES:
1. INSTALL NO TRESPASSING SIGNS IN 30m INTERVALS
ALONG THE BARBED WIRE FENCE. SEE DETAILS 4
AND 5 ON SHEET CS502.
LEGEND:
X X PERIMETER FENCING
EXISTING TREE
TOPOGRAPHIC LINESXXX.XX
XX" DIAMETER
MATCH LINE
PI: STATION #
NORTHING
EASTING
INTERSECTION ALIGNMENT
SURVEY POINT
AS: STATION #
NORTHING
EASTING
ALIGNMENT STATION
SURVEY POINT
TITLE
NORTHING
EASTING
COORDINATE GEOMETRY
SURVEY POINT
BP OR EP: STATION #
NORTHING
EASTING
START AND END
ALIGNMENT
SURVEY POINT
AS: 4+00.00
N: 257322.2603 E: 200010.8589
AS: 5+00.00
N: 257411.4097 E: 199978.9945
PI: 3+46.82
N: 257269.299 E: 200010.917
PI: 3+74.14
N: 257296.506 E: 200008.470
PI: 3+96.56
N: 257318.832 E: 200010.537
PI: 4+17.97
N: 257340.151 E: 200012.537
PI: 4+56.67
N: 257377.103 E: 200001.045
PI: 4+71.43
N: 257384.358 E: 199988.190
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X X
X X
X
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
CS121
BMWALK
PERIMETER FENCING - AREA J
SCALE:1 PERIMETER FENCING - AREA J
1 = 400
402010620
SCALE: 1:400
4 8
MATCHLINE
MATCHLINE
KEYPLAN
CS121
CS120
CS122
CS121
CS122
CS121
CS121
CS120
F D
CS112
AREA A
CS113
AREA B
CS114
AREA C
CS115
AREA D
CS116
AREA E
CS117
AREA F
CS118
AREA G
CS119
AREA H
CS120
AREA I
CS121
AREA J
CS122
AREA K
CS123
AREA L
CS124
AREA M
CS125
AREA N
CS126
AREA O
CS501
LEGEND:
X X PERIMETER FENCING
EXISTING TREE
TOPOGRAPHIC LINESXXX.XX
XX" DIAMETER
MATCH LINE
PI: STATION #
NORTHING
EASTING
INTERSECTION ALIGNMENT
SURVEY POINT
AS: STATION #
NORTHING
EASTING
ALIGNMENT STATION
SURVEY POINT
TITLE
NORTHING
EASTING
COORDINATE GEOMETRY
SURVEY POINT
BP OR EP: STATION #
NORTHING
EASTING
START AND END
ALIGNMENT
SURVEY POINT
AS: 6+00.00
N: 257505.2974 E: 199991.6288
AS: 7+00.00
N: 257593.0967 E: 200034.9388
PI: 5+21.63
N: 257431.886 E: 199972.034
PI: 5+58.66
N: 257468.912 E: 199972.616
PI: 5+65.43
N: 257475.482 E: 199974.273
PI: 5+69.84
N: 257479.601 E: 199975.838
PI: 6+26.87
N: 257528.191 E: 200005.697
PC: 6+70.35
N: 257564.098 E: 200030.219
PT: 6+78.31
N: 257571.503 E: 200032.895
PI: 7+15.61
N: 257608.636 E: 200036.410
PI: 7+28.80
N: 257619.322 E: 200044.136
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X
X X
X X
X X
X
X
X
X
X
X X
X X
X
X X
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
CS122
BMWALK
PERIMETER FENCING - AREA K
SCALE:1 PERIMETER FENCING - AREA K
1 = 400
402010620
SCALE: 1:400
4 8
MATCHLINE
MATCHLINE
KEYPLAN
CS123
CS122
CS122
CS121
C S1
C
S1
CS123
CS122
C S1
CS121
CS124
CS122
F D
CS112
AREA A
CS113
AREA B
CS114
AREA C
