This document is a set of construction drawings for the Morovis National Cemetery - Phase 1B project located in Morovis, Puerto Rico. The drawings are construction documents (CD1) prepared by AES Group, Inc., the Architect/Engineer of Record, with an issue date of March 2026. The project is managed by the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management, under project number 971-031B.

The irrigation plan drawings (sheets IR108, IR109, and IR110) depict the comprehensive irrigation system layout for the cemetery expansion, including piping networks, water retention ponds, and irrigation zones distributed across the property. The irrigation details sheets (IR501-IR504) specify component assemblies and installation requirements, including isolation gate valve assemblies, air/vacuum relief valve assemblies, quick coupling valve assemblies, pop-up spray sprinkler assemblies, pop-up rotor assemblies, soil moisture sensor assemblies, and flower water station assemblies. Additional details cover sprinkler placement within preplacedcrypts and inground cremains sections, controller and weather station grounding and assembly specifications, and trenching requirements for the irrigation infrastructure. The drawings use standard engineering notation with dimensions provided in feet and inches, and include notes regarding installation procedures, material specifications, and coordination requirements between components.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll

BIO RETENTION

POND 2

4"

4"

4"

8"

1"

1"

3"

2.5"

1.5"

1.5"

3"

2.5"

1.5"

3" 3"

2.5"

1.5"

2.5"

1.5"

3"

3"

2.5"

1.5"

3"

3"

3"3" 1.5"

3"

2.5"

1.5"

1.5"

1.5"

2.5"

1.5"

3"

3"

3"

2.5"

1.5"

1.5"

2.5"

2.5"

2.5" 2"

2"

1.5"

1.5"

2.5"

2"

1.5"

1.5"

2.5"

2" 2"

1.25"

1.25"

1.25"

1.25" 1.5"

1.5" 1.25"

2"

1.25"

1.5"

1.25"

1.5"

1.25" 1.25"

3" 1.5"

2.5"

1.5" 1.5"

3"

3"2.5"

1.5"

1.5"

1.5"

2.5" 2"

2" 1.25" 1.5"

1.25" 1.25"

3"

2.5"

2"

2"

2"

1.5"

1.5"

1.25"

1.5"

2" 2"

1.5"

3" 2"

2"

2" 1.5"

2"

1.5"

3" 1.5"

2.5"

1.5"

1.5"

3"

1.5"

3"

2.5"

2.5"

2.5"

2.5"2.5"

1.5" 2"

1.5"

1.25"

2" 1.5"

1.25"

1.25"

1.5"

1.5"

2.5" 1.5"1.25"

2.5"

2"

2"

1.5" 1.25"

1.25" 1.25"

1.25" 1.25"

1.5"

1.25"

2"

1.5"

1.25"

1.25" 1.25" 1.25"

1.5"

1.5"

1.5"

2.5"

3"

2.5"

1.5"

2"

1.5"

3"

1.5"

1.25"

1.5"

1.25"

1.25"

2"

2" 2"

1.5"

1.5"

1.25"

1.25"

3"

2.5" 1.5"1.5"

1.5"

3"

2.5"

1.5"

3"

1.5"

2.5"

1.5"

3"

1.5"

2.5"

1.5"

3"

1.5"

2.5"

1.5"

3"

3"

3"

2.5"

3"

1.5"

2.5"

1.5"

3" 3"

1.5"

2.5"

1.5"

3"

2"

2"

1.5"

2"

1.5"

3"

2"

1.5"

2"

1.5"

1.5"

1.25"

1.25"

1.25"

2" 1.25"

1.25"

2"

2"

2"

1.25"

2"

2"

2" 1.5"

1.5"

1.25" 1.25"

1.25"

1.25"

2" 1.25"

3" 1.5"

2.5"

1.5" 1.5"

Q

Q

10 10

A-37

2"

A-36

2"

A-27

2"

A-26

2"

A-24

2"

A-35

2"

A-31

2"

A-30

2"

A-29

2"

A-45

2"

A-52

2"

A-46

1.5"

A-43

2"

A-40

1.5"

A-42

2"

A-41

2"

A-39

1.5"

A-53

2"

A-25

2"

A-34

2"

A-33

2"

A-32

2"

A-38

2"

A-23

2"

A-28

2"

A-49

1.5"

A-50

1.5"

A-51

1.5"

A-44

1.5"

25 2525

25 25

35H

35H

35H

25Q

25H

25H

35H

35H

.25

.25

.25

.25

.25

.25

.25

.25

30F

30F

35H

25F 25H

25H

35H

35H

.25

.25

.25

.25

.25

.25

.25

.25

B-62

2"

B-57

2"

B-56

2"

B-55

2"

B-54

2"

B-53

2"

B-52

2"

B-45

2"