CS115
AREA D
CS116
AREA E
CS117
AREA F
CS118
AREA G
CS119
AREA H
CS120
AREA I
CS121
AREA J
CS122
AREA K
CS123
AREA L
CS124
AREA M
CS125
AREA N
CS126
AREA O
CS501
LEGEND:
X X PERIMETER FENCING
EXISTING TREE
TOPOGRAPHIC LINESXXX.XX
XX" DIAMETER
MATCH LINE
PI: STATION #
NORTHING
EASTING
INTERSECTION ALIGNMENT
SURVEY POINT
AS: STATION #
NORTHING
EASTING
ALIGNMENT STATION
SURVEY POINT
TITLE
NORTHING
EASTING
COORDINATE GEOMETRY
SURVEY POINT
BP OR EP: STATION #
NORTHING
EASTING
START AND END
ALIGNMENT
SURVEY POINT
137.289
TCB
AS: 8+00.00
N: 257685.1801 E: 200071.1424
AS: 1+00.00
N: 257711.0269 E: 200005.8903
AS: 2+00.00
N: 257713.4246 E: 199906.0425
30"
PI: 7+68.66
N: 257655.888 E: 200060.011
PI: 7+76.76
N: 257663.546 E: 200062.647
PI: 8+16.03
N: 257700.097 E: 200077.000
PI: 8+23.52
N: 257707.566 E: 200077.656
PI: 0+57.82
N: 257711.351 E: 200048.035
PI: 0+60.49
N: 257711.737 E: 200045.389
PI: 0+87.80
N: 257711.178 E: 200018.094
PI: 1+65.10
N: 257710.222 E: 199940.790
PI: 2+60.09
N: 257718.939 E: 199846.208
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
MOROVIS NATIONAL
CEMETERY - PHASE 1B
MOROVIS, PUERTO RICO
971-031B
APPROVED: PROJECT MANAGER
CHERI L. COOPER
202-841-4052
MARCH 2026REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
DWG. OF
CONSTRUCTION
DOCUMENTS - CD1
APPROVED: CONTRACTING SPECIALIST
JOSHUA GIBSON
202-746-5192
N
CONSTRUCTION DOCUMENTS - CD1
CS123
BMWALK
PERIMETER FENCING - AREA L
SCALE:1 PERIMETER FENCING - AREA L
1 = 400
402010620
SCALE: 1:400
4 8
M
AT
C H
LI
N
E
MATCHLINE
MATCHLINE
KEYPLAN
CS125
CS124
C S1
C
S1
CS126
CS123
CS123
CS122
CS123
CS122
C S1
C
S1
CS126
CS123
C S1
C
S1
C S1
CS124
F D
CS112
AREA A
CS113
AREA B
CS114
AREA C
CS115
AREA D
CS116
AREA E
CS117
AREA F
CS118
AREA G
CS119
AREA H
CS120
AREA I
CS121
AREA J
CS122
AREA K
CS123
AREA L
CS124
AREA M
CS125
AREA N
CS126
AREA O
CS501
KEY NOTES:
1. PERIMETER FENCING TERMINATES AT LOCATION
INDICATED.
SHEET NOTES:
1. PERIMETER FENCING IS NOT REQUIRED ALONG THE
WATERWAY. COORDINATE WITH THE COR TO
CONFIRM LOCATION OF FENCE TERMINATION PRIOR
TO BEGINNING WORK.
LEGEND:
X X PERIMETER FENCING
EXISTING TREE
TOPOGRAPHIC LINESXXX.XX
XX" DIAMETER
MATCH LINE
PI: STATION #
NORTHING
EASTING
INTERSECTION ALIGNMENT
SURVEY POINT
AS: STATION #
NORTHING
EASTING
ALIGNMENT STATION
SURVEY POINT
TITLE
NORTHING
EASTING
COORDINATE GEOMETRY
SURVEY POINT
BP OR EP: STATION #
NORTHING
EASTING
START AND END
ALIGNMENT
SURVEY POINT
File details come from the government source that posted it. Updated .