B-46

2"

B-47

2"

A-78

2"

A-77

2"

A-76

2"

A-75

2"

B-61

1.5"

B-60

1.5"

B-59

1"

B-58

1.5"

3"

3"

2.5"

2"

2"

1.5"

2"

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

MOROVIS NATIONAL

CEMETERY - PHASE 1B

MOROVIS, PUERTO RICO

971-031B

APPROVED: PROJECT MANAGER

CHERI L. COOPER

202-841-4052

MARCH, 2026REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG. OF

CONSTRUCTION

DOCUMENT - CD1

APPROVED: CONTRACTING SPECIALIST

JOSHUA GIBSON

202-746-5192

CONSTRUCTION DOCUMENTS - CD1

0' 400'200' 800' 1200'

1" = 400'

MATCHLINE SEE SHEET IR110

M

AT

C H

LI

N

E

SE

E

SH

EE

T

IR

MATCHLINE SEE SHEET IR105

IRRIGATION PLAN

KEYMAP

JD JD

IR108

https://www.aquaengineering.com/

ARMY

NAVY

AIR FO

RCE

MARINES

C O

AST G

U

AR

D

DEV

DEV

DEV

DEV

DEV

DEV

DEV

DEV

DEV

DEV

DEV

DEV

DEV

DEV

DEV

DEV

DEV

DEV

DEV

DEV

DE

V

DE

V

D

EV

DEV

DEV

l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l

D

C

A

%I O

R

ET

EN

TI

O N

O

N D

%IO RETENTION

3OND �

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

6"

6"

6"

8"

4"

1"

8"

4"

1"

1"

1"

1"

4"

4"

3RO-ECT NUM%ER

%UI/DING NUM%ER

DRA:ING NUM%ER

3RO-ECT TIT/E

/OCATION

ISSUE DATE C+EC.ED DRA:N

DRA:ING TIT/E

VA FORM �� � ����

A

FL

OH

DW

K

OIILFH RI

CRQVWUXFWLRQ

DQG FDFLOLWLHV

MDQDJHPHQW

U�S� DHSDUWPHQW

RI VHWHUDQV AIIDLUV

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 ��

3+ASE�ARC+ITECT�ENGINEER OF RECORD SEA/CONSU/TANT

321 4 5 6 7 8 9 ��

MOROVIS NATIONA/

CEMETERY � 3+ASE �%

MOROVIS� 3UERTO RICO

A33ROVED� 3RO-ECT MANAGER

C+ERI /� COO3ER

MARCH, 2026REVISIONS� DATE�

GURXS� IQF�

����� SOUT+ 3I.ES 3EA. DRIVE ����

3AR.ER� CO/ORADO �����

3+� ������������

:::�AES�GR3�COM

D:G� OF

CONSTRUCTION

DOCUMENT � CD�

A33ROVED� CONTRACTING S3ECIA/IST

-OS+UA GI%SON

CONSTRUCTION DOCUMENTS � CD�

0' 400'200' 800' 1200'

1" = 400'

MATC+/INE SEE S+EET IR���

M

ATC

/IN

E SEE S+

EET IR

IRRIGATION 3/AN

.EYMA3

JD JD

IR109

DEV

DEV

DE

V

D

EV

DEV

DEV

DEV

DEV

DE

V

DE

V

DEV

DEV

DEVDEVDEVDEV

DEV

DEV

l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l lllll l ll l l l l l

BIO RETENTION

POND 5

BIO RETENTION

POND 6

8"

1"

1.5" 1.5"

1.5" 2.5"

1.5"

1.5" 3"

2.5"

1.5"

3"

3"

2.5"1.5"

2" 2"

2"

1.5"

1.5"1.25"

1.25"

1.25" 1.25" 2"

1.5"

3"

2.5"

2"

1.5"

1.25"

1.25"

1.25"

2" 1.25"

1.25"

1.5"1.25"

1.25" 1.25"1.25"

3"

2"

2.5"

2.5" 2"1.25"

1.25"

1.25"

3"

1.5"

1.5"

3" 2"

1.5" 2"2"

1.5"

1.5" 3"

2.5" 1.5"

2.5"

1.5"

1.5"

3"

3"

2.5"

1.5"

3"

3"

2.5"

2"

2.5"

1.25"

3"

2.5"

1.5"

3"

2.5"

1.5"

3" 1.5"

2.5"

1.5"

3"

2.5"

1.5"

1.5"

3"

1.5"

2.5"

1.5"

2.5"

1.5"1.5"

3"

2.5"

1.5"

3" 2.5" 1.5"

3"

2.5" 1.5"

1.5"

Q

25 25

25 25

A-57

1.5"

A-61

1.5"

A-62

2"

A-58

1.5"

A-59

2"

A-55

2"

A-21

1.5"

A-20

1.5"

A-22

1.5"

A-54

2"

A-56

2"

2"

25 25

2"

2"

2"

2"

2"

2"

- 2"

2"

- 2"

B-51

2"

-2"

1"

2"

2"

3" 2.5"

1.5"

3"

3" 2.5"

1.5"

2"

2.5"

1.5"

2"

2.5"

1.5"

1.5"

2.5"

1.5"

25H

25H

25H

2.5"

1.5"

1.5"

2.5"

1.5"

1.5"

2"

1.5"

1.25"

1.5"

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

MOROVIS NATIONAL

CEMETERY - PHASE 1B

MOROVIS, PUERTO RICO

971-031B

APPROVED: PROJECT MANAGER

CHERI L. COOPER

202-841-4052

MARCH, 2026REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG. OF

CONSTRUCTION

DOCUMENT - CD1

APPROVED: CONTRACTING SPECIALIST

JOSHUA GIBSON

202-746-5192

CONSTRUCTION DOCUMENTS - CD1

0' 400'200' 800' 1200'

1" = 400'

MATCHLINE SEE SHEET IR108

M

AT

C H

LI

N

E

SE

E

SH

EE

T

IR

IRRIGATION PLAN

KEYMAP

JD JD

IR110

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

MOROVIS NATIONAL

CEMETERY - PHASE 1B

MOROVIS, PUERTO RICO

971-031B

APPROVED: PROJECT MANAGER

CHERI L. COOPER

202-841-4052

MARCH, 2026REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG. OF

CONSTRUCTION

DOCUMENT - CD1

APPROVED: CONTRACTING SPECIALIST

JOSHUA GIBSON

202-746-5192

CONSTRUCTION DOCUMENTS - CD1

IRRIGATION DETAILS

1 ISOLATION GATE VALVE

ASSEMBLY N.T.S. 2 AIR\VACUUM RELIEF

VALVE ASSEMBLY N.T.S.

3 QUICK COUPLING VALVE

ASSEMBLY N.T.S.

4 REMOTE CONTROL VALVE

ASSEMBLY N.T.S.

Q

I

JD JD

IR501

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

MOROVIS NATIONAL

CEMETERY - PHASE 1B

MOROVIS, PUERTO RICO

971-031B

APPROVED: PROJECT MANAGER

CHERI L. COOPER

202-841-4052

MARCH, 2026REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG. OF

CONSTRUCTION

DOCUMENT - CD1

APPROVED: CONTRACTING SPECIALIST

JOSHUA GIBSON

202-746-5192

CONSTRUCTION DOCUMENTS - CD1

IRRIGATION DETAILS

1 PALM TREE BUBBLER

ASSEMBLY N.T.S.

2 POP-UP SPRAY SPRINKLER

ASSEMBLY N.T.S. 3 POP-UP ROTOR

ASSEMBLY N.T.S.

4 SOIL MOISTURE SENSOR

ASSEMBLY N.T.S.

5 FLOWER WATER STATION

ASSEMBLY N.T.S.

JD JD

IR502

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

MOROVIS NATIONAL

CEMETERY - PHASE 1B

MOROVIS, PUERTO RICO

971-031B

APPROVED: PROJECT MANAGER

CHERI L. COOPER

202-841-4052

MARCH, 2026REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG. OF

CONSTRUCTION

DOCUMENT - CD1

APPROVED: CONTRACTING SPECIALIST

JOSHUA GIBSON

202-746-5192

CONSTRUCTION DOCUMENTS - CD1

IRRIGATION DETAILS

1 SPRINKLER PLACEMENT

DETAIL N.T.S.

IRRIGATION

ALLEY BOUNDARY

8"

25° 24"

4"

52" MIN.

IRRIGATION

ALLEY BOUNDARY

8"

69"

100"

60"

JD JD

IR503

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

MOROVIS NATIONAL

CEMETERY - PHASE 1B

MOROVIS, PUERTO RICO

971-031B

APPROVED: PROJECT MANAGER

CHERI L. COOPER

202-841-4052

MARCH, 2026REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG. OF

CONSTRUCTION

DOCUMENT - CD1

APPROVED: CONTRACTING SPECIALIST

JOSHUA GIBSON

202-746-5192

CONSTRUCTION DOCUMENTS - CD1

IRRIGATION DETAILS

1 TRENCHING

DETAIL N.T.S. 2 CONTROLLER GROUNDING

ASSEMBLY N.T.S.

3 WEATHER STATION

ASSEMBLY N.T.S.

5 CONTROLLER ASSEMBLY

N.T.S.4 CENTRAL CONTROL

ASSEMBLY N.T.S.

A

PRINTER

JD JD

IR